MINUTES - Council - 19330124I
I
f
i
/
THE '.CRUll lillETING of the Council for the year 1933 was held in the Council
' .. . -. ~ -Room on Tuesday eve.Jan.24th.at 8.lo P.lll •. ,with alJ. the members in attendance and
the Mayor pres.iding ..
The minutes of the preceding meeting were read and approved.
Mr.Stuart,chairman of the relief committee reported verbally ~nrthaework that
has comme before that ColllllLitteel38 persons or families on relief,for which work
had.. been ord.ered found a.s follows 0 13 for three days ,20 for two days and six for
one day ee.ch at remuneration of $2.40 per daylcosting two hundred dollars per week
of which two thirds will be repaid by the Province and Dominiom.The Wells St.sewer
had provided some work but had cost about $1.40.00 for material,for which the Prov-
ince will not assist to pay,and stating t-hat the Council should decide whether
an at tempt should be made to area te work or whether we should go on direct relief.
After discussion IV!r.Legge moved,seconded by 11lr.Knowles,that until the regular
meeting of the Council the colllllLittee do not attempt to create work,but go on dir-
ect relief,except in the case of necessary work arising out of the daily routine.
This resolution was carried ,and a further discussion resulted in the adoption of
the following; tton motion of Messrs .:Bunn and DeLaHaye, "that no person receiving
reJ.ief be allowed to use their car,and that they hand in their permit to drive
and their markers to the relief Committee before receiving relief or assistance.
One tender only,having been received for the construction of a manhole on l'ells
st.the following resolution was moved by Mr.Knowles,seconded by Mr.DeLaHaye and
carried that the tender of F.Browning for constructing a manhole on the east side
of Wells st.seven feet deep for the sum of forty nine dollars,be accepted,and that
the seal of the Corporation be attached hereto.
The following report was then presented by Messrs.Redfern and Mcintyre regarding
the oosts of the Sewerage system and disposal plant;
Earth excavatiiipn 30164.91 cubic yds.. at o.51 cu .. yd.
Pipe supplied and laid,
30 inch 64o feet @ 4.45 lin.ft.
24 II 1939.7 II @ 2.71 II
21 ! 180o9 II .2.63 II
18 " 835.6 " @ l.o3
15 11 1751.7 '! @ 1.1o "
12 11• 874lo9 U @ 0 .. 77 II
9 '! 17737. " @ 6~53
8 " 2901.4 " @ 0.41
Manholes complete,l25,1131.5l.feet@ 8.5567
Irregularly shaped manholes ~ ,117.4 ft.
Tilllber left in trench 59,903 feet at 40.00 per m.
Concrete around sewer pipe 233 .. 17 cu.yds.at 9.90 cu.yd.
Cutting hales in main sewer for connections 90 at 90
Junction pipes 0 6_'' Off an 38 at 1.00
6 10 off 9 10 283 at 1.10
5f off 12" 101 at 1.52
6 10 off 18" 2 at 2.70
$15,384.11
2,870.25
o,255.59
377.38
1.278.47
2014. 46
6.731.26
9.400.61
1.189 .57
g .841.95
1.470.04
2395.12
2308.38.
81.00
38.00
311.30
153.52
5.40
r-·
9" Off 9 11 a at 2.30
6" off 30 11 4.at 25
Cutting asphalt pavement 46.54 yds .• @ 5.00
gutting sidewalk 1947.l2 sq_.ft. at 0.24
f$1• riser pipes. o9 lin.ft. @ a.3.o
Boulders, 13.1:6 cu.yds .• @,&.!20.
Catchbasins complete 5. at !;;4.00 each
J?ipe connections :t:o sewer fo;r catchbasins
U7 services,serving 45.2 houses,9708.65 '
Tunnelling for sewers,l747.l8 lin .. ft.
Connecting 122 existing drains into sewer
River crossings, ''ellington St.sJtphon
Tyler St.syphon
Temp.St... •t
Yonge _st.crossing
Tannery 11·
lrwin-Ma.chell
Relaying storm. sewers ,.:Wellington Sto258,8 11
Yonge St.
Connaught
pipe
u. ... 216,9~
98.151t
78' 8'!
32' 12 11
76'' 9".
Bulkheading manhole at Spruce and
Creek easement, moving old cars
Cellitre
l!'leury easement moving barrels etc.
Hillary easement,hauling earth to cover
Yonge St.altering 4 catchbasins
pipe
J:lanbury drain,bal.assumed by town
·Nellington St.rem.oving oldC .:a.
:N[ill St.cutting brush .
Berczy St.change inline due"to box drain
Kennedy .st.lanterns & barricades
fielaying_pipe rear of P.O.
less 10% holdback,al!l&l*ft4.:.:r\&w-a,ll&
Paid to.date
Amount now due
Ji·inal report on Sewerage Plant account W .E.Taylor
-"'11 work to be done under. contract completed,
Work done but not included in original contract
Raising compressor house floor 12 11 •
Reinforcing in comp.house over sludge piping
Enlarging sump for cellar drain
Concrete foundation for air compressor
Additional anchor bolts for roof plate
cast iron pipe added in revised layout
Concrete supporting walls for outlet sewer
Piping around air compressor
Pipe railing 11 · ••
Drip connection from air discharge line
Extra joints,flanged and lead.
Screen chamber complete
Additional creosoted plank
Raising wall 12" on final settling tank
Additional concrete wall at pre-settling tank
Additional air valves
Additional length drain from sludge beds
Drain from compressor house
Copper strips for construction joints
Concrete base for sludge pump
Additional reinforcing steel
Timber supporting 30 11 pipe at west end
Fitting shear gate
Cartage charges
urout in final settling tank
Lumber to town (Mr.Dunham)
Alterations to aeration tank rail
Grading
Adjustment for hardware
4.60
1.00
232.70
467 .. 30
20.65.
32.9l
270.00
21.02
7595.4&
2320.ll
807.70
452.45
437.35
201.78
l2l.26
319.38
95.00
1oo.7a
114.48
112.70
3l.g8
24.64
40.28
7.18
6.57
4.39
36.45
94.90
35~70
27 .5.l
10.86
28.31
23~26
30.38 75,244.42
7524.44
67719.98
13949.90
74.73
4.02
2.44
114.98
3.68
93.72
193.l5
204.02
22.09
3.68
16.8<1
33.99
6.28
75.ll
46.39
12.77
21.83
10.99
74.75.
l2.80
10.37
4.5l
2.12
10.10
!).72
7.02
3.18
9.36
4.00
9899.77
"·'·
·· ... ,}
"'"\..
~
Ad.ditional cost of ladder due to raising floor ·
:,Pile used by town men
1iloting down pipe
lieadwall. tor 30 11 pipe
Total
Less 5% holdback
Xotal net to date
J?revio.ualy ea t:i.mated and paid
!\mOunt now due
Glass overs and Conservatories Ltd. contract
Value of work to _date ·
250.00 retained to complete grouting under sills
Amount previously paid on estimates
.~)mount now due
~.2fi
4.04
2.50
34.30
15.076.69
753.84
14322.85
11900.00
242~.8fi
2771.00
2521.00
1960.00
061.00
1127.69
BLAY,L'EGGE,that Greenhouse and Conservatories Ltd,be paid the sum of $561.00
to apply.on their contract re.install~tion of glassovers at disposal plant,leaving
a balance of $250.00 whicg will be retained until the work is completed,a'nd cert-
ified t.o by the Engineers,and that the seal of the Corplltration be attached hereto.
Carrmed.
KNOVI'LES,STUART,that the following services be detailed tp the respective
Committees-;g~me~ai ·~ewer age system, exclusive oi' plant and ma!Ihinery to Road and
Bridge;Disposal Plant and Machinery to Property Comn1ittee and Garbage collection
to Property Committee .. Carried.
The Council adjourned,at 12.30 A.M:.to meet at an early date to discuss further
the reports tabled above.
---------------