Loading...
AGENDA - Special Council - 20150414SPECIAL COUNCIL MEETING AGENDA TUESDAY,APRIL 14,2015 5:30 P.M. COUNCIL CHAMBERS AURORA TOWN HALL PUBLIC RELEASE April 14,2015 TOWN OF AURORA SPECIAL COUNCIL MEETING AGENDA Tuesday,April 14,2015 5:30 p.m. Council Chambers OPEN FORUM (5:30 p.m.to 6 p.m.) 1.DECLARATION OF PECUNIARY INTEREST AND GENERAL NATURE THEREOF 2.APPROVAL OF THE AGENDA RECOMMENDED: THAT the agenda as circulated by Legal and Legislative Services be approved. 3.CONSIDERATION OF ITEM 4.READING OF BY-LAW RECOMMENDED: THAT the following confirming by-law be given first,second,and third readings and enacted: 5708-15 BEING A BY-LAW to Confirm Actions by Council Resulting from a Special Council Meeting on April 14, 2015. pg.4 5.ADJOURNMENT Special Council Meeting Agenda Tuesday,April 14,2015 Page 2 of 2 AGENDA ITEM 1.Memorandum from Director of Infrastructure &Environmental Services pg.1 Re:Aurora Family Leisure Complex (AFLC)Outstanding Deficiency List RECOMMENDED: THAT the memorandum regarding Aurora Family Leisure Complex (AFLC) Outstanding Deficiency List be received for information. Infrastructure and Environmental Services 100 John West Way, Box 1000, Aurora,ON L4G 6J1 Phone:905-727-3123 ext.4371 www.aurora.ca MEMORANDUM DATE:April 14,2015 TO:Mayor Dawe and Members of Council FROM:Ilmar Simanovskis,Director of Infrastructure and Environmental Services RE:Aurora Family Leisure Complex (AFLC)Outstanding Deficiency List Memo 10-15 RECOMMENDATIONS THAT the memorandum regarding Aurora Family Leisure Complex (AFLC) Outstanding Deficiency List be received for information. BACKGROUND Over the last few months the project team has been tracking all outstanding issues and working to find resolutions to these problems.Attached is a consolidated list of deficiencies for the AFLC.To date between the consultants,contractors and Town staff,the vast majority of noted issues have been resolved or are in the process of being resolved. Some noted concerns require further investigation as they are more complex,while others have a variety of solutions and we are working to find the correct path for the Facility and Community.Many of the issues noted have been resolved;66%of comments from the Operations staff and Facility users have been addressed.The Facility/Recreation Teams, Architect,General Contractor and Engineers are still involved in the project and will be for some time.We will find workable solutions to the outstanding issues and all future operational deficiencies.The Team commitment is to continue to work on all feasible building improvement in due course. ATTACHMENT: Appendix A –AFLC Outstanding Deficiency List Special Council Meeting Agenda Tuesday,April 14,2015 Item 1 Page -1 -1 - Attachment A-AFLC Item Status Action Item General Deficiencies Missing led lights in the washrooms Completed Installed Ladies GYM CHANGE ROOM add built in towel unit Completed Installed No water pressure,water not hot Completed Recirculation pump and valves serviced Add water fountain for users /Cycle Fit/Installation by April 30,2015 To purchased water coolers for as needed locations Install Ceiling Fans in Exercise class Waiting for Direction Coating is coming off Track We inspected area:investigated with installer To Specifications Could the Track be Banked N/A N/A Program room "C"lights are still not working.Completed N/A Install lines on Track to make Two lanes N/A N/A Benches in main hall near program rooms Will order 3 more benches for Facility Work in progress Need to install permanent lighting on the 2nd floor by administration offices and entrance to the track. Work In Progress:Ordered Lights Open doors to West side of building Not per the design Staff to lock the doors We need a couple of benches along North wall at the entrance to the track Complete We need coat hooks on the South wall at the entrance to the track Complete The back entrances (both interior and exterior)need to be converted to Emergency Exits only Complete Install low hair dryer in Women’s Pool Change room Work in Progress Paint wall in the gym Complete Signs for walking/running track need to be Re-installed Work in Progress Coat hooks for all community rooms (A,B&C).Completed Fitness room fix TV and Heater Cover Completed Hair Dryer in Family change room fourth unit Completed Bottle fill station requested Pending Quotes New 2015 Project Monitor Temp in Fitness room Too Hot/Too cold HVAC balancing and programming completed Will require ongoing adjustment as we move through the seasons. Missing Shower Curtain Installed Completed Change Enter/Exit to Track Recreation Department has requested to change signage to Track as of 4/13/15 Work in Progress Special Council Meeting Agenda Tuesday,April 14,2015 Item 1 Page -2 -2 - Heating and Ventilation Complaints Heating problem in the main floor offices behind reception.Completed Still monitor building Automation System Fitness room and Yoga room too hot HVAC balancing and programming completed Will require ongoing adjustment as we move through the seasons. South exposure in fitness and yoga room too bright and uncomfortable 3 Quotations on Electric Blinds pending Will be installed before Summer Cycle fit room too hot HVAC balancing and programming complete/lowered HVAC set points: Temp Fix is to install Mov n cool A/C unit or Fans Quote to add new Roof top unit for this space pending Track too hot HVAC balancing and programming completed Still monitor building Automation System Building Layout Complaints Reduction of showers in female pool change room from 9 to 4 Design required access through building to comply with building code N/A Shower water flow too low Water conservation showers are installed to manage water consumption Council to approve the removal of water flow restrictors No shelves in showers to place soap on Installation by April 30,2015 Work In Progress Family change room cubicles are too small Size based on code requirements and accessibility considerations. Hair dryers too high Architect selected height to accommodate adult users for hair drying. Installation of one lower drying unit will be installed in Women’s Pool change room. Location of bathing suit spinner not in shower area to allow for drainage Installation of a bucket Will monitor Not enough benches in woman’s Fitness change room Solution is to move Lockers to Hall Waiting for Direction Need coat hooks in woman’s change room Completed N/A Yoga room and fitness room are too small Same size as before Useable area has not changed Yoga room has too much glass and people are too visible.(no privacy)Install Frosted glass in for the full panels Waiting for Direction Yoga room floor not bouncy enough This is a proper sprung floor per specifications Same as the old gym. Install two more benches along the wall of the female Fitness change room Solution is to move Lockers to Hall Waiting for Direction Install bigger lockers All lockers have been reused other than the family change room. N/A Men’s fitness change room too small Solution is to move Lockers to Hall Waiting for Direction Only one bench in the men’s fitness change room Solution is to remove all of the lockers Waiting for Direction No coat racks and lockers are too small Coat hooks installed.Lockers under investigation Fitness facility has too much equipment and is too crammed Under investigation Members not permitted to use the north entrance doors This is because there are no staff at that location and therefore are unable to control access properly. Approved by Council Out of 141 issues noted 94 completed within 6 weeks 66%completion of noted issues On Going Special Council Meeting Agenda Tuesday,April 14,2015 Item 1 Page -3 -3 - Special Council Meeting Agenda Tuesday,April 14,2015 By-law No.5708-15 Page -1 -4 -