AGENDA - Council - 20190321
Special Meeting
of Council
Agenda
Thursday, March 21, 2019
5:45 p.m.
Council Chambers
Aurora Town Hall
Public Release
March 15, 2019
Town of Aurora
Special Meeting of Council
Agenda
Thursday, March 21, 2019
5:45 p.m., Council Chambers
1. Approval of the Agenda
Recommended:
That the agenda as circulated by Legislative Services be approved.
2. Declarations of Pecuniary Interest and General Nature Thereof
3. Delegations
(a) Joanne Russo, representing Aurora BIA
Re: Library Square
(b) Suzanne Haines, Executive Director, Aurora Cultural Centre
Re: Library Square
4. Consideration of Items Requiring Discussion
Presentation to be provided by Robin McDougall, Director of Community Services,
Martin van Zon, President, Interkom Inc., and Brian McCurdy, Consultant,
Interkom Inc.
1. PDS19-020 – Library Square – Planning Policy – Conformity Report
Recommended:
1. That Report No. PDS19-020 be received for information.
Special Meeting of Council Agenda
Thursday, March 21, 2019 Page 2 of 4
2.CMS19-008 – Library Square – Outdoor Square
Recommended:
1.That Report No. CMS19-008 be received; and
2.That the design of the Library Square outdoor square be approved as
presented in the amount of $8,380,500 to include:
(a)An ice rink in the shape of a trail; and
(b)Water spray feature covering a 1/3 of the space; and
(c)Water wall feature; and
3.That staff be authorized to proceed with the detailed design stage of the
Library Square outdoor square; and
4.That staff be authorized to apply for the Building Communities Through
Arts and Heritage – Legacy Fund, including entering into any agreements
to give effect to same.
3.CMS19-007 – Library Square – Addition to Church Street School
Recommended:
1.That Report No. CMS19-007 be received; and
2.That the design of the Addition to Church Street School including the
enlarged stage area be approved in the amount of $27,189,600 and that
staff be authorized to proceed to detailed design stage; and
3.That Council provide direction on the Linkage between the Library and
Church Street School Addition for potential further development; and
4.That the budget be increased by 1% in the amount of $256,600 in support
of public art in accordance with the Official Plan requirements.
4.PDS19-018 – Library Square – Parking Strategy
Recommended:
Special Meeting of Council Agenda
Thursday, March 21, 2019 Page 3 of 4
1.That Report No. PDS19-018 be received; and
2.That Parking Strategy Phase 1: ‘Quick Wins’ as outlined in this report be
adopted; and
3.That Council approve $87,882.00 to the Library Square budget to be
funded as per Funding Strategy Report FS19-012 for additional on-site
parking on Victoria Street, conditional on the approval of the addition to the
Church Street School; and
4.That Council approve $185,376.00 to the Library Square budget to be
funded as per Funding Strategy Report FS19-012 for additional on-site
parking within the laneway, conditional on the approval of the addition to
the Church Street School; and
5.That Council approve $145,740.00 to the Library Square budget to be
funded as per Funding Strategy Report FS19-012 for additional on-site
parking on Church Street subject to further public consultation, conditional
on the approval of the addition to the Church Street School.
5.CMS19-009 – Library Square – Proposed Operating Plan
Recommended:
1.That Report No. CMS19-009 be received; and
2.That the draft operating plan be approved and finalized prior to the
approval of the final construction tender; and
3.That the hiring of a contract Project Leader position to implement the
business plan be approved.
6.FS19-012 – Library Square – Financial Strategy
Recommended:
1.That Report No. FS19-012 be received; and
2.That staff be authorized to apply for any eligible capital or operating grants
in support of the Library Square project; and
Special Meeting of Council Agenda
Thursday, March 21, 2019 Page 4 of 4
3.That the recommended preliminary capital investment financial strategy for
Library Square be approved; and
4.That the recommended preliminary operating plan financial strategy for
Library Square be approved.
5.Confirming By-law
Recommended:
That the following confirming by-law be enacted:
XXXX-19 Being a By-law to Confirm Actions by Council Resulting from a Special
Meeting of Council on March 21, 2019.
6.Adjournment
Special Meeting of Council Agenda Thursday, March 21, 2019Delegation (a) Page 1 of 1
Delegation Request
7KLV'HOHJDWLRQ5HTXHVWIRUPDQGDQ\ZULWWHQVXEPLVVLRQVRUEDFNJURXQGLQIRUPDWLRQ
IRUFRQVLGHUDWLRQE\HLWKHU&RXQFLORU&RPPLWWHHVRI&RXQFLOPXVWEHVXEPLWWHGWRWKH
&OHUN¶VRIILFHE\WKHIROORZLQJGHDGOLQH
D.m.2QH ()%XVLQHVVDay Prior to the Requested Meeting Date
Council/Committee Meeting DQGDate:
Subject:
Name of Spokesperson:
Name of Group or Person(s) being Represented (if applicable):
Brief Summary of Issue or Purpose of Delegation:
Please complete the following:
+DYH\RXEHHQLQFRQWDFWZLWKD7RZQVWDIIRU
&RXQFLOPHPEHUUHJDUGLQJ\RXUPDWWHURILQWHUHVW"<HV ܆܆1R ܆
,I\HVZLWKZKRP"'DWH
܆ ,DFNQRZOHGJHWKDWWKH3URFHGXUH%\ODZSHUPLWVILYHPLQXWHVIRU'HOHJDWLRQV
/HJLVODWLYH6HUYLFHV
&OHUNV#DXURUDFD
7RZQRI$XURUD
-RKQ:HVW:D\%R[
$XURUD21/*-
Special Meeting of Council/March 21, 2019
Library Square
Suzanne Haines
Aurora Cultural Centre
Library Square project
✔
Mayor Mrakas 19-03-14
Special Meeting of Council Agenda
Thursday, March 21, 2019
Delegation (b)
Page 1 of 1
Town of Aurora
Special Council Report No. PDS19-020
Subject: Library Square – Planning Policy - Conformity Report
Prepared by: Andria Sallese, Senior Policy Planner
Anthony Ierullo, Manager, Policy Planning and Economic Development
Department: Planning and Development Services
Date: March 21, 2019
Recommendation
1. That Report PDS19-020 be received for information.
Executive Summary
As the Town continues to refine the Library Square plan towards its final form, Staff
have had the opportunity to review the detailed plans against relevant provincial and
local policies, and objectives for the Aurora Promenade. Further to previous Planning
reports on Library Square, this report speaks to the policy context of the development
and discusses those findings.
This report can be summarized as follows:
• Library Square design concept consistent with the Provincial Policy Statement
and conforms to the Growth Plan;
• Library Square design and planned programming for the building expansion and
square will achieve many Official Plan policies and objectives;
• Library Square revitalization project will be an integral component in encouraging
public heritage appreciation;
• Staff will continue to ensure the Library Square final design meets the policy
intent of the Aurora Promenade Secondary Plan;
• Staff will continue to ensure the vision and objectives of the Aurora Promenade
Urban Design Strategy are applied to the final design of Library Square;
• The redevelopment of Library Square represents an opportunity to continue to
explore parking options and strategies for the site and the Downtown area; and
• Library Square lands represent a key opportunity for improvement and
redevelopment within the Promenade Community Improvement Area.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 1
Page 1 of 13
March 21, 2019 Page 2 of 13 Report No. PDS19-020
Background
In June 2018, Council approved the design for Library Square. Staff and consultants for
Library Square have been refining the design based on site conditions, feedback from
the public and cultural partners, and preliminary designs for the 22 Church Street
expansion. The most recent plans propose a 2,975 square metre addition to the Church
Street School. The addition includes community programming space (program room,
performing arts studio, and a multi-purpose studio visual arts room), as well as a 192-
250 seat performance hall. The design concept also proposes re-purposing the parking
lot between the Library and the Church Street School House into a 2700 square metre
urban plaza with outdoor programmable space (‘the Square’).
Analysis
As the Town continues to refine the Library Square plan toward its final form, Planning
Staff have had the opportunity to review detailed plans against relevant provincial and
local policies and objectives. Planning Staff’s comments are summarized below:
Library Square design concept consistent with the Provincial Policy Statement
and conforms to the Growth Plan
The Provincial Policy Statement (PPS) directs that long-term economic prosperity be
supported by encouraging a sense of place, enhancing the vitality of downtowns,
promoting well-designed built form and cultural planning, as well as conserving features
that help define character, including built heritage resources. The PPS also encourages
healthy, active communities by promoting safe streets that meet the needs of
pedestrians, foster social interactive and community connectivity.
Sections 1.7.1 and 2.0 of the PPS encourages the wise use and management of
heritage resources, which in turn promotes long-term prosperity and social well-being
through economic, environmental and social benefits for the community. The PPS
recognizes official plans as the most important vehicle for implementing the policies in
the PPS, and that comprehensive, integrated and long-term planning is best achieved
through official plans.
The Growth Plan builds upon the policy foundation provided by the PPS and provides
more specific land use planning policies to address issues facing the Greater Golden
Horseshoe region. The Growth Plan establishes a land use planning framework that
supports the achievement of a number of objectives, including the creation of complete
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 1
Page 2 of 13
March 21, 2019 Page 3 of 13 Report No. PDS19-020
communities. The policies of the Growth Plan take precedence over the policies of the
PPS to the extent of any conflict, except where the relevant legislation provides
otherwise.
The 2017 Growth Plan promotes well-designed communities with high quality built form
and an attractive and vibrant public realm. Site design and urban standards will help
achieve these attractive and vibrant places to support walking, cycling and transit use.
The Growth Plan recognizes important cultural heritage resources contributing to a
sense of identity and attracting investment. Growth can put pressure on these resources
and as such, the Growth Plan directs that cultural heritage resources be protected and
maximized so that communities continue to be attractive places to live.
Policy 5.1 of the Growth Plan states that where a municipality must decide on a
planning matter before its official plan has been amended to conform with this Plan, or
before other applicable planning instruments have been updated accordingly, it must
still consider the impact of its decision as it relates to the policies of the Growth Plan,
which require comprehensive municipal implementation.
Planning Staff have reviewed the proposed development for consistency with the PPS
and for conformity to the Growth Plan. Staff have determined that the design concept is
consistent with the PPS and conforms to the Growth Plan. The proposal would support
many policy objectives of the PPS and Growth Plan, including directing new growth to
the built up areas of the community through intensification, that public services be co-
located in community hubs that are broadly accessible, and heritage resources be
protected.
Library Square design and planned programming for the building expansion and
square will achieve many Official Plan policies and objectives
Regional Centres and Corridors are a focal point of commerce, business and cultural
activities in the Region. The York Region Official Plan (YROP) directs local
municipalities to support the development of Corridors by encouraging attractive,
compact community design. This segment of Yonge Street is identified as a Regional
Corridor in ‘Map 1: Regional Structure’ in the YROP. The Library Square site is also
identified as an ‘Urban Area’.
An important objective of the YROP is the creation of high-quality, sustainable
communities, as well as vibrant and sustainable urban areas. Policy 5.2.8 of the YROP
promotes the highest standard of urban design, which:
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 1
Page 3 of 13
March 21, 2019 Page 4 of 13 Report No. PDS19-020
a. provides pedestrian scale, safety, comfort, accessibility and connectivity;
b. complements the character of existing areas and fosters each community’s unique
sense of place;
c. promotes sustainable and attractive buildings that minimize energy use;
d. promotes landscaping, public spaces and streetscapes;
e. ensures compatibility with and transition to surrounding land uses;
f. emphasizes walkability and accessibility through strategic building placement and
orientation; and,
h. creates well-defined, centrally-located urban public spaces.
The YROP (Policy 5.3) directs that development in intensification areas provide well-
designed public open spaces that create attractive and vibrant places; support walking,
cycling and transit for everyday activities; achieve an appropriate transition of built form
to adjacent areas; and that intensification enhance the planned urban structure. City-
building creates communities that are compact, well-designed and lively, are served by
transit, and have exciting opportunities to live, work, and play. Another objective of the
YROP is to achieve an urban, integrated and connected system of Regional Centres
and Corridors.
Staff have reviewed the design concept and are satisfied that it meets the intent of the
policies of the YROP, notably with respect to the provision of a compact pedestrian
scaled and attractive building that promotes landscaping, public spaces and
streetscapes, and that is compatible with, and transitions to, surrounding land uses.
Staff will continue to work with the consultant team to ensure that the final design of the
building expansion and square, parking area, as well as the design of the Victoria Street
and Church Street streetscape, continue to meet the policy intent of the YROP.
Town of Aurora Official Plan
A fundamental principle of the Town of Aurora Official Plan (TAOP) is promoting design
excellence through high-quality buildings, and well-designed and functioning
streetscapes. As the Town grows, the value of its public realm – its streets and publicly
accessible spaces – as well as the design of infill development in creating a vibrant and
livable urban environment, becomes more and more important. Appropriate transition,
as well as the integration between existing and new development and connected open
spaces, help define places and the spaces in between.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 1
Page 4 of 13
March 21, 2019 Page 5 of 13 Report No. PDS19-020
TAOP policy 4.0 ‘Ensuring Design Excellence’ recognizes the importance of high quality
urban design and architecture as an essential part of Town-building. Policy 4.2
encourages parking in the Historic Core to locate at the rear of buildings and screened
to ensure the amenity of adjacent areas. Similarly, TAOP Policy 4.4 recognizes public
art as an important component of the public realm in contributing to an overall sense of
place and community, as well as improving and enhancing the built environment.
Community services and facilities (CS&F) are publically accessible, non-profit facilities
whereby the Town and its agencies deliver programs and services that help build
healthy, strong and complete communities and are designed for all stages of life. CS&F
contribute to the social, economic and cultural development of the Town, are vital in
supporting a successful, functioning and vibrant downtown, and often serve as
neighbourhood focal points and gathering spaces.
Staff have reviewed the design concept and are satisfied that its design and the
programming planned for the expansion, as well as the Square itself, will help the Town
achieve a number of its Official Plan policies and objectives. Staff will continue to work
with the consultant team to ensure that the final design and programming of the building
expansion and square, as well as the design of the Victoria Street and Church Street
streetscapes, continue to meet the policy intent of the TAOP.
Library Square revitalization project will be an integral component in encouraging
public heritage appreciation
The subject property, known as the Aurora Cultural Centre or “Church Street School”, is
designated under Part IV of the Ontario Heritage Act (By-law 2390-80), listed on the
Canadian Register of Historic Places, and recognized under Easement to the Ontario
Heritage Trust. The Church Street School was constructed in 1885-86 and is one of the
finest remaining examples of a High Victorian designed public school in Ontario.
Preserving heritage resources like the Church Street School enhances the diversity,
beauty and richness of the built environment. Under section 13.1 of the Town’s Official
Plan, it is an objective to promote the conservation of heritage resources for the
enjoyment of existing and future generations, and to promote public awareness of
Aurora’s cultural heritage. The Library Square Project aligns with these objectives by
encouraging the heritage conservation of 22 Church Street and revitalizing the site as a
hub for cultural activity and community celebration.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 1
Page 5 of 13
March 21, 2019 Page 6 of 13 Report No. PDS19-020
Similarly, policy 11.3.2(f) of the Aurora Promenade Secondary Plan directs that, when
the design of a development includes a cultural heritage resource, the Town shall
encourage the compatible use of the significant cultural heritage building, while not
adversely affecting the character of the building or surrounding area. A Heritage Impact
Assessment was produced for the addition to 22 Church Street, and it determined that
there will be minimal to no impact on the character-defining elements of the heritage
resource. This will be achieved through the sympathetic placement, massing and
materiality of the addition. Furthermore, the proposed uses for the site will encourage
greater public appreciation of the heritage building.
Being a building of high heritage significance, the exterior and scenic character of the
property are also protected by an Ontario Heritage Trust (OHT) conservation easement.
The OHT was circulated the plans and elevations for the proposed addition, and gave
their initial support for the project and design on January 23, 2019. The Ontario Heritage
Trust, as an important development partner, will continue to be consulted with on
finishing details or minor amendments.
Staff believe the addition will rehabilitate the site and conserve the cultural heritage
value of the building by having minimal to no impact on the character-defining elements
of the property. As part of the Library Square revitalization project, the addition will be
an integral component in making the downtown a ‘destination’, encouraging public
heritage appreciation, and providing community and cultural space for visitors and
residents of Aurora alike.
Staff will continue to ensure the Library Square final design meets the policy
intent of the Aurora Promenade Secondary Plan
The Promenade, wherein the Town’s historic core and downtown is located, plays a
critical role in achieving the Town’s long-term growth objectives. The Aurora Promenade
Secondary Plan (APSP) envisions the Promenade evolving over time into a vibrant
place to live, shop, work and play. Key objectives of the Aurora Promenade include:
• Conserving, protecting and reinforcing its neighbourhoods, streetscapes and
significant buildings;
• Creating a mixed-use urban environment in creating a vibrant economic, cultural
and social environment that supports arts, culture and diversity and that
encourages pedestrian activity;
• Promoting beautiful civic spaces, great streets and inspiring architecture that is
inviting and attracts residents and new businesses while enhancing the vitality of
retail uses; and
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 1
Page 6 of 13
March 21, 2019 Page 7 of 13 Report No. PDS19-020
• Promoting complete and livable neighbourhoods of different ages and socio-
economic status.
The Library Square site is located within the APSP area, are designated ‘Aurora
Promenade Commercial,’ and form part of the Aurora Promenade’s Downtown.
Entertainment and cultural venues, recreational uses, as well as Urban Squares, are
encouraged in the Promenade’s Downtown. Urban squares are envisioned as being
predominantly hardscaped in nature, framed by animated uses, and serving high
pedestrian traffic areas. In addition to providing for entertainment, cultural and
recreation uses in the Square, the existing parking lot between the Cultural Centre and
the Library will be repurposed as an urban plaza that can be used as outdoor program
space for all seasons.
The Secondary Plan directs that, in the Downtown, the scale and character of new
structures be carefully regulated and controlled to enhance the pedestrian experience.
The Secondary Plan also envisions buildings in this area having a minimum height of
two storeys and maximum of five storeys, and designed to contribute to street level
vibrancy. The proposed addition will be a maximum height of three storeys, which
provides transition to, and ‘fits’, with the existing two-three storey built form context.
Schedule ‘B3 – Streetscape’ of the Secondary Plan identifies an east-west midblock
pedestrian in the block bound by Mosley Street to the north, Church Street to the south,
Yonge Street to the west and Victoria Street to the east. The concept design includes a
laneway connecting Yonge Street to Victoria Street. The laneway will be landscaped
and accessible to pedestrians, cyclists as well as vehicles. This laneway implements the
Secondary Plan vision for a mid-block pedestrian connection in the Cultural Precinct.
Both Victoria Street and Church Street are identified as ‘Civic/Special Streets’
(Schedule B3). Civic/Special Streetscapes are streets that provide visual and physical
links to major cultural and civic landmarks and destinations in The Aurora Promenade.
Staff have reviewed the design concept and are satisfied that the design of the building,
square and parking areas, as well as its open spaces and streetscape, will help the
Town achieve a number of its city-building objectives. Staff will continue to work with the
consultant team to ensure that the final building design, parking area, and the Victoria
Street and Church Street streetscape design, meets the policy intent in the Aurora
Promenade Secondary Plan.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 1
Page 7 of 13
March 21, 2019 Page 8 of 13 Report No. PDS19-020
Staff will continue to ensure the vision and objectives of the Aurora Promenade
Urban Design Strategy are applied to the final design of Library Square
Aurora Promenade Urban Design Strategy
The Urban Design Strategy (the ‘Strategy) for the Aurora Promenade is intended to
guide and manage growth through the revitalization of the Promenade area and
improvements to the public realm. The Urban Design Strategy is premised on a number
of objectives, which include:
• Protecting and enhancing the Promenade’s heritage core;
• Reinforcing and enhancing a Cultural Precinct and leveraging opportunities in
this area;
• Creating new vibrant, transit-oriented focus areas;
• Creating a pedestrian friendly environment with great streets;
• Facing and Framing Major Open Spaces; and
• Creating a ‘Green Lattice’ of interconnected parks and open spaces.
The site also forms part of the larger ‘Old Town’ and is identified as a Focus Area – the
Cultural Precinct - in the Strategy. The Cultural Precinct area focuses on the lands
bounded by Yonge Street to the west, Larmont Street to the east, Church Street and
Metcalf Street to the south and Mosley Street to the north. The Cultural Precinct
includes the Aurora Public Library and the Church Street School Cultural Centre.
Objectives for the Old Town Character Area include:
• Reinforcing and leveraging the ‘main street’ look and feel and the intact heritage
resources of the Historic Downtown;
• Providing transition in scale and use from Yonge and Wellington Street to the
adjacent residential neighbourhoods;
• Enhancing the streetscape of Yonge, Wellington and neighbourhood streets;
• Encouraging new mid-block pedestrian connections in the Cultural Precinct; and
• Reinforcing the Cultural Precinct with additional cultural facilities, wayfinding and
enhanced streetscapes.
Objectives for Cultural Precinct Focus Area include:
• Development should occur based on a comprehensive plan to ensure
compatibility;
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 1
Page 8 of 13
March 21, 2019 Page 9 of 13 Report No. PDS19-020
• Development must be sympathetic and compatible with heritage built form
character;
• The streetscape should be enhanced to create an inviting pedestrian
environment.
The manner in which open spaces are designed, programmed and interface with
surrounding streets and land uses is crucial to their capacity to attract a broad spectrum
of users and to ensure they are places where people feel safe and comfortable. Crime
Prevention through Environmental Design (CPTED) is a strategy that advocates the
design of the built environment to reduce the incidence and fear of crime. Staff will work
with the consultant to ensure that principles that build on CPTED are applied to the
design of publicly accessible spaces on the site, including the Square, pathways, indoor
spaces that accessible after hours such as washrooms, and the parking lot.
As noted above, Victoria Street and Church Street are identified as ‘Civic/Special
Streets’ in the Secondary Plan. The design direction in the Strategy for these streets is
for the quality of the streetscape and street walls reinforce their civic importance.
Streetscape characteristics in the design of these streets, which implements the
objective, could include:
• Distinctive paving along sidewalks, at crosswalks and across the roadway;
• Unique lighting, signage, banners and furnishings;
• Continuous street trees, flower beds and landscape features; and
• On-street parking where possible.
The proposed addition to the Church Street school proposes to animate the street by
including active uses at grade. Additionally, the landscape design of the Victoria Street
amenity area (crush space), and the portion of the Square fronting Church Street,
proposes high-quality landscape treatment, including permeable pavers, trees and
ground cover planting materials. Given that the plans for both private and public spaces
on the site are evolving, Staff will continue to work with the consultant to ensure that the
objectives for these Special Streets are achieved.
The redevelopment of Library Square represents an opportunity to continue to
explore parking options and strategies for the site and the Downtown area
The Strategy’s public realm framework map (p. 24) identifies a potential public parking
facility on the block that includes Library Square. The Strategy highlights the importance
of comprehensively balancing the supply of parking in the Downtown with
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 1
Page 9 of 13
March 21, 2019 Page 10 of 13 Report No. PDS19-020
redevelopment, and recommends a special approach to parking that takes into account
a variety of strategies to mitigate traffic demand. Some of the parking strategies put
forward in the Strategy, which builds on a 2007 Downtown Core Parking Study by
MMM, include:
• the provision of higher-order transit and improved cycling and pedestrian routes;
• cash-in-lieu of parking or reduced parking requirements for new development;
• partnering with developers to provide parking underground, or with civic and
institutional uses to share parking facilities.
In addition to good urban design, the above approaches can help mitigate the visual
unsightliness of large surface parking lots or monolithic parking structures. Planning
Staff believe that the redevelopment of Library Square represents an opportunity to
continue to explore parking options and strategies for the site and the Downtown area.
Library Square lands represent a key opportunity for improvement and
redevelopment within the Promenade Community Improvement Area
Consistent with Community Improvement policies (Section 15.2.13) in the Aurora
Official Plan, Section 11.17(d) of the Secondary Plan provides that all lands within the
Aurora Promenade be identified as a Community Improvement Project Area (CIPA).
The site is located within the Aurora Promenade Community Improvement Area. The
subject lands represent a key opportunity for improvement and redevelopment within
the CIPA.
Advisory Committee Review
Accessibility Committee
As noted in the June 2018 report, both the Heritage and Accessibility Committee were
consulted on the proposed project. As there have been revisions to the concept plan
since the Committees last provided comments, the latest versions of the plans will
return to each committee for comment before it goes to tender. The plans have also
been circulated to the Town’s Accessibility Advisor for review comment. Staff have
received comments from the Accessibility Advisor and shared those comments with The
Planning Partnership for consideration in refining the design drawings.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 1
Page 10 of 13
March 21, 2019 Page 11 of 13 Report No. PDS19-020
Heritage Committee
The Heritage Permit Application (HPA-19-03) to approve the addition to the Part IV
designated 22 Church Street was reviewed by the Heritage Advisory Committee on
March 5, 2019. As part of this application, a Heritage Impact Assessment was produced
by ERA Architects, a firm that specializes in heritage consulting. The Heritage Impact
Assessment outlined that there will be minimal to no impact on the character-defining
elements of the heritage resource, through the sympathetic placement, massing and
materiality of the addition. Furthermore, the Ontario Heritage Trust, who has a Heritage
Conservation Easement over the property, has also provided their initial support for the
project and design.
Ensuring design excellence, promoting responsible growth management, providing
appropriate community facilities, and conserving cultural heritage resources are all
objectives of the Town of Aurora Official Plan. As part of the Library Square Project, the
addition to 22 Church Street will meet these objectives and has the support of the
Heritage Advisory Committee and Staff.
Should further changes to the design of Library Square be proposed that alter character
defining elements of the site, further input may be required from the HAC and OHT.
Legal Considerations
Provincial Plans are intended to be read in their entirety and relevant policies are to be
applied to each situation. The policies of the Plans represent minimum standards.
Council may go beyond these minimum standards to address matters of local
importance, unless doing so would conflict with any policies of the Plans.
The policies of the Growth Plan take precedence over the policies of the PPS to the
extent of any conflict, except where the relevant legislation provides otherwise. All
decisions of Council that affect a planning matter shall conform with the Growth Plan.
Comments, submissions or advice affecting a planning matter that are provided by
Council shall also conform with the Growth Plan.
Financial Implications
None.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 1
Page 11 of 13
March 21, 2019 Page 12 of 13 Report No. PDS19-020
Communications Considerations
The plans for Library Square are premised on a significant amount of public
consultation, including with stakeholders and Town partners. In addition to a webpage
on the Town’s website dedicated to Library Square, communication staff have prepared
an internal and external communication strategy to address the effective communication
of this initiative.
Link to Strategic Plan
The development of Library Square supports the following Strategic Plan goals and key
objectives:
Supporting an exceptional quality of life for all in its accomplishment in satisfying
requirements in the following key objectives within these goal statements:
• Invest in sustainable infrastructure;
• Celebrating and promoting our culture;
• Encourage an active and healthy lifestyle; and
• Strengthening the fabric of our community
Enabling a diverse, creative and resilient economy in its accomplishment in satisfying
requirements in the following key objectives within these goal statements:
• Promoting economic opportunities that facilitate the growth of Aurora as a
desirable place to do business.
Conclusions
Ensuring design excellence, promoting responsible growth management, providing
appropriate community facilities, and conserving cultural heritage resources are all
objectives of the PPS, Growth Plan, the Region and Town of Aurora Official Plan, as
well as the Aurora Promenade, for which the addition to 22 Church Street, the Square
and associated open space, supports. Staff will continue to work with the consultant to
ensure the final design continues to meet these policies and objectives.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 1
Page 12 of 13
Special Meeting of Council Agenda Thursday, March 21, 2019Item 1 Page 13 of 13
Town of Aurora
Special Council Report No. CMS19-008
Subject: Library Square – Outdoor Square
Prepared by: Robin McDougall, Director of Community Services
Department: Community Services
Date: March 21, 2019
Recommendation
1. That Report No. CMS19-008 be received, and;
2. That the design of the Library Square outdoor square be approved as
presented in the amount of $8,380,500 to include:
a. An i ce rink in the shape of a trail
b. Water spray feature covering a 1/3 of the space
c. Water wall feature; and
3. That staff be authorized to proceed with the detailed design stage of the
Library Square outdoor square, and;
4. That staff be authorized to apply for the Building Communities Through Arts
and Heritage – Legacy Fund, including entering into any agreements to give
effect to same.
Executive Summary
The outdoor square is a focal point for the Library Square and Aurora’s downtown area.
The design has been revised based on inputs, seasonal activation and land conditions.
• The outdoor square could provide many different experiences, from exciting
events to peaceful engagements
• An ice rink has been included in the design of the project in order to activate the
square year-round
• Water Spray Feature and Fountain/Wall provide unique experiences for the
patrons of the outdoor square
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 2
Page 1 of 11
March 21, 2019 Page 2 of 8 Report No. CMS19-008
• Studies have confirmed the need to manage ground water through a storm water
management program
• Application for the Building Communities Through Arts and Heritage – Legacy
Fund is being explored as an option to assist funding the outdoor square
• With Council’s approval to proceed, the construction project is scheduled to be
complete Fall 2021
Background
In June 2018, Council approved the design of the square and staff provided an update
on the design in February 2019. Through additional consultation and input, staff are
providing more information on the inclusion of an ice rink during the winter months and
a potential water feature/wall.
Analysis
The outdoor square could provide many different experiences, from exciting
events to peaceful engagements
The design of the outdoor square has evolved to offer a variety of experiences including
such things as performances in the amphitheatre, movie nights, fairs, and also quiet
areas for reading or having lunch or a coffee. It will offer variety of sights and sounds to
be experienced through the water features, sound of people talking, birds chirping,
music playing and children laughing. The goal of the design has been to capture as
many of these experiences as possible while providing a unique experience in the
outdoor square.
An ice rink has been included in the design of the project in order to activate the
square year-round
In June 2018, Council approved the design without an ice rink, however, through
discussions it became evident that to activate the square year-round (aside from the
attraction of special events), an ice rink was needed to draw the public to the space
during the winter months. This feature requires a refrigeration system, a mechanical
building and a small ice resurfacer. The ice rink would be located in the area where the
summer water feature would take place.
A recent recommendation suggested the ice rink could be in the shape of a trail versus
an ice pad as depicted in previous images. A trail design would provide a different type
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 2
Page 2 of 11
March 21, 2019 Page 3 of 8 Report No. CMS19-008
of experience compared to the outdoor rinks offered in a few Town parks, but it would
also assist in the control the use of hockey sticks and pucks. The trail shape would
provide an environment for more of a traditional leisure skate with family and friends. A
sample design is attached to provide a visual of the trail option (Attachment 1).
Water Spray Feature and Fountain/Wall provide unique experiences for the
patrons of the outdoor square
The original outdoor square design included a water spray feature (similar to the one at
Dundas Square) which could cover most of the open area in the square or only a
portion. In recent discussions, it was recommended that the water spray feature be
limited to a smaller area (approximately 1/3 of the space). The feature could be
programmable and coordinated with music if desired, therefore, providing a more artistic
enhancement (public art) to the space. This was motivated by the suggestion that the
outdoor square should be providing a unique experience compared to a typical splash
pad found in local parks.
Additionally, another water feature was recommended similar to a fountain or water
wall.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 2
Page 3 of 11
March 21, 2019 Page 4 of 8 Report No. CMS19-008
The goal of this feature was to provide a peaceful enhancement similar to a running
spring. Based on feedback from the architects, they have recommended a water wall
located on a large bulkhead adjacent to the end of the amphitheatre seating.
This wall would be designed to incorporate detailed/contoured concrete to provide a
textured surface enhancing the sound of the water. The wall could also be illuminated
so that it captures various light angles and would drain away through a trench drain.
The wall would be approximately 2-2.5m tall and 4-5m long. The attached drawing
highlights the suggested wall (Attachment 2) for this water feature.
Studies have confirmed the need to manage ground water through a storm water
management program
In preparation of the construction of the various components of the Library Square
project (including parking area, laneway, outdoor square and building), a number of
studies have been completed to obtain data on soil quality and compaction, ground
water and storm water management. These studies/tests are typically required when
planning for a major construction project such as this.
The results will properly inform the design of each of the amenities and allowances have
been incorporated in the cost estimate to mitigate any potential issues.
Application for the Building Communities Through Arts and Heritage – Legacy
Fund is being explored as an option to assist funding the outdoor square
Staff are investigating the opportunity to apply for this grant application in support of
offsetting construction costs.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 2
Page 4 of 11
March 21, 2019 Page 5 of 8 Report No. CMS19-008
The Legacy Fund of the Building Communities Through Arts and Heritage provides
funding of up to 50% of eligible expenses to a maximum of $500,000. Eligible projects
must commemorate a significant local historical event or pay tribute to a significant local
historical personality marking the 100th anniversary or greater, in increments of 25
years. The project must involve the restoration, renovation or transformation of an
existing building and/or exterior space intended for community use. A public garden or
park is an eligible project as long as over half the costs are devoted to arts and heritage
elements of the anniversary. A key significant event that meets the criteria would be the
establishment of the Library in Aurora.
The area surrounding the square has been the site of every library in Aurora from 1855
onwards including the first purpose built library in Aurora. This rich history has
contributed to the project being referred to as Library Square. The funding application
would focus on elements related to the Library such as the outdoor reading room area,
amphitheatre, and the possible linkage between the facilities.
Deadline for application is ongoing but must be received before the anniversary date.
With Council’s approval to proceed, the construction project is scheduled to be
complete Fall 2021
As the consultants summarized in their presentation on February 12, 2019, following
detailed design, the construction is scheduled to commence Fall 2019 with final
completion in Fall 2021. This would result in fit-out and occupancy in 2022 (Attachment
3).
Advisory Committee Review
The Accessibility Advisory Committee was consulted May 2018 and March 2019 on this
design and they have provided their input for consideration.
Legal Considerations
Not applicable
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 2
Page 5 of 11
March 21, 2019 Page 6 of 8 Report No. CMS19-008
Financial Implications
Funding the costs of capital construction have been outlined in report number FS19-012
provided on this Special Council agenda. These options include the possible grant
funding through the Building Communities Through Arts and Heritage – Legacy Fund.
Construction costs for the outdoor square, including all site preparation, grading,
landscaping, ice rink (and applicable amenities), a water spray feature over the full ice
pad, a water wall and necessary storm water management results in a cost of
$8,380,500. This cost estimate is considered a Class C estimate and includes
significant contingency allowances.
During the next stage of detailed design, the construction cost of the outdoor square will
be further defined enabling a refinement of the contingency allowance and result in a
Class B estimate.
Communications Considerations
This report will be posted to the website to keep residents informed of plans and any
future direction from Council will be shared via Council Highlights, Town website and
social media.
Link to Strategic Plan
The development of Library Square supports the following Strategic Plan goals and key
objectives:
Supporting an exceptional quality of life for all in its accomplishment in satisfying
requirements in the following key objectives within these goal statements:
• Invest in sustainable infrastructure
• Celebrating and promoting our culture
• Encourage an active and healthy lifestyle
• Strengthening the fabric of our community
Alternative(s) to the Recommendation
1. Council could approve the outdoor square design without one or all the following
amenities:
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 2
Page 6 of 11
March 21, 2019 Page 7 of 8 Report No. CMS19-008
a. ice rink
b. water spray feature
c. water wall
2. Council may provide further direction.
Conclusions
This report provided a few other alternatives for consideration of the design for the
outdoor square. Based on feedback from Cultural Partners, public and Council, staff
recommend the approval of the outdoor square with the trail shaped ice rink, a smaller
water spray area and the water wall.
Attachments
Attachment 1 - Ice Rink in Trail configuration
Attachment 2 - Water Wall – site location
Attachment 3 - Library Square – Project Schedule
Previous Reports
PBS17-066 – Award of Contract for Library Square Site Plan, September 5, 2017;
PBS17-096 – Preferred Design for Library Square, December 5, 2017;
PBS17-100 – Preferred Design for Library Square – Additional Information December
12, 2017;
PDS18-014 – Updated Design for Library Square, January 30, 2018;
PDS18-076 – Library Square – June 19, 2018;
CMS19-005 – Library Square – Project Update – February 12, 2019
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 2
Page 7 of 11
Special Meeting of Council Agenda Thursday, March 21, 2019Item 2 Page 8 of 11
UPUPFACPDISP
UPLAND EXCHANGELOW : PHASE 1LOW : PHASE 2LOW : PHASE 2LOW :PHASE 2LOW : PHASE 2LOW : PHASE 2LOW : PHASE 1LOW : PHASE 1LOW : PHASE 2LOW : PHASE 2LOW : PHASE 2LOW : PHASE 2LOW : PHASE 2LSLSLSLSLSLSLSLSLSLSLSLSLSLSLSLSAURORA TOWN SQUAREPHASE 29197087654321THIS DRAWING SHALL NOT BE USED FORCONSTRUCTION PURPOSES UNTIL SIGNED BYTHE LANDSCAPE ARCHITECT.Designed ByDrawn ByGeneral NotesNo.DescriptionDateByIssue / RevisionsStampThe Planning Partnershipurban design . landscape architecture . planning . communications1255 Bay Street, Suite 500 Toronto, Ontario, Canada M5R 2A9t.416.975.1556 f. 416.975.1580 info@planpart.caDrawing TitleScaleProj. No.Sheet No.Drawing No.Copyright Reserved10Project /ClientThis plan and design are, and at all times remain, the exclusiveproperty of The Planning Partnership. They cannot be used orreproduced without written consent. Contractors shall verify and beresponsible for all dimensions and conditions on the job. This officeshall be informed of any discrepancies from the dimensions andconditions shown on the drawing.1. The contractor shall check and verify all dimensions and conditionsof the project and immediately report any discrepancies to theconsultant before proceeding with the work.2. The contractor is to be aware of all existing and proposed servicesand utilities. The contractor shall have all underground services andutility lines staked by each agency having jurisdiction prior tocommencing work.YY.MM.DDTOWN OF AURORADL / TCSK / JW11121314Checked ByDL / BH15ISSUED FOR 100% SCHEMATIC DESIGN19.01.31TCMATERIALS PLAN1:200L4.00$.4"UUBDINFOUSpecial Meeting of Council Agenda Thursday, March 21, 2019 Item 2 Page 9 of 11Attachment 1
Water wallWater WallCMS19-008 Attachment 2Special Meeting of Council Agenda Thursday, March 21, 2019Item 2 Page 10 of 11Attachment 2
DRAFT - as of March 2019
2020 2021 2022
TASK SPRING SUMMER FALL WINTER SPRING WINTER SPRING
1 Commence Design Development x
2 Complete Design Development x
3 Receive direction to Proceed to next Phase x
4 Commence Construction Documentation (CD)x
5 Class-B costing prepared at 50-60% CD x
6 Value Engineering options at 75% CD x
7 Class-A costing prepared at 90% CD x
8 Receive direction to Proceed to next Phase x
1 Prepare Tender Documentation (late Dec.)x
2 Early Works Tenders (Early January)x
3 Remaining Trade Tenders (January)x
1 Early Works
2 Construction
3 Substantial Performance x
4 Fit Out x
5 Occupancy xPRE-CONSTRUCTIONPROC.CONSTRUCTION2019
AURORA LIBRARY SQUARE - ELEMENTAL PROJECT SCHEDULE
*Assumption: with Council approval to commence March 2019 CMS19-008 Attachment 3 Special Meeting of Council Agenda Thursday, March 21, 2019Item 2 Page 11 of 11
Town of Aurora
Special Council Report No. CMS19-007
`Subject: Library Square – Addition to Church Street School
Prepared by: Robin McDougall, Director of Community Services
Department: Community Services
Date: March 21, 2019
Recommendation
1. That Report No. CMS19-007 be received, and;
2. That the design of the Addition to Church Street School including the enlarged
stage area be approved in the amount of $27,189,600 and that staff be
authorized to proceed to detailed design stage, and;
3. That Council provide direction on the Linkage between the Library and Church
Street School Addition for potential further development, and;
4. That the budget be increased by 1% in the amount of $256,600 in support of
public art in accordance with the Official Plan requirements.
Executive Summary
The addition to Church Street School has evolved to include a variety of spaces to suit
many different types of use while maximizing the space in a unique architectural design
that celebrates the original heritage school building. Previous reports have highlighted
a number of features while this report focusses on the most recent revisions.
• Based on inputs from consultants and cultural partners, an enlargement on the
eastern side of the building was included to improve seating capacity,
performance stage size and acoustics
• The addition of a universal washroom meets code requirements for accessibility
and provides a gender neutral option
• Consideration of a commercial café space on the plaza level requires further
assessment
• Linkage between the Library and Church Street School Addition would connect
the two facilities and ultimately expand functionality
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 3
Page 1 of 30
March 21, 2019 Page 2 of 10 Report No. CMS19-007
• Heritage and Accessibility considerations continue to be important to the
development of the design
• Design Review Panel will be engaged through the detailed design phase of the
project
• Application for the Canada Cultural Spaces Fund has been submitted
• Recruitment of a Project Management firm and then progressing to the detailed
design stage are the next steps in the process
• With Council’s approval to proceed, the construction project is scheduled to be
complete Fall 2021
Background
In June 2018, Council approved continuing with the next steps in the planning and
design for the project. With their approval of the three-floor option including a theatre,
staff continued with the schematic design of the building. In February 2019, staff and
the consultants provided an update on the project including all changes since June.
Revisions to the design were based on inputs from Council, consultants and cultural
partners.
Analysis
Based on inputs from consultants and cultural partners, an enlargement on the
eastern side of the building was included to improve seating capacity,
performance stage size and acoustics
Through discussions with the cultural partners and the theatre specialist, it became
evident that with the seats fully extended in the Performance Hall (approximately 250
seats), the size of the stage floor was less than desirable and not fully functional (only
10’). A number of the partners stated that the limited floor space would restrict how
often it would be used in that configuration. Therefore, the theatre specialist
recommended a couple of options in order to ensure the floor space offered a minimum
performance space of 16’. One option was to extend the seating by two (2) less rows
resulting in approximately 210 seats, another option was to ‘bump out’ the facility length
by an additional 1.9m enabling the desired floor space while keeping the desired
seating capacity of 250 seats and yet additionally benefiting the acoustic interests with
the longer facility. With the latter option serving more of the interests, staff included the
‘bump out’ in the latest designs (Attachment 1).
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 3
Page 2 of 30
March 21, 2019 Page 3 of 10 Report No. CMS19-007
In addition, the preference for a 250 seat theatre was reconfirmed through a survey
issued to cultural partners. Majority of the cultural partners surveyed preferred a theatre
offering 200-250 seats. Other factors were also considered which support the need for
250 seats:
• The community is currently served by 100-150 seat spaces but at that number it
is difficult to cover cost of the program without expensive ticket pricing
• The community is surrounded by larger theatres including: 400 seats in
Newmarket, 550 in Markham, 600 in Richmond Hill, 400 in Vaughan. 250 seat
theatre is a niche size that does not exist in the region.
• At 250 seats, one can start to cover costs with reasonable ticket prices. With the
right modern technical capabilities, mid-stream established artists will see the
space as a viable place to perform. A modern space will be able to compete in
this market given that others have a tenure without technical upgrades.
The ‘bump out’ will cost approximately $536,000 including the revised acoustic
treatments for the elongated space. The ‘bump out’ on the east side of the building will
provide the desired 250 theatre seating capacity, the enlarged performance stage floor
and improved acoustics, as a result, staff recommend proceeding with the ‘bump out’.
Another option that was explored was the potential for gallery seating to be added on
both sides of the Performance Hall. This would have required the north side of the
building cantilever to extend an additional one (1) meter and would add approximately
28 additional seats. Through further assessment of this option, it was confirmed that
this additional meter would cost approximately $330,000 plus would require additional
acoustic treatments. When assessing the return on investment for 28 additional seats,
staff would not recommend proceeding with the gallery option.
The addition of a universal washroom meets code requirements for accessibility
and provides a gender neutral option
Through the code review process, it was determined that with an addition the size
proposed for the Church Street School, the design requires at least one universal
washroom. A universal washroom is not only accessible; it provides an option that is
gender-neutral. The architects have revised the design to incorporate a universal
washroom on the main floor to meet code requirements and support our patrons
(Attachment 2).
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 3
Page 3 of 30
March 21, 2019 Page 4 of 10 Report No. CMS19-007
In addition, all public washrooms within the addition are accessible. It is important to
note that the existing facility also offers gender-neutral washrooms as additional
options.
Consideration of a commercial café space on the plaza level requires further
assessment
Currently the plaza level offers an open concept gathering space suitable for a breakout
room for programs, service area for light refreshments and creates a connection to the
outdoor square through large sliding doors. Previous discussions regarding a
permanent café or commercial operation resulted in limiting the space to a breakout
room and service area for light refreshments. This decision was based on the lack of a
business case for a commercial operation of this size and the desire to not compete
with the existing concession in the library and similarly not compete with a potential
business opportunities on Yonge St. Through recent discussions, Council has
expressed interest in revisiting this with further evaluation.
Staff have discussed with the architects potential revisions to the design to
accommodate the possibility of a small commercial operation. It is important to note
that the consultants are confident there are options and that those revisions could be
further vetted during the detailed design stage.
Ultimately, with a proven business case, the goal would be to revise the design so that a
future opportunity for a commercial operation is possible.
Linkage between the Library and Church Street School Addition would connect
the two facilities and ultimately expand functionality
Through consultation with the Library, a permanent linkage has been suggested for
consideration. There is a desire to provide a dry/temperature controlled route for
pedestrians to get from one facility to the other. It was envisioned that if the two sites
were physically connected, the site could be treated more like a conference centre and
patrons could get from one facility to the other more easily.
The preliminary designs provide a few on-ground options for consideration (Attachment
3). The first is a fully enclosed linkage that would provide a dry and temperature
controlled route. The second option is strictly a covered shelter, still providing a dry
route. The third is a combination of half enclosed and half open.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 3
Page 4 of 30
March 21, 2019 Page 5 of 10 Report No. CMS19-007
Linkage (on-ground) Cost estimate
Fully enclosed $1,936,000
Open $654,000
½ enclosed and ½ open $1,600,000
Excludes soft costs, contingencies and taxes.
Initial observations of these on-ground options highlighted concerns that an on-ground
linkage would create a divider or take away from the open and welcoming environment
the square can provide. As such, a suggestion of either a bridge above the square or
linkage underground was discussed. Both of these options would be higher in costs
than the options shown above and yet would enable a dry/temperature controlled route
while maintaining the open and welcoming environment for the outdoor square. Of
these two options, the underground option would not be preferred due to a variety of
observations such as; security concerns, soils and ground water mitigation on this site.
Therefore, the above ground/bridge option would be the preferred option as it would
provide a dry/temperature controlled route while preserving the open and welcoming
environment for the square.
Direction from Council is required on which linkage option if any they would like further
analysis.
As this linkage would also expand the functional use of the library, a portion of the
capital costs could be recovered through Library development charges.
Heritage and Accessibility considerations continue to be important to the
development of the design
Both Heritage and Accessibility Advisory Committees were consulted on the proposed
project, including input from their respective committee meetings held May 2018 and
March 2019.
In addition, staff have received comments from the Town’s Accessibility Advisor and
have shared those comments with TPP for consideration in the designs.
For additional heritage considerations, the project has received comments from both
ERA Architects (specialists in Heritage architecture) and Ontario Heritage Trust (OHT).
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 3
Page 5 of 30
March 21, 2019 Page 6 of 10 Report No. CMS19-007
The Heritage Permit Application (HPA-19-03) to approve the addition to the Part IV
designated 22 Church Street was reviewed by the Heritage Advisory Committee (HAC)
on March 5, 2019. As part of this application, a Heritage Impact Assessment was
produced by ERA Architects, a firm that specializes in heritage consulting. The Heritage
Impact Assessment outlined that there will be minimal to no impact on the character-
defining elements of the heritage resource, through the sympathetic placement,
massing and materiality of the addition. Furthermore, the Ontario Heritage Trust (OHT),
who has a Heritage Conservation Easement over the property, has also provided their
initial support for the project and design.
Ensuring design excellence, promoting responsible growth management, providing
appropriate community facilities, and conserving cultural heritage resources are all
objectives of the Town of Aurora Official Plan. As part of the Library Square Project, the
addition to 22 Church Street will meet these objectives and has the support of the
Heritage Advisory Committee and Staff.
Should there be any further modifications to the site plan that proposes alterations to
character defining elements of the site to accommodate additional parking, further input
may be required from the HAC and OHT.
Design Review Panel will be engaged through the detailed design phase of the
project
As the project continues to be refined, more images are shared creating interest and
comments about style, colours, textures, materials, etc. It is important to understand
that this level of discussion is determined during the detailed design stage of the project,
which is the next step in the process.
In order to assist with the detailed design, the Design Review Panel will be engaged for
their input. This Panel was established by Council as a panel of experts to assist with
the design review of projects within the downtown area and in particular with heritage
projects.
The Terms of Reference for the Design Review Panel are summarized in the
Committees Introduction:
The Town of Aurora Design Review Panel for the Heritage Properties (the Panel)
is being established in order to assist in the review of development and
redevelopment applications to ensure the protection of the Town’s Heritage
Resources and the character of the Town’s Historic Neighbourhoods. The Panel
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 3
Page 6 of 30
March 21, 2019 Page 7 of 10 Report No. CMS19-007
will review (re)development applications for historic properties in order to ensure
that they are appropriately designed within the historic context of the area. It is a
fundamental principle of the Town’s Official Plan to “promote the conservation
and enhancement of Aurora’s cultural heritage resources…to tell the story of a
community’s evolution and provide important visual reminders that can help
define a sense of place.”
Application for the Canada Cultural Spaces Fund has been submitted
Staff worked diligently to prepare the comprehensive grant application and business
plan for Canada Cultural Spaces Fund. This process included engagement with the
cultural partners and the consultants. The Town’s application submission was based on
the maximum allowable, which was up to 50% of the capital costs of the building.
Recruitment of a Project Management firm and then progressing to the detailed
design stage are the next steps in the process
For projects the size and complexity of the Library Square, it is typical to hire a
dedicated project manager (or project management firm) to lead the project through to
completion. The funding for this role has been captured in the capital project cost
estimate. Therefore, at the time of Council’s approval to proceed, staff will issue an
RFP for a project management firm. In this scenario, senior staff will lead the project,
but the project management firm will manage and coordinate all aspects including
preparation of tender packages, contract administration, change orders, work
schedules, payments, etc.
With Council’s approval to proceed with the design, we will continue with the next stage
of design, which is referred to as ‘detailed design’, followed by tender ready drawings
and ultimately construction tender packages. At each step of the project, staff will
continue to keep Council, the cultural partners and the public informed of the project
phases. This will include communications on social media, updates to the dedicated
project webpage and Council reports.
With Council’s approval to proceed, the construction project is scheduled to be
complete Fall 2021
As the consultants summarized in their presentation on February 12, 2019, following
detailed design, the construction is scheduled to commence Fall 2019 with final
completion in Fall 2021. This would result in fit-out and occupancy in 2022 (Attachment
4).
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 3
Page 7 of 30
March 21, 2019 Page 8 of 10 Report No. CMS19-007
Advisory Committee Review
The Heritage Advisory Committee and Accessibility Advisory Committee were consulted
in May 2018 and March 2019 on the latest design.
Legal Considerations
Not applicable
Financial Implications
Funding the costs of capital construction have been outlined in report number FS19-012
provided on this Special Council agenda.
The capital construction costs for the building is $27,189,600. This Class C estimate
includes the enlarged stage area, universal washroom as described above, and
appropriate contingency allowances for this stage of detail.
The cost for the linkage is not included and requires Council direction and if approved,
would require additional funding.
As the project progresses through detailed design, further refinement of the cost
estimate will take place, refining the contingency allowance and resulting in a Class B
estimate.
Communications Considerations
This report will be posted to the website to keep residents informed of plans and any
future direction from Council will be shared via Council Highlights, Town website and
social media.
Link to Strategic Plan
The development of Library Square supports the following Strategic Plan goals and key
objectives:
Supporting an exceptional quality of life for all in its accomplishment in satisfying
requirements in the following key objectives within these goal statements:
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 3
Page 8 of 30
March 21, 2019 Page 9 of 10 Report No. CMS19-007
• Invest in sustainable infrastructure
• Celebrating and promoting our culture
• Encourage an active and healthy lifestyle
• Strengthening the fabric of our community
Alternative(s) to the Recommendation
1. Council may approve the design without the enlarged stage area, reducing the
stage floor and seating capacity.
2. Council may provide further direction.
Conclusions
Through further review, the proposed enlarged stage area and universal washroom
have been included in the design. With Council’s approval of the schematic design and
authority to proceed to detailed design, staff will commence the next stage of the project
and secure a project management firm.
Direction from Council is required on which linkage option if any they would like further
analysis.
Attachments
Attachment 1 - Enlarged Stage Area – site plan
Attachment 2 - Universal Washroom – site plan
Attachment 3 – Linkage Options
Attachment 4 – Library Square – Project Schedule
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 3
Page 9 of 30
Special Meeting of Council Agenda Thursday, March 21, 2019Item 3 Page 10 of 30
TOWN OF AURORA CHURCH STREET SCHOOL HOUSE ADDITIONTHEATRE STAGE SIZE COMPARISONFEBRUARY 22nd, 2019$.4"UUBDINFOUSpecial Meeting of Council Agenda Thursday, March 21, 2019 Item 3 Page 11 of 30
LIBRARY SQUARE TOWN OF AURORA FEBRUARY 22, 20192PERFORMANCE HALLFEATURES:+ Retractable Seating+ Sprung Floor+ Professional lighting and audio equipment+ A/V Projector Screen+ Seating for 250 in Theatre format, or 192 in Banquet format, with tables and chairs.SAMPLE USES:+ Live Theatrical Performances+ Concerts, comedy shows, variety acts+ Movie Screenings+ Presentations / Ceremonies+ Recitals / Rehearsals+ Auditions+ Acting Lessons+ Workshops / Lectures+ Panel Discussions / Debates+ Dinner Theatre+ Fairs+ Banquets+ TradeshowsAMENITIES AND FEATURESSpecial Meeting of Council Agenda Thursday, March 21, 2019 Item 3 Page 12 of 30
LIBRARY SQUARE TOWN OF AURORA FEBRUARY 22, 20193'1'1UPDNDNUP' ' ' ' 272.470272.470272.4708 ACCESSIBLE SEATSGENIE LIFTEYE-WASH STATION1420
OPEN TO ABOVE AND BELOWOPEN TO ABOVE AND BELOWFEATURE WALL BELOWRETRACTABLE FIRE CURTAIN ABOVEWATER FIRE-CURTAIN ABOVEBIRD-FRIENDLY CURTAIN WALLBIRD-FRIENDLYCURTAIN WALLRETRACTABLE SEATING STORAGE400RECYCLED TIMBER BAR COUNTERDISPLAY CASEDISPLAY CASE3200110010570EXISTING SCHOOL HOUSE NOT IN SCOPEEXISTING SCHOOL HOUSE NOT IN SCOPE272.470CRUSH SPACETHEATRETABLE/SEATINGSTORAGE246-SEATTHEATREBACK-OF-HOUSESTORAGEWOMEN'SWASHROOMMEN'SWASHROOMEXITCORRIDORS/L LOCK 02BARS/L LOCK 01JANITORSTAIR BSTAIR ABAR STORAGEB-F W/CJAN.THEATRE VEIL 30CCESSIBLE SEATSBESSESESESBLE BLE SCBSISBSIBSCESSCESS8 ACCESSIBLE SEATSC8 AACEEATSS1420RETRACTABLE SEATINGSTORAGE10570246-SEAT246 SEAT6SA26T26ETA4A44SA4SA246 SEAT246 SEATTHEATREEEEEEEEETTRRRTTTHTTHTTTTAATTTATHHHHEEEEHHEEEHEHHGEGGGCURRENT PERFORMANCE HALL LEVEL PLAN - 246 SEATS'1272.470RETRACTABLE FIRE CURTAIN ABOVEWATER FIRE-CURTAIN ABOVERECYCLED TIMBERBAR COUNTERDISPLAY CASEDISPLAY CASECRUSH SPACES22’ STAGE DEPTH(16’ EFFECTIVE STAGE DEPTH)Special Meeting of Council Agenda Thursday, March 21, 2019 Item 3 Page 13 of 30
LIBRARY SQUARE TOWN OF AURORA FEBRUARY 22, 20194267.07GROUND FLOOR272.47LEVEL 02262.47PLAZA LEVEL281.88ROOF LEVEL276.57LEVEL 03279.22THEATRE GRID265.39ESTABLISHED GRADE265526554095540016802920164856750RETRACTABLE SEATINGRETRACTABLE SEATING STORAGERETRACTABLE FILM SCREENGREEN ROOMBACK-OF-HOUSESTORAGEGNIGATSGNIDAOLVISUAL ARTSSTUDIOWOMENSWASHROOMMENSWASHROOMSTAIR ATHEATRETABLE/SEATINGSTORAGE246-SEATTHEATREA/V BOOTHPROGRAMROOMPROGRAMROOMSTORAGERETRACTABLESEATINGRETRACTABLESEATINGSTORAGERETRACTABLEFILMSCREEN246-SEATTHEATREVISUALARTSSTUDIOEAST-WEST BUILDING SECTIONSpecial Meeting of Council Agenda Thursday, March 21, 2019 Item 3 Page 14 of 30
LIBRARY SQUARE TOWN OF AURORA FEBRUARY 22, 20195PERFORMANCE HALL - THEATRE CONFIGURATIONSpecial Meeting of Council Agenda Thursday, March 21, 2019 Item 3 Page 15 of 30
LIBRARY SQUARE TOWN OF AURORA FEBRUARY 22, 20196PERFORMANCE HALL LEVEL PLAN - 246 SEATSPRE- EAST-WEST BUMP-OUT16’ STAGE DEPTH(10’ EFFECTIVE STAGE DEPTH)CURRENT THEATRE SIZE SHOWN WITH DASHED LINESpecial Meeting of Council Agenda Thursday, March 21, 2019 Item 3 Page 16 of 30
LIBRARY SQUARE TOWN OF AURORA FEBRUARY 22, 20197'1'1UPDNDNUP' ' ' ' A2BCDEGFHJKLMN1A50113581A5029111A5031A504A4041A4021A4011A4012"%^L"%'WeNBAR203")'^L#!!%WeNCRUSH SPACE201#(^L#)*WeNSTAIR A202$!&^L$#(*WeN228 SEAT THEATRE207)^L)*WeNS/L LOCK 02206)^L)*WeNS/L LOCK 01205(^L('WeNJANITOR204$"^L$$)WeNMEN'S WASHROOM214$"^L$$(WeNWOMEN'S WASHROOM213)^L)(WeNEXIT CORRIDOR212#)^L#**WeNSTAIR B211&)^L'#$WeNBACK-OF-HOUSESTORAGE209%^L%&WeNB-F W/C210$$^L$&$WeNTHEATRE TABLE/SEATINGSTORAGE208272.470272.470272.47065' - 11"2008948' - 4"1473648' - 4"1473620' - 2"615058' - 6"1782824' - 8"752031' - 2"950019' - 0"579013' - 5 1/2"409924' - 10"756519' - 8"600084' - 6 1/2"25766103' - 6"3154719' - 8"600084' - 6 1/2"257667' - 6 1/2"229510' - 0 1/2"30625' - 11"180014' - 10"451819' - 8"60008 ACCESSIBLE SEATSGENIE LIFTEYE-WASH STATIONJAN.209aGx4242660006003394400024005600470450682x15472261263962002800107002800294013057620001100142020005xOPEN TO ABOVE AND BELOWOPEN TO ABOVE AND BELOW1A506FEATURE WALL BELOW1A505RETRACTABLE FIRE CURTAIN ABOVEWATER FIRE-CURTAIN ABOVESPIDER-JOINT TIMBER CURTAIN WALLSPIDER-JOINT TIMBER CURTAIN WALLRETRACTABLE SEATING STORAGE400RECYCLED TIMBERBAR COUNTERDISPLAY CASEDISPLAY CASE3000 30PERFORMANCE HALL LEVEL PLAN - 228 SEATSPRE- EAST-WEST BUMP-OUT$!&^L$#(*WeNL$#(*WeNL$#(* WeN**228 SEAT THEATREEEEEEEEEEEERREEERETTTTTTTTTTAAATTTTATAA2222222222222222228882228882822EEAAAAAEAEAEAEAEAEAEAHHHEEEEEHEHH888888888888888EEEEEE88SEEE8E88TTTTTTTTTTTTTTEEEEEEEEEEEEETTTTTTTTTTTTTTTTTTTTTEEEAATTTETEE2288EETTTHEATET207207207RRR65' - 11"2008948' - 4"1473631' - 2"950019' - 0"57908 ACCESSIBLE SEATSL1420RETRACTABLE SEATING STORAGECURRENT THEATRE SIZE SHOWN WITH DASHED LINE19’ STAGE DEPTH(13’ EFFECTIVE STAGE DEPTH)Special Meeting of Council Agenda Thursday, March 21, 2019 Item 3 Page 17 of 30
LIBRARY SQUARE TOWN OF AURORA FEBRUARY 22, 20198STAGE SIZE COMPARISONSWITH PRE- BUMP-OUT SCHEMESpecial Meeting of Council Agenda Thursday, March 21, 2019 Item 3 Page 18 of 30
LIBRARY SQUARE TOWN OF AURORA FEBRUARY 22, 20199'1'1UPDNDNUP' ' ' ' 272.470272.470272.470GENIE LIFTEYE-WASH STATIONOPEN TO ABOVE AND BELOWOPEN TO ABOVE AND BELOWFEATURE WALL BELOWRETRACTABLE FIRE CURTAIN ABOVEWATER FIRE-CURTAIN ABOVEBIRD-FRIENDLY CURTAIN WALLBIRD-FRIENDLYCURTAIN WALLRETRACTABLE SEATING STORAGE400RECYCLED TIMBER BAR COUNTERDISPLAY CASEDISPLAY CASE32001100EXISTING SCHOOL HOUSE NOT IN SCOPEEXISTING SCHOOL HOUSE NOT IN SCOPE272.470CRUSH SPACETHEATRETABLE/SEATINGSTORAGEBACK-OF-HOUSESTORAGEWOMEN'SWASHROOMMEN'SWASHROOMEXITCORRIDORS/L LOCK 02BARS/L LOCK 01JANITORSTAIR BSTAIR ABAR STORAGEB-F W/CJAN.THEATRE VEILBANQUET LAYOUT24 TABLES192 SEATS 30GEGGBANQUET LAYOUT24 TABLES192 SEATSPERFORMANCE HALL LEVEL - BANQUET CONFIGURATION'1272.470RETRACTABLE FIRE CURTAIN ABOVEWATER FIRE-CURTAIN ABOVERECYCLED TIMBERBAR COUNTERDISPLAY CASEDISPLAY CASECRUSH SPACESSpecial Meeting of Council Agenda Thursday, March 21, 2019 Item 3 Page 19 of 30
LIBRARY SQUARE TOWN OF AURORA FEBRUARY 22, 201910'1'1UPDNDNUP' ' ' ' 272.470272.470272.470GENIE LIFTEYE-WASH STATIONOPEN TO ABOVE AND BELOWOPEN TO ABOVE AND BELOWFEATURE WALL BELOWRETRACTABLE FIRE CURTAIN ABOVEWATER FIRE-CURTAIN ABOVEBIRD-FRIENDLY CURTAIN WALLBIRD-FRIENDLYCURTAIN WALLRETRACTABLE SEATING STORAGE400RECYCLED TIMBER BAR COUNTERDISPLAY CASEDISPLAY CASE32001100EXISTING SCHOOL HOUSE NOT IN SCOPEEXISTING SCHOOL HOUSE NOT IN SCOPE272.470CRUSH SPACETHEATRETABLE/SEATINGSTORAGEBACK-OF-HOUSESTORAGEWOMEN'SWASHROOMMEN'SWASHROOMEXITCORRIDORS/L LOCK 02BARS/L LOCK 01JANITORSTAIR BSTAIR ABAR STORAGEB-F W/CJAN.THEATRE VEILCONFERENCE LAYOUT30 TABLES90 SEATSGEGGGCONFERENCE LAYOUT30 TABLES90 SEATSPERFORMANCE HALL LEVEL - CONFERENCE CONFIGURATION'1272.470RETRACTABLE FIRE CURTAIN ABOVEWATER FIRE-CURTAIN ABOVERECYCLED TIMBERBAR COUNTERDISPLAY CASEDISPLAY CASECRUSH SPACESSpecial Meeting of Council Agenda Thursday, March 21, 2019 Item 3 Page 20 of 30
838383UPUPUPDN'1UP)$&3
',63)'/2:3+$6(
/2:3+$6(
/2:3+$6(
3+$6(
/6 /6 /6
/6
/6
/6
/6
/6/6
/6
/6 )'' ' A2BCDEGFHJKLMN1A50113581A5029111A5031A504A4041A4021A4011A401243 m [466 ft ]MULTI-PURPOSE STUDIO102111 m [1198 ft ]VISUAL ARTS STUDIO111147 m [1585 ft ]PERFORMING ARTS DANCESTUDIO1105 m [58 ft ]ELEC. ROOM10916 m [174 ft ]WOMENS WASHROOM11216 m [174 ft ]MENS WASHROOM11322 m [242 ft ]COAT ROOM10712 m [130 ft ]LOADING1067 m [74 ft ]JANITOR ROOM10411 m [116 ft ]IT ROOM10341 m [441 ft ]RECEPTION AREA10866 m [715 ft ]ENTRANCE LOBBY10043 m [467 ft ]STAGING10596 m [1038 ft ]CORRIDOR10128 m [299 ft ]STAIR B11427 m [292 ft ]STAIR A11523' - 3 1/2"70950' - 4"9823' - 2"706233' - 10"1031446' - 9 1/2"14256267.900267.070267.07039' - 4"1198529' - 8 1/2"905919' - 6 1/2"595519' - 5 1/2"593329' - 10"90957' - 6"22927' - 2 1/2"220011' - 11"363412' - 0"3652W/C102aW/C102b24' - 6 1/2"747518' - 8 1/2"569925' - 9"784919' - 9 1/2"60345' - 3"16005' - 11"18003' - 11"120028' - 10"879112' - 1 1/2"369010' - 0 1/2"305924' - 10 1/2"7586104' - 0"3169519' - 8"600069' - 3"2110619' - 8"600069' - 3"21106Gx4242660006003394421321875600470450682x154722612639620028004300740018002940130576200020002000200033972854CACF AREA5xOPEN TO ABOVE AND BELOWOPEN TO ABOVE1A506FEATURE WALL1A505RETRACTABLE PARTITIONRETRACTABLE PARTITIONBIRD-FRIENDLY CURTAIN WALLBIRD-FRIENDLY CURTAIN WALL1100CLERESTORYWINDOW ABOVERECYCLED TIMBERCOUNTER19027' - 8"23435' - 2 1/2"1592EXISTING SCHOOL HOUSE NOT IN SCOPEEXISTING SCHOOL HOUSE NOT IN SCOPE267.070267.07011' - 4"34507' - 0 1/2"2150850This drawing is the property of the Architect and may not be reproduced or used without the express consent of the Architect. The Contractor is responsible for checking and verifying all levels and dimensions and shall report all discrepancies to the Architect and obtain clarification prior to commencing work.ISSUE RECORDREVISION RECORD405-317 ADELAIDE STREETWESTTORONTO CANADA M5V 1P9+1 416 599 9729WWW.RAWDESIGN.CANorth 1 : 10030Town of Aurora17-086Church StreetSchool ExpansionGROUND FLOORPLANA201NO. DATE DESCRIPTION2019-02-06 100% SCHEMATIC DESIGN$.4"UUBDINFOUSpecial Meeting of Council Agenda Thursday, March 21, 2019 Item 3 Page 21 of 30Attachment 2
TOWN OF AURORA LIBRARY SQUARELIBRARY SQUARE LINK DESIGN OPTIONSFEBRUARY 21st, 2019$.4"UUBDINFOUSpecial Meeting of Council Agenda Thursday, March 21, 2019 Item 3 Page 22 of 30
LIBRARY SQUARE TOWN OF AURORA FEBRUARY 21, 2019243 METERSLANDSCAPED ICERESURFACER GARAGEGREEN ROOFOVER ENCLOSEDCONNECTIONVESTIBULE FORPLAZAENTRANCE VIASTAIRS +ELEVATORNEW LIBRARY ENTRANCE - SINGLESTOREY, GLASS ENCLOSED, DOORS ONEACH SIDE.OPTION 1Special Meeting of Council Agenda Thursday, March 21, 2019 Item 3 Page 23 of 30
LIBRARY SQUARE TOWN OF AURORA FEBRUARY 21, 20193ICE RESURFACERGARAGE DOORENTRANCEVESTIBULE/PAVILLIONGLASS WALLCURRENTBUILDING EXIT/ENTRANCEOPTION 1Special Meeting of Council Agenda Thursday, March 21, 2019 Item 3 Page 24 of 30
LIBRARY SQUARE TOWN OF AURORA FEBRUARY 21, 20194ICERESURFACERGARAGETERMINUS OFCONNECTION ATNEW LIBRARYENTRANCECONCRETEFRAMEOPTION 1Special Meeting of Council Agenda Thursday, March 21, 2019 Item 3 Page 25 of 30
LIBRARY SQUARE TOWN OF AURORA FEBRUARY 21, 20195ICERESURFACERGARAGEOPEN CONNECTING PORTICOBETWEEN LIBRARY AND NEWBUILDING - CONCRETECOLLUMNS AND ROOFSTRUCTUREGREEN ROOFCONCRETE-FRAMEDNEW LIBRARYENTRANCE - GLASSWALLS43 METERSOPTION 2Special Meeting of Council Agenda Thursday, March 21, 2019 Item 3 Page 26 of 30
LIBRARY SQUARE TOWN OF AURORA FEBRUARY 21, 20196ICERESURFACERGARAGEOPEN CONNECTING PORTICOBETWEEN LIBRARY AND NEWBUILDING - CONCRETECOLLUMNS AND ROOFSTRUCTURE43 METERSGREEN ROOFCONCRETE-FRAMEDNEW LIBRARYENTRANCE - GLASSWALLSOPTION 2Special Meeting of Council Agenda Thursday, March 21, 2019 Item 3 Page 27 of 30
LIBRARY SQUARE TOWN OF AURORA FEBRUARY 21, 20197ENTRANCEVESTIBULEICE RESURFACER GARAGE -LANDSCAPING OVERCONCRETE STRUCTURECONCRETE-FRAMEDNEW LIBRARYENTRANCE - GLASSWALLSOPTION 3Special Meeting of Council Agenda Thursday, March 21, 2019 Item 3 Page 28 of 30
LIBRARY SQUARE TOWN OF AURORA FEBRUARY 21, 20198CONCRETE-FRAMEDNEW LIBRARYENTRANCE - GLASSWALLSOPEN CONNECTING PORTICO BETWEENLIBRARY AND NEW BUILDING -CONCRETE COLLUMNS AND ROOFSTRUCTUREGREEN ROOFOVER ENCLOSEDCONNECTION43 METERSICE RESURFACER GARAGEOPTION 3Special Meeting of Council Agenda Thursday, March 21, 2019 Item 3 Page 29 of 30
DRAFT - as of March 20192020 2021 2022TASKSPRING SUMMER FALL WINTER SPRING WINTER SPRING1 Commence Design Developmentx2 Complete Design Developmentx3 Receive direction to Proceed to next Phasex4 Commence Construction Documentation (CD)x5 Class-B costing prepared at 50-60% CDx6 Value Engineering options at 75% CDx7 Class-A costing prepared at 90% CDx8 Receive direction to Proceed to next Phasex1 Prepare Tender Documentation (late Dec.)x2 Early Works Tenders (Early January)x3 Remaining Trade Tenders (January)x1 Early Works2 Construction3 Substantial Performancex4 Fit Outx5 OccupancyxPRE-CONSTRUCTIONPROC.CONSTRUCTION2019AURORA LIBRARY SQUARE - ELEMENTAL PROJECT SCHEDULE*Assumption: with Council approval to commence March 2019$.4"UUBDINFOUSpecial Meeting of Council Agenda Thursday, March 21, 2019 Item 3 Page 30 of 30
Town of Aurora
General Committee Report No. PDS19-018
Subject: Library Square – Parking Strategy
Prepared by: Andria Sallese, Senior Policy Planner
Anthony Ierullo, Manager, Policy Planning and Economic Development
Department: Planning and Development Services
Date: March 21, 2019
Recommendation
1. That Report No. PDS19-018 be received;
2. That Parking Strategy Phase 1: ‘Quick Wins’ as outlined in this report be
adopted; and
3. That Council approve $87,882.00 to the Library Square budget to be funded as
per Funding Strategy Report FS19-012 for additional on-site parking on
Victoria Street, conditional on the approval of the addition to the Church
Street School; and
4. That Council approve $185,376.00 to the Library Square budget to be funded
as per Funding Strategy Report FS19-012 for additional on-site parking within
the laneway, conditional on the approval of the addition to the Church Street
School; and
5. That Council approve $145,740.00 to the Library Square budget to be funded
as per Funding Strategy Report FS19-012 for additional on-site parking on
Church Street subject to further public consultation, conditional on the
approval of the addition to the Church Street School.
Executive Summary
The intent of this report is to present the findings of the draft parking strategy for Library
Square and to seek Council’s approval to proceed with the implementation of the
identified ‘Quick Wins’ to augment the existing parking supply. This report also seeks
Council direction to continue to explore medium and long-term parking solutions. The
report can be summarized as follows:
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 4
Page 1 of 19
March 21, 2019 Page 2 of 15 Report No. PDS19-018
• Library Square design progressing to final approval;
• Onsite Parking supply, as currently designed, will not support expanded
programming in Library Square;
• Barrier-free parking spaces meet the minimum AODA requirement; and
• Consultant recommends a phased parking strategy approach.
Background
Since 2000, Council has directed Staff to undertake various studies to address the
parking supply in the downtown. The following provides a quick summary of these
activities.
In 2002, the Town conducted a Master Transportation Operations Study that indicated
that there was an adequate amount of both on and off-street parking in the downtown
area to meet demand. In 2007, the Town retained Marshall Macklin Monaghan (MMM)
to update the parking component of the 2002 study to assess whether parking supply
was still adequate in response to concerns raised by the Aurora Public Library. The
MMM report reviewed existing parking supply and demand, and determined that the
core area in Downtown Aurora generally had enough parking and was expected to
continue to do so in the future, with the exception of library parking which was operating
at capacity. The MMM report also determined that, while the library lot was operating at
full capacity, on-street parking was poorly utilized and that there was sufficient on-street
parking available to address the needs of not only the library, but also the more
intensive use of the other three municipal buildings at the time.
The report proposed five options to address the shortfall of parking in the library parking
lot. These options were evaluated against a set of criteria, including the ability of the
option to address the parking demand, the impact of construction on additional parking,
urban design considerations, and costs. On the basis of this analysis, the consultant
report determined that Options A and D, which included using on-street parking on
Yonge Street more effectively, and relocating some or all library employees to another
site with available surplus parking, such as a church site, would free up space in the
library parking lot. These recommendations were later jointly implemented by both the
Town and Library.
In 2016, in response to a Council motion, Staff initiated a Downtown Traffic
Management Plan for Library Square to assess a number of issues in the area,
including traffic infiltration, parking demand and a plan to convert on-street parking to
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 4
Page 2 of 19
March 21, 2019 Page 3 of 15 Report No. PDS19-018
angled parking on the Church Street, Victoria Street and Mosley Street boulevard, and
traffic operation configuration on these streets to one-way only.
Infrastructure and Environmental Services Staff brought forward a report in September
of 2016 summarizing their findings and recommendations. The report concluded at that
time that, on the basis of their analysis and the 2007 Downtown Core Parking Area
Study, the existing parking layout and traffic operation configuration was functioning
well. The report recommended a comprehensive approach that was driven by an update
to the Master Transportation Plan in order to align various initiatives with the Aurora
Promenade Concept Plan.
Aurora Promenade Urban Design Strategy
In 2010, the Town of Aurora approved the Aurora Promenade Urban Design Strategy
(the ‘Strategy’). The purpose of the Urban Design Strategy was to guide and manage
growth in a way that realizes the Official Plan and Secondary Plan vision for revitalizing
the Yonge and Wellington corridors into a vibrant place to live, shop, work and play. Key
to the strategy is reinforcing and enhancing the Cultural Precinct by leveraging cultural
assets, enhancing public spaces and promoting a distinct streetscape.
The Strategy, building on a downtown parking assessment of the downtown area,
included recommendations for further exploration of travel demand management
measures, as well as the potential for a shared parking structure, to address parking
demand in the area.
Among other matters, the Strategy stresses the importance of comprehensively
balancing the supply of parking in the Downtown with redevelopment. Section 3.1.2 of
the Strategy describes a key objective for The Aurora Promenade in transforming the
area from one that is largely auto-oriented to a vibrant pedestrian-oriented one. Part of
this objective requires a ‘special’ approach to parking that relies on a variety of travel
demand management strategies to mitigate parking demand. The strategies put forward
in Section 3.1.2 include:
• Subsidizing transit trips to the area;
• Improving cycling and pedestrian routes to local destinations;
• Accepting cash-in-lieu of parking or reducing parking requirements for new
development; and
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 4
Page 3 of 19
March 21, 2019 Page 4 of 15 Report No. PDS19-018
• Partnering with developers to provide parking underground, or with civic and
institutional uses, to share parking facilities.
The above strategies are intended to reduce the demand for additional surface parking
and help mitigate the visual unsightliness of large parking lots or monolithic parking
structures.
The Strategy’s Public Realm framework identifies a potential public parking facility on
the Library Square site. Planning Staff believe that the redevelopment of Library Square
represents an opportunity to continue to explore parking options and travel demand
management strategies for the site and within the Cultural Precinct.
Analysis
Library Square design progressing to final approval
The Town is in the detailed design stages of preparing plans for Library Square. The
latest design concept was approved by Council in June 2018 and proposes a 2,975
square metre addition to the Church Street School. The addition includes community
programming space (program room, performing arts studio, and a multi-purpose studio
visual arts room) and a 192-250 seat performance hall. The design concept also
proposes re-purposing the parking lot between the Library and the Church Street
School House into a 2700 square metre urban plaza with outdoor programmable space
(‘the Square’).
In June 2018, Council approved parking for Library Square. On-site parking would be
provided primarily in a parking lot on the north-east corner of the site. Five parallel
parking spaces are also proposed in a laneway connecting Yonge Street, the parking
lot, and Victoria Street. The laneway is intended to act as an east-west mid-block
connection, realizing one of the public realm objectives for this block. Full-moves access
to the parking lot is proposed from Victoria Street, with one-way access from Yonge
Street.
The Council approved design for Library Square would provide a total of 83 parking
spaces, which would serve the Library, School House addition and the Square.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 4
Page 4 of 19
March 21, 2019 Page 5 of 15 Report No. PDS19-018
Onsite Parking supply will not support expanded programming in Library Square
The Town, in partnership with the Aurora Public Library, has hired a parking consultant
to evaluate parking requirements in Library Square. The parking study examined both
the existing parking supply and demand with or without the proposed School House
Addition.
This study was informed by feedback received through the Library Square consultation
including ongoing engagement with the Aurora Public Library and other Cultural
partners. The Town’s parking consultant also prepared a parking survey for patrons of
the Library and Cultural Centre as well as an inventory of parking and related parking
counts to support the analysis.
The consultant’s report reveals that there is an existing parking supply of 89 parking
spaces for the Library and the Cultural Centre. The existing uses on-site generate a
total demand for 79 and 84 parking spaces during weekday and weekend peak periods
respectively. The consultant report concluded that, currently, there is sufficient on-street
parking supply within the Focus Area, which represents a two block radius (Figure 2),
and within the Broader Area of the site (Figure 1), to accommodate the existing parking
demand. Parking within the Focus Area is largely within a 5 to 6 minute (250 metres)
walking distance from Library Square, with the furthest parking in the Broader Area
within a 10 to 12 minute (500 metres) walking distance.
The consultant has modelled two future parking demand scenarios. The first scenario
includes the demand generated by the existing uses, as well as the proposed
community uses in the addition. This scenario generates a total demand for
approximately 108 and 113 parking spaces during weekday and weekend peak periods
respectively, or 29 additional parking spaces over the existing demand for these
periods.
The consultant’s report also concluded that, currently, there is sufficient on-street
parking supply within the Focus Area, to accommodate the existing and forecast parking
demand, even without the use of private parking lots. However, this strategy would
require a significant shift in user behaviour in the use of on-street parking. Staff have
completed an evaluation of the travel distance proposed in the Focus Area compared to
commonly used Aurora Facilities and their parking lots to provide context as to the
proposed walking distance (Figure 3).
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 4
Page 5 of 19
March 21, 2019 Page 6 of 15 Report No. PDS19-018
The second scenario includes the demand of all the community uses on the site,
including a full capacity theatre for events. This scenario generates a total demand of
approximately 200 and 213 parking spaces during weekday and weekend peak periods
respectively, or 121 to 129 additional parking spaces. These scenarios are illustrated in
Figure 1 below:
Figure 1: Parking Demand Scenarios
Weekday Weekend
Existing On-site Parking
Spaces 89 89
Existing On-site Parking
Demand 79 84
Proposed On-site Parking
Supply with new concept 83 83
Proposed Barrier-Free
Spaces 8 8
Comprehensive Zoning
By-law 6000-17
Requirement*
89 89
AODA Requirement
Barrier-Free Parking 4 4
Future Scenario 1 Total
Parking Demand 108 113
Future Scenario 1
(additional demand above
supply, without theatre
events)
25 30
Future Scenario 2 Total
Parking Demand 200 spaces 213 spaces
Future Scenario 2
(Scenario 1 + additional
with theatre events)
117 130
*Section 5.4.1 “Promenade Parking Standards’, 1 space per 100m2 of gross floor area.
As noted previously, the current site design would accommodate a total of 83 parking
spaces. The resulting pressure on the existing parking supply suggests 29 additional
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 4
Page 6 of 19
March 21, 2019 Page 7 of 15 Report No. PDS19-018
vehicles during the daytime weekday and weekend peak periods, and 121 to 129
additional parking spaces for full capacity theatre events.
Major events on-site will generate significantly greater demand that can be
accommodated through on-street parking within a two block radius. The parking
demand for these types events are typically more flexible and generally willing to park
further away from the event venue, which suggests less concerns related to visitor
behaviour.
Barrier-free parking spaces exceeds the minimum AODA requirement
The Accessibility for Ontarians with Disabilities Act (AODA) requires that, where there
are between 13 and 100 parking spaces, four percent be for the use of persons with
disabilities. This minimum requirement increases where there are 101 to 200 parking
spaces provided on-site to 1 parking space plus three percent of the total number of
parking spaces. The current site plan proposes 83 parking spaces, including eight (8)
barrier free spaces or 10 percent of the total number of parking spaces.
Two barrier-free parking spaces are provided in the laneway. These barrier-free parking
spots are located 23 metres from the library entrance, and 52 metres from the lower
level entrance of the addition. Two additional barrier-free spaces are located at the
south-east corner of the parking lot, and are located 32 metres from the main entrance
of the School House addition. Three (3) barrier-free spaces are located in the lay-by on
Victoria Street. The furthest stall is 15 metres from the main entrance of the addition.
Finally, one barrier-free space is located at the north corner of the parking lot. This stall
is located five (5) metres from the back entrance of Victoria Hall.
The Town’s parking consultant has recommended that the Town proceed with barrier-
free parking spaces that meet the minimum AODA requirement, while monitoring actual
usage of the barrier-free spaces in Library Square once the addition has been
constructed and operations have commenced. The minimum AODA requirement for
barrier free spaces is 4 parking spots or 4 percent, whereas the current site plan
proposes 8 barrier free spaces, or 10 percent of the total number of parking spaces.
The “Quick Wins” described in the subsequent paragraphs will offer opportunities to
further expand accessible parking if necessary. It is recommended that 4 additional
parking spaces be built to an accessible standard on Victoria Street as described below.
This approach allows Staff the flexibility to increase accessible parking according to
demand, without increasing additional capital costs.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 4
Page 7 of 19
March 21, 2019 Page 8 of 15 Report No. PDS19-018
Consultant recommends phased parking strategy approach
The parking consultant has recommended a number of strategies, including travel
demand management measures, to accommodate the forecast parking demand. These
strategies allow the Town of Aurora to proceed with parking on a phased basis, initially
with the proposed addition to the school house and reconstruction of parking on the
north end of the site.
Phase 1 of the parking strategy proposes ‘Quick W ins’ that can be implemented in the
short-term. Phase 2 of the parking strategy includes medium to long-term solutions to
expand on- and off-street parking supply. The consultant’s recommendations are
described in more detail below:
PHASE 1: QUICK W INS
Maximize Use of Existing Off-Street Public Parking
• Develop and implement consistent signage and branding for public off-site
parking lots.
• Treat the new Library Square surface parking lot as a public parking lot for use
by all visitors to the area.
• Increase the prominence of the public parking lot west of Yonge Street. Add
more prominent signage along the adjacent roads.
• Increase pedestrian access to the public parking lot by establishing a direct
pedestrian connection from Yonge Street through future development
applications along the corridor.
Revisit Yonge Street Parking Restrictions
• On-street parking along Yonge Street was underutilized during the study periods.
Increase parking restrictions to two or three hours to allow patrons more flexibility
and promote on-street parking along the Yonge Street corridor.
• Any changes to permitted parking hours should be monitored over time to
determine impacts on businesses and the availability of parking.
Increase On-Street parking on Church Street and Victoria Street
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 4
Page 8 of 19
March 21, 2019 Page 9 of 15 Report No. PDS19-018
• Through the redevelopment of the Site, remove existing curb cuts along Church
Street for the public library parking lot and allocate the space to on-street
parking.
• A conceptual design of lay-by parking on Church Street determined that a total of
13 additional spaces on the north side of the street could be provided. Similarly,
9 dedicated parking spaces could be provided within the boulevard on Victoria
Street. This design would result in a total of 108 parking spaces, with 12 barrier-
free spaces (12.5% of the total parking supply) and one loading space.
Transition from Private Parking Lots to Shared Public Parking Lots
• The area surrounding the site consists of many small, private surface parking lots
that serve individual businesses. Over time, these lots could be consolidated into
public lots in order to increase efficiency, design quality, and access
opportunities.
• New buildings in the area should not be encouraged to construct new surface
visitor parking and instead accommodate the parking demand from these new
buildings in off-site, public lots.
Encourage Long-Term Parking in Less-desirable Lots
• As local area parking increases, the most desirable spaces (typically street
parking outside popular destinations) will be at a premium. Work with local
businesses to encourage employees to park in less-desirable spaces in order to
prioritize customer parking.
Use Parking Pricing to Alter Behaviour and Raise Revenue for New Parking
• Many municipalities have implemented parking charges to alter behavior and
raise revenues.
• The key impacts on visitor behaviour would be:
o Discouraging unnecessary automobile trips – it will be less expensive to
carpool, bike, or walk; and
o Influencing where people park – charging more for premium street parking
compared to lots that are further away will influence demand and help
spread parking demands through the area.
Monitoring demand for barrier-free parking spaces
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 4
Page 9 of 19
March 21, 2019 Page 10 of 15 Report No. PDS19-018
• In order to provide a ratio of barrier-free parking spaces that reflects what is
currently in use today, meets the minimum AODA requirement, while meeting the
future demand generated by new programming on-site, monitor actual usage of
barrier-free parking spaces in Library Square once the addition has been
constructed and operations have commenced.
• This approach allows Staff the flexibility to increase accessible parking according
to demand.
Consider additional parking in Library Square
• Consider lay-by parking on the north-side of Church Street and further explore
whether there is sufficient space within the Church Street right-of-way to permit
on-street parking on the south side. This option would require public consultation
with local residents and stakeholders to consider the potential impact of
modifications to the existing right-of-way.
• Provide additional parking on the west side of Victoria Street within the
boulevard, and in the internal laneway on-site. These improvements would need
to be carefully designed to limit the urban design and heritage impacts on the
site.
• Cumulatively, these options could add an additional 25 parking spaces to help
offset the parking shortfall for weekday non-theatre events, at an approximate
total cost of $418,998.00.
PHASE 2: MEDIUM TO LONG TERM PARKING SOLUTIONS
Option 1: Build Structured Parking on the Library Block (Long Term)
Construct structured parking with an additional 55 parking spaces than that currently
proposed in the redevelopment of the site. The 55 parking spaces would incorporate the
15 parking spaces that are being lost with the proposed parking plan in the current
development proposal, as well as accommodate the additional forecast parking demand
for the community centre use (approximately 40 parking spaces). The exact parking
quantity can be refined and optimized as design progresses.
This would be able to accommodate the existing public library and school house parking
demand, as well as the forecast community centre demand. The redevelopment of the
Site would maintain the status quo, where there is no additional demand being added to
the street network during a typical, non-event day. It is important to note that this would
not accommodate the theatre parking demand, which would be distributed to the on-
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 4
Page 10 of 19
March 21, 2019 Page 11 of 15 Report No. PDS19-018
street parking supply. The building structure would likely limit the ability to redevelop the
larger block.
The additional parking could be provided under the school house addition, the public
square where the library parking currently sits or the proposed surface parking lot.
Option 2: Acquire additional lands to expand parking supply (Long Term)
Lands could be acquired within the vicinity of Library Square to expand the local parking
supply. This could increase the area parking supply, to be more efficient in
accommodating parking demand.
Staff recommend proceeding immediately with the implementation of Phase 1: ‘Quick
Wins’ and continuing to explore medium and long-term parking solutions and that Staff
report back to Council with recommendations.
Advisory Committee Review
Accessibility Committee
As noted in the June 2018 report, both the Heritage and Accessibility Committee were
consulted on the proposed project. As there have been revisions to the concept plan
since the Committees last provided comments, the latest versions of the plans have
recently returned to each committee for comment. The plans have also been circulated
to the Town’s Accessibility Advisor for review comment. Staff have received comments
from the Accessibility Advisor and shared those comments with The Planning
Partnership for consideration in refining the design drawings.
Heritage Committee
The Heritage Permit Application (HPA-19-03) to approve the addition to the Part IV
designated 22 Church Street was reviewed by the Heritage Advisory Committee (HAC)
on March 5, 2019. As part of this application, a Heritage Impact Assessment was
produced by ERA Architects, a firm that specializes in heritage consulting. The Heritage
Impact Assessment outlined that there will be minimal to no impact on the character-
defining elements of the heritage resource, through the sympathetic placement,
massing and materiality of the addition. Furthermore, the Ontario Heritage Trust (OHT),
who has a Heritage Conservation Easement over the property, has also provided their
initial support for the project and design.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 4
Page 11 of 19
March 21, 2019 Page 12 of 15 Report No. PDS19-018
Ensuring design excellence, promoting responsible growth management, providing
appropriate community facilities, and conserving cultural heritage resources are all
objectives of the Town of Aurora Official Plan. As part of the Library Square Project, the
addition to 22 Church Street will meet these objectives and has the support of the
Heritage Advisory Committee and Staff.
Should there be any further modifications to the site plan that proposes alterations to
character defining elements of the site to accommodate additional parking, further input
may be required from the HAC and OHT.
Legal Considerations
The Town’s Zoning By-law exempts the Town from complying with the parking
requirements of the By-law since the site is not adjacent to a residential zone. The
Town is required to comply with provincial accessibility laws and standards and will
comply if the recommendations in this report regarding barrier-free parking spaces are
adopted.
Financial Implications
The ‘Quick Wins’ proposed as part of the Phase 1 implementation strategy have a fairly
low cost and can be incorporated into the cost of the Library Square redevelopment.
However, the refinement of the design to maximize parking supply would add additional
costs to the project as highlighted in Figure 2 below:
Figure 2
Church Street lay-by
parking
13 additional
parking spaces
$145,740.00 $11,210/stall
Victoria Street
parking
9 additional
parking spaces
$87,882.00 $9,764.67/stall
Additional parking in
the laneway
4 additional
parking spaces
$185,376.00 $46,344/stall
Total $418,998.00
While the four additional parking spaces within the laneway would be convenient for
patrons of the Library, these spaces come at a cost of $46,344.00 per stall. The medium
and longer term solutions require further evaluation and consultation, and have a
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 4
Page 12 of 19
March 21, 2019 Page 13 of 15 Report No. PDS19-018
greater cost implication. The evaluation of these options will be outlined in future
reports.
Communications Considerations
The plans for Library Square are premised on a significant amount of public
consultation, including with stakeholders and Town partners. In addition to a webpage
on the Town’s website dedicated to Library Square, communication staff have prepared
an internal and external communication strategy to address the effective communication
of this initiative.
Link to Strategic Plan
The development of Library Square supports the following Strategic Plan goals and key
objectives:
Supporting an exceptional quality of life for all in its accomplishment in satisfying
requirements in the following key objectives within these goal statements:
• Invest in sustainable infrastructure;
• Celebrating and promoting our culture;
• Encourage an active and healthy lifestyle; and
• Strengthening the fabric of our community
Enabling a diverse, creative and resilient economy in its accomplishment in satisfying
requirements in the following key objectives within these goal statements:
• Promoting economic opportunities that facilitate the growth of Aurora as a
desirable place to do business.
Alternative(s) to the Recommendation
1. That the recommendations in this report not be approved.
2. That Council receive the report for information only.
3. Council direct Staff to undertake further study of a comprehensive parking solution for
the Cultural Precinct.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 4
Page 13 of 19
March 21, 2019 Page 14 of 15 Report No. PDS19-018
Conclusions
Planning Staff believe that the redevelopment of Library Square represents an
opportunity to continue to explore parking options and travel demand management
strategies for the site and within the Cultural Precinct.
Staff also recommend proceeding immediately with the implementation of Phase 1:
‘Quick Wins’ and continuing to explore medium and long-term parking solutions, to allow
Staff to continue to work with the parking consultant on additional travel demand
management strategies, as well as longer term solutions, to accommodate the forecast
parking demand. Staff will report back to Council with their findings and
recommendations.
Attachments
1. Figure 1 – Library Square – On and Off-Site Parking - Broader Area
2. Figure 2 – Library Square – On and Off-Site Parking – Focus Area
3. Figure 3 – Library Square – On and Off-Site Parking – Focus Area Distance
Comparison
4. Figure 4 – Library Square - Parking Options Plan
Previous Reports
General Committee Report No. IES16-073 – Library Square/Downtown Traffic
Management Plan
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 4
Page 14 of 19
Special Meeting of Council Agenda Thursday, March 21, 2019Item 4 Page 15 of 19
Victoria StreetMaryStreetWells StreetGurnett StreetSpruceStreetWalton DriveYonge StreetAlexGardnerCircleWellington Street WestWellsStreetNorthTyler StreetWellington Street EastEdward StreetMachell AvenueReuben StreetMosley StreetChurch StreetMetcalfe StreetLarmont StreetBerczy StreetConnaught AvenueHarrison AvenueCentre StreetMill StreetTemperance StreetIndustrial Parkway SouthVictoria SVVicictctotoorriaia reetStStrtrereeeeetMaryMaMaarryreeSSttrereeeeetWells StreeWeWeelllsls SStrrtrereeeeteturnettGuGururnrneneettt trerrSStrtrereeeetetppruceSppSpprurucucecetrerSStrtretreeeeetWWaWaalon ton Drltootoon DDrvevriviveveYonge StreetYoYoongngege StStrtrereeeetetxAAAlelexexrrrGdGaGaardrdndneneerCircCCirircrccleleWellington Street WestWeWeellllininngtgtootoon SSttrereeeetet WeWeeststWeWeWeelllslstrrtSStrtrereeeeetrNoNoorrthhthTyler StreetTyttTyyleleer SSttrereeeetetWellinWton Streetton Street EastStreetolliWeWeellllininngtgtotottEon SSSttrereeeetet EaEastasstdward SEdEdwdwawaardrd treetSSttrereeeeetMachell AvenueMaMacaccheheelll AvvAveveennueueReuben StreeRReReeuubbeen SSttrereeeetMosleey StreetylStMoMoossleleyey SSSttretreeeetetrhrChurch StreeCChhuurcrcch SSttrereeeeetMetcalfe MeMeetctccaallfefe SStreetSttrereeeetLaLarmonLLaarrmottmoonnt SStrtrereeeeteterczBerczy StreetBeBeercrcczyzy StreSttrereeteetetConnaugCoht ACoonnnanauaugugghtht AAvAveveennueuevAAAiAHaHaarrrrisisosoon AvAveveennueueCentre StrCeCeennttrere SSttSttrereeeetMill StreetMMiilll StStrtrereeeetetTTeTemeTemperancSnnce Streeperpeananpppe SppemperancetrereTeTeemmpepeeraraancncece StStrtrereeeetttetl Parkwaal PaPaary SouthkwaySorkwkwawayay SooSooututhth~ 160 m~ 305 m~ 345 m~ 215 mLIBRARY SQUARE - ON- AND OFF-SITE PARKINGBROADER AREAFIGURE 1Map created by the Town of Aurora Planning & Development Services Department, March 4, 2019. Base data provided by York Region and Aurora - GIS.¯0200100MetresBroader Area22 Church StreetLinearDistanceSpecial Meeting of Council Agenda Thursday, March 21, 2019 Item 4 Page 16 of 19
Victoria StreetMaryStreetWells StreetGurnett StreetSpruceStreetWalton DriveYonge StreetAlexGardnerCircleWellington Street WestWellsStreetNorthTyler StreetWellington Street EastEdward StreetMachell AvenueReuben StreetMosley StreetChurch StreetMetcalfe StreetLarmont StreetBerczy StreetConnaught AvenueHarrison AvenueCentre StreetMill StreetTemperance StreetIndustrial Parkway Southre tVictoria StrrVVicictctotoorriaia StStrtrereeeeetMaryMaMaarryreeSSttrereeeeetWWWeWesStreelllsls SStrrtrereeeeteturnetttreerGuGururnrneneettt SStrtrereeeetetppruceSppSpprurucucecetrerSStrtretreeeeetWon ton DrWaWaalltootoon DDrvevriviveveYYononge Se Streetre tYoYoongngege StStrtrereeeetetxAAAlelexexrrrGdGaGaardrdndneneerCircCCirircrccleleWellington Street WestWeWeellllininngtgtootoon SSttrereeeetet WeWeeststWellsWeWeelllslstrrtSStrtrereeeeetrNoNoorrthhthTyler StreetTyTyyleleer ttSSttrereeeetetWellington Street EastWeWeellllininngtgtotoon SSttEtSttrereeeetet EaEasasstdward StreetEdEdwdwawaardrd SSttrereeeeetMachell AvenueMaMacaccheheelll AvvAveveennueueReuben RReReeuubtreebeen SSttrereeeetosley StreetMosley SyStMoMoossletleyey SSSttretreeeetetrhrChurcCChhuurcrcch SSttrereeeeetMeMeMetcalfe Streeetctccaallfefe SSSttrereeeetLarmont LLaarrmmoonnt treeSSttrereeeetetBerczy StreetBBeBeercrcczyzy StreSttrereeteetetConnaugCoht ACoonnnanauaugugghtht AAvAveveennueuevarrison AvenueHaHaarrrrisisosoon AvAveveennueueCentre StrCeCeennttrere SSttSttrereeeetMill StreetMMiilll StStrtrereeeetetTTeTemeemperance StreeSperpeananpppe SnpptreTeTeemmpepeeraraancncece StStrtrereeeetttetal Parkwaal Paaal PaPaary SouthkwaySorkwkwawayay SooSooututhth~ 200 m~ 115 mLIBRARY SQUARE - ON- AND OFF-SITE PARKINGFOCUS AREAFIGURE 2Map created by the Town of Aurora Planning & Development Services Department, March 4, 2019. Base data provided by York Region and Aurora - GIS.¯0200100Metres~ 120 m~ 110 mFocus Area22 Church StreetLinearDistanceSpecial Meeting of Council Agenda Thursday, March 21, 2019 Item 4 Page 17 of 19
Wal-mart-175mAuroraFamilyLeisureComplex-160mSuperstore-140mLIBRARY SQUARE - ON- AND OFF-SITE PARKINGFOCUS AREA DISTANCE COMPARISONFIGURE 3Map created by the Town of Aurora Planning & Development Services Department, March 4, 2019. Base data provided by York Region and Aurora - GIS.¯015075Metres22 Church StreetFocus AreaDISTANCE COMPARISONAurora Family Leisure Complex ~ 160mSuperstore ~ 140mWal-mart ~ 175mWWWaaWll--mmaarrtrr-11177775mAAAAAAAAAAuurroorraFFFaammiillyyLLLLLLLLLeeiissuurreCCCCCoommppppppplleex-11660mSSuupppppeerrssttoorre-11144440mLIBRARY SQUARE - ON- AND OFF-SITE PARKINGFOCUS AREA DISTANCE COMPARISONFIGURE 3Map created by the Town of Aurora Planning & Development Services Department, March 4, 2019. Base data provided by York Region and Aurora - GIS.¯015075Metres22 Church StreetFocus AreaDISTANCE COMPARISONAurora Family Leisure Complex ~ 160mSuperstore ~ 140mWal-mart ~ 175mSpecial Meeting of Council Agenda Thursday, March 21, 2019 Item 4 Page 18 of 19
Special Meeting of Council Agenda Thursday, March 21, 2019 Item 4 Page 19 of 19
Town of Aurora
Special Council Report No. CMS19-009
Subject: Library Square – Proposed Operating Plan
Prepared by: Robin McDougall, Director of Community Services
Department: Community Services
Date: March 21, 2019
Recommendation
1. That Report No. CMS19-009 be received; and
2. That the draft operating plan be approved and finalized prior to the approval of
the final construction tender; and
3. That the hiring of a contract Project Leader position to implement the
business plan be approved.
Executive Summary
The Library Square project has been a long anticipated project for Aurora and required
significant evaluation to confirm interest and potential utilization. Through a collection of
information, consultation and expertise, a business plan has been created resulting in a
draft operating plan. The following factors were used in the creation of the operating
plan:
• In collaboration with experienced cultural facility consultants, an operating budget
has been developed for the expanded facility
• Consultation has taken place with Cultural and Community Partners to evaluate
their interest in this project
• Comparable projects were used to help develop a plan for Aurora’s new facility
• Compiling of the current collective budgets established the baseline and provided
guidance on the development of a conservative operating budget for the
expanded facility
• Consideration of the operating expenses for the outdoor square have been
incorporated into the proposed operating budget
• Proposed implementation of the operating budget impact over three years
enables immediate action on planning and preparing for the opening of the
facility and spreads financial impact over multiple years
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 1 of 51
March 21, 2019 Page 2 of 8 Report No. CMS19-009
Background
In June 2018, Council approved continuing with the next steps in the planning and
design for the project. With their approval of the three (3) floor option including a
theatre, staff continued with the schematic design of the building and outdoor square.
Staff have worked with Interkom Inc. (cultural consultants) along with various
engagements with cultural partners and community groups in refining the project details.
This work generated the development of the business plan (Attachment 1), proposed
operating budget and grant application for Canada Cultural Spaces Fund.
For the purpose of this report, the temporary title given to the facility (including the
expansion) will be referenced as the Aurora Museum and Cultural Centre (AMCC).
Analysis
In collaboration with experienced cultural facility consultants, an operating
budget has been developed for the expanded facility
Martin van Zon is the founder and President of Interkom Inc. and is the project lead for
the Aurora Museum and Cultural Centre (AMCC) engagement. He has personally
directed and managed the planning, opening and successful launch of many important
municipal capital arts assets in Ontario. Some of those are Art Gallery of Hamilton, Art
Gallery of Burlington, Art Gallery of Windsor, Judith and Norman Alix Art Gallery in
Sarnia, The Rose Theatre Brampton, The Burlington Performing Arts Centre, The
FirstOntario Performing Arts Centre in St. Catharines and Flato Markham Theatre.
Martin brings valuable insights and a unique perspective to each project including areas
of consulting, planning, strategy, finance, reviewing and evaluating municipal sector
assets. He also has extensive experience in working in situations where multiple-
stakeholders are involved, including elected politicians, advisory committee/governance
boards, senior management, and funders/donors.
Brian McCurdy is an Interkom consultant with over 35 years’ experience as chief
executive officer of arts facilities, including six years as an Assistant Vice Chancellor of
a major university, five years as a municipal Cultural Director, and three years as
Executive Director of an Opera Company. Brian is a seasoned arts administrator who
thoroughly understands operations, planning and management in the arts & culture
sector.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 2 of 51
March 21, 2019 Page 3 of 8 Report No. CMS19-009
Brian has developed business plans, hired, trained, and managed staff, ranging in size
from eight to 45 full-time staff, and hundreds of part-time staff and volunteers. His
recent consulting work included management services for The Burlington Performing
Arts Centre; Strategic Plan for Flato Markham Theatre; Strategic Plan for Sanderson
Centre, Brantford; Programming consultant, UA Presents, University of Arizona; Ontario
Presents (Ontario’s foremost presenting organization), Municipal Performing Arts
Centres policy development; and Culture Plan for City of Edmonton.
With all of their relevant experiences, Martin and Brian bring a solid base of information
and knowledge to support the development of a draft operating budget for the AMCC.
Consultation has taken place with Cultural and Community Partners to evaluate
their interest in this project
Since June 2018, staff and consultants engaged cultural partners to understand their
interest in this project. Specifically, Interkom has reached out and conducted
discussions (one-on-one meetings and phone calls) with various cultural partners
regarding their interests in AMCC, such partners include: Aurora Cultural Centre, Aurora
Public Library, Aurora Museum and Archive, Marquee Theatrical Productions, York
Region Arts Council, Aurora Film Circuit. In addition, Interkom also conducted an online
survey to gather responses from 43 cultural organizations and contacts regarding the
usage potential of AMCC, venue preference, and rental rates expectations, etc.
Comparable projects were used to help develop a plan for Aurora’s new facility
To gain an understanding of the landscape of comparable cultural facilities to Aurora’s
new facility, Interkom conducted research and review of information and insights
gathered from various cultural facilities regarding their operation, programming, space
utilization and rental information. They also benchmarked the sector information that is
available from Ontario Presents. Ontario Presents is a province-wide network of
performing arts touring and presenting organizations that work collaboratively to
facilitate the distribution of live, performing arts shows. Its members include municipal
performing arts centres; not-for-profit, volunteer, community presenters; touring
artists/arts organizations, artists’ agents, and industry service consultants.
Summary of the venues used in the research:
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 3 of 51
March 21, 2019 Page 4 of 8 Report No. CMS19-009
Municipality Venue
Town of Aurora Aurora Cultural Centre, etc – various cultural partners
City of Orillia Opera House – Studio Theatre
Town of Whitchurch-
Stouffville
Lebovic Centre for Arts & Entertainment
City of Barrie Five Points Theatre, Georgian Theatre
Town of Newmarket Newmarket Theatre
City of Vaughan City Playhouse
City of Markham Flato Markham Theatre
City of Richmond Hill Centre for the Performing Arts
City of Burlington Art Gallery of Burlington
City of Burlington Performing Arts Centre
Town of Oakville Oakville Centre for the Performing Arts
City of Mississauga Mississauga Living Arts Centre
City of St. Catharines FirstOntario Performing Arts Centre
City of Guelph River Run Centre
City of Brantford Sanderson Centre
Town of Caledon Townhall Players
City of Kingston Grand Theatre, Tett Centre
City of Brampton Rose Theatre, Cyril Clark Theatre
Orangeville Opera House
Gravenhurst Opera House
Huntsville Algonquin Theatre
City of Ottawa Ottawa Art Gallery
City of Sarnia Judith & Norman Alix Art Gallery
City of Windsor Art Gallery of Windsor
Compiling of the current collective budgets established the baseline and
provided guidance on the development of a conservative operating budget for the
expanded facility
Utilizing the funding and operating budgets for the Aurora Cultural Centre, the Aurora
Museum and Archives and the facility operating expenses for the current facility
provided a collective budget to be used as a baseline. Once that was created the
consultants than applied their research and best practices to generate a conservative
budget for the expanded facility.
With the new addition in place, the AMCC will have doubled its capacity. Yet the budget
has taken into consideration that it will take three to five years to ramp up and maximize
the opportunities that exist for additional revenue generation and added cultural and
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 4 of 51
March 21, 2019 Page 5 of 8 Report No. CMS19-009
community activities within the expanded facility. Therefore, the budget as presented
allows the AMCC to expand the performing and visual audience engagement in Aurora,
coupled with technical functions within a much larger and more complex organization.
The forecast ratio of earned and unearned revenue compares favourably to comparable
arts centers in surrounding municipalities. It is the opinion of the consultant that the
annual Town contribution will be seen as a smart investment compared to the economic
impact this exciting project will generate based on this conservative forecast.
Consideration of the operating expenses for the outdoor square have been
incorporated into the proposed operating budget
In order to develop a draft operating budget for the outdoor area, staff compared other
assets within the municipality to obtain typical costs for the parking lot and grounds
including winter maintenance, utilities and landscaping. In addition, staff compared
operating costs from other outdoor refrigerated ice rinks offered in surrounding
municipalities.
Proposed implementation of the operating budget impact over three years
enables immediate action on planning and preparing for the opening of the
facility and spreads financial impact over multiple years
In preparation for the opening of the facility in 2022, it is recommended to spread the
anticipated increase in operating costs over the next few years so that the effect on the
tax levy is minimized. Staff are suggesting the first increase take effect in the 2019
budget.
With that increase budget in 2019, staff would begin immediately with hiring a Project
Leader position. This individual would be required to have expertise in cultural facilities,
business management, facility management, revenue generation, partnership
agreements, etc. They would be responsible for engaging the community, partners and
artists along with confirming and recruiting the staffing needs in preparation for opening
the facility. This role is critical in ensuring the facility hits the ground running and is well
prepared for success upon opening.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 5 of 51
March 21, 2019 Page 6 of 8 Report No. CMS19-009
Advisory Committee Review
Not applicable
Legal Considerations
Not applicable
Financial Implications
Funding strategy for the operating budget has been outlined in report number FS19-012
provided on this Special Council agenda. The strategy outlines the management of the
annual estimated incremental cost of $620,000 for the building operation plus $100,000
for the outdoor square (totaling $720,000).
The anticipated increase in operating expenses is net of any new revenues these
facilities are anticipated to develop.
Communications Considerations
This report will be posted to the website to keep residents informed of plans and any
future direction from Council will be shared via Council Highlights, Town website and
social media.
Link to Strategic Plan
The development of Library Square supports the following Strategic Plan goals and key
objectives:
Supporting an exceptional quality of life for all in its accomplishment in satisfying
requirements in the following key objectives within these goal statements:
• Invest in sustainable infrastructure
• Celebrating and promoting our culture
• Encourage an active and healthy lifestyle
• Strengthening the fabric of our community
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 6 of 51
March 21, 2019 Page 7 of 8 Report No. CMS19-009
Alternative(s) to the Recommendation
1. Council may provide further direction.
Conclusions
This report summarizes all of the research and consultation that went into the
development of the business plan and proposed operating budget. With the consultants
expertise, a conservative draft operating plan is presented for approval. Staff will work
to finalize the operating plan prior to the approval of the final construction tender.
In addition, staff are seeking Council approval to hire a contract Project Leader position
who will be responsible to refine the business plan to ensure the facility is well prepared
for success upon opening.
Attachments
Aurora Museum and Cultural Centre - Business Plan
Previous Reports
PBS17-066 – Award of Contract for Library Square Site Plan, September 5, 2017;
PBS17-096 – Preferred Design for Library Square, December 5, 2017;
PBS17-100 – Preferred Design for Library Square – Additional Information December
12, 2017;
PDS18-014 – Updated Design for Library Square, January 30, 2018; and
PDS18-076 – Library Square – June 19, 2018
CMS19-005 – Library Square – Project Update – February 12, 2019
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 7 of 51
Special Meeting of Council Agenda Thursday, March 21, 2019Item 5 Page 8 of 51
Aurora Museum & Cultural Centre
BUSINESS PLAN
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 9 of 51
Attachment 1
The Town of Aurora would like to acknowledge
the contribution of the following organizations
and individuals who assisted with the
development of this document - Aurora
Museum & Cultural Centre Business Plan.
● Cultural Partners Group
● Aurora Public Library
● Aurora Cultural Centre
● Aurora Historical Society
● Aurora Seniors Centre
● Aurora Sports Hall of Fame
● Pine Tree Potters Guild
● Society of York Region Arts (SOYRA)
● Theatre Aurora
● Farmers Market
● Staff of the Community Services
Department, Town of Aurora
● Project Consultants: Interkom Inc.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 10 of 51
2 Executive Summary
4 Project Background and History
6 The Need for An Expansion
10 Population Characteristics
11 0ƬȒȇȒȅǣƬ ƺȇƺˡɎɀ
12 Relevant Town of Aurora Studies
17 Community Consultation
18 Potential Uses of Expanded Space
21 Town of Aurora Cultural Partners
30 Proposed Management Structure
32 Planning Considerations
34 Operational Considerations
39 Appendix
TABLE OF CONTENTS
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 11 of 51
The Town of Aurora is creating a new cultural
hub in its downtown core that will serve as
a focal point for residents and out of town
visitors. The hub will be located within Library
Square and will consist of an outside public
square and an expansion to the historic Church
Street School (CSS) which is currently home to
the Aurora Museum & Archives and the Aurora
Cultural Centre.
This Business Plan is for the building and
operations of a three-storey expansion that
will be connected to the CSS existing historic
structure via a glass atrium and include a
ɎǝƺƏɎȸƺٖȵƺȸǔȒȸȅƏȇƬƺɀȵƏƬƺȒȇɎǝƺɎȒȵˢȒȒȸ
with retractable seating; multi-purpose
performing arts and visual arts spaces; and
a climate controlled museum storage space,
among other features.
The proposed expansion will make the new,
combined Church Street School facility a
central hub for cultural activities in Aurora
positioning the Town to be the lead entity that
can help bring all of the cultural partners in
Aurora together as envisioned through the
Town’s Cultural Master Plan.
The purpose of this document is to provide
an overview of the plan for the building and
operations of a brand-new cultural hub in
Aurora. The working name for this facility is
the Aurora Museum & Cultural Centre (AMCC).
This plan also clearly outlines the need for an
expansion to the current Church Street School
property and proposes how new spaces might
be utilized. Finally, it outlines the required
ȒȵƺȸƏɎǣȒȇƏǼƏȇƳˡȇƏȇƬǣƏǼƬȒȇɀǣƳƺȸƏɎǣȒȇɀِ
ÁǝƺȵȸȒȵȒɀƺƳבאًבɀȷɖƏȸƺǔȒȒɎˢƺɴǣƫǼƺً
multi-use addition includes the following
components:
1. 3,680 square foot multi-use
Performance Hall with capacity for:
● 246 seating in a theatre/performance
venue with retractable, raked seating
● ³ȵȸɖȇǕˢȒȒȸًȵȸȒǔƺɀɀǣȒȇƏǼǼǣǕǝɎǣȇǕƏȇƳ
audio equipment
● A/V projector screen
● 192 seating with tables and chairs
(banquet style)
● 300+ capacity for markets/fairs/
tradeshows/corporate events
2. 1,585 square foot multi-purpose
Performing Arts Studio
● Divisible into two separate studios with
each space able to accommodate up to
60 people
● ³ȵȸɖȇǕˢȒȒȸƏȇƳȅǣȸȸȒȸɀ
● Professional sound system
3. 1,198 square foot multi-purpose
Visual Arts Studio
● Divisible into two separate studios each
space accommodating 32 seated at art
tables
4. 466 sq. ft Multi-Purpose Studio
● Space allows for small meetings, prep
classes and rehearsal
2
EXECUTIVE SUMMARY
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 12 of 51
5. 2,333 square feet of Environmentally
Controlled Storage Space for the Aurora
Museum’s artifact collection
● Space allows for a glass wall allowing
for visible storage and display
opportunities
6. 1,567 square foot Program Room
● Divisible programming space with
external access to outdoor square, each
space able to accommodate up to 60
people
7. 673 square foot Café/Multipurpose Area
with seating for 20-30 people
8. 283 square foot Catering Kitchen/Servery
Construction costs are projected to be
$28,000,000
Anticipated construction start will be Fall 2019
and construction completion will be in late
2021.
The operating budget for the new AMCC
is projected to be $2.6 million in year 1. The
Town will be required to provide an additional
$620,000 operating grant to support the new
AMCC. Required new staff to operate the
facility is anticipated to be 4 full-time, 2 part-
time and a variety of contract positions relating
to programming.
The redesign of Library Square and expansion
of the Church Street School, supports the Town
of Aurora’s Strategic Plan – goal of supporting
an exceptional quality of life for all through
the following key objectives:
● IɖǼˡǼǼȅƺȇɎȒǔɎǝƺ!ɖǼɎɖȸƏǼxƏɀɎƺȸ¨ǼƏȇ
that includes heritage, music, and art to
promote more cohesive and coordinated
cultural services;
● Expand opportunities and partnerships
that contribute to the celebration of
culture in the community; and
● Actively promote and support a plan to
revitalize the downtown that includes
Culture
This expansion also supports the strategic
directions of the Town of Aurora’s Cultural
Master Plan:
● Expand Culture’s role in economic
development
● Build a strong and vital cultural sector
● Enhance access to cultural resources
3
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 13 of 51
In 1952, Aurora Public School moved from 22
Church Street to Wells Street School, after
the high school students moved into their
new building on Dunning Avenue. The Town
purchased the building for one dollar in 1953
and rented it to the Whitchurch School Board
ƏɀƏȇȒɮƺȸˢȒɯɀƬǝȒȒǼِIȸȒȅחדדɎȒחהאɎǝƺ
building was used as a national training
ǔƏƬǣǼǣɎɵƫɵ«ƺȅǣȇǕɎȒȇٮ«ƏȇƳًƏȇȒǔˡƬƺȅƏƬǝǣȇƺ
company. After they vacated, the building was
ɖɀƺƳƏǕƏǣȇƏɀƏȇȒɮƺȸˢȒɯɀƬǝȒȒǼǔȒȸ«ƺǕƺȇƬɵ
Acres and Aurora Heights public schools.
From 1969 to 1976 the York County Board of
Education used the building, then known as
“Church Street School”, as headquarters.
Faced with an empty building after the York
County Board of Education vacated the space,
the Town undertook a feasibility study in
1978 to determine future uses. Guided by this
study, the Town determined that the Church
Street School should become a cultural and
recreational centre. With council’s approval,
the Aurora Historical Society (AHS) opened
ɎǝƺɖȸȒȸƏxɖɀƺɖȅȒȇɎǝƺɀƺƬȒȇƳˢȒȒȸȒǔ
the building in 1981, after their initial request
for space in the building was granted. The
museum shared the building with other
groups including the Friendship Circle, Boy
Scouts, Big Brothers, and the Pottery Guild.
In June 1999 the AHS submitted a paper
to the Town of Aurora senior staff entitled,
“Policy Position on the Future of the Church
Street School”. The paper advocated that the
entire building become a museum creating
more space for programming, exhibition and
storage. By the year 2000 necessary repairs
to the building were mounting including
foundation restoration, a drainage system,
ɖȵǕȸƏƳƺƳˡȸƺƺɴǣɎȸȒɖɎƺɀًȇƺɯɯǣȇƳȒɯɀًƏȇƳ
barrier-free entrances including an elevator.
A plan for restoration was approved in 2002
with funding from the provincial SuperBuild
grant and contributions from the Town. All
tenants moved out of the building while the
renovations modernized the interior of Church
Street School while retaining the exterior
architecture.
In 2003 after lengthy negotiations, the AHS
signed a 10-year lease to be the sole tenants of
the Church Street School to create the Aurora
Heritage Centre. In 2004 architects Lynch &
Comisso and project manager Ron McKnight
of McKnight Associates were contracted by
the Society to transform the building. Their
ˡȸɀɎɎƏɀǸɯƏɀɎȒȸƺȅȒɮƺɎǝƺǔƏǼɀƺƬƺǣǼǣȇǕɀ
and interior walls that had been built over
the previous 40 years revealing the building’s
original tin ceilings. Several Open Houses
were held for the public to come and see the
building. The AHS applied for and received
a Trillium Grant and a Museums Assistance
Program Grant.
A capital campaign was launched in 2005 to
raise the remaining funds needed to complete
the renovations. The AHS contributed $228,634
from their own funds along with a $200,000
bequest from member Margaret Brevik which
combined with other donations amounted
to $548,372. The Society also applied for
capital support to the Cultural Spaces Canada
Program on behalf of the Town and received a
further $775,000 in 2007.
PROJECT BACKGROUND AND HISTORY
4
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 14 of 51
When their fundraising efforts failed to meet
the project requirements, the AHS turned to
the Town for support.
In July 2007, Aurora Town Council resolved to
support the renovation of the Aurora Heritage
Centre. While the renovations continued,
an Arts & Cultural Advisory Committee was
formed and the Town commissioned a
Strategic and Business Plan for an arts and
cultural centre in the Church Street School
with work beginning in January 2008. The AHS
ɯƺȸƺȇȒɎǣȇƏˡȇƏȇƬǣƏǼȵȒɀǣɎǣȒȇƏɎɎǝǣɀȵȒǣȇɎǣȇ
time to operate the entire Centre.
Presented in June 2008, the Novita Report
recommended the establishment of a
separately incorporated entity and broadened
the original mandate to include a wider set
of arts and cultural programming including
heritage programming in recognition of
the Town’s cultural development needs and
goals. The report also recommended that
the name be changed to the Church Street
School Cultural Centre with the vision that The
Cultural Centre will be a dynamic hub in the
heart of Aurora, providing a focus for arts and
culture in the town.
The AHS collection, which had been placed
into storage in 2005, was moved back into
Church Street School in 2009 and the building
ȒǔˡƬǣƏǼǼɵȒȵƺȇƺƳǣȇhƏȇɖƏȸɵאِÁǝƺȇƏȅƺȒǔ
the Centre was subsequently changed to the
Aurora Cultural Centre.
While the Novita Report recommended that
the Cultural Centre enter into an agreement
with the Aurora Historical Society to exhibit the
museum collection, such an agreement never
came into force and the collection remained
in storage in the building. In 2015, the Aurora
Museum & Archives re-opened in the Church
Street School as a municipal museum after the
AHS transferred the Aurora Collection to the
Town in 2013 for the sum of one dollar. Since
that time the Town-run museum and the
separately incorporated Aurora Cultural Centre
have been independently operating within the
Church Street School building.
5
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 15 of 51
THE NEED FORAN EXPANSION
Over the course of many years, a variety of
locations across Aurora have been used for
community assembly, performances, and
as cultural spaces. During Aurora’s earliest
days, there were plenty of spaces available for
cultural assembly:
● Mechanics’ Hall, built in 1870 and located
on the south east corner of Mosley and
Victoria Street, hosted a regular program of
lectures, social gatherings, performances,
music festivals and community classes.
● The Armoury, built in 1874 and located
on the southwest corner of Mosley and
Larmont Street, has served as a venue for
live music, dances, parties, performance,
and exhibition spaces.
● ÁǝƺɀƺƬȒȇƳˢȒȒȸȒǔɎǝƺȒǼƳÁȒɯȇRƏǼǼ٢זוהٮ
1956), that was located on the northeast
corner of Yonge and Mosley Streets, was
a large public auditorium that hosted a
variety of events and programs.
● ƺǕǣȇȇǣȇǕǣȇזווًɎǝƺɀƺƬȒȇƳˢȒȒȸȒǔדאאג
Yonge Street (known as the Faughner
Block) was used as a music hall as well as a
reading room.
After the Second World War, many of these
spaces were no longer available. In their place,
the community used the following locations
for cultural purposes:
● The Aurora Armoury continued to serve
as a venue for music, dances, parties and
performance. In 2014, it was purchased by
the Town.
● The Aurora Historical Society, established
in 1963, operated a community museum in
the old Town waterworks building.
● The Aurora Community Centre, built in
1967 and located off Aurora Heights Drive,
hosted sporting events as well as a number
ȒǔǝǣǕǝٮȵȸȒˡǼƺȅɖɀǣƬȵƺȸǔȒȸȅƏȇƬƺɀƏȇƳ
regular community events.
● Since 1973, Theatre Aurora, a not-for-
ȵȸȒˡɎƬȒȅȅɖȇǣɎɵɎǝƺƏɎȸƺًǝƏɀƫƺƺȇ
leasing the Town owned Factory Theatre
on Henderson Drive for live theatrical
productions
● In 1978, the old Church Street School
located at 22 Church Street became a
cultural and recreation center. It was home
to the Aurora Historical Society, Friendship
Circle, Boy Scouts, Big Brothers and the
Pottery Guild
● Since 1992, the Aurora Historical Society
have been operating a museum out of
RǣǼǼƏȸɵRȒɖɀƺƏǔɎƺȸˡȸɀɎƏƬȷɖǣȸǣȇǕɎǝƺ
property from the Hillary family in 1981
● In 2001, the Aurora Public Library moved
into a new building and their old location
(56 Victoria Street) was used for recreation
and cultural programing
6
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 16 of 51
During the beginning of the 21st Century, the
availability of cultural space in Aurora changed:
● In 2001 the current Library was opened
with two community rooms (the Magna
and Lebovic Rooms) that were used by
the Town and community groups as
programming space. As of the end of
2019 these rooms will be managed by the
Library only and Town programs will be
displaced.
● In 2003, the Aurora Historical Society
agreed to a 10-year exclusive use lease
of 22 Church Street and embarked on
a comprehensive renovation project.
Ultimately, the project costs were taken
over by the Town and a third party, now
known as the Aurora Cultural Centre, was
given use of the building to deliver cultural
programs.
● In 2013, the Town assumed control of
the municipal portion of the Aurora
Historical Society collection
● In 2015, a municipal museum opened in
the facility and currently occupies 3,200
sq./ft. of the 15,000 sq./ft. available
● In 2017, the Town of Aurora embarked
on a partnership with Niagara College
for exclusive use of the Aurora Armoury.
Although there will be public space
available, the facility will no longer be
exclusively operated by the Town.
● In 2017, the old Aurora Public Library and
former Senior’s Centre/Fire Hall were
demolished, which removed space that
was used for community meeting space
and Town-run programs.
7
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 17 of 51
Aurora Seniors Centre
● Activity/Meeting Rooms (3) (capacity 20-60)
● West McKenzie Room: 2,224 square feet (capacity 200)
● Priestly Room A/B: 804 square feet (capacity 48)
● Craftroom: 969 square feet (capacity 60)
● Activity Room C: 425 square feet (capacity 24)
Aurora Family Leisure Complex
● Meeting Room: 420 square feet (capacity 61)
● Program Room A: 375 square feet (capacity 35)
● Program Room B: 725 square feet (capacity 60)
● Program Room C: 650 square feet (capacity 59)
● Gymnasium: 5,460 square feet (capacity 300)
8
While much investment has been made by the Town in sporting and recreational facilities,
the creation of additional cultural programming spaces had not been a priority. Through its
Community Services department, the Town runs approximately 65 arts and cultural programs
serving a total audience of 134,150 in facilities that, for the most part, were not purpose built.
Space for Town programming is currently available in the following Town-owned facilities:
Aurora Community Centre
● Auditorium: 2,560 square feet (capacity 160)
● Meeting Room #1: 384 square feet (capacity 25)
● Meeting Room #2: 256 square feet (capacity 15)
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 18 of 51
Victoria Hall
● Hall/Meeting Room: 962 square feet
(capacity 60)
Church Street School
● Aurora Museum & Archives – dedicated space for museum
display and storage
Stronach Aurora Recreation
Complex
● Meeting Room: 507 square feet
(capacity 25)
Aurora Public Library
(only available until September 2019,
then may be booked for a fee)
● Lebovic Room: 930 square feet (capacity 45-60)
● Magna Room: 1,144 square feet (capacity 50-70)
Aurora Cultural Centre
(space available for a rental fee)
● Brevik Hall (capacity 180)
● Library Room (capacity 20)
● Red Gallery (capacity 60)
● Blue Gallery (capacity 60)
● Activity Room (capacity 60)
9
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 19 of 51
10
The Town of Aurora has seen steady growth
since it was incorporated as a Village in 1863.
Large periods of growth were experienced
between 1951 and 1961 when the population
rose by 161.8% and again from 1981 to 1991
when it rose by 81.1% (1996 Census of Canada:
0ǼƺƬɎȸȒȇǣƬȸƺƏ¨ȸȒˡǼƺɀ٣ِ³ǣȇƬƺאًɎǝƺ
population of Aurora has grown by over
15,000 people and is projected to grow by a
further 14,000+ by 2020 to a total population
of 69,688.
As the population has grown, so too has
interest and participation in arts and cultural
events.
A 2018 study by Culture Track: Canada has
found that Culture matters in the lives of
Canadians: it has intrinsic lasting value that
is a force for good in our society (https://
culturetrack.com/research/culture-track-
canada/). Results also indicate that Canadians
are cultural omnivores, viewing culture as a
broad and diverse set of activities. Traditional
ƳƺˡȇǣɎǣȒȇɀȒǔǝǣǕǝƏȇƳǼȒɯƬɖǼɎɖȸƺȇȒǼȒȇǕƺȸ
exist for modern audiences who are more
concerned with relevance. Lack of relevance,
in fact, is the greatest barrier to participation.
ǔȵƏȸɎǣƬɖǼƏȸȇȒɎƺǣɀɎǝƺɀɎɖƳɵټɀˡȇƳǣȇǕɎǝƏɎ
charitable giving to cultural organizations is
on the rise from 33% of respondents in 2011 to
35% in 2014, and 41% in 2017. While audience
participation is lagging for what they term
“benchmark arts” (Art Museums, Ballet, Opera,
and Classical Music), attendance at Community
Festivals, Food & Drink Experiences, and
Historic Attractions is high.
The population growth in the Town of Aurora
and cultural programming increase has not
been met with additional and suitable facilities
to accommodate that growth. Facilities in fact,
have been reduced through demolition and
repurposing.
POPULATION CHARACTERISTICS
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 20 of 51
11
Having a versatile multi-use cultural facility
ǣȇɎǝƺƳȒɯȇɎȒɯȇƬȒȸƺɯǣǼǼǝƏɮƺƏɀǣǕȇǣˡƬƏȇɎ
positive economic impact on local businesses
including restaurants, pubs, professionals,
specialty stores and residential development.
Many communities across Canada have
ȸƺƏǼǣɿƺƳɎǝƺƺƬȒȇȒȅǣƬƫƺȇƺˡɎȒǔƏɀɎȸȒȇǕ
cultural sector.
ȇɎƏȸǣȒټɀˡȸɀɎ!ɖǼɎɖȸƺ³ɎȸƏɎƺǕɵًTelling Our
Stories, Growing Our Economy notes that
spending by arts and culture tourists generates
about $3.9 billion in GDP and supports about
61,000 jobs in the province. In the report’s
opening remarks, the Provincial Minister of
Tourism, Culture, and Sport noted that “Arts
and culture inspire us, bring us together
and make our communities and economy
stronger.”
Released in 2016, Ontario’s Culture Strategy
focuses on four key goals:
● promote cultural engagement and
inclusion
● strengthen culture in communities
● fuel the creative economy
● promote the value of the arts throughout
government
The report notes that strengthening culture
in communities relies on municipalities
as key partners in supporting local arts,
culture and heritage. Aurora is among the 69
municipalities in Ontario that have developed
cultural master plans to integrate cultural
interests into municipal planning efforts.
Federally, the Provincial and Territorial Culture
Satellite Account (PTCSA) was developed by
Statistics Canada with the support of the
Department of Canadian Heritage and its
many partners to measure the economic
importance of culture (inclusive of the arts and
heritage) and sport by province and territory in
terms of output, gross domestic product and
employment, for reference years 2010-2016.
The report found that the broader cultural
sector represents 3.5% of the total GDP of
Canada, with 41% coming from Ontario
representing about 269,082 jobs in the cultural
industries in Ontario (4.5% of all the jobs
available in Ontario).
The addition and creation of a cultural hub
in Aurora’s downtown will act as a catalyst
for redevelopment which will provide spin-
ȒǔǔƫƺȇƺˡɎɀɎȒǼȒƬƏǼƫɖɀǣȇƺɀɀƺɀƏǼȒȇǕçȒȇǕƺ
Street.
Town Council recently approved the
establishment of a Business Improvement
Area within the historic downtown which the
Cultural Hub is located within. The purpose of
the BIA is to improve the attractiveness of the
area and promote the area as a good place
to shop, visit, and do business. The addition
of the Cultural Hub will strengthen the value
proposition of shopping, visiting and doing
business in Aurora’s downtown providing
residents and visitors alike another reason to
come downtown.
ECONOMIC BENEFITS
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 21 of 51
12
Town of Aurora
ǔˡƬǣƏǼ¨ǼƏȇ
A fundamental principle of the Town of
ɖȸȒȸƏ ǔˡƬǣƏǼ¨ǼƏȇ٢Á ¨٣ǣɀȵȸȒȅȒɎǣȇǕ
design excellence through high-quality
buildings, and well-designed and functioning
streetscapes. As the Town grows, the value
of its public realm – its streets and publicly
accessible spaces – as well as the design of
ǣȇˡǼǼƳƺɮƺǼȒȵȅƺȇɎǣȇƬȸƺƏɎǣȇǕƏɮǣƫȸƏȇɎƏȇƳ
livable urban environment, becomes more and
more important. Appropriate transition, as well
as the integration between existing and new
development and connected open spaces,
ǝƺǼȵƳƺˡȇƺȵǼƏƬƺɀƏȇƳɎǝƺɀȵƏƬƺɀǣȇƫƺɎɯƺƺȇِ
TAOP policy 4.0 ‘Ensuring Design Excellence’
recognizes the importance of high quality
urban design and architecture as an essential
part of Town-building. Policy 4.2 encourages
parking in the Historic Core to locate at the
rear of buildings and screened to ensure
the amenity of adjacent areas. Similarly,
TAOP Policy 4.4 recognizes public art as an
important component of the public realm
in contributing to an overall sense of place
and community, as well as improving and
enhancing the built environment.
Community services and facilities (CS&F)
ƏȸƺȵɖƫǼǣƬƏǼǼɵƏƬƬƺɀɀǣƫǼƺًȇȒȇٮȵȸȒˡɎǔƏƬǣǼǣɎǣƺɀ
whereby the Town and its agencies deliver
programs and services that help build
healthy, strong and complete communities
and are designed for all stages of life. CS&F
contribute to the social, economic and
cultural development of the Town, are vital
in supporting a successful, functioning
and vibrant downtown, and often serve as
neighbourhood focal points and gathering
spaces.
Church Street School
Cultural Centre Strategic
and Business Planning
Study (2008)
The Town of Aurora commissioned a Strategic
and Business Plan for an arts and cultural
centre in the Church Street School and
work began in January 2008. Through the
Strategic and Business Planning process, the
Consultants developed and presented to the
ad hoc Arts and Cultural Advisory Committee
of Council three plans: a Strategic Plan, a
Business Plan and an Implementation Plan for
the Centre to be created at the Church Street
School.
Known as the Novita Report, this document
brought together the three plans for the
Church Street School Cultural Centre. Together,
these reports provided a guiding concept and
framework for the Cultural Centre and outlined
steps for its implementation. The intent of this
report was to establish the conditions that
would allow the Church Street School Cultural
Centre to be established and to be sustainable.
The study came to the realization that while
there are many cultural needs in Aurora, not
RELEVANT TOWN OF AURORA STUDIES
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 22 of 51
all can be accommodated in the Church
Street School. The renamed Arts and Cultural
Centre was viewed as a useful and effective
bridging project which would promote cultural
development in Aurora and set the stage for
the addition of future cultural facilities.
Promenade Study (2009)
In 2009, the Town initiated a secondary
planning process for the Downtown Yonge/
Wellington Street Corridor. This resulted in
the creation of a Concept Plan – Urban Design
Strategy for the area now known as “The
Aurora Promenade”. Implementing policies
ɯƺȸƺǣȇƬǼɖƳƺƳǣȇɎǝƺÁȒɯȇټɀ ǔˡƬǣƏǼ¨ǼƏȇِÁǝƺ
Aurora Promenade Concept Plan sought to
leverage the distinct heritage and culture of
Aurora as an attraction through enhancing the
Cultural Precinct with additional facilities and
enhanced public spaces. The Promenade plays
a critical role in achieving the Town’s long-term
growth objectives.
The Urban Design Strategy for the Aurora
Promenade is intended to guide and manage
growth through the revitalization of the
Promenade area and improvements to the
public realm. The Urban Design Strategy is
premised on a number of objectives, which
include:
● Protecting and enhancing the
Promenade’s heritage core;
● Reinforcing and enhancing a Cultural
Precinct and leveraging opportunities in
this area;
● Creating new vibrant, transit-oriented
focus areas;
● Creating a pedestrian friendly environment
with great streets;
● Facing and Framing Major Open Spaces;
and
● Creating a ‘Green Lattice’ of interconnected
parks and open spaces.
Collection Review Process:
The Aurora Collection
(2013)
The Town of Aurora engaged Cultural Asset
Management Group (CAM Group) in August
2012 to review and assess the historical
collection (Aurora Collection) of art, artifacts,
textiles, and archives as a component of a
larger project in which the ownership and
operations of the Aurora Collection was
transferred from the Aurora Historical Society
to the Town. In general, the review found that
there are too many items for the available
space which puts the collection as a whole
at risk of physical damage and potential loss.
The basement storage space is also used by
Cultural Centre Staff, creating a security risk as
they are not museum staff and are not trained
ɀȵƺƬǣˡƬƏǼǼɵɎȒɯȒȸǸƏȸȒɖȇƳɎǝƺƬȒǼǼƺƬɎǣȒȇِ
Shared storage space is not museum best-
practice and in fact, controlled access to
storage is one of the key requirements for
receiving operational funding through the
Provincial Community Museums Operating
Grant program.
The report recommended the creation of a
safe and appropriate environment for the
ƬȒǼǼƺƬɎǣȒȇȸƺƬȒǕȇǣɿǣȇǕɎǝƺǣȅȵȒȸɎƏȇƬƺȒǔǼȒȇǕٯ
term preventative conservation strategies and
methods, including increased appropriate
museum storage space.
Cultural Master Plan (2014)
The Cultural Master Plan was initiated by
Council in 2012 with the appointment of
an Ad Hoc Working Group to oversee its
development. Consultants were hired to guide
ɎǝƺáȒȸǸǣȇǕJȸȒɖȵƏȇƳɎǝƺǣȸˡȇƏǼȸƺȵȒȸɎ
was presented to Council in May 2014. The
plan is built on four Strategic Directions and
ƬȒȸȸƺɀȵȒȇƳǣȇǕ³ɎȸƏɎƺǕǣƺɀƏȇƳǣƳƺȇɎǣˡƺƳƏɯǣƳƺ
13
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 23 of 51
variety of arts and cultural groups in Aurora.
Aiming to attract new and creative talents,
boost tourism, and enhance quality of life,
cultural resources and opportunities in Aurora,
the plan cites the expressed community need
for a cultural hub to support networking and
collaboration through the development of a
multi-use cultural facility within Library Square.
Building the Foundation:
A Three-Year Plan (2015)
This plan was created by the Town’s Curator to
outline the growth, development and use of
the Aurora Collection after it was transferred
from the Aurora Historical Society to the Town
in 2013.
The plan provides a blueprint for increased
use and development of the collection that
responds to local needs and objectives by
valuing the cultural heritage and history of our
community. It outlined measurable goals and
ɀȵƺƬǣˡƬȒƫǴƺƬɎǣɮƺɀȒȸǕƏȇǣɿƺƳǣȇɎȒIȒɖȸkƺɵ
Areas:
● Access
● Collections Management
● Conservation
● Outreach
Determining factors for the success of the plan
included additional space, and the need to be
compliant with the Standards for Community
Museums, among other factors.
Music Strategy (2016)
Council endorsed a Music Strategy for
ɖȸȒȸƏǣȇȵȸǣǼאהِÁǝƺɀɎȸƏɎƺǕɵǣƳƺȇɎǣˡƺɀ
and addresses the main areas of focus for
the development and support of the music
industry for the Town:
1. Support an environment friendly to music
creators
2. Encourage the business of music in Aurora
3. Promote Aurora’s music sector locally
4. Foster alliances with other music cities
5. Implement a process for monitoring
progress and measuring success
The Strategy cites the need in the community
for rehearsal space, access to civic venues, and
the creation of a physical Music Hub among
other measures.
Cultural Precinct Concept
Plan (2016)
In September 2015, the Town hired FOTENN
to create a Cultural Precinct Concept Plan.
The plan was developed to create a new
cultural hub that will serve as a focal point for
residents and tourists. It was stated that this
revitalization will attract and boost tourism,
enhance the quality of life for residents and
expand cultural resources in the community.
Library Square was included in this plan which
proposed, among other things, an addition to
the current Church Street School property.
In December 2016, Council provided direction
regarding a concept plan for the Cultural
Precinct that would involve the demolition
of the former library and former senior’s
centre. This decision was made taking into
14
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 24 of 51
consideration public input obtained from
the public consultation that took place in
2016 as part of the Council endorsed public
consultation strategy with respect to the
Cultural Precinct. FOTENN prepared two
alternative revisions of the Library Square
Concept Plans which were presented to
Council in May 2017. At that meeting, Council
received the revised concept plans and
directed staff to move forward with the
procurement process for design services in the
next planning stages for Library Square.
Aurora Repurposing
Study (2016)
In parallel with the work being conducted by
Fotenn Consultants Inc., Council also engaged
the consulting services of AECOM Canada
Architects Ltd. to conduct a Repurposing Study
ƏȇƳȅƏǸƺȸƺƬȒȅȅƺȇƳƏɎǣȒȇɀȒȇɎǝƺɖɀƺȒǔˡɮƺ
Town-owned structures – the former Library,
former Senior’s Centre, Victoria Hall, The Petch
House and the Armoury.
The Repurposing Study was part of the
background information to support the
Council approved multi-stage planning
approach to ensure a successful conclusion
to the Cultural Precinct/Library Square
project. The broad objective of this study
was to identify and meet key stakeholders
and recognize their needs for facility use.
Furthermore, based on the information
received from the user groups and after
holding public meetings and conducting a
survey to identify the needs of the community
stakeholders of Aurora, the report will
made recommendations to Council on the
determination and disposition of use of the
above mentioned facilities.
Library Square (2018)
The contract for the detailed design phase of
Library Square was awarded to The Planning
Partnership in September 2017. Through public
consultation conducted over late summer/early
fall, the largest theme was the demand for
ˢƺɴǣƫǼƺًȵȸȒǕȸƏȅȅƏƫǼƺȵɖƫǼǣƬɀȵƏƬƺɎǝƏɎƬȒɖǼƳ
be used by the Library, Cultural Centre, Town,
and the public for events and programs.
Two design options were presented to Council
ǣȇ(ƺƬƺȅƫƺȸًאוِÁǝƺˡȸɀɎȒȵɎǣȒȇǣȇƬǼɖƳƺƳ
an elevated or upper square, while the second
option included a lowered Square. Both
options included a proposed addition to the
Church Street School. At this meeting, Council
also increased the budget for design work for
the project to $1,077,500.
As per Council’s direction to proceed with
designs, RAW Architects were brought into
the project through The Planning Partnership.
A further design for Library Square with
proposed designs for the expansion was
approved by Council in June 2018. A proposed
Ɏǝȸƺƺ٢ב٣ˢȒȒȸƏƳƳǣɎǣȒȇɯȒɖǼƳƫƺƬȒȇȇƺƬɎƺƳ
to the existing building by way of a glass
atrium which would serve as access into the
square from Victoria Street. This design would
also give prominence to the existing historic
building by separating it from the proposed
addition.
15
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 25 of 51
Cultural Partners
Consultation and
Workshop Facilitation
(2018)
The Town conducted a facilitated workshop
with its cultural partners to help identify the
strengths and weaknesses of existing cultural
partnerships and to gain an understanding of
what cultural partners would like to see from
the Town moving forward. Considerations
included:
● Individual consultations with each partner
prior to the workshop
● A facilitated workshop hosted with cultural
partners to identify a baseline of services
and determine future needs
● The workshop agenda and observations
● Short term action items
Through the Cultural Partners Consultation
and Workshop, the Town met with key
Cultural Partners to determine what cultural
partners would like to see from the Town.
The consultants from Interkom facilitated
the workshop and summarized a number
ȒǔǸƺɵˡȇƳǣȇǕɀƏȇƳȸƺƬȒȅȅƺȇƳƏɎǣȒȇɀِÁǝƺ
short-term action items included revisiting
the Cultural Services Master Plan and creating
an implementation plan in cooperation with
the cultural partners, and reviewing current
partnership agreements and evaluating
existing delivery models. This review is ongoing
with an expected completion date in the fall of
2019.
16
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 26 of 51
17
The Town of Aurora views community
consultation as a key component in
understanding the needs, wants, and wishes
of its residents as it strives to create an
exceptional quality of life for all.
The most recent round of research conducted
to address the wishes of residents in relation
ɎȒƏȸɎɀƏȇƳƬɖǼɎɖȸƺɀȵƺƬǣˡƬƏǼǼɵƫƺǕƏȇǣȇאבƏɀ
part of the Cultural Master Plan. The Cultural
Master Plan was developed through an
extensive community engagement process to
ensure that the Plan’s directions and priorities
ȸƺˢƺƬɎƺƳɎǝƺƬȒȅȅɖȇǣɎɵټɀǣƳƺƏɀƏȇƳxɖȇǣƬǣȵƏǼ
needs and opportunities. Community
engagement included a community survey,
interviews with key stakeholders, focus groups,
and a visioning session.
Consultation was also a guiding factor in the
development of the Cultural Precinct Concept
Plan in 2016 which included:
● In person surveys during the month of
August at Concerts in the Park, Farmers
markets, Doors Open, at the Aurora Public
Library
● Rate Payers Meeting: September 19, 2016
● Public Meeting: September 21, 2016
● Visioning Workshop was held with key
staff, Aurora Cultural Centre staff and
Aurora Public Library staff on October 6,
2015
● Councillor’s Open House held on October
6, 2015
● Culture Walk (Public Engagement) was
held on October 25, 2015
● Online Survey was launched on October 27,
2015
● Development Community review of
Cultural Precinct Plan held November 17,
2015
● Aurora Chamber of Commerce: November
17, 2016
● Stakeholder/Area Residents Roundtable
held on November 24, 2015
● CultureQuest! Aurora held on November
25, 2015
● Presentation of Concept Plan to Council
held on December 8, 2015
● Accessibility Advisory Committee: October
5, 2016
● Economic Development Advisory
Committee: October 13, 2016
● Heritage Advisory Committee: October 17,
2016
● Aurora Public Library Board: October 19,
2016
● Parks and Recreation Advisory Committee:
November 17, 2016
● Trails & Active Transportation Committee:
Nov. 18, 2016
● Environmental Advisory Committee:
November 24, 2016
The proposed vision for Library Square
also included consultation with a variety of
stakeholders from October 2017 through
September 2018, including the Mayor and
members of Council, Town staff, cultural
partners, business leaders, and residents.
COMMUNITYCONSULTATION
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 27 of 51
The Town of Aurora prides itself on the quality
programming it offers to the community.
!ɖǼɎɖȸƏǼȵȸȒǕȸƏȅȅǣȇǕǝƏɀƫƺƺȇǣƳƺȇɎǣˡƺƳ
through corporate planning documents as an
area to build upon and enhance as part of the
effort to provide an exceptional quality of life
for all.
Current Town
Programming
The Town provides a variety of cultural
programming through its service agreements
with the Aurora Cultural Centre and the
Aurora Seniors Centre, but also offers cultural
programs on its own account including music,
art, theatre and dance for children, youth and
adults.
It is important that the municipality provide
and develop places and spaces for cultural and
artistic activities throughout the community
to create an environment that encourages
a thriving artistic and cultural community.
This includes providing affordable, grassroots,
beginner level arts and culture programming
for all ages all the way through to professional
development. This is done through
programming, alliances and partnerships
that will increase and enhance the variety and
diversity of creative cultural experiences.
The Town of Aurora currently offers the
following arts and culture based programs
to the community through its Recreation
Division:
● Preschool Craft Time (ages 2-5)
● Spring into Summer (ages 2-5)
● Snugglebugs (ages 2-5)
● Crafty Kids (ages 2-5)
● Little Picassos (ages 2-5)
● Keyboarding beginners (ages 7-12)
● Summer Arts Camp – 8 weeks (ages 6-11)
● Dance Camp – 2 weeks (ages 6-10)
● Computer Animation camp – 1 week
(ages 6-12)
● 3D Modelling and printing Camp – 1 week
(ages 6-12)
● Ukelele Heroes (ages 8-13; 55+)
● Apple Game Creation Camp – 1 week
(ages 8-12)
● Virtual Reality Avatars Creation
Camp – 1 week (ages 9-12)
● Dynamic Dancers (ages 8-11)
● Intro to Guitar (ages 8-11; 12-14; 18+)
● Aurora Teen Idol (ages 12-17)
● Learn to Draw (ages 12+; 18+)
● Virtual Reality Design and Development
Camp – 1 week (ages 13-16)
● Intro to Ballroom and Latin – Beginner
and Intermediate (ages 18+)
● Ballroom Dance Party (ages 18+)
● Acrylic Painting – Beginner and
Intermediate (ages 55+)
● Ballroom Dancing (ages 55+)
● Drawing Fundamentals (ages 55+)
● Guitar – Levels 1 and 2 (ages 55+)
● Painting and Sketching – Beginner
and Intermediate (ages 55+)
● The Story of My Life (ages 55+)
POTENTIAL USESOF EXPANDED SPACE
18
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 28 of 51
There is an opportunity to expand programs in
the AMCC, particularly those for preschoolers
and older adults to deal with the increased
demand for dance classes for preschoolers and
art classes for adults and older adults.
Growth and enhancement in cultural
programming has been limited by the
availability of suitable, purpose-built space.
The expansion of the Church Street School
property would provide just such needed
space and amenities and keep up with the
growth of the community.
Adaptable Theatre Space
The proposed AMCC Performance Hall is
designed to be an adaptable space (retractable
seating) which would allow for a multitude
of events from theatrical and concert
ȵƺȸǔȒȸȅƏȇƬƺɀɎȒǼƺƬɎɖȸƺɀًˡǼȅɀƬȸƺƺȇǣȇǕɀƏȇƳ
ceremonies. The design also allows the room
to be completely transformed into a space
that could accommodate an endless array of
activities including meetings, gatherings and
banquets at an affordable cost for internal and
external users.
Immediate Town uses for the Theatre space
include:
● Aurora Teen Idol auditions
● Aurora’s Christmas Market
● Aurora Art Show & Sale
● Town-run Summer Camps
● Culture Days Programming
● Community Awards
● Rain location for Concerts in the Park/
Movies in the Park
● Ballroom Dance Party (18+)
Future Programming could include:
● Live Performances (community and
professional) including theatre, music,
comedy, improv, variety acts, cabaret, etc.
● Acting Workshops/Lessons/Performances
(Town and Community Run)
● Panel Discussions/Debates
● Lectures/Presentations
● Movie Screenings (Documentary Film
Festival, Local Filmmakers)
● Presentations/Ceremonies
● Recitals/Rehearsals
● Community Dinners
Multipurpose/Community
Programming Spaces
The proposed new design includes dedicated
programming spaces for both “dry and wet”
activities. Town programming in these areas
is currently offered in facilities not purposely
designed for these activities. A proper dance
ɀɎɖƳǣȒ٢ǣȇƬǼɖƳǣȇǕɀȵȸɖȇǕˢȒȒȸǣȇǕًȅǣȸȸȒȸƺƳ
wall, etc.) will enhance the Town’s ability to
offer dance, theatre and movement classes,
while a properly equipped art studio will do the
same for our visual arts programming. There
is a clear lack of available space within existing
Town facilities for both these types of uses.
Immediate uses of the multi-purpose/
community programming rooms include:
● Children and Youth Theatre and Music
Programs (see above listing of current
offerings)
● Summer Camps (Dance, Theatre, Arts)
● Visual Arts Programs
● Leadership Courses and Camps
Future Programming could include:
● gross motor programs for preschool
● language classes
● small seminars/presentations
● ȅƺƳǣƏƏȸɎɀ٢ɎƺǼƺɮǣɀǣȒȇًˡǼȅȅƏǸǣȇǕً
photography, etc.)
● music lessons
19
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 29 of 51
Environmentally
Controlled Collection
Storage Space
The expansion of the CSS facility will also
provide much needed storage space for the
Aurora historical collection. As cited in the
2013 Collection Review, the current storage
facilities do not meet the needs of the existing
collection with overcrowding and improper
environmental conditions which serve as
the biggest risk to the long-term survival of
the collection. This lack of space was further
compounded by the demolition of the old
library building in which many larger items,
such as the doors from the former Fleury
Estate, Inglehurst, had been stored. These
ƳȒȒȸɀƏȸƺȇȒɯǣȇɎǝƺɯȒȸǸȒǔˡƬƺɀȒǔɎǝƺ
museum with other large items stored in the
crowded shared storage area in the basement.
The proposed designs for the expansion
allocate just over 2,300 square feet in the
lower level of the new building. This space
would allow for the creation of appropriate
environmentally controlled storage for the
museum’s small and large artifacts and
textiles. Moving the collection to the new space
would free up much needed working space for
documenting and researching the collection
amongst other uses.
There will also be the opportunity in the new
expanded space to showcase more of the
collection. As it stands, there is only one room
in the current Church Street School that is
available for the display of objects. Working
directly with the architects, the museum
will be able to transform newly created walls
and alcoves into valuable exhibition spaces.
Additional, unimpeded areas will allow the
stories of Aurora to be told to current and
future generations.
More importantly, the expanded space will
allow the Aurora Museum & Archives to provide
heritage programming to schools and other
user groups that is currently not possible due
to lack of space. School and community groups
will once again have a place to come and learn
the stories of their own community.
20
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 30 of 51
21
For the purposes of preparing this business
plan, Town staff met individually with
representatives of each of the cultural partners
to discuss their thoughts on the proposed
addition to the Church Street School. Draft
plans for the expansion were reviewed and
a series of questions were proposed that
included current space utilization, future
plans and need for space, and features that
each would like to see included in the new
facility. In addition, the consultants from
Interkom interviewed various arts groups and
conducted a rental survey with 40 different
arts organizations to add to the community
ƬȒȇɀɖǼɎƏɎǣȒȇƏȇƳƫɖɀǣȇƺɀɀȵǼƏȇˡȇƏȇƬǣƏǼ
budgeting.
Aurora Farmers Market
& Artisans Fair
Established in 2002, the Aurora Farmers
Market and Artisans Fair (the Market) was
founded by a Councillor from the Town, Nigel
Kean. At the beginning, the Market was a
Town event operating out of a parking lot on
Temperance Street and the small group of
vendors paid a small fee to vend at the Market.
In 2010, the Market became independent of
ɎǝƺÁȒɯȇƏȇƳɯƺȸƺȒǔˡƬǣƏǼǼɵƺɀɎƏƫǼǣɀǝƺƳƫɵƏ
Bylaw which required the Market to pay a $60
fee per vendor per season to the Town. The
Market also changed location moving to Wells
Street and Town Park. The Market currently
receive a reduced vendor permit and have
exclusive use of a portion of Town Park and
part of Wells Street on Saturdays from April-
October.
The Market attracts hundreds of visitors from
across the region. They have six special events
including Soup Fest for Culture Days, which
attracts over 1,000 visitors per event. Recently,
Council extended the Market’s approved hours
so that they could collaborate with the Town
on local events. A smaller version of the Market
supported the Town’s Concerts in the Park
series this past season providing a welcome
enhancement to this long standing tradition.
This type of collaboration would further expand
with the addition to the Church Street School,
such as an indoor market at Christmas.
In the past, the Market has extended their
season by offering indoor winter markets
in space rented from the Aurora Cultural
Centre and at the Armoury. As the Armoury is
currently undergoing renovations, the Market
is planning only one indoor market this season
while they evaluate their plans for the future.
The Market also rents space at Town Hall for
their annual general meeting and would like
additional space for monthly meetings. Use
of these spaces would be dependent on the
cost as they are self-supporting, relying only on
vendor fees and some sponsorships to pay for
expenses.
While the Market does not have any
immediate plans to expand their season
beyond one indoor market, the members of
the Board change each year and new Directors
could sometimes take the Market in a different
direction. Should the Market wish to extend
their season, the adaptable theatre space
would provide an ideal space during the winter
TOWN OF AURORACULTURAL PARTNERS
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 31 of 51
months. The large elevator from the loading
area off Victoria Street provides ample space
for moving vendor goods into the building. The
new expansion also offers the opportunity for
the Market to hold their monthly meetings.
Aurora Cultural Centre
Established in 2010, the Aurora Cultural Centre
(the Centre) delivers high quality professional
visual and live performing arts programming,
community based artistic projects, and a
diversity of educational classes to support
the cultural, social, and economic well-
ƫƺǣȇǕȒǔɖȸȒȸƏِȸƺǕǣɀɎƺȸƺƳȇȒɎǔȒȸȵȸȒˡɎ
charitable organization (legally under the
Church Street School Cultural Centre), they
continue to open doors to diverse community
organizations, groups, and individuals,
providing opportunities for community
interaction and activities. As a strong cultural
leader in the community and region, the
Centre continuously assesses its effectiveness
and seeks out opportunities to innovate and
inspire the community. New and engaging
arts opportunities are available for existing
residents, newcomers, and a wide variety
of diverse community and cultural groups
through a proactive, strategic and collaborative
approach.
The Centre currently functions under a
Provision of Cultural Services Agreement to
provide Cultural Services on behalf of the
Town. The agreement provides access to
the Church Street School heritage facility to
operate artistic and cultural activities based on
the vision, mission and values that the not-fot-
ȵȸȒˡɎɮȒǼɖȇɎƺƺȸ ȒƏȸƳȒǔ(ǣȸƺƬɎȒȸɀǣƳƺȇɎǣˡƺɀ
for the community. Primary programs
include professional live performing arts
presentations, professional gallery exhibitions,
arts educational classes, camps and lectures,
volunteer engagement programs, and rentals
of the facility for the community groups.
The Centre’s current Inspire, Engage and
Transform 2018-2021 Strategic Plan outlines
the Centre’s plan to focus its attention on
professional visual and live performing arts
and on educational programs that support
this kind of programming. The Centre also
cites a strategy to offer a diversity of classes
that complement and build upon Town
access programs. The Centre cites educational
programming as the biggest potential for
growth, but note limitations for this increased
programming due to the current physical
space constraints of the building. In particular,
they see opportunities for expansion of current
visual arts and performing arts educational
programs taught by professional artists.
ÁǝƺǣȸƳƺˡȇƺƳɀɎȸƏɎƺǕɵƬƏǼǼɀǔȒȸǣȇƬȸƺƏɀƺƳ
programming to diversify and expand
professional musical offerings, expand family
performances, and launch new partnerships
to work with the schools to support the arts
curriculum through professional presentations
and access to artists. There is also the appetite
to add professional dance and theatre
programming for the community.
Proposed programming spaces in the
expansion such as the concert/theatre space,
dance studio, and multipurpose/community
programming spaces would provide the
necessary room for the Centre to grow its
program on behalf of the Town.
Aurora Historical Society
The Aurora Historical Society (AHS) was
established in 1963 in celebration of the
100 year anniversary of the Town of Aurora.
Throughout its 55 years history, the AHS has
worked to preserve and share the history of
Aurora, while acting as a leader for the future.
In 1963, AHS began collecting artifacts to create
the Aurora Collection. In 1981, this collection
was moved into the former Church Street
School to open the Aurora Museum. The
Aurora Museum served the community until
22
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 32 of 51
2007 when the building underwent extensive
renovations and reopened as the Aurora
Cultural Centre. In 2013, the Aurora Collection
was given to the Town for the fee of $1.00 and
forms the main collection of the municipally
run Aurora Museum & Archives.
Today the AHS owns and operates Aurora’s
‘hidden gem,’ Hillary House National Historic
Site. Hillary House was purchased by the AHS
in 1981 and converted into a historic house
and medical museum. The site acts as the
headquarters for the AHS, and is also open
year-round for historical tours, events, exhibits
and more. Each year Hillary House welcomes
over 2,000 visitors through its doors, and the
AHS reaches over 1,900 more through a variety
of outreach programs and events.
The AHS currently receives an annual grant
from the Town to help offset the costs of
maintaining Hillary House. Operating out of
a historic building, the Society is continually
challenged with the need for storage and
programming space.
Until recently, part of the Society’s archival
collection was stored alongside that of the
Town’s Museum collection. The loss of storage
space for the Museum at both the old library
and the Armoury buildings has meant that
the Museum is no longer able to store any
of the Society’s collection which has forced
them to secure off-site storage for which the
Town has granted them temporary funding
to cover the additional costs. The creation of
additional storage space within the expansion
of 22 Church Street would allow enough room
for part of this collection to be stored alongside
the Museum’s collection.
The Society also offers an annual monthly
Speaker’s Series whose attendance is severely
limited by the amount of available space
within their ballroom. Most of these sessions
are packed beyond capacity. The adaptable
theatre space would be an ideal venue for
some of these talks.
In addition, the Museum and the Historical
Society have increased their level of cross-
partnership activities to support both of their
mandates. Space within the new facility would
provide additional opportunities for joint
projects and activities.
Aurora Public Library
The Aurora Public Library (APL) has a long
history in Aurora, with roots tracing back to
1855. It has since evolved into a multi-faceted
organization that provides an essential
public service to the community through
a central library in downtown Aurora. The
Library operates under the direction of a
Board and the Public Libraries Act of Ontario.
It is autonomous in its decision-making. The
primary funder of the Library is the Town of
Aurora.
The Library is community-led through ongoing
consultation with the public and delivers rich,
meaningful programs, services and collections
to all residents of Aurora. The Library builds
community by sparking connections, enriching
lives and contributing vibrant spaces for all.
Aurora Public Library is a focal point of the
community and is a key component of Library
Square. With yearly visits approaching 260,000,
circulation close to 728,000 items along
with over 900 programs attended by 22,600
ȸƺɀǣƳƺȇɎɀ٢אז٣ًǣɎǣɀˡȸȅǼɵǣȇǔɖɀƺƳǣȇɎǝƺƺɎǝȒɀ
of Aurora.
APL’s Strategic Plan 2017-2021 aims to create
a Place of Possibilities for people of all ages
and interests. One of their key strategies is to
expand cultural initiatives to attract new users,
and expand the Library’s physical space based
on the recommendations of their 2014 Facility
Needs Assessment.
APL is in favour of a more collaborative
approach to the use of space within the
Town, featuring interconnectivity between
the Library, the Museum and the Cultural
23
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 33 of 51
Centre. The creation of new cultural and
performance space through the addition to
the historic Church Street School provides
the ideal opportunity to develop a cohesive,
interconnected model of cultural and library
services.
The Library looks forward to working with its
partners on the Church Street School project.
Aurora Seniors Association
The Aurora Seniors Association was originally
established in 1965 as the Friendship Circle,
and met in Victoria Hall with a membership
of 60. Increasing membership forced several
moves into larger facilities including the main
ˢȒȒȸȒǔɎǝƺ!ǝɖȸƬǝ³ɎȸƺƺɎ³ƬǝȒȒǼǣȇחווًƏȇƳ
ɎǝƺȸƺȇȒɮƏɎƺƳȒǼƳˡȸƺǝƏǼǼȒȇàǣƬɎȒȸǣƏ³ɎȸƺƺɎǣȇ
1991. It was at this time that they joined with
the Top of the Hill Seniors Club to form the
Aurora Seniors Club. The group was renamed
once again in 2004 as the Aurora Seniors
Association and have been in their current
purpose-built location on John West Way since
2006. Current membership stands at over
1,500.
The Aurora Seniors Association is a group
of energetic mature adults who are very
enthusiastic about the programs and activities
at the Aurora Seniors Centre (ASC), which
is operated in partnership with the Town of
Aurora Community Services Department. The
Centre’s goal is to provide programs, events
ƏȇƳƏƬɎǣɮǣɎǣƺɀɎǝƏɎɯǣǼǼƫƺȇƺˡɎƏȇƳƺȇȸǣƬǝɎǝƺ
lives of older adults. Dedicated volunteers
devote 17,000 hours a year at the Centre.
The Association currently operates under a
partnership agreement with the Town and are
the principal users of the Seniors Centre with
exclusive use of some spaces within. They offer
55 programs per week including a variety of
art, theatre, music and dance classes.
Interest in the Association’s programs and
activities is strong and membership continues
to grow. While the majority of programming
will remain at their present location, the
Association have expressed interest in using
the facilities in the proposed expansion for
some of their activities including Silver Stars
(theatre), Evergreen Choir, and drop in art
classes. Their current space at the ASC limits
growth of their programs including a demand
to offer barre classes, guitar and voice lessons.
The proposed CSS expansion would allow the
Aurora Seniors Association the space needed
to increase their programming.
Aurora Sports Hall
of Fame
Founded in 2013, The Aurora Sports Hall of
Fame (ASHoF) is a celebration of sport history
and excellence; dedicated to the recognition
of the important place that sport has assumed
within the fabric of Aurora. Since its founding,
ASHoF has inducted 29 honoured members
into the Hall with a further 4 members being
inducted every November at their annual
induction dinner and ceremony.
ASHoF currently have use of space at the
Stronach Aurora Recreation Centre (SARC) for
the display of their honoured members and
related sports history. As more inductees are
added to the Hall, more space will be needed.
ÁǝƺɖȸȒȸƏxɖɀƺɖȅۭȸƬǝǣɮƺɀǣɀɎǝƺȒǔˡƬǣƏǼ
repository for the Hall’s collection and work
in partnership with ASHoF to develop yearly
displays at the SARC. Additionally, the
Moments in Sports program is a partnership
between ASHoF, the Museum, and Sport
Aurora that tells the sporting stories of this
community at venues throughout the Town.
³RȒIɯȒɖǼƳǼǣǸƺɎȒǣȇƬȸƺƏɀƺɎǝƺȵȸȒˡǼƺȒǔ
the Hall through educational programming
and exhibits in other buildings throughout
the Town. The expansion of the Church Street
School would provide another venue for
ASHoF’s programs which links sport, culture,
and history.
24
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 34 of 51
Pine Tree Potters’ Guild
¨ǣȇƺÁȸƺƺ¨ȒɎɎƺȸɀټJɖǣǼƳ٢¨Á¨J٣ǣɀƏȇȒȇٮȵȸȒˡɎ
organization founded in 1979, dedicated to
the preservation and advancement of ceramic
arts supporting members from Aurora and
the surrounding area. For the past 39 years,
the Guild has rented space from the Town
of Aurora for their activities including the
basement of the Church Street School which
they occupied for over 17 years. Currently they
operate out of a studio in the basement of
the Aurora Library under a lease agreement
with the Town that has been in effect since
2003. Current membership stands at 80 with
a waiting list of 20 individuals wanting to join.
Preference for membership is given to Aurora
residents.
In addition to two major sales events per year,
the Guild supports community programs and
charitable events such as Empty Bowls which
has raised over $142,000 over the past eight
years, and the Canada Day 2017 Poppy Garden
project which raised approximately $8,000 for
the Aurora Legion’s roof repair.
PTPG hosts about 20 classes each year for
adults and kids, taught by members of the
guild:
● Adult classes are open to the public and
members during both the day and evening
each Fall, Winter and Spring. 3-6 different
classes are offered in each ‘Season’ with
3-10 students per class. Topics include hand
building, wheel, and sculpture.
● PTPG offers 3 kids clay camps per summer,
with two teachers in attendance for
maximum of 12 students. These are ½
day, week-long sessions that encourage a
creative experience with clay. Participants
range from 8-12 years old for hand building
programs, and ages 13-18 for teen wheel
classes. For the last few years, this has been
in collaboration with the Aurora Cultural
Centre.
● PTPG has facilitated the work of the Able
Network by offering them hand building
pottery classes to expand their recreational
outlets and skills in a normal community
setting.
● PTPG has also been called upon to provide
classes to special organizations within
Aurora such as the Aurora Women’s
Institute, Girl Guides and Boy Scouts,
Japanese wives of Honda executives (no
English), Southdown, St. Andrews College,
Devins Drive Public School, Aurora Senior
Public School and Dr. G.W. Williams High
School.
¨Á¨JǣɀˡȇƏȇƬǣƏǼǼɵɀɖɀɎƏǣȇƺƳɎǝȸȒɖǕǝǣɎɀ
membership fees, sales, classes, grants and the
generosity and support of the Town of Aurora
in the form of manageable rent. In 2018, The
Pine Tree Potters’ Guild delegated to Council
to provide information on the guild, its history,
activities and community involvement. Current
space constraints limit the opportunity to offer
more programming or increase membership.
Some of the Guild’s existing activities could be
held in the new building including their annual
sales, bi-annual exhibitions, and Empty Bowls
Fundraiser, which is always sold out within 48
hours of the 450 tickets becoming available.
If PTPG is requested to leave their current
premises, they would like to be considered for
accommodation in the new space.
Society of York Region
Artists
The Society of York Region Artists (SOYRA)
is dedicated to providing interesting events,
unique speakers and opportunities for local
artists to showcase their work and attract
new visitors to Aurora. They strive to produce
professional quality exhibitions in specially
chosen venues which leave a positive
impression on the Town of Aurora residents.
25
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 35 of 51
The original 7-member group founded in 1987,
has become a vibrant membership of 115 with
the SOYRA name recognized throughout
southern Ontario. They support their members
and members of the public by offering
educational workshops with recognized
professionals. SOYRA provides the community
with opportunities to view and enjoy art
throughout the region. They encourage
partnerships with local businesses to enhance
corporate spaces. They enhance the Town of
Aurora’s public spaces with ongoing exhibits
and partner with the Town under the 2014
Visual Art Partnership Agreement to run the
Aurora Art Show & Sale, one of the longest
running art events in Canada.
SOYRA views their relationship with the Aurora
!ɖǼɎɖȸƏǼ!ƺȇɎȸƺ٢!!٣ƏɀȅɖɎɖƏǼǼɵƫƺȇƺˡƬǣƏǼِ
SOYRA and their activities in the Church Street
School act as a magnet for the community and
beyond. The Society exhibits annually as part of
the ACC’s programming and offer workshops
and courses in the basement studio space at
the current Church Street School property.
Their members have children, parents,
relatives, neighbours who visit the annual show
– all of whom have been introduced to the
ACC’s programming. Past SOYRA events have
played a role in persuading families relocating
to York Region from outside the area to
choose Aurora as a desired community to live
ɀȵƺƬǣˡƬƏǼǼɵƫƺƬƏɖɀƺȒǔɎǝƺƬɖǼɎɖȸƏǼƺɮƺȇɎɀƏɎ
the ACC.
The lack of facility availability hinders SOYRA’s
sustainability efforts. There is a growing market
for workshops/community classes in Aurora
that cannot be met with existing available
space. Increased space within the new facility
would allow a greater number of local artists to
participate and would enable SOYRA to offer
an increased number of workshops for the
community including photography, sculpture,
painting, drawing as well as other ways of
making art. Larger spaces will accommodate
more participants than the current studio
space and will mean that the rentals stay in
town instead of seeking space elsewhere.
Theatre Aurora
Founded in 1958, Theatre Aurora recently
celebrated 60 years as a Community Theatre
JȸȒɖȵِÁǝƺɵƏȸƺƏȇȒɎǔȒȸȵȸȒˡɎȸƺǕǣɀɎƺȸƺƳ
charity that is governed by a board of directors
who are all volunteers. At the present time,
they have a 12-member board and a group of
250-300 committed volunteers working both
on their stage and behind the scenes. Theatre
ɖȸȒȸƏɖɀɖƏǼǼɵȅȒɖȇɎˡɮƺɀǝȒɯɀǣȇƏɀƺƏɀȒȇ
that runs from September to May. Each show
typically runs for 7 performances over 2 weeks
with the majority of shows at the theatre
capacity of 154. Overall annual attendance is
approximately 4,250. This year in honour of 60
years they are mounting a 6th production.
Theatre Aurora is a member of ACT-CO
(Association of Community Theatres – Central
Ontario division). Over the past 60 years, they
have presented over 300 shows, many of which
have been part of the ACT-CO annual festival.
They have a very long list of nominations and
awards over the years including 21 nominations
and 7 wins including Best Director of a Musical,
Best Production of a Musical, and Best New
Director for Drama, to name but a few.
For the past 5 years, Theatre Aurora have
been involved with the Aurora Public Library
(APL) with the “Page to Stage” initiative. All
of the scripts from the presented shows at
Theatre Aurora are available for the season
to the general public at the town library as a
reference book so people can read the plays
either before or after seeing the plays. They
have also held many “pop up” performances
at the APL and have provided support to the
library’s “One Book One Aurora” with staged
readings and performances.
Theatre Aurora have a lease agreement for
exclusive use of the Factory Theatre building
26
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 36 of 51
on Henderson Drive, which they have been
leasing from the Town of Aurora since
1973. Their existing space constrains their
ability to increase programming and they
are always looking for affordable rehearsal
space. In addition, Theatre Aurora would like
to work directly with the Town to develop
programming for children/youth.
OTHERÈ« «ٳ ³0(CULTURALPROGRAMMERS
XȇƏƳƳǣɎǣȒȇɎȒ!ȒɖȇƬǣǼƳƺˡȇƺƳ!ȒȅȅɖȇǣɎɵ
Partners, a broad range of groups and
individuals will be able to make use of a
ȇƺɯx!!ɎǝƏɎǣɀɀȵƺƬǣˡƬƏǼǼɵƳƺɀǣǕȇƺƳǔȒȸ
performances, creation, and community
ǕƏɎǝƺȸǣȇǕɀِÁǝƺ!ɖǼɎɖȸƏǼxƏɀɎƺȸ¨ǼƏȇǣƳƺȇɎǣˡƺƳ
41 community cultural organizations including
arts, heritage, performance and service
groups among others. The following are
some examples of feedback received from
organizations that were directly consulted
regarding the proposed expansion to the
Church Street School property.
Music Aurora
ǔˡƬǣƏǼǼɵǔȒɖȇƳƺƳǣȇאהًxɖɀǣƬɖȸȒȸƏǣɀƏ
ȸƺǕǣɀɎƺȸƺƳȇȒɎٮǔȒȸٮȵȸȒˡɎȒȸǕƏȇǣɿƏɎǣȒȇɯǝȒɀƺ
mission is to foster a vibrant and active music
scene in the community of Aurora and area
ǔȒȸɎǝƺƫƺȇƺˡɎȒǔǣɎɀȸƺɀǣƳƺȇɎɀًǼȒƬƏǼȅɖɀǣƬǣƏȇɀً
schools and businesses that support the
music industry and live programming. Music
ɖȸȒȸƏɯƏɀǔȒȸȅƺƳǔȒȸɎǝƺƫƺȇƺˡɎȒǔɎǝƺȅɖɀǣƬ
ƬȒȅȅɖȇǣɎɵًɯǝǣƬǝǣɀƳƺˡȇƺƳƏɀȅɖɀǣƬǼȒɮƺȸɀً
musicians, individuals involved in the music
industry and those who are interested in music
as an art form.
The Aurora Winter Blues Festival is the
premier programming event for Music Aurora.
Programming consists of award-winning
Aurora Winter Blues Festival, Aurora Music
Festival, standalone live music performances,
music workshops and Pop up live
performances. In addition, since its founding,
Music Aurora has hosted 50+ live events/
programs; partnered with 23 organizations
to provide live music at community events
including the annual Street Sale; offered
24+ programs/workshops/seminars; and has
provided expertise/assistance for 50+ number
of musicians/events.
Music Aurora currently rent space at
St. Andrews College, Town Park, Aurora
Cultural Centre, and Theatre Aurora for their
programming.
Marquee Theatrical
Productions
Marquee Theatrical Productions, a registered
ȇȒɎٮǔȒȸٮȵȸȒˡɎƬȒȅȅɖȇǣɎɵȒȸǕƏȇǣɿƏɎǣȒȇً
was founded in 2003 by its current General
Manager, Sheryl Thomas.
Located on Industrial Parkway, they are
an award-winning, registered charitable,
community theatre group. Aside from
teaching musical theatre, dance, acting,
piano and voice lessons, their goal is to inspire
excellence, motivate learning, uplift the
ǝɖȅƏȇɀȵǣȸǣɎًƫɖǣǼƳƬȒȇˡƳƺȇƬƺƏȇƳɀȵƏȸǸƏ
lifelong appreciation for the arts. By helping
children develop their artistic talents and
coaching them to strive for excellence, they
teach them how to achieve – in the performing
arts, in school, and ultimately in life. Marquee
Theatrical Productions strives to provide an
environment that meets the needs of all
children. They believe in the interconnection of
physical, mental, social and emotional health
and work hard to provide an environment that
promotes holistic health and wellness.
27
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 37 of 51
Operating year-round, Marquee Theatrical
productions teaches valuable life skills to
children age 4-18 through the magic of Musical
Theatre programs. They reach an audience
of over 18,000 and currently have over 750
students/year. Marquee has a successful track
record for fundraising through their annual
Golf Tournament, online auction, private
donations, the Magna Hoedown, Canada
Summer Jobs, and the Aurora Mayor’s Golf
Tournament. As Marquee is self-sustaining,
funds raised are primarily used to support
less fortunate children from their community
partners allowing them the opportunity to
attend programs with a partial subsidy or fee
waiver. These partners include the Children’s
Aid Society, Foster Parents, Girls Inc, Yellow
Brick House and Big Brothers Big Sisters as
well as some lower income local schools.
Marquee proudly take part in annual local
community events such as Movies in the Park,
Concerts in the Park, Aurora Farmers Market,
Halloween Haunted Forest, and Aurora’s
Christmas Market. One of their absolute
favourite events is the Student Hoedown Event
with the Magna Hoedown as they volunteer
to dress up in character costumes and dance
and take photos with all the amazing special
needs students from York Region Schools who
attend, regardless of whether or not they are a
chosen recipient of Hoedown funding.
Marquee Theatrical Productions operate out
of rented facilities on Industrial Parkway in
Aurora. They rent space at St. Andrew’s College
and Newmarket Theatre for their production
runs, and also rent space at Theatre Aurora,
Stronach Aurora Recreation Complex, and
the Aurora Family Leisure Complex for other
programs. Their current facilities are maxed
out which limits their growth.
Marquee management feels that the proposed
expansion has much to offer and would
ƳƺˡȇǣɎƺǼɵɖɀƺƏɮƏǣǼƏƫǼƺȸƺǝƺƏȸɀƏǼɀȵƏƬƺɀ٢ȅɖǼɎǣٮ
purpose performing arts studio), and the
larger theatre space although it is somewhat
limiting in terms of their current needs. They
would really like to see the town invest in a
larger facility that would house larger stage
productions such as Newmarket Theatre in
terms of the size of the stage.
Aurora Community Band
The Aurora Community Band (ACB) is a not-for
ȵȸȒˡɎȒȸǕƏȇǣɿƏɎǣȒȇɯǝȒɀƺȅǣɀɀǣȒȇǣɀɎȒƬȸƺƏɎƺ
beautiful concert band music with and for the
citizens of Aurora. They welcome participants
of all ages who have had some experience
playing a concert band instrument.
The band was established in 2011 by founder
and music director Gord Shephard, and has a
membership of approximately sixty musicians.
Their season consists of formal concerts as well
as numerous informal performances in the
town of Aurora. The band also participates in
the York University Community Band Festival.
The band has received support from the Town
of Aurora, the Aurora Mayor’s Golf Charity
Classic Event, the Optimist Club of Aurora, the
Ontario Trillium Foundation, and individual
donations under the “Friends of ACB” patron
program. The band is also very proud to
have received the Town of Aurora “Johnson’s
Cultural Achievement Award” in recognition of
ɎǝƺƫƏȇƳټɀɀǣǕȇǣˡƬƏȇɎƬɖǼɎɖȸƏǼƬȒȇɎȸǣƫɖɎǣȒȇɎȒ
the Town.
¨ƺȸǔȒȸȅƏȇƬƺɀƫɵɎǝƺ! ǔƺƏɎɖȸƺɎǝƺˡȇƺɀɎ
wind band repertoire (classical and pops), that
celebrate music from all genres and cultures.
They currently perform publicly at Trinity
Anglican Church, the Farmers Market, and
various Town Events including Canada Day and
the Mayor’s Anti-Litter Day.
The Aurora Community Band currently rents
rehearsal space every Sunday evening at the
Aurora Cultural Centre. Formal performances
for the band occur at Trinity Anglican Church
as this is the only venue in Aurora that provides
28
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 38 of 51
ɀɖǔˡƬǣƺȇɎȵƺȸǔȒȸȅƏȇƬƺƏȇƳƏɖƳǣƺȇƬƺɀȵƏƬƺِ
The Borealis Big Band (an off-shoot of the
Aurora Community Band) does not have a
permanent home. Practices are held in space
at various retirement homes that are provided
free of charge. Borealis currently performs
at the Newmarket Town Hall as Aurora does
not have suitable space. The Cultural Centre
is too small and Trinity Anglican Church is
not appropriate for cabaret style seating.
Gord Shephard cites a growing demand for
additional ensemble groups including a New
Horizon’s Band for 55+ which is being formed
this year. All of these ensembles require a
ˢƺɴǣƫǼƺȵƺȸǔȒȸȅƏȇƬƺɀȵƏƬƺِ
The Aurora Community Band would like to
ɀƺƺƏȵƺȸǔȒȸȅƏȇƬƺƏȸƺƏɎǝƏɎǣɀˢƺɴǣƫǼƺƏȇƳ
large enough to accommodate a performance
ensemble of 60 to 80 performers. The
opportunity to create extensive large ensemble
community music experiences for Aurora
residents of all ages and experiences has been
hindered by the lack of access to appropriate
rehearsal and performance areas. It is also
important that the rental fee for both the
rehearsal and performance areas is affordable
for community music programs.
The Aurora Community Band is enthusiastic
about the proposed expansion but would like
to ensure that rehearsal and performance
spaces are acoustically designed and
dedicated to community music activity. The
band also expressed a need for a dedicated
secure storage space to store percussion
equipment and a community music library.
Aurora Studio Tour
The Aurora Artist Studio Tour was founded
in 2010 by Aurora resident Artist Deborah
Campo. The tour began as a holiday studio
tour and sale within her residence. With
growing popularity her Artist Studio Tour idea
became open to more artists starting with a
telephone call to her friend and fellow artist
Christine Valentini who became involved. The
Aurora Artist Holiday Studio Tour opened up
on Saturday & Sunday December 4th & 5th
with six studio locations featuring ten artists.
Snowstorms did not hamper the turnout of
excited guests looking for that one of a kind
piece of artwork.
In 2011 The Aurora Artist Studio Tour changed
to the fall season and has remained a much
loved Aurora Cultural event. Now in its 9th year,
the Aurora Artist Studio Tour is welcoming
ɎǝƺǕƺȇƺȸƏǼȵɖƫǼǣƬɎȒɮǣɀǣɎɎɯƺǼɮƺƏȸɎǣɀɎɀǣȇˡɮƺ
studio locations through Aurora. The Tour is
always looking for venues to promote the work
of local artists and welcomes the opportunities
for creation and exhibition that the expanded
ɀȵƏƬƺȵȸȒɮǣƳƺɀًɀȵƺƬǣˡƬƏǼǼɵًɎǝƺɵɯȒɖǼƳƫƺ
interested in opportunities for creating works
of art (studio space) and for exhibiting (lobby
walls).
Aurora Film Circuit
The Aurora Film circuit is a volunteer initiative
committed to enhancing arts and culture in
the community of Aurora. They are a devoted
ƫȒƳɵȒǔǼȒƬƏǼˡǼȅƺȇɎǝɖɀǣƏɀɎɀɯǝȒȵȸȒɮǣƳƺ
audiences with an alternative experience in
cinema. Their program includes a wide variety
ȒǔˡǼȅƬǝȒǣƬƺɀ٫!ƏȇƏƳǣƏȇً(ȒƬɖȅƺȇɎƏȸǣƺɀƏȇƳ
XȇɎƺȸȇƏɎǣȒȇƏǼˡǼȅɀِ
The Aurora Film Circuit does eight screenings
at a Cineplex Theatre (capacity 300 seats) on
Monday nights, runs January to November,
breaking in June, July and August. They have
subscriptions for 250 seats and the rest are
sold as single tickets. Proceeds from all ticket
sales support special community projects and
programs.
With the new addition to the Church Street
School, the Aurora Film Circuit would like to
increase their screenings from 8 to 16 in the
new space, including matinees.
29
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 39 of 51
3030
The expansion of the Church Street School will
effectively create a Cultural Hub as envisioned
in the Town’s Cultural Master Plan.
The Town supports a wide range of artistic,
creative, and heritage practices through
Cultural Partnership Agreements. While this
operational structure has been in place for a
number of years and is generally considered
to be successful, the Town has engaged an
outside consultant to review these agreements
with the goal of identifying the strengths and
weaknesses of existing cultural partnerships,
and to gain an understanding of what cultural
partners would like to see from the Town
moving forward. This review is expected to
be completed in Fall 2019 and will inform the
funding, governance, and operation of the
cultural hub.
It is anticipated that the new and expanded
Aurora Museum & Cultural Centre will require
an adaptive operating structure that will deal
with the expanded “presenting” aspect of
the performing and visual arts, function as a
cultural service agency to community groups,
a real estate and facility management entity, a
fundraising and promotional organization and
an advocate for culture in general.
ÁǝƺȅƏȇƳƏɎƺɯǣǼǼƫƺƳƺˡȇƺƳɯǣɎǝƏǔȒƬɖɀ
on cultural programs for all community
ȅƺȅƫƺȸɀƳƺǼǣɮƺȸƺƳƫɵƺɴȵƺȸǣƺȇƬƺƳًȷɖƏǼǣˡƺƳ
arts and heritage professionals. To carry out
the proposed responsibilities, here is the draft
organizational structure:
Under the proposed structure,
● The community will have a hub for artists & heritage supporters
● Collective in a hub should potentially have the support of centralized services
ǼǣǸƺȅƏȸǸƺɎǣȇǕۭƳƺɮƺǼȒȵȅƺȇɎًǔƏƬǣǼǣɎɵًȸƺƬƺȵɎǣȒȇٖ Ȓɴ ǔˡƬƺƺɎƬِ٫ȅƏɴǣȅǣɿǣȇǕ
ƺǔˡƬǣƺȇƬɵƏȇƳǣȅȵƏƬɎ
● Ability to be charged with implementing the Cultural Master Plan
● Maximize program development and delivery in all cultural area
PROPOSED MANAGEMENT STRUCTURE
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 40 of 51
3131
Project
Leader
Existing staff: 3 FT
New staff required
(after expansion):
3 FT + 4 Contract Positions
Programming
Existing staff: 1 FT + 1 PT
New staff required
(after expansion):
1 PT + 1 Contract Position
Operations
Existing staff: 2 FT + 1 PT
New staff required
(after expansion):
1 FT + 1 PT
Marketing &
Development
Administrative
Assitant
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 41 of 51
32
CONSTRUCTION SCHEDULE
Winter 2019
● Approval of the revised plan for Library
Square including the ice rink
● Approval of the Schematic for the new
building
● Tendering and construction of the parking
lot and pedestrian connections
Spring 2019
● Commencement and completion of
Design Development Phase for new
building
Summer 2019
● Commencement of Construction
Documentation Phase for Square and new
building
● Construction of the parking lot and
pedestrian connections completed
Fall 2019
● Approval of funding for tendering and
construction of the Square and new
building, including 1% of the capital budget
for the Square and new building to be
dedicated to public art, in accordance with
גِגِƏِǣɮȒǔɎǝƺ ǔˡƬǣƏǼ¨ǼƏȇ
● Tendering for construction of the Square
and new building
Winter 2020
● Commence construction of new building
and laneway connection
Fall 2020
● Commence construction of portions of
the Square not being impacted or used for
staging for construction of new building
● Completion of laneway connection
completed
Fall 2021
● Construction completion for both the
Square and new building
PLANNING CONSIDERATIONS
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 42 of 51
33
RISKASSESSMENT
There are numerous risks associated with
a project of this magnitude. Notable risks
include the following:
Increased costs – brought about by numerous
factors including trade tariffs with United
States and acute market conditions
● Cost Control measures will be put in place
through the PMO ensuring that the scope
ȒǔɯȒȸǸǣɀƬǼƺƏȸǼɵƳƺˡȇƺƳɮǣƏƏƳƺɎƏǣǼƺƳ
control budget
● Contingency funds have been included as
part of the overall budget to help mitigate
an increase in material costs
Construction Risks – risks that delays occur
due to adverse weather conditions, resource
availability (Labour, Equipment), and scope
changes
● PMO will monitor and control schedule
and scope of the project to ensure risks
and issues are under control and will be
addressed properly
Communication Risks – in adequate
ǣȇǔȒȸȅƏɎǣȒȇˢȒɯɯǣɎǝǣȇɎǝƺȵȸȒǴƺƬɎɎƺƏȅ
● A Project Governance Framework has
been established and is being managed
through the PMO for the Town with regular
meetings occurring on an ongoing basis
with all of the Functional Project Leads
including Procurement, to ensure that
each department receives the correct
information
Labour Issues – potential for strike by trades
● An initial scan of the construction sector
reveals no imminent strike potential
Site Conditions – soil/water issues
● A Phase 2 Environmental Site Assessment
will be conducted to identify potential
issues; an allowance has been included in
the budget to address any concerns that
may arise
Issues Relating to the Tendering Process –
Incomplete RFP tender documentation
● Project team will review and approve
all RFP tender documents that
are developed by consultants and
procurement team prior to issue.
BUILDINGCOSTS
ÁǝƺƫɖǣǼƳǣȇǕƬȒɀɎɀǔȒȸɎǝƺɎǝȸƺƺ٢ב٣ˢȒȒȸ
building would be approximately $28,000,000
(HST excluded)
Material & Labour $18,516,840
Excavation & Site Preparation $935,000
Specialized Equipment $1,889,949
Consultants & Engineers $2,235,483
Project Management $324,741
Contingency $3,303,000
Furniture, Fixtures & equipment $415,300
Public Art Contribution $256,639
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 43 of 51
OPERATIONAL CONSIDERATIONS
ANNUAL OPERATING COSTS
● $2,630,325 (Year 1 operation)
Salaries
● Operations - $1,533,727
● Based on Church Street School
Museum, Archives and Cultural
Centre annual operations actuals, plus
ǣȇƬȸƺƏɀƺƳɀɎƏǔˡȇǕȸƺȷɖǣȸƺƳƏɀȵƺȸ
business plan operations budget
● Artistic Fees, Marketing, Programming,
IɖȇƳȸƏǣɀǣȇǕً¨ȸȒǔƺɀɀǣȒȇƏǼǔƺƺɀً ǔˡƬƺƏȇƳ
Facility Expenses: $1,096,598
Programming Expenses
● Anticipated that programming expenses
will be offset by program revenues
● The new Centre will require a new annual
subsidy of $620,000 from the Town of
Aurora in Year 1
REVENUE POTENTIAL
Fundraising and
Sponsorship
The AMCC will need to support their operations
with a robust fundraising and sponsorship
program.
Given the excitement regarding the
development of the new cultural spaces in
the AMCC as part of the Church Street School
expansion, a fundraising feasibility study will be
undertaken as early as possible to gauge the
community capacity and assess the potential
fundraising success of a multi-million-dollar
capital and community fundraising campaign
which could assist with the capital and future
operating funds required to invest in this new
downtown cultural jewel.
A separate consideration could be to raise
funds to set-up a reserve (sustainability fund)
ɯǝǣƬǝɯȒɖǼƳƫƺɖɎǣǼǣɿƺƳƳɖȸǣȇǕɎǝƺˡȸɀɎבٮד
years of operations to cover annual budget
shortfalls or to be able to take some risks in
delivering new artistic direction, sponsoring
local professional artists or supporting new
cultural start-up programs.
The new AMCC presents an exciting and
pivotal moment for a donor/sponsor to invest
in an unprecedented cultural facility. Where
sport has been the focus in town, culture
٨! nn0!ÁXà0
Á0zzÁ³٩
34
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 44 of 51
is now being offered like never before in a
ǝǣɀɎȒȸǣƬًɵƺɎƬȒȇɎƺȅȵȒȸƏȸɵƏȇƳȅƏǕȇǣˡƬƺȇɎ
facility. This is a completely unique opportunity
for untapped markets to become a partner
with the new AMCC on the ground level
and as such will offer a donor/sponsor
ɀǣǕȇǣˡƬƏȇɎɮƏǼɖƺɎȒɎǝƺǣȸƫɖɀǣȇƺɀɀȒȸȵƺȸɀȒȇƏǼ
philanthropic goals.
For example, the Stronach Aurora Recreational
Complex, is named after its sponsor Frank
Stronach who, 20 years ago, donated
$2,000,000 to the construction efforts. To date,
his name is a household name associated with
this centre. Indeed, we can do the same with
our new expansion, creating a new household
name for years to come.
ǼɎǝȒɖǕǝɎǝƺƏƬɎɖƏǼɎȸƏǔˡƬɀɎƏɎǣɀɎǣƬɀȒǔɎǝƺ
new addition are somewhat of an unknown,
there are many other known factors that
ǕɖǣƳƺɀɖɀɎȒƳƺˡȇǣȇǕƏƬȒȇˡƳƺȇɎƏȇƳٹɀƺǼǼƏƫǼƺٺ
fundraising campaign.
kȇȒɯȇIƏƬǣǼǣɎɵƏȇȇɖƏǼɎȸƏǔˡƬɀɎƏɎǣɀɎǣƬɀي
ACC 30,000
SARC 600,000
AFLC 520,000
Library 260,000
Avg 352,500
One of the aspects donors may be interested
in are the number of expected visitors to the
AMCC. Some 290,000 patrons visit the current
Aurora Public Library and Church Street School
locations annually which are located within
Library Square, the new home of the AMCC.
It will make for a compelling business case to
ensure the potential donors will know about
this important aspect.
ɎǝƺȸǣȇˢɖƺȇɎǣƏǼǔƏƬɎȒȸɀɎȒnǣƫȸƏȸɵ³ȷɖƏȸƺ
ƏȸƺƏɎȸƏǔˡƬȅƏɵǣȇƬǼɖƳƺي
1. Town Park
a. ÁȒɯȇɀȵƺƬǣˡƬ0ɮƺȇɎɀ
b. Sporting events (soccer/baseball)
c. Camps
d. Farmers Market
e. Armoury/New Niagara College Food
Campus and Facility
f. Splash Pad/park
g. Winter Ice surface
2. àǣǼǼƏǕƺɎȸƏǔˡƬٖȸƺɀɎƏɖȸƏȇɎɀ٫çȒȇǕƺ³Ɏِ
3. United Church
Intangible Evaluation
When presenting to a prospective sponsor,
there are a number of “intangible”
considerations that increase the value and
desirability of the naming rights opportunity.
The new expanded facility offers many.
● Exclusivity
● Unique opportunity – once in a lifetime
● Community Landmark
● Cultural Hub not present before
● Social Media Exposure
● Organic Growth
● Household Name
Each of these considerations adds more
dollar value to the equation and as previously
mentioned, increases the desirability and
therefore negotiation power behind the
process. There is much to leverage.
ÁǝƺƬȒȅƫǣȇƏɎǣȒȇȒǔɎȸƏǔˡƬًƺɴɎƺȸȇƏǼǔƏƬɎȒȸɀƏȇƳ
ǣȇɎƏȇǕǣƫǼƺƫƺȇƺˡɎɀƫȸǣȇǕɖɀɎȒɎǝƺƬȒȇƬǼɖɀǣȒȇ
that this is a once in a lifetime opportunity for a
business to partner with our great community
of Aurora; a chance to begin a unique story
around the cultural and geographical hub
where memories will be made for years to
come for both the Sponsor, the Community
and the growing Town of Aurora.
35
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 45 of 51
36
Rentals
The anticipated rental revenue for the AMCC
will be nearly $250,000 in year 1 of operations.
This conservative forecast is based on current
rentals at ACC, in-person meetings with local
cultural stakeholders and a survey to the arts
community in and around Aurora to estimate
their needs for use of the various spaces.
There will be two sets of rental rates, one
ǔȒȸȇȒɎٮǔȒȸٮȵȸȒˡɎȒȸǕƏȇǣɿƏɎǣȒȇɀƏȇƳȒȇƺǔȒȸ
corporate rentals.
Programs
Building on the current cultural programming
from the Town, the Museum & Archives, the
ACC, and other Cultural Partners, the new
AMCC will feature robust programming year-
round. From a spectacular “Presenting Live
Entertainment” series, to expanded exhibits,
courses, and camps for children, the new
Centre will be bustling with cultural activities.
Other municipalities have shown, that once
the AMCC project has been approved, there
will be an increased demand from all kinds of
community groups who will step forward to
take advantage of this beautiful new facility.
This expanded Programming will generate
$185,000 in revenue in year 1, based on current
ACC activities and forecasted expanded
ƏƬɎǣɮǣɎǣƺɀǣȇǼǣǕǝɎȒǔɎǝƺȇƺɯƏȇƳˢƺɴǣƫǼƺɀȵƏƬƺɀ
available for the Museum, Gallery, Education
and Performing Arts Programmers.
Financial Plan
The Town of Aurora will be applying for any
available grants from the various levels of
government to fund the design and building
for this much needed new cultural community
asset.
A common formula for municipal cultural
capital projects is one-third from the federal
government, one-third from the province and
one-third from the community. Often that
one third of the community is split between
the municipality and the community. The
community aspect is often shared, half
from the corporate sector, service clubs and
foundations, and half from individuals in the
community.
Depending on the outcome of the fundraising
efforts from other levels of government, the
Town will adjust its funding plan for the AMCC
ƏƬƬȒȸƳǣȇǕǼɵɎȒƺȇɀɖȸƺɀɖǔˡƬǣƺȇɎǔɖȇƳǣȇǕǣɀ
available for this project.
A fundraising consultant will be hired as
ɀȒȒȇƏɀɎǝƺȵȸȒǴƺƬɎǝƏɀȸƺƬƺǣɮƺƳˡȇƏǼ!ȒɖȇƬǣǼ
approval to conduct a feasibility study and to
provide guidance in setting up a community
fundraising plan that will work for the Town of
Aurora.
Branding and Marketing
The new Aurora Museum & Cultural Centre
will require a robust branding and launch
strategy. The branding launch and inaugural
performance and programming season of
the AMCC will be crucial for establishing
an ongoing and long-term success and
sustainability.
Branding and marketing will be in line with
a more comprehensive marketing plan for
the Aurora cultural precinct and downtown
core. In addition to this plan, a robust arts
marketing plan will be developed to build
initial awareness and ongoing promotion of
the AMCC, ensuring long-term operational
stability and success.
Engaging the entire Aurora community early
on and undertaking market research prior to
programming the inaugural year for the AMCC
will be paramount. This should also include
collaborating with every community cultural
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 46 of 51
37
partner and programmer that will be renting
new spaces in the AMCC. These local and
professional arts entrepreneurs will require
ample support from the AMCC organization to
ensure that their rental events and programs
are successful. This in turn will ensure that
the AMCC will be an operational and cultural
success story, by supporting their operations
with programming from a diverse group of
stakeholders.
Some of the recommended marketing
components:
● Actively promote the various arts forms
presented at the AMCC to both local
patrons and visitors
● Grow attendance by continuing to engage
current patrons and cultivating new
audiences
● Establish a presence in the local
community as the arts and cultural leader
● Provide more opportunity to experience
and generate performances, exhibits
and classes that resonate with the local
community and the broader region
● Embrace local multicultural groups that
exist within the community, including the
local Aboriginal Community
● Build partnership and collaborative
marketing opportunities with cultural
organizations
Communication Plan
The Library Square project, which includes the
expansion of the current Church Street School
property into a new home for culture in the
Town of Aurora, and an important community
transformation piece in the development of a
Cultural Hub, has been talked about for many
years.
The current Mayor and Council are committed
to seeing this important new economic
development initiative and cultural asset
completed during this term of council for all
residents to enjoy when it opens in late 2021.
In order for this investment to provide the
cultural and economic impact that has
been envisioned, a sound communication
plan needs to be developed as soon as the
project has been approved, which will include
a project webpage, robust social media
and digital engagement and even some
traditional advertising, to continually update
all stakeholders and residents with the latest
information about the project.
Fundraising, rental agreements, building of
new cultural capacity, pre-marketing and
setting up an organizational infrastructure
which will be able to lead, operate and support
this new cultural investment, and many other
aspects will require a continued presence
and support by the Town of Aurora and its
residents.
A sound communication plan will assist
with making this project become a catalyst
for downtown redevelopment and add to
community pride while building the Town
of Aurora’s reputation as the most desirable
community to establish a new corporate
presence or new family roots.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 47 of 51
AURORA MUSEUM & CULTURAL CENTRE3 YEAR OPERATING FORECASTCurrent StatusYear 1 Year 2Year 3REVENUESFederal Grants–52,00053,30054,633Provincial Grants–25,50026,13826,791User Fees–758,762777,731797,175Fees & Services–84,58186,69688,863Sponsorship/ Donations–177,736182,179186,734Misc–12,10012,40312,713TOTAL REVENUE–1,110,6801,138,4461,166,908COSTS- Direct:Salaries & ƺȇƺˡɎɀ255,9251,533,7271,572,0701,611,372Artistic Expenses–588,352603,061618,137Program Expenses495,188 751,11325,918 2,147,99726,566 2,201,69727,230 2,256,740- Indirect:Marketing/Fundraising–99,424101,910104,457 ǔˡƬƺٖ³ɖȵȵȒȸɎServices8,75192,33594,64397,009Start-up FF&E––––Facility Costs 135,500206,450211,611216,902Specialized Equip Reserve Cont’n–50,00051,25052,531Insurance/Permits/Licenses–21,50022,03822,588Bank/Credit Card Charges–144,25112,619 482,32812,934 494,38613,258 506,746TOTAL COSTS895,3642,630,3252,696,0832,763,485Required Contribution from The Town of Aurora895,3641,519,6451,557,6371,596,577Current Town Contribution895,36438
Special Meeting of Council Agenda Thursday, March 21, 2019 Item 5 Page 48 of 51
39
APPENDIX
1. BACKGROUND MATERIAL REVIEWED
Aurora Collection (Final Report)
Aurora Cultural Centre: Professional Arts Season 2018/19
Aurora Cultural Centre: Strategic Plan
Aurora Cultural Master Plan
Aurora Cultural Precinct Plan Presentation
Aurora Library Square Fact Sheet
Aurora Museum & Archives: Building the Foundation – A Three-Year Plan
Aurora Town Square (Library Square) Presentation
Church Street School New Addition: Architectural drawings (Draft)
Cultural Service agreements with various cultural partners
Church Street School Cultural Centre: Strategic and Business Planning Study
(Novita Report)
York Region Arts Council Research: Creative Space Feasibility Study
2. RENTAL SURVEY OF CULTURAL
ORGANIZATIONS
2 Thumbs Up
Production
A2Y Dance Inc
Attitude Productions
Aurora Artists Studio
Tour
Aurora Camera Club
Aurora Community
Band
Aurora Cultural Centre
Aurora Farmers’
Market
Aurora Film Circuit
Aurora Garden and
Horticultural Society
Aurora Historical
Society
Aurora Music
Academy
Aurora Public Library
Aurora Seniors
Association
Aurora Sports Hall of
Fame
Canadian Children’s
Theatre Company
CDA Dance Academy
Elva’s Piano Studio
European Club
Eva Folks
Judy Sherman
Marquee Theatrical
Productions
Niagara College
Northern Lights
Dance Studio
Ontario Registered
Music Teachers
Association
Pine Tree Potters
Guild
Rotary Club of Aurora
Society of York Region
Artists
St. Andrew’s Scottish
Country Dance Group
Star Productions
Theatre Aurora
Wavestage Theatre
Company
York Chamber
Ensemble
York Dance Academy
York Harmony Chorus
York Region Arts
Council
Yunhong Art Studio
Yvonne Kelly Dance
Academy (Formerly
Irish Dance Studio)
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 49 of 51
40
3. REVIEW OF RENTAL RATES
OF SIMILAR ARTS & CULTURAL
ORGANIZATIONS IN GTA
MUNICIPALITIES
Town of Aurora Aurora Cultural Centre, etc –
various cultural partners
City of Orillia Opera House – Studio Theatre
Town of Stouffville Lebovic Centre for Arts & Entertainment
City of Barrie Five Points Theatre, Georgian Theatre
Town of Newmarket Newmarket Theatre
City of Vaughan City Playhouse
City of Markham Flato Markham Theatre
City of Richmond Hill Centre for the Performing Arts
City of Burlington Art Gallery of Burlington
City of Burlington Performing Arts Centre
Town of Oakville Oakville Centre for the Performing Arts
City of Mississauga Mississauga Living Arts Centre
City of St. Catharines FirstOntario Performing Arts Centre
City of Guelph River Run Centre
City of Brantford Sanderson Centre
Town of Caledon Townhall Players
City of Kingston Grand Theatre, Tett Centre
City of Brampton Rose Theatre, Cyril Clark Theatre
Town of Orangeville Opera House
Town of Gravenhurst Opera House
Town of Huntsville Algonquin Theatre
City of Ottawa Ottawa Art Gallery
City of Sarnia Judith & Norman Alix Art Gallery
City of Windsor Art Gallery of Windsor
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 50 of 51
100 John West Way, Box 1000
Aurora, Ontario, L4G 6J1
March 2019
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 5
Page 51 of 51
Town of Aurora
Special Council Report No. FS19-012
Subject: Library Square - Financial Strategy
Prepared by: Jason Gaertner, Acting Director Financial Services - Treasurer
Department: Financial Services
Date: March 21, 2019
Recommendation
1.That Report No. FS19-012 be received; and
2.That staff be authorized to apply for any eligible capital or operating grants in
support of the Library Square project; and
3.That the recommended preliminary capital investment financial strategy for
Library Square be approved; and
4.That the recommended preliminary operating plan financial strategy for
Library Square be approved.
Executive Summary
Staff have recently presented to Council, for its consideration, a final Class C cost
estimate varying between $35.6m to $37.9m, depending upon the options selected by
Council, for the construction of the Library Square including the addition to the Church
Street School and the outdoor square. The funding relating to the construction of the
Library Square parking lot and laneway has been previously approved by Council. As
this represents a major investment for the Town, both a capital and operating funding
strategy is essential in ensuring the financial success of the Library Square project.
This report will provide:
•A break-down of the Library Square project by its key components,
•A recommended preliminary capital investment funding strategy, and
•A recommended preliminary incremental operating cost funding strategy.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 6
Page 1 of 9
March 21, 2019 Page 2 of 8 Report No. FS19-012
Background
On February 12, 2019 Council was presented with the latest design concepts for the
Library Square project. Considerations included:
• Further consultation on the project had taken place to refine the design, cost
estimate and project timeline.
• Based on inputs from consultants and cultural partners, revisions have been
made to the design of the Church Street School expansion.
• Enhancements to the Outdoor Square include features for year-round attraction.
• Heritage and Accessibility considerations were deemed important in the
development of the design.
• Parking study, parking lot, laneway and accessible parking considerations were
incorporated in the latest design.
• Acknowledgement that any applications for grants that may offset the capital
costs will be explored and submitted.
• A project management model will be used for the Library Square project
implementation.
At present a total of $2.3m has been approved to date for the Library Square project. In
addition, a placeholder for a further $35m for the Library Square project has been
recommended to Council by the Budget Committee for conditional approval as part of
the 2019 capital budget.
Analysis
A break down of the Library Square project by its key components
The Library Square project can be broken down into the following three key
components:
• Demolition of 52 and 56 Victoria Street Structures,
• Addition to Church Street School, and
• Outdoor square and Parking.
A detailed break-down of these noted key components can be found under Attachment
#1. This attachment provides a summary of the total estimated budget required in order
to complete each noted key component, as well as their total approved budget and
expenditures to date. In addition, the total estimated budget for the Library Square
project is presented should all of the proposed optional items be approved.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 6
Page 2 of 9
March 21, 2019 Page 3 of 8 Report No. FS19-012
A recommended preliminary capital investment funding strategy
As the total proposed required investment for the Library Square project is significant, a
sound funding strategy is essential. In developing its recommendation, staff considered
several of the funding options presented in the recent report to Council, FS19-004 Major
Capital Investment Funding Strategy. After careful consideration, staff recommend that
the following sources of funding form part of this project’s funding strategy:
Development Charges
Development Charges (DC’s) are to be used for funding the creation of new amenities
to extend service capacities in order to meet the demands of growth. Development
charges are collected as separate components which can only be used for their specific
components. In this instance, staff recommend that library services and park
development DC funding be utilized as a partial funding source for this project. At
present, the Library DC reserve is in a positive position, while the Parks Development
DC reserve is in a negative position. Staff project that all of the town’s negative DC
balances will return to a balanced position within the next ten years.
Community Benefit Fees
Community Benefit fees have been collected from developers in addition to statutory
DC’s. These surcharges for development, intended to help fund growth related assets,
may be applicable to the subject projects. The Town has no specific identified purposes
established for these funds. The current value of available funds as of December 31,
2018 is $ 2.6m. Staff recommend that this full amount be applied to this project.
Proceeds from Sale of Municipal Lands
The Town consolidates all net proceeds from the sale of Town owned lands, such as its
Leslie street lands, under a single reserve. The Town has no specific identified
purposes established for these funds. The current value of available funds as of
December 31, 2018 is $7.1m. Staff recommend that this full amount be applied to this
project.
Hydro Sale Investment Reserve Fund
The Town sold Aurora Hydro in 2005, and 90% of the proceeds were established in a
reserve fund. Interest has accumulated since that time, however, some of this income
has been spent from time to time. No specific purpose has ever been formally
approved for these funds. The current value of available funds as of December 31, 2018
is $ 31.0m.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 6
Page 3 of 9
March 21, 2019 Page 4 of 8 Report No. FS19-012
Because of its significant balance and the Town’s ability to invest these funds over a
longer term, these funds have become an important contributor to the Town’s annual
investment income which is utilized to subsidize the Town’s operating budget, as well as
a further top up of all reserve balances. Consequently, any draw on this reserve is likely
to have a material impact on the Town’s annual investment income; as well as
deteriorate the Town’s general reserves health. Keeping this in mind, staff recommend
that the utilization of this reserve as a funding source be minimized as much as
possible.
Debt Financing
Debt financing, either internal or external, could be used to finance the capital
investment costs of a project, to allow time for the intended source of financing to be
realized, such as revenues from development charges or the tax levy. Any such
financing would incur interest costs, which would be covered by the intended funding
source.
Internally financing this scope of resource requirement would tie up a material
proportion of the Town’s available resources for up to twenty years. It is anticipated that
the Town will require access to the majority of its currently available reserve funds
within this twenty year time horizon. Should these reserves be tied up through internal
financing, the Town would risk requiring external financing for these other purposes
instead.
In an effort to effectively manage the town’s cash flows, staff recommend that the Town
utilize external debt financing, likely in the form of a 20 year debenture. The current
20 year debenture interest rate offered by Infrastructure Ontario is 3.26%. This external
debt would subsequently be repaid in a controlled fashion through the above noted DC
funding sources and a dedicated one-time tax levy increase of 1% which would be
applied wholly to the 2020 levy, or phased in over two fiscal years. Once this noted
debt has been paid off, the equivalent dedicated tax levy increase can be removed.
Grant Funding
The Town of Aurora will be applying for any available grants from the various levels of
government, seeking funding for the design and construction of the various components
of the Library Square project.
A common funding formula for municipal cultural projects, such as the proposed
addition to the Church Street School, is one-third from the federal government, one-third
from the province and one-third from the community.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 6
Page 4 of 9
March 21, 2019 Page 5 of 8 Report No. FS19-012
Often the one third from the community is split between the municipality and the
community. The community aspect is often shared half and half from the corporate
sector, service clubs and foundations and half from individuals in the community.
In support of this much needed new cultural community asset, staff have now submitted
the Town’s grant application to the federal government’s Canada Cultural Spaces Fund
for consideration. In this regard, as soon as the addition to the Church Street School
project has received final Council approval, a fundraising consultant will be hired to
conduct a feasibility study and to provide guidance in setting up a community
fundraising plan that will work for the Town of Aurora.
In addition, staff are investigating another grant opportunity (Building Communities
through Arts and Heritage - Legacy Fund) that could potentially be utilized as a funding
source in support of the construction of the outdoor square.
Staff have already, or intend to, approach Provincial and Federal representatives in an
effort to explore further potential funding sources for all components of the Library
Square project. Depending upon the outcome of fund raising efforts, the Town will
adjust its funding plan accordingly in order to ensure sufficient funding is available.
The below table outlines, in detail, staff’s recommended capital investment funding
strategy for this project, based upon current projections. This strategy is applicable to
varying levels of required investment. For illustrative purposes, a total required
additional capital investment in the Library Square project of $35.6m has been utilized in
the presented table.
Library Square Consolidated Capital Investment Funding Strategy
($millions)
Total estimated required investment 35.6
Proceeds from the sale of municipal lands reserve (7.1)
Community benefits reserve (2.6)
Grants (14.1)
Outdoor recreation & Library Development
Charges (1.6)
Tax levy funded twenty year debenture* (6.7)
Hydro investment reserve (3.5)
* Assume a 20 year debenture with an annual carrying cost equivalent to a one-time 1% tax
levy increase. The currently available 20 year debenture interest through Infrastructure
Ontario is 3.26%.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 6
Page 5 of 9
March 21, 2019 Page 6 of 8 Report No. FS19-012
It is important to note that the grant funding that has been included in the above table is
subject to change as the Town has not yet received a formal decision from either of
these grant providers. Should a lower than anticipated grant value be ultimately
awarded, any related funding short-falls could be drawn from the Hydro Investment
reserve, or adjustments to the debt portion of the recommended funding strategy could
be made.
A recommended preliminary incremental operating cost funding strategy
In addition to a funding strategy for the Town’s initial investment in the Library Square
project, a financial strategy for the resultant ongoing incremental operating costs for the
Library Square is important as well. As indicated in Report Number CMS19-009, the
total incremental operating costs for the library square’s key components are estimated
to be $720,000 per year which must be borne by the Town’s tax levy.
Staff recommend that this estimated incremental tax levy impact be phased onto the tax
levy in gradual controlled fashion over the next three years commencing in 2019. This
would represent an incremental tax levy increase of $240,000 or 0.5% per year. See
below table:
Incremental Net Operating Costs for Library Square
($000's)
Fiscal Year Phased in Amount
2019 240.0
2020 240.0 2021 240.0
Total 720.0
Advisory Committee Review
None
Legal Considerations
Not applicable.
Financial Implications
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 6
Page 6 of 9
March 21, 2019 Page 7 of 8 Report No. FS19-012
The total additional required investment for the Library Square Project relating to an
increase in the design and consultation costs, as well as the inclusion of the estimated
construction costs for the addition to the Church Street School and the outdoor square
and parking, is estimated to be between $35.6m to $37.9m, depending upon the options
selected by Council. The above presented funding strategy offers a financially viable
solution that the Town can deploy in order to successfully fund this large required
investment.
In addition, it is estimated that the Library Square, upon becoming operational net of all
expected new revenues, will produce an annual incremental operating budget impact of
$0.7m ($720K). The proposed controlled phase in of this operating budget impact over
a three year period commencing in 2019 will ensure that this expense is fully funded by
the tax levy in time for the complete Library Square becoming fully operational in the
spring of 2022, while smoothing the impact to tax payers.
Communications Considerations
This report will be posted to the website to keep residents informed of plans, and any
future direction from Council will be shared via Council Highlights, Town website and
social media.
Link to Strategic Plan
Reporting to Council and the public on capital investment and an incremental
operational cost funding strategy supports the Strategic Plan principles of transparency
and accountability.
Alternative(s) to the Recommendation
1. Council may provide further direction.
Conclusions
As previously discussed, the required capital investment and the on-going net
incremental operating costs are expected to be material for the Library Square project.
It is recommended that the preliminary funding strategies as set out above be adopted
in an effort to ensure that this project is a financial success in addition to the many other
benefits that this project will bring to the Town.
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 6
Page 7 of 9
Special Meeting of Council Agenda Thursday, March 21, 2019Item 6 Page 8 of 9
Attachment #1
$128,500 $130,000 $1,500
Addition to Church Street School $977,500
Spent to Date 255,500
Outstanding 1,991,100 2,246,600
Total construction estimate 24,952,400
324,800
Unrecoverable HST $386,700
Public Art Contribution $256,600 25,920,500
$28,167,100 $977,500 ($27,189,600)
Outdoor Square & Parking $1,232,600
Spent to Date 195,500
Outstanding 151,700 347,200
Total construction estimate 9,018,900
112,700
Unrecoverable HST $134,300 $9,265,900
$9,613,100 $1,232,600 ($8,380,500)
Total - Before Options $37,908,700 $2,340,100 ($35,568,600)
2340135
Additional Parking in Laneway 145,700 -$37,908,735
Perpendicular Parking on Victoria 87,900
Parallell on Church Street 185,400 1210135
Link Option #1 - Enclosed 1,936,000 #REF!
Total - After Options $40,263,700 $2,340,100 ($37,923,600)
Library Square Project Break-down by Key Component
(Excludes Options)
Preparation for Construction
Construction
Approved
Budget BalanceCosts
Demolition of 52 and 56 Victoria Street
Structures
Options:
Project Management
Project Management
(Excludes Options)
Preparation for Construction
Construction
Special Meeting of Council Agenda
Thursday, March 21, 2019
Item 6
Page 9 of 9
The Corporation of The Town of Aurora
By-law Number XXXX-19
Being a By-law to Confirm Actions by Council
Resulting from a Special Meeting of Council
on March 21, 2019.
The Council of the Corporation of The Town of Aurora hereby enacts as follows:
1. That the actions by Council at its Special Meeting of Council held on March 21,
2019, in respect of each motion, resolution and other action passed and taken by
the Council at the said meeting is hereby adopted, ratified and confirmed.
2. That the Mayor and the proper officers of the Town are hereby authorized and
directed to do all things necessary to give effect to the said action or to obtain
approvals where required and to execute all documents as may be necessary in
that behalf and the Clerk is hereby authorized and directed to affix the corporate
seal to all such documents.
Enacted by Town of Aurora Council this 21
st day of March, 2019.
Tom Mrakas, Mayor
Michael de Rond, Town Clerk
Special Meeting of Council Agenda
Thursday, March 21, 2019
Confirming By-law
Page 1 of 1
Public Release
March 21, 2019
Town of Aurora
Additional Items to
Special Meeting of Council Agenda
Thursday, March 21, 2019
5:45 p.m., Council Chambers
• Delegation (c) Bruce Gorman, Chief Executive Officer, Aurora Public Library
Re: Library Square Development
• Delegation (d) David Heard, Resident
Re: Library Square Proposal
• Delegation (e) Sandra Ferri, Executive Director, Aurora Chamber of Commerce
Re: Library Square Development
Note: According to the Procedure By-law, the consent of at least a two-thirds majority
vote of Members present is required to permit the addition of Delegations (c), (d),
and (e) to the agenda.
Delegation Request
7KLV'HOHJDWLRQ5HTXHVWIRUPDQGDQ\ZULWWHQVXEPLVVLRQVRUEDFNJURXQGLQIRUPDWLRQ
IRUFRQVLGHUDWLRQE\HLWKHU&RXQFLORU&RPPLWWHHVRI&RXQFLOPXVWEHVXEPLWWHGWRWKH
&OHUN¶VRIILFHE\WKHIROORZLQJGHDGOLQH
D.m.2QH ()%XVLQHVVDay Prior to the Requested Meeting Date
Council/Committee Meeting DQGDate:
Subject:
Name of Spokesperson:
Name of Group or Person(s) being Represented (if applicable):
Brief Summary of Issue or Purpose of Delegation:
Please complete the following:
+DYH\RXEHHQLQFRQWDFWZLWKD7RZQVWDIIRU
&RXQFLOPHPEHUUHJDUGLQJ\RXUPDWWHURILQWHUHVW"<HV ܆܆1R ܆
,I\HVZLWKZKRP"'DWH
܆ ,DFNQRZOHGJHWKDWWKH3URFHGXUH%\ODZSHUPLWVILYHPLQXWHVIRU'HOHJDWLRQV
/HJLVODWLYH6HUYLFHV
&OHUNV#DXURUDFD
7RZQRI$XURUD
-RKQ:HVW:D\%R[
$XURUD21/*-
Thursday, March 21, 2019
Library Square - open forum/discussion
Bruce Gorman, CEO
Aurora Public Library
To speak in support of the Library Square development
✔
Additional Items to Special Meeting of Council Agenda
Tuesday, March 21, 2019
Delegation (c)
Page 1 of 1
Additional Items to Special Meeting of Council Agenda Tuesday, March 21, 2019Delegation (d) Page 1 of 1
Additional Items to Special Meeting of Council Agenda
Tuesday, March 21, 2019
Delegation (e)
Page 1 of 1