Loading...
Agenda - Public Planning - 20251201Town of Aurora Special Council Public Planning Meeting Revised Agenda Date:Monday, December 1, 2025 Time:7 p.m. Location:Council Chambers, Aurora Town Hall Meetings are available to the public in person and via live stream on the Town’s YouTube channel. To participate, please visit aurora.ca/participation. Pages 1.Call to Order Note: Added items are marked with an asterisk (*). 2.Land Acknowledgement 3.Approval of the Agenda 4.Declarations of Pecuniary Interest and General Nature Thereof 5.Planning Applications The Mayor will introduce the procedure that will be followed during the meeting. 5.1 PDS25-118 - Application for Zoning By-law Amendment, 2697331 Ontario Inc., 1289 Wellington Street East, File Number: ZBA-2025-07, Related File Number: SUB-2025-01 1 That Report No. PDS25-118 be received; and1. That comments presented at the statutory Public Planning meeting be addressed by Planning and Development Services in a report to a future Committee of the Whole meeting. 2. *5.1.1 Staff Presentation 24 *5.1.2 Applicant Presentation 36 6.Confirming By-law 6.1 By-law Number XXXX-25 - Being a By-law to confirm actions by Council resulting from a Special Council Public Planning meeting on December 1, 51 2025 7.Adjournment 100 John West Way Aurora, Ontario L4G 6J1 (905) 727-3123 aurora.ca Town of Aurora Public Planning Report No. PDS 2 5 -118 Subject: Application for Zoning By-law Amendment 2697331 Ontario Inc. 1289 Wellington Street East File Number: ZBA-2025-07 Related File Number: SUB-2025-01 Prepared by: Peter Fan, Planner Department: Planning and Development Services Date: December 1, 2025 Recommendation 1. That Report No. PDS25-118 be received; and 2. That comments presented at the statutory Public Planning meeting be addressed by Planning and Development Services in a report to a future Committee of the Whole meeting. Executive Summary The purpose of this report is to provide Council and members of the public with background information on the proposed Zoning By-law Amendment (ZBA). Although Bill 23 removed the requirement to hold public planning meetings related to Draft Plan of Subdivision applications, this report will provide details of the proposed related Draft Plan of Subdivision (SUB) application. The following is a summary of the development proposal:  The proposed ZBA seeks to rezone the subject lands by removing the site- specific Apartment zone RA2(559) and updating the existing site-specific Townhouse R8(558) and Single Detached R5(560) zones while maintaining the Environment Protection Zone.  The proposed Draft Plan of Subdivision will divide the lands into two large blocks, one to permit the residential development and one to maintain the environment Page 1 of 51 December 1, 2025 2 of 11 Report No. PDS25-118 protection area. No roads or lots will be created through the Draft Plan of Subdivision.  The conceptual Site Plan demonstrates a low-density residential development consisting of 117 townhouses and eight single detached lots for a combined 125 dwelling units.  A preliminary review of the proposed application has been undertaken by Town departments and public agencies, with those comments and any additional comments from the Public Planning Meeting to be addressed prior to a recommendation report being brought forward to Council. Background Application History In June of 2022, Council refused Official Plan Amendment (OPA-2022-02) and Zoning By-law Amendment (ZBA-2022-02) application on the subject lands to facilitate a condominium residential development. Subsequently, the above noted applications were appealed to the Ontario Land Tribunal (OLT). On August 26, 2024, the OLT issued a final order to approve four seven-storey apartment buildings with a total of 698 apartment units, 40 townhouse units and eight single detached dwellings on the subject lands. The current, site specific Official Plan policies and Zoning by-law reflects the OLT’s order. No subsequent Planning Act applications were applied for to advance the development beyond the land use permission stage. In response to the current market condition, in July of 2025, the Owner revised their proposal and submitted the subject applications to implement the revised proposal. Overall, the revised proposal comprises of 117 townhouses and eight single detached dwellings for a total of 125 dwellings. A Community Information Meeting was held on October 27, 2025, to introduce the revised plan. Location / Land Use The subject lands are located on the southwest corner of Wellington Street East and Leslie Street (Figure 1). The subject lands are irregular in shape with frontages along Wellington Street and Leslie Street. The subject lands have a total land area of approximately 5.86 hectares (14.47 acres). The lands are currently vacant (no structures); however, the lands have areas of vegetation, woodland, wetlands and a watercourse. Page 2 of 51 December 1, 2025 3 of 11 Report No. PDS25-118 Surrounding Land Uses The surrounding land uses are as follows: North: Wellington St E, Stronach Aurora Recreation Complex (SARC), Low Density Residential, Medium density residential (Livewell – SP-2022-10 approved for 30 townhouses), Gas Station, High Density Residential (Polo Club – SP-2020-06 approved for 3 apartment buildings with a total of 345 units) South: Golf course, Low density residential, Adena Meadows Way East: Leslie Street, Gas Station, vacant employment lands West: Low density residential subdivision Policy Context Provincial Policies All Planning Act development applications are subject to provincial policies. The Provincial Planning Statement (PPS) provides policy direction on matters of provincial interest. These policies support the development of strong communities through the promotion of efficient land use and development patterns and encourage the creation of diverse housing opportunities that capitalize on proximity to goods, services, and transit. The Lake Simcoe Protection Plan (LSPP) is a provincial document that provides policies which addresses aquatic life, water quality, water quantity, shorelines and natural heritage, other threats and activities (including invasive species, climate change and recreational activities) and implementation. The subject lands are partially within the Lake Simcoe Region Conservation Authority (LSRCA) Regulated Area. Oak Ridges Moraine Conservation Plan (ORMCP) The ORMCP provides land use and resource management planning direction on how to protect the Moraine’s ecological and hydrological features and functions. The southernly part of the subject lands are located within the ‘Settlement Area’ of the ORMCP. Settlement Areas are intended for urban development, allowing for a variety of residential uses. Their purpose is to concentrate and manage urban growth, reducing encroachment on and impact to nearby ecological features, while aligning with the growth objectives outlined in the Town's Official Plan. Page 3 of 51 December 1, 2025 4 of 11 Report No. PDS25-118 Town of Aurora Official Plan The subject lands are designated “Medium-High Density Residential” and “Environmental Protection” (Figure 2) on Schedule “B” of the Town of Aurora Official Plan and is located within the Bayview Northeast Area 2B Secondary Plan (OPA 30). The Ontario Land Tribunal approved a site-specific Official Plan policy area #57 with the following provisions:  Notwithstanding Official Plan Amendment 30, the permitted uses shall include Townhouses, Apartments, and Detached Dwelling Units  Notwithstanding Official Plan Amendment 30, the permitted maximum net residential density shall be 201 units per hectare  Notwithstanding Official Plan Amendment 30, the permitted maximum height shall be seven storeys for Apartment Buildings, and three storeys for townhouse and detached dwelling units  The maximum height provisions applying to specific portions of the Subject Lands are implemented by way of the site-specific Zoning By-law Amendment  Apartment buildings taller than four storeys are subject to side yard step-backs and shall be implemented Within Schedule “F1 - Environmental Designations on Oak Ridges Moraine (ORM)” of the Town of Aurora Official Plan, the southern portion of the subject lands is identified as being within the Woodlands Minimum Vegetation Protection Zone (MVPZ) under the Oak Ridges Moraine Settlement Area. In accordance with Section 12 of the Official Plan, development is not permitted to encroach within 30 metres of significant woodlands located within an ORM Settlement Area. Furthermore, Section 12.4.1 requires that where any proposed development is located within 120 metres of an Environmental Protection designation or a Key Natural Heritage Feature, an Environmental Impact Study must be prepared to evaluate potential ecological impacts. The subject property abuts an Environmental Protection designation and is within 120 metres of a Significant Woodland. An Environmental Impact Study and Natural Heritage Evaluation was submitted in support of the applications and is currently under review by the Town and the Lake Simcoe Region Conservation Authority (LSRCA). Zoning By-law 6000-17, as amended The OLT approved the following site-specific zoning over the subject lands: Townhouse Dwelling Residential (R8) Exception Zone (558), Second Density Apartment Residential (RA2) Exception Zone (559), Detached Fifth Density Residential (R5) Exception Zone (560), and Environmental Protection (EP) Zone (Figure 3). Each site-specific residential Page 4 of 51 December 1, 2025 5 of 11 Report No. PDS25-118 zoning provides individual development standards to facilitate the previous OLT approved development. Reports and Studies The Owner submitted the following documents as part of a complete application to the proposed Zoning By-law Amendment application: Report Name Report Author Planning Justification Report Groundswell Urban Planners Inc. Urban Design Brief Groundswell Urban Planners Inc. Functional Servicing and Stormwater Management Report SCS Consulting Group Ltd. Hydrogeological Investigation Fisher Engineering Ltd. Geotechnical Investigation Fisher Engineering Ltd. Environmental Impact Study and Natural Heritage Evaluation GEI Consultants Ltd. Tree Inventory and Preservation Plan and Edge Management Report Kuntz Forestry Consulting Inc. Tree Inventory and Protection Plan Kuntz Forestry Consulting Inc. Landscape Plan Wang Architects Traffic Impact Study JD Engineering Noise Feasibility Study HGC Engineering Stage 1 & 2 Archaeological Assessment AMICK Consultants Ltd. Phase 1 & 2 Environmental Site Assessment Fisher Engineering Ltd. Topographic Survey Schaeffer Dzaldov Purcell Ltd. Proposed Applications Proposed Zoning By-law Amendment Page 5 of 51 December 1, 2025 6 of 11 Report No. PDS25-118 The proposed ZBA seeks to remove the site-specific Apartment zone RA2(559) and updating the existing site-specific Townhouse R8(558) and Single Detached R5(560) zones while maintaining the Environment Protection Zone. As shown on Figure 4, the applicant proposes to rezone the subject lands as follows:  Update the existing Townhouse Dwelling Residential (R8) Exception Zone (558)  Remove Second Density Apartment Residential (RA2) Exception Zone (559) and replace it with the updated site specific Townhouse Dwelling Residential (R8) Exception Zone (558)  Update the existing Detached Fifth Density Residential (R5) Exception Zone (560)  Maintain the existing Environmental Protection (EP) Zone unchanged The owner has submitted a draft amending Zoning By-law, which is currently under review by staff. The following summarizes the primary modifications proposed through the site-specific zones: Updated the existing Townhouse Dwelling Residential (R8) Exception Zone (558) (Appendix A)  Increased minimum lot area per dwelling unit from 125 m² to 138 m²  Increased the minimum lot frontage per unit from 5.5 metres to 6.25 metres  Reduced the minimum front yard setback from 4.0 metres to 3.0 metres  Increased the minimum setback for steps and landings from 2.8 metres to 3.4 metres  Increases the maximum building height from 11.0 metres to 11.5 metres  Increased the minimum rear yard setback from 3.5 metres to 6.0 metres  Increased the minimum interior side yard setback from 0 metres to 1.2 metres Updated the existing Detached Fifth Density Residential (R5) Exception Zone (560) (Appendix B)  Increased the minimum lot area from 250m² to 255 m²  Increased the minimum side yard setback from 1.0 metre to 1.2 metres Final zoning standards will continue to be reviewed by staff and agencies prior to the implementing By-law being presented to Council. Proposed Draft Plan of Subdivision Page 6 of 51 December 1, 2025 7 of 11 Report No. PDS25-118 The proposed Draft Plan of Subdivision (Figure 5) establishes a framework for the ground-oriented residential community. The proposed Draft Plan of Subdivision will divide the subject lands into two large blocks as follows. As a common elements condominium development is proposed for the subject lands, no public highways or lots will be created through the Draft Plan of Subdivision. Instead, the enactment of a future Part Lot Control Exemption By-law to subdivide Block 1 will be required to create the lots and a future condominium plan will be required to create the private roads. A 0.3 metre reserve is proposed to restrict and control future connections to the adjoining public right of way, identified as Block 3 on the proposed Draft Plan. Block # Purpose Size Notes Block 1 Residential 3.70 ha (9.15 ac) Established development limits Block 2 Environmental Protection 2.14 ha (5.28 ac) Protecting areas with key natural heritage features Conceptual Site Plan The conceptual Site Plan consists of 117 townhouses, and eight single detached dwelling for a combined 125 dwelling units. The applicant has not applied for a formal site plan application but has provided a conceptual Site Plan (Figure 6), Rendering (Figure 7) and Elevation drawing (Figure 8 and 9) for discussion purposes. The proposed Conceptual Site plan consists of 117 townhouse dwellings and eight single detached dwellings, together with associated parkettes, internal roads, and an Environmental Protection area. The proposed development will be serviced by two vehicle access points connecting Wellington Street East and Leslie Street. The Wellington Street East access is proposed to align with the entrance to the Stronach Aurora Recreation Complex, and the Leslie Street access will align with Don Hillock Drive. Future signalization will be dealt with at the site plan stage and is subject to final Regional approval. A total of approximately 490 resident parking spaces is proposed on site as each townhouse and single detached dwelling includes an average of two parking space on the driveway and two parking space in the garage. Thirty visitor parking spaces and two accessible parking spaces are provided throughout the internal road network, generally located near parkettes and along common visitor nodes. Page 7 of 51 December 1, 2025 8 of 11 Report No. PDS25-118 A multi-use trail is proposed along the southern edge of the residential block, connecting to the Environmental Protection (EP) lands and ultimately linking with the Town’s broader trail system associated with the Stronach Aurora Recreation Complex. No traffic signals are proposed at either access at this stage. Department / Agency Comments The proposed application was circulated to all internal and external agencies for review and comments. The following is a summary of matters that will require further discussions on:  Conformity to the Provincial policies and other planning policies  Location and placements of future signalized traffic lights  Review of the proposed site-specific zoning standards  Servicing capacity and allocation  Vehicular maneuvering and access of the subject lands  Consultation with the LSRCA regarding the natural heritage area (Environmental Protection lands) be continued into the site planning stage Public Comments A Community Information Meeting (CIM) was held on October 27, 2025, at the Stronach Aurora Recreation Complex (SARC). The meeting was attended by individuals, including Town Planning staff, the property owner, the applicant team, local residents, and the Councillors for Ward 4 and Ward 5. No formal comments were received by the public at the timing of drafting of this report Advisory Committee Review No communication required. Legal Considerations Section 34(11) of the Planning Act states that if Council refuses the Zoning By-law Amendment application or fails to make a decision on it within 90 days after the receipt of the application, the applicant (or Minister) may appeal the application to the Ontario Land Tribunal (OLT). The application was received on July 22, 2025, and therefore, the applicant may appeal to the OLT at anytime. Page 8 of 51 December 1, 2025 9 of 11 Report No. PDS25-118 Financial Implications There are no direct financial implications as a result of this report. Communications Considerations Notice of Public Planning Meeting was delivered to all addressed property owners within 120 m of the subject lands on November 6, 2025. In addition, the notice was published in the Auroran on November 13, 2025. Signs are posted on both frontages of the subject lands with information regarding the Public Meeting. In addition, notice of Public Planning Meeting was made available at the Community Information Meeting (CIM). Due to Canada Post strike, on September 30, 2025, notifications for CIM was hand delivered by the applicant to property owners within 120m of the subject lands. As such, Public Meeting notification has been provided in accordance with the Planning Act. Climate Change Considerations The Official Plan identifies sustainability, energy efficiency, and climate change mitigation as important objectives for new development. Staff will continue to encourage the applicant to include measures such as energy-efficient systems, landscaping, and low-impact stormwater management as part of the Site Plan process. Link to Strategic Plan The proposed applications will need to comply with the directions set in the Town’s Strategic Plan. Staff will continue to review the proposed applications to ensure that all new residential development supports the goal of providing an exceptional quality of life for all. More specifically, the following key objectives will be considered: Strengthening the fabric of our community: Through the review and approval of the Zoning By-law Amendment and Plan of Subdivision applications, housing opportunities are created that collaborates with the development community to ensure future growth includes housing opportunities for everyone. Page 9 of 51 December 1, 2025 10 of 11 Report No. PDS25-118 Alternative(s) to the Recommendation 1. Direct staff to report back to another Public Planning Meeting addressing any issues that may be raised at the Public Planning Meeting. 2. Refusal of the application with an explanation for the refusal. Conclusions Staff will continue to review the subject application having consideration for the above noted matters and comments received. The applicant can address the comments and incorporate required revisions as appropriate. If directed by Council, a recommendation report will be prepared for a future Committee of the Whole meeting once the technical review is completed. Attachments Appendix A - Amended R8(558) Zone Comparison Appendix B - Amended R5(560) Zone Comparison Figure 1 – Location Map Figure 2 – Existing Official Plan Designation Figure 3 – Existing Zoning By-Law Figure 4 – Proposed Zoning By-law Figure 5 – Draft Plan of Subdivision Figure 6 – Conceptual Site Plan Figure 7 – Conceptual Rendering Figure 8 – Conceptual Elevations – Townhouses Figure 9 – Conceptual Elevations – Detached Houses Previous Reports None. Pre-submission Review Agenda Management Team review on November 20, 2025 Page 10 of 51 December 1, 2025 11 of 11 Report No. PDS25-118 Approvals Approved by Marco Ramunno, Director, Planning and Development Services Approved by Doug Nadorozny, Chief Administrative Officer Page 11 of 51 Appendix ‘A’ Amended R8(558) Zone Comparison Existing R8 Exception Zone (558) Requirements Existing RA2 Exception Zone (559) Requirements Proposed Updated R8 Exception Zone (558) Standards Permitted Uses In accordance with R8 uses Home occupation Dwelling, Townhouse Back-to-back, Townhouse In accordance with RA2 uses No more than Four Apartment Buildings per Lot In accordance with R8 uses Home occupation Dwelling, Townhouse Back-to-back, Townhouse Total Property Coverage (Maximum) 45% 45% 45 % Lot Area (minimum) 125 square metres N/A 138 square metres* Lot Frontage (minimum) 18 metres (5.5 metres per unit) N/A 6.25 metres* Front Yard (minimum) 4.0 metres 2.0 metres 3.0 metres* Rear Yard (minimum) 3.5 metres 1.5 metres 6.0 metres* Interior side Yard (minimum) 0 metres 2.5 metres 1.2 metres* Exterior Side Yard (minimum) 0 metres 2.0 metres 1.2 metres* Lot Coverage (maximum) 70% N/A 70% Page 12 of 51 Existing R8 Exception Zone (558) Requirements Existing RA2 Exception Zone (559) Requirements Proposed Updated R8 Exception Zone (558) Standards Minimum Parking Requirement 1.5 spaces per dwelling unit, minimum 20% of spaces provided shall be set aside for visitor parking 1.0 spaces per dwelling unit, minimum 20% of spaces provided shall be set aside for visitor parking.” 1.5 spaces per dwelling unit, minimum 20% of spaces required shall be set aside for visitor parking Steps, Landings 2.8 metres In no case shall be closer than 2.5 metres from the Front Lot Line N/A 3.4 m* In no case shall be closer than 0.3 metres from the Front Lot Line Open porches, uncovered terraces and decks (3.2m in height or less) Front Yard - 4.0 metres N/A Front Yard - 4.0 metres Height (maximum) 11.0 metres 28.0 metres or 7 storeys, whichever is less 11.5 metres* Note: The proposed bylaw exceptions are highlighted and labelled with an asterisk “*”. Final zoning performance standards will be evaluated by Staff in detail prior to the implementing Zoning By-law Amendment being brought forward to Council for enactment. Page 13 of 51 Appendix ‘B’ Amended R5(560) Zone Comparison Existing R5 Exception Zone (560) Standards Proposed Updated R5 Exception Zone (560) Standards Total Property Coverage (Maximum) 45% 45% Lot Area (minimum) 250 square metres 255 square metres* Front Yard (minimum) 6.0 metres 6.0 metres Rear Yard (minimum) 7.5 metres 7.5 metres Side Yard (minimum) 1.0 metres 1.2 metres* Lot Coverage (maximum) 50% 50% Minimum Parking Requirement 2.0 spaces per unit 2.0 spaces per unit Height (maximum) 12.5 metres 12.5 metres Note: The proposed bylaw exceptions are highlighted and labelled with an asterisk “*”. Final zoning performance standards will be evaluated by Staff in detail prior to the implementing Zoning By-law Amendment being brought forward to Council for enactment. Page 14 of 51           %1&+101+1#/"1#1 -)&1 """1"1 - "1&.*1 %(,!"+1 1 *1+1%'#.101#&1#"1+1#/"1#1 -($&1 &1#+#*1+"1%&"1 1 &*+1 *1# -+#"*1"1 1(,#%#+#&%01Page 15 of 51 Page 16 of 51       +P*J>F+5M5_PY__W_1_9BBD<PK_Z_+P__=_ -9BB_ <QJF+P-[_"_#____ !_      $_9F69MOJF7_,2F5JN;_+5N5_/__\C_GV9__R@___ %]_I_^_&_ 444   /4'4!404 &'.4&(4'4#414 &'.4&(4     +4 "4"4 #,(4 "4"4 ,#!(4 #!'(!4)+  '4!*%4&'.4&(4      '4 '4&(.4&'4!-!+&4-4& (434 *#4    !4&(.4"$)'4&'4#,4!#4   24 &('+(! 4    +&&&4 #4        U_(  +' &+!#+ + +*+%"$+       !*"%*)*%*(**&# "* ** &*"'$* !"%%** $*%*!# '*)*"* *_%*(**&# "*L4_ E_ HS__8T?X_ _ 3A_ _ _ '_H_H_ 0)_ _  _.:_(_Page 17 of 51 Page 18 of 51 %& ' '             4(: 2: 38::*7.9:: '0: : : :3:3: &: :   :%,:/: -8):3:$:$' !' '!: : 1:"+6+5+: "'# ' : :#:   #.$).-.).!, .!. *&"%.  . . * .$+(. #' ). . ).#&"+.-. &"* (,.% . %(. .Page 19 of 51                                          ' 4,27*''7'7)7+07670!7(5&7(7 1.+7#&&"& 7&71"$"& 7+3"/7)+0%&07    707)-(3"767& 7 +!"00/7&7* #*$% &)* !* * *$$* *   " * %$* ' (*Page 20 of 51             *!%*)*%*(**&"!* ** &*!'$*  !%%** %* #'*)**!%%$* *Page 21 of 51 .$;!$5,E/<&E E5"/,E %ECE*$!/E: 3$!E4='E    .$;!$7,E4<&E EE6#/,E $BE) *E: .$"E4<&E0$;!$9,E0>(EEE7#1,E ?$EDE+$"0E: 1$"E@1<(E2$;!$7-E4<&E EE8!.,E $E) )E : 0$!EA1<'E                )$)()$)'))% ) )) %)&#) "$)) #)$)!&)())$$#) )Page 22 of 51  ]SE= YFT]+!42<'][UG] *R=]%A>/9JCO]]33 32 3$(31%33 & '3 / !333+ 3-)3 *30. ,3#"33Z]:="-'$].7@]LNM%]] P%Q](5'1 =086]]VIH=# Y&W],!?;']\UG] *X=])3%B>/9KDO]]                      *!%*)*%*(**&"!* ** &*!'$*  !%%** %* #'*)**!%%$* *Page 23 of 51 Public Planning Meeting1289 Wellington Street WestAApplication: Zoning By-law AmendmentApplicant: 2697331 Ontario Inc. Location: 1289 Wellington Street East File Number: ZBA-2025-07Related File: SUB-2025-01December 1, 2025Page 24 of 51 TOWN OF AURORA, PLANNING AND DEVELOPMENT SERVICESLocationSubject Lands: 1289 Wellington Street WestSubject applicationsPage 25 of 51 TOWN OF AURORA, PLANNING AND DEVELOPMENT SERVICESSite ContextSurrounding AreaPage 26 of 51 TOWN OF AURORA, PLANNING AND DEVELOPMENT SERVICESExisting Official Plan DesignationOOfficial Plan Designation•“Medium-High Density Residential” and “Environmental Protection”•Proposed development is entirely outside of the Environmental Protection •No amendments proposed towards the Official PlanPage 27 of 51 TOWN OF AURORA, PLANNING AND DEVELOPMENT SERVICESExisting Zoning Page 28 of 51 TOWN OF AURORA, PLANNING AND DEVELOPMENT SERVICESProjectPProposed Development•117 Townhouse dwelling units •8 Single Detached dwelling units •488 resident parking spaces and 32 visitor parking spaces•Signalized access off Wellington Street West, and LesliePage 29 of 51 TOWN OF AURORA, PLANNING AND DEVELOPMENT SERVICESConceptual Rendering Page 30 of 51 TOWN OF AURORA, PLANNING AND DEVELOPMENT SERVICESProposed Zoning PProposed Zoning By-lawTo rezone the subject lands by removing the site-specific Apartment zone RA2(559) and updating the existing site-specific Townhouse R8(558) and Single Detached R5(560) zones while maintaining the Environment Protection Zone. Page 31 of 51 TOWN OF AURORA, PLANNING AND DEVELOPMENT SERVICESProposed Plan of Subdivision Page 32 of 51 TOWN OF AURORA, PLANNING AND DEVELOPMENT SERVICESApplication Circulation Review Staff have identified the following matters to be addressed:•Conformity to the Provincial Planning Statement, Local policies•Details review of the proposed site-specific zoning standards•Location and placements of future signalized traffic lights•Availability of municipal servicing capacity•All technical matters will be addressed through the Site Plan Approval processPage 33 of 51 TOWN OF AURORA, PLANNING AND DEVELOPMENT SERVICESNext Steps Next Steps in the Planning process:•Staff will work with the applicant to address all comments from the commenting agencies. When appropriate, a staff report with recommendations will be presented at a future Committee of the Whole Meeting for consideration•A future Plan of Condominium application will be required and directed to Council for consideration•All interested parties will be notified of updates relating to the subject applicationsPage 34 of 51 Thank youFor any questions please contact:Peter FanPlannerpfan@aurora.ca365-500-3098Page 35 of 51 ʩʪʰʱʺÇąŁŁĪŊĞƄŒŊʺ¢ƄŵąąƄʺ.ÚŻƄÖŒŊĪŊĞʺƧˏŁÚơʺňąŊþňąŊƄʺűűŁĪøÚƄĪŒŊ¢ƄÚƄƊƄŒŵƧʺ˜ƊöŁĪøʺoąąƄĪŊĞʺGœy°q%¢Ç.ggʺ°œqʺ˜gqq.œ¢ʺSqʿʪʨʪʭˏʩʪˏʨʩÖŒŊĪŊĞʺƧˏŁÚơʺňąŊþňąŊƄʺEĪŁąʺqŒʿʺÖˏʪʨʪʭˏʨʯœąŁÚƄąþʺ%ŵÚĜƄʺ˜ŁÚŊʺŒĜʺ¢ƊöþĪƠĪŻĪŒŊʺEĪŁąʺqŒʿʺ¢°ˏʪʨʪʭˏʨʩPage 36 of 51 d.Íʺ˜˜gSªSyqʺ%ª.¢.YP]RH2);%440-'%8-32779&1-88)(*36(6%*840%23*79&(-:-7-32%2(>32-2+&=0%;%1)2(1)28*3603;6-7)6)7-()28-%03GXSFIVXL'31192-8=-2*361%8-321))8-2+%YKYWXXL46):-397308%4463:)(34%%2(>&%*361)(-91,-+,()27-8=6)7-()28-%0.YP]XL>&%%2((47%440-'%8-327())1)('3140)8)(IGIQFIVWX>32-2+&=0%;%1)2(1)2878%89836=49&0-'1))8-2+*9896)'311-88))3*8,);,30)*9896)'392'-01))8-2+83(%=Page 37 of 51 /dI<XIghI<jP+kgjIYYŸ/P<gd! +.++/I[Q]g+Y<[[IgŸg]k[GhqIYY1gD<[+Y<[[Igh g<G.]OIgh! +.+++gQ[EQd<Y+Y<[[IgŸg]k[GhqIYY1gD<[+Y<[[IghƔg]k[GhqIYY1gD<[+Y<[[Igh +Y<[[Q[O<[G1gD<[IhQO[Ɣ7<[OgEPQjIEjh gEPQjIEjkgIƔ/ / ][hkYjQ[O  QpQY[OQ[IIgQ[OƔ ][hkYj<[jh E]Y]OsƔQhPIg[OQ[IIgQ[O I]jIEP[QE<Y›sGg]OI]Y]OQE<YƔ [OQ[IIgQ[O "]QhI ][hkYj<[jƔ[OQ[IIgQ[O 0g<[hd]gj<jQ][[OQ[IIgQ[OƔ!/   <[GhE<dIgEPQjIEjkgI˜œyb.ªʺª.oPage 38 of 51 ¢Sª.ʺyqª.̪Ɣ)URQWDJHDORQJERWK:HOOLQJWRQDQG/HVOLH6WUHHWƔ/RW$UHDRIKD DF Ɣ/DQGVDUHYDFDQWƔ$SSUR[LPDWHO\NPIURP$XURUD*2ƔNPIURP+LJKZD\Page 39 of 51 ˜œy˜y¢gƔ7RZQKRXVH8QLWVƔ'HWDFKHG8QLWVƔ0D[6WRUH\VLQ+HLJKWƔ7RWDO8QLWV+HFWDUHƔ7RWDO3DUNLQJ6SDFHVš 7RZQKRXVH3DUNLQJ6SDFHVš 'HWDFKHG'ZHOOLQJ3DUNLQJ6SDFHVš 9LVLWRU3DUNLQJ6SDFHVPage 40 of 51 ªyÇqʺyEESSgʺ˜gqƔ'HVLJQDWHGŕ0HGLXP+LJK8UEDQ5HVLGHQWLDOŖDQGŕ(QYLURQPHQWDO3URWHFWLRQŖŖƔ'HVLJQDWHG6LWH6SHFLıF3ROLF\1RŶ7RZQKRXVHVDQGGHWDFKHGXQLWVDUHSHUPLWWHGƔ0D[LPXPKHLJKWRIVWRUH\VŶ$SDUWPHQWVDOVRSHUPLWWHGƔ0D[LPXPKHLJKWRIVWRUH\VŶ0D[LPXPQHWUHVLGHQWLDOGHQVLW\XQLWVSHUQHWKHFWDUHƔ:LWKLQWKH:HOOLQJWRQ6WUHHW/RFDO&RUULGRUƔ3URSRVDOFRQIRUPVWRWKH7RZQRI$XURUD2ĴFLDO3ODQQRDPHQGPHQWVSURSRVHGPage 41 of 51 ÖyqSqGʺÍˏgÇʺo.q%o.qªʺ˜˜gSªSyqƔ5H]RQLQJWRSHUPLWD7RZQKRXVH'ZHOOLQJDQG6LQJOH'HWDFKHG'ZHOOLQJ'HYHORSPHQWŶ7RZQKRXVHODQGVWREH5  Ŷ'HWDFKHG'ZHOOLQJODQGVWREH5  Ɣ5H]RQLQJLQFOXGHVPLQRUXSGDWHVWRWKH5  DQG5  GHYHORSPHQWVWDQGDUGVƔ1RDPHQGPHQWVWRWKH(QYLURQPHQWDO3URWHFWLRQ (3 ]RQLQJERXQGDU\Page 42 of 51 œ.gª.%ʺ%œEªʺ˜gqʺyEʺ¢°%SÆS¢SyqƔ%ORFNIRU'HYHORSPHQW/DQGVŶ$FUHVƔ%ORFNIRU(QYLURQPHQWDO3URWHFWLRQ/DQGVŶ$FUHVƔ%ORFNIRUP5RDG5HVHUYHŶ$FUHVƔ)XWXUH'UDIW3ODQRI&RQGRPLQLXPWRFUHDWHWKHLQGLYLGXDOORWVPage 43 of 51 yq.˜ª°gʺgq%¢˜.ʺ˜gqPage 44 of 51 ¢Sª.ʺSœ°gªSyq˜ŵŒűŒŻąþʺªŵÚĪŁÆąĦĪøŁąʺĪŵøƊŁÚƄĪŒŊdąƧʺbƊŊøƄĪŒŊŻˀʺSŊƄąŵŻąøƄĪŒŊŻʺŒŵʺGÚƄĦąŵĪŊĞʺ˜ŒĪŊƄŻ¢ĪþąơÚŁĽŻʺÚŊþʺ˜ÚƄĦơÚƧŻPage 45 of 51 .g.ƪSyq¢ʺˏʺªyÇqOy°¢.¢Page 46 of 51 .g.ƪSyq¢ʺˏʺ%.ªO.%ʺ%Ç.ggSqG¢Page 47 of 51 œ.q%.œSqGʺˏʺÆS.ÇʺEœyoʺÇ.ggSqGªyqʺq%ʺg.¢gS.ʺ¢ªœ..ªʺ˔gyydSqGʺ¢y°ªOˏÇ.¢ª˕ʺPage 48 of 51 œ.q%.œSqGʺˏʺGœy°q%ʺÆS.ÇPage 49 of 51 ªĦÚŊĽʺÍŒƊʿGœy°q%¢Ç.ggʺ°œqʺ˜gqq.œ¢ʺSqʿʪʨʪʭˏʩʪˏʨʩÖŒŊĪŊĞʺƧˏŁÚơʺňąŊþňąŊƄʺEĪŁąʺqŒʿʺÖˏʪʨʪʭˏʨʯœąŁÚƄąþʺ%ŵÚĜƄʺ˜ŁÚŊʺŒĜʺ¢ƊöþĪƠĪŻĪŒŊʺEĪŁąʺqŒʿʺ¢°ˏʪʨʪʭˏʨʩPage 50 of 51 The Corporation of The Town of Aurora By-law Number XXXX-25 Being a By-law to confirm actions by Council resulting from a Special Council Public Planning meeting on December 1, 2025. The Council of the Corporation of The Town of Aurora hereby enacts as follows: 1. That the actions by Council at its Special Council Public Planning meeting held on December 1, 2025, in respect of each motion, resolution and other action passed and taken by the Council at the said meeting is hereby adopted, ratified and confirmed. 2. That the Mayor and the proper officers of the Town are hereby authorized and directed to do all things necessary to give effect to the said action or to obtain approvals where required and to execute all documents as may be necessary in that behalf and the Clerk is hereby authorized and directed to affix the corporate seal to all such documents. Enacted by Town of Aurora Council this 1st day of December, 2025. Tom Mrakas, Mayor Ishita Soneji, Deputy Town Clerk Page 51 of 51