Loading...
Agenda - Public Planning - 20251029Town of Aurora Special Council Public Planning Meeting Agenda Date:Wednesday, October 29, 2025 Time:7 p.m. Location:Council Chambers, Aurora Town Hall Meetings are available to the public in person and via live stream on the Town’s YouTube channel. To participate, please visit aurora.ca/participation. Pages 1.Call to Order 2.Land Acknowledgement 3.Approval of the Agenda 4.Declarations of Pecuniary Interest and General Nature Thereof 5.Planning Applications The Mayor will introduce the procedure that will be followed during the meeting. 5.1 PDS25-103 - Official Plan Amendment and Community Planning Permit System, Downtown Community Planning Permit By-law, File Number: OPA-2025-08 1 That Report No. PDS25-103 be received; and1. That comments presented at the statutory Public Planning meeting be addressed by Planning and Development Services in a report to a future Committee of the Whole meeting. 2. 5.1.1 Staff Presentation 56 5.1.2 Consultant Presentation 63 6.Confirming By-law 6.1 By-law Number XXXX-25 - Being a By-law to confirm actions by Council resulting from a Special Council Public Planning meeting on October 29, 2025 88 7.Adjournment 100 John West Way Aurora, Ontario L4G 6J1 (905) 727-3123 aurora.ca Town of Aurora Public Planning Report No. PDS 2 5 -103 Subject: Official Plan Amendment and Community Planning Permit System Downtown Community Planning Permit By-law File Number: OPA-2025-08 Prepared by: Dania Asahi Ogie, MScPl, Policy Planner Department: Planning and Development Services Date: October 29, 2025 Recommendation 1. That Report No. PDS25-103 be received; and 2. That comments presented at the statutory Public Planning meeting be addressed by Planning and Development Services in a report to a future Committee of the Whole meeting. Executive Summary The purpose of this report is to provide Council and members of the public with information regarding a Town-initiated Official Plan Amendment (OPA) and Community Planning Permit System (CPPS) for the downtown area.  The Community Planning Permit System streamlines the development application process and allows the Town to proactively set development standards for the Downtown.  The proposed Official Plan Amendment and the Community Planning Permit By- law focuses on the historic Downtown area and is a continuation of the Promenade Plan and the Town’s commitment to revitalizing the area.  An Open House for the project was held on June 19, 2025, and the public was generally supportive.  The Community Planning Permit By-law can manage future growth in the Downtown in a sensible manner. Page 1 of 88 October 29, 2025 2 of 13 Report No. PDS25-103 Background Project History and Overview of Community Planning Permit Systems The Community Planning Permit System (CPPS) consolidates Zoning, Site Plan, and Minor Variance applications into one streamlined approval process. A Community Planning Permit (CPP) By-law implements the CPPS by setting the development standards and requirements for the by-law area. Through the CPP By-law, the Town is proactively setting the criteria for development in the Downtown and positioning itself to responsibly manage future growth in the area. On June 6, 2019, Provincial Bill 108 received Royal Assent and introduced the ability for municipalities to establish and administer the CPPS. This new planning tool streamlines approval processes for development while also providing opportunities for municipalities to set prescribed growth criteria and development standards. Further, municipalities can use the CPPS to secure and require additional community benefits, such as the provision of affordable housing and/or the protection of built heritage resources. On October 15, 2019, Council passed a motion which directed staff to develop a Community Planning Permit By-law. The motion recognized the Downtown core as a significant area in the Town and that the CPPS could be used as a tool to streamline development approvals and promote collaborative and predictable community building while also achieving the growth targets for the area and Promenade. The Town’s new Official Plan was approved to recognize the implementation of a Community Planning Permit System. Then, on January 14, 2025, staff presented an information report at Committee of the Whole to provide Council and the public with information on the CPPS project and its initiation. Following this report, on June 19, 2025, staff held a public Open House regarding the development of the Community Planning Permit By-law. Urban Strategies, a leading planning and design firm, has led the design and visioning of the area and prepared the attached Draft Downtown Urban Design Study (Attachment 3) which will be used as the basis for the formulation of the CPP By-law itself. Location / Land Use The CPP By-law area is demarcated by Temperance Street to the west, Center Street to the north, Victoria Street to the east, and approximately 70 metres south of Church Street at the south. Within this boundary contains the Aurora Town Square, commercial buildings with heritage designations (passed and registered on title), and some Page 2 of 88 October 29, 2025 3 of 13 Report No. PDS25-103 residential buildings. The entire area is part of the Aurora Promenade and the CPP By- law builds on the vision established through the Aurora Promenade Secondary Plan. Policy Context Provincial Policies All Planning Act matters are subject to provincial policies. The Provincial Planning Statement (PPS) provides policy direction on matters of provincial interest. These policies support the development of strong communities through the promotion of efficient land use and development patterns. The proposed CPP By-law is consistent with the PPS by being able to streamline development application review, increase housing supply and affordability, promote economic development and downtown revitalization, protect heritage resources, and allow for the efficient and wise use of land in a strategic growth area as part of a Regional Corridor. The CPP By-law allows the Town to be proactive in its planning approach and manage growth responsibly. Town of Aurora Official Plan The Community Planning Permit By-law area is in its entirety part of the Aurora Promenade and Major Transit Station Area (MTSA) Mixed Use designation of the Town’s Official Plan. This area is identified by the Town’s Official Plan as a priority area for a CPP By-law. Under the Official Plan, much of the lands within the CPP By-law boundary falls under the Downtown designation, as indicated in Schedule D1 of the Official Plan. Some parts of the area fall within the Downtown Shoulder designation – primarily being the southwest intersection of Wellington Street East and Victoria Street, which completes the Yonge-Wellington-Victoria-Mosley block. Both the Downtown and Downtown Shoulder designations envision the area for mixed-use development while protecting the heritage main street character. The CPP By-law area is also along the Yonge Street Regional Corridor and the Wellington Street Local Corridor, as identified on Schedule A of the Official Plan. Both the Regional and Local Corridors are the Town’s Strategic Growth Areas, which are the preferred location for accommodating intensification and higher-density mixed uses. At large, the Official Plan recognizes this area as a destination that will build on its assets and evolve into a vibrant place to live, shop, work, and play. The Aurora Promenade (along with the MTSA as part of the Promenade and MTSA Mixed Use Secondary Plan) is intended to be the Town’s primary focus area for growth and Page 3 of 88 October 29, 2025 4 of 13 Report No. PDS25-103 intensification, accommodating the highest densities, while also maintaining and preserving the built heritage assets. The CPP By-law works to balance the increase in density with the unique character of the Downtown, supporting the visions outlined in the Official Plan. The CPP By-law, as identified by the Official Plan, will become the place Aurora’s residents will want to call their “home,” “main street,” or “heart.” This is where the community meets, interacts, celebrates, shops, entertains, and is where visitors will want to come to experience sophisticated culture, in a small-Town setting. Zoning By-law 6000-17, as amended The parent zone for most of the properties within the CPP By-law area is Promenade Downtown (PD1) and the parts southwest of Wellington Street East and Victoria Street are designated as Promenade Downtown Shoulder (PDS1). Several properties within the boundary have exceptions that range from permitting more forms of dwelling units to extending permitted uses to day cares and personal service shops. A key component of the Promenade Plan and the respective zoning in this area is the ability to accommodate mixed-use development, with commercial at grade and residential units above. The CPP By-law is intended to largely mirror these permitted uses. Permitted uses under the PD1 and PDS1 zones are listed below: Permitted Uses Promenade Downtown PD1 Promenade Downtown Shoulder PDS1 Art Gallery X X Bed and Breakfast X X Clinic X X Commercial Schools X X Day Care Centres X Dry Cleaning Establishment X X Dry Cleaning Distribution Station and Depot X X Dwelling Units above the First Storey X X Dwelling, Boarding, or Rooming Houses X Dwelling, Converted X Dwelling, Detached X Dwelling, Double Duplex or Fourplex X Dwelling, Duplex X Dwelling, Quadraplex X Dwelling, Second Suite X Page 4 of 88 October 29, 2025 5 of 13 Report No. PDS25-103 Dwelling, Semi-Detached X Dwelling, Townhouse X Dwelling, Triplex X Financial Institutions X X Fitness Centre X X Funeral Parlours X X Garden Centre X X Hospitals X X Hotel X X Institutional Uses as Permitted in Section 11.1 of the By-law X X Laundromat X X Museum X X Offices X X Personal Service Shops X X Pet Services X X Place of Entertainment X X Club X X Private Parks X X Restaurants X X Retail Stores X X Service Shops X X Studios X X Veterinarian Clinic X X Analysis Proposed Official Plan Amendment: The Official Plan Amendment will formally delineate the boundary of the CPP By-law area in the Official Plan Schedules and recognize the lands as a special policy area subject to the development standards and administrative processes set by the implementing CPP By-law. Proposed Community Planning Permit By-law: The Community Planning Permit System streamlines the development application process and allows the Town to proactively set development standards for the downtown The Community Planning Permit By-law will become the primary tool setting the development standards in the By-law area. The boundary for the CPP By-law area is shown in Attachment 1 of this report. Page 5 of 88 October 29, 2025 6 of 13 Report No. PDS25-103 The CPP By-law will outline the policies, standards, and provisions surrounding use, heights, step backs (the horizontal recession of an upper storey), setbacks (distances from property boundaries), parking, façade articulation and materiality, amongst other matters. In addition to establishing land use policies, development applications received for the CPP By-law area will have a shorter approval timeline of 45 days and a more streamlined application process as the CPPS consolidates Zoning, Site Plan, and Minor Variance application processes into one. Approval of the CPP By-law will repeal the current zoning for the lands and have the CPP By-law become the primary tool setting the development standards for the area. The proposed Official Plan Amendment and the Community Planning Permit By-law focuses on the historic Downtown area and is a continuation of the Promenade Plan and the Town’s commitment to revitalizing the area. The attached Downtown Urban Design Study prepared by Urban Strategies recommends several development standards for the CPP By-law area. The Study is intended to guide the policies of the CPP By-law. Comparing two development concepts, as-of-right (drawn from the current Aurora Promenade Plan) and the alternative option, the study makes recommendations based on current best design practices. A summary of key recommendations from the Downtown Urban Design Study to inform the development of the CPP By-law are:  Continued preservation of the heritage buildings and façades.  The use of high-quality materials such as stone and brick to complement the character of the area.  Significant step backs (horizontal recessions) of ten metres on upper levels of buildings above the three-storey heritage facades and above the fifth storey.  General heights of six to eight storeys on the interior blocks and subject to the aforementioned step backs.  A maximum height of nine-storeys strategically located at Wellington Street West and Temperance Street, due largely to the slope in elevation and reduced impacts on neighbouring properties.  Heights are to be concentrated on the interior of blocks behind the heritage façades to protect the distinct Yonge Street heritage streetwall.  Identification of the area as a “Downtown Mixed Use” zone with similar proposed permitted uses with the current Zoning By-law and continued support for mixed- use development in the area. Page 6 of 88 October 29, 2025 7 of 13 Report No. PDS25-103 Development applications within the CPP By-law area are currently proposed to be categorized into classes, with each class having varying application and approval processes in accordance with the required statutory review timeline. The classification of applications into three categories was developed through a municipal best practice review of various CPP By-laws but is still subject to review and refinement as needed. The following table below breaks down the proposed application categories/classes under the CPP By-law and further, Attachment 2 shows the overall application process: Application Category Class One Class Two Class Three Class Type/Naming Convention Standard Application Minor Variation Major Variation Variations No variation from the development standards outlined in the CPP By-law, with the proposal fully conforming to the prescribed development standards. Application generally meets the intent, standards, and provisions of the CPP By-law, but may require minor variations based on:  Minor land use, design or materiality requirements; or  Minor variations due to individual site constraints or characteristics. Minor variations are variances of up to 10% of development standards. Application proposes a major variation that may impact the overall purpose and intent of the CPP By- law, and will require Council’s direct approval, such as:  A significant land use or development standard deviation, such as an increase in maximum height. Note: a 5-year moratorium on any major amendment of the CPP By-law would also apply. Approval Authority Approval by the Director of Planning and Development Services and/or delegate Approval by the Director of Planning and Development Services and/or delegate. Council approval. Timeline 45 days. 45 days. Requires a separate application and OPA approval process Page 7 of 88 October 29, 2025 8 of 13 Report No. PDS25-103 outside the 45 day approval timeline. Conditions Can be required as a condition of approval for any class. (E.g. preparation of additional studies, or requirements to enter into an agreement, provide community benefits or to complete infrastructure improvements etc.). An Open House for the Official Plan Amendment and the Community Planning Permit By- law was held on June 19, 2025, and the public was generally supportive. The initial development concepts were presented at the Open House and feedback from residents, business owners, and property owners were generally supportive. Suggestions provided by the attendees stressed the need for protecting the heritage façade and materiality of existing buildings, incorporating street beautification elements and infrastructure, and increasing height where appropriate. In addition, there were also suggestions of the CPP By-law going further as the by-law will guide long-term growth in the area. There is a need for the CPP By-law to recognize the necessity of incorporating greater densities based on current and future housing demands and realities. However, the increase in density cannot come at the expense of the neighbourhood character or heritage buildings. The general consensus was that balance was necessary, respecting the character of the Downtown and providing transition to lower density areas while overall heights and densities increased in a sensible manner, and in areas where impacts are minimal, such as the portion of the lands near Wellington Street West and Temperance Street. Following the feedback from the Open House, changes were made to the alternative development concept including increases in height in strategic locations and ensuring appropriate step backs. Additionally, the boundary was adjusted in the southern portion to include the lands south of Church Street to better align with the Downtown designation already established in the Promenade Plan. The proposed Community Planning Permit By-law, which will be brought to Council at a future date, will also incorporate feedback received through this public meeting. The Community Planning Permit By-law can manage future growth in the Downtown in a sensible manner The as-of-right development concept within the CPP By-law area would allow for approximately 1,100 units with maximum height being 6 storeys north of Wellington Street and five storeys everywhere else. Although the maximum heights under this development concept are currently permitted as of right, the zero metre setback and Page 8 of 88 October 29, 2025 9 of 13 Report No. PDS25-103 three metre step back above the third storey on Yonge Street would create a pedestrian environment that is possibly less friendly and also less sensitive to the heritage buildings in the area, as referenced by the Downtown Urban Design Study. The lack of step back distance creates an imposing streetwall and any additional massing would significantly alter the built form character of the area. The alternative development concept proposes greater heights but offsets the height increase by concentrating the massing of new buildings in the interior of the sites with greater step backs. By increasing the step back above the third storey to ten metres and requiring an additional ten metre step back again above the fifth storey, totalling to a 20 metres of step back, the taller buildings proposed under this concept have less of an impact on pedestrian views, the heritage façade, and the streetwall of Yonge Street. Through the careful consideration of increased step backs, the alternative development concept introduces greater height while producing a better built form. Furthermore, new buildings on Yonge Street that are not already heritage designated are expected to be setback two metres from the right-of-way (unless an existing historic façade has been retained) to provide more space for pedestrians and patios, thus contributing to the vibrancy of the Downtown area. The maximum height of nine storeys is to be concentrated only at the southeast corner of Wellington Street West and Temperance Street. Other parts of the By-law area will have a maximum height ranging between six to eight storeys. This southeast corner was strategically selected to take on the additional height of nine storeys given its natural slope in elevation and no adjacent residential uses. The western portion Temperance Street for this corner has an industrial/commercial use present, therefore, such height would have minimal impact on adjacent properties and on the character of Yonge Street. The table below shows the height, setback, step back, and unit count differences of both development concepts: Maximum Height Setback from lot line on Yonge Street for new buildings without a heritage façade Step Back on Yonge Street (horizontal recessions on upper floors) Approximate Number of Units Page 9 of 88 October 29, 2025 10 of 13 Report No. PDS25-103 Advisory Committee Review The Downtown Urban Design Study was brought to the Heritage Advisory Committee on October 6, 2025, for review. The Committee was generally supportive of the vision and plan for the area, recognizing that the CPP By-law allows for an opportunity to revitalize the Downtown, while protecting the heritage façades and character of the area which is paramount. Taking note of the significant step backs incorporated into the alternative design concept, the Committee recognized that although heights are increasing under the alternative concept, the built form produced through this concept better enhances the heritage façades along Yonge Street. Gathering the Heritage Advisory Committee’s feedback to protect of heritage buildings in the Downtown, the CPP By-law will incorporate policies on compliance with respective heritage designation by-laws, conservation management plans for conditions of approval for developments working with designated heritage buildings, and the use of high quality materiality to ensure that all new developments are in harmony with existing heritage façades and the character of the Downtown. In support of the CPP By-law, the Heritage Advisory Committee also inquired about the possibility of including the Bacon Basketware property into the by-law area. Town staff can explore this opportunity further; however, it’s anticipated that the CPP By-law will include policies on the process of consolidating neighbouring and adjacent properties into the By-law area for property owners who are interested in assembling or have assembled parcels of land. The timing of the land consolidation into the By-law area will As-of-Right 6 Storeys north of Wellington Street. 5 Storeys everywhere else. 0 metres Only 3 metres above the 3rd floor only 1,100 Alternative Varying maximum heights between 6 to 8 storeys, except for the southeast corner of Wellington Street West and Temperance Street, where a maximum height of 9 storeys would be permitted. 2 metres 10 metres above the 3rd floor, plus an additional 10 metres again above the 5th floor 1,260 Page 10 of 88 October 29, 2025 11 of 13 Report No. PDS25-103 be largely dependent on the owner, but options to do so will be made available through the By-law. Legal Considerations The Community Planning Permit By-law and Official Plan Amendment are pursuant to the provisions of the Planning Act and O. Reg. 173/16: Community Planning Permits. All owners within the CPP By-law area would be entitled to appeal the CPP By-law to the OLT within 20 days of a Notice of Passing being issued. There is also a 5-year moratorium on amendments being made to the CPP By-law once it is passed (unless an amendment is otherwise supported by Council). Once a CPP By-law is in place, only the applicant can appeal a decision made on its application no later than 20 days after the day notice of the decision is give. The applicant also has the right to appeal if no decision is made on its application within 45 days. Financial Implications In accordance with the Planning Act, Community Benefit Charges are not applicable within CPP By-law area. This is because the CPP By-law can be used as an alternative tool for municipalities to secure community benefits directly, such as through conditions of approval that may require facilities, public art, affordable housing, financial contributions, heritage enhancement/preservation etc. Despite that, a municipal best practice review determined that most municipalities with Community Planning Permit By-laws in place have added “Community Charges” or “Community Contributions” in the amount of four per cent of the value of the land that is subject to any development with five or more storeys and 10 or more residential units. The proposed CPP By-law for the Downtown area is similarly considering the implementation of a Community Levy of four per cent which is in line with other municipal CPP By-laws and the Town’s Community Benefit Charge By-law. Development Charges would be applicable to any development within the Town’s CPP area as per the Development Charges By-law, and appropriate fees for each class of development under the CPP will be incorporated into the Town’s Fee By-law. Communications Considerations Notices for this Public Planning Meeting were published online and in multiple cycles of the newspaper, posted physically in the Downtown area and also sent by email to all Page 11 of 88 October 29, 2025 12 of 13 Report No. PDS25-103 interested parties in accordance with the Planning Act. In addition, Town staff hand delivered notices to local property owners due to the Canada Post strike. Statutory notice requirements were exceeded. Town staff will continue to notify residents and landowners within the CPP By-law area of any future Council decisions and project updates through mail and/or email, as well as updates through the CPP By-law Engage Aurora page. Climate Change Considerations Through conditions for approval, the Town has the discretion to require applicants to provide facilities, services, and matters that have positive environmental impacts, including but not limited to, green roofs or other sustainable design initiatives. Incorporating these elements into any proposed development within the By-law area will lead to a greener Downtown where the streets and buildings are sensitive to the environment. Link to Strategic Plan The Official Plan Amendment and Community Planning Permit By-law supports the strategic plan goal of Supporting an exceptional quality of life for all through satisfying requirements of strengthening the fabric of our community through downtown revitalization. Alternative to the Recommendation 1. Direct staff to report back to another Public Planning Meeting addressing any issues that may be raised. Conclusions The proposed OPA and Community Planning Permit By-law is a natural extension of the Promenade Plan vision. Town staff will work to address and/or consider comments received from the public and any Council direction provided through the Special Public Planning meeting, prior to proceeding with a final recommendation report and OPA and CPP By-law for approval. Page 12 of 88 October 29, 2025 13 of 13 Report No. PDS25-103 Attachments Attachment 1 – Location Map Attachment 2 – Community Planning Permit Application Process Flowchart Attachment 3 – Draft Downtown Urban Design Study Previous Reports PDS25-001, January 14, 2025. Pre-submission Review Agenda Management Team review on October 16, 2025 Approvals Approved by Marco Ramunno, Director, Planning and Development Services Approved by Doug Nadorozny, Chief Administrative Officer Page 13 of 88 !CH          , C -P  78           *8+086808)5'8(8 2+(+8$'' '8'8 2!%!'8,4!/8*,1&'08   8 08 -3 88 (+#88 "('808 )5'8(8 2-+8 +8(0(/80#'88 + '8 8  +/08($20 ('/8'8 8.(8 (0(8 +8 8 Page 14 of 88 Step 1: Pre-ConsultationStep 2: SubmissionStep 3: ReviewStep 4: DecisionPre-Consultation with Town of Aurora Planning Staff and Applicable Agencies Submit Community Planning Permit Application Acknowledgement of Complete Application Permit required Prepare a Community Planning Permit Application Class 1 Approval Authority: Director Class 2 Approval Authority: Director Class 3 Approval Authority: Council Application circulation to relevant departments and agencies Class 1 Application Review Proceed to decision unless concerns arise, then, concerns to be discussed with applicants and revisions to be made. Class 2 Application Review Potential referral to Council if there is a significant concerns in variation; otherwise delegated to Director. Public Notification On site notification, newspaper ad, and mail out within 120-meter radius Class 3 Application Review Presentation to Council. Decision Approve with no conditions and issue CPP Approve with conditions required before issuing CPP Satisfy conditions Proceed to Building Permit Issue CPP Refuse application May appeal decision to Tribunal Attachment 2 – Community Planning Permit Application Process Flowchart *No Class 3 Variation will be considered for the first five years Page 15 of 88 DOWNTOWN AURORA COMMUNITY PLANNING PERMIT SYSTEM Downtown Urban Design Study Draft Final Report SEPT 2025 Attachment 3 Page 16 of 88 Page 17 of 88 TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 BACKGROUND 3 »Aurora Promenade Concept Plan and Urban Design Strategy 4 »Town of Aurora Official Plan 5 »Comprehensive Zoning By-Law 7 »Aurora Promenade Streetscape Project 9 3.0 DOWNTOWN TODAY: ASSETS AND OPPORTUNITIES 10 4.0 GUIDING PRINCIPLES AND FRAMEWORK FOR CHANGE 13 »Guiding Principles 13 »Framework for Change 14 5.0 MASSING STUDY 15 »As-of-Right Development Concept 16 »Alternative Development Concept 22 »Comparison of the Development Concepts 28 6.0 RECOMMENDATIONS 30 »Land Use 30 »Built Form & Site Planning 32 »Design Guidelines 36 Page 18 of 88 1 DOWNTOWN AURORA COMMUNITY PLANNING PERMIT SYSTEM | DOWNTOWN URBAN DESIGN STUDY | DRAFT FINAL REPORT What is a Community Planning Permit System? A Community Planning Permit System, or CPPS, is a land use planning tool that combines Zoning By-law Amendments, Minor Variances, and Site Plan applications into a single application and approval process. This tool helps make the application and approval process more efficient, allowing housing to reach the market more quickly. It also can be used to deliver other elements fundamental to a healthy, thriving community, such as affordable housing and diverse housing types, public facilities, parks and open spaces, and infrastructure improvements needed to support growth. Benefits such as these may be secured by permitting variances to regulations within a Community Planning Permit By-law. Like the traditional zoning by-law it replaces, a CPP By-law contains a list of permitted uses and development standards, such as minimum and maximum heights and setbacks. The CPP By- law can also include urban design requirements, such as the preservation of mature trees, conservation of heritage properties, and compatibility with the historic character of Downtown. The Town of Aurora has initiated a Community Planning Permit System (CPPS) for its historic Downtown with the goal of encouraging and guiding residential intensification. More residential and mixed- use development will broaden the range of housing options for existing and future Aurora residents, and more people living Downtown will reinforce it as the town’s civic heart and create the vitality needed to sustain a variety of businesses. A CPPS for Downtown will be implemented through a Community Planning Permit By-law, which will replace current zoning regulations. The Town initiated an Urban Design Study to review and update current land use and built form regulations. Within a proposed network of enhanced pedestrian connections and laneways, the study considered how future buildings could be massed to optimize potential development sites while respecting the valued character of Downtown and the surrounding neighbourhoods. This report documents the study process and findings and recommends regulations for the CPP By-law based on an illustrated massing concept that varies from what is permitted today. The Downtown Urban Design Study commenced in the fall of 2024 and followed a highly consultative process. Regular meetings were held with Town staff and CIMA+, the consultant retained for the ongoing Aurora Promenade Streetscape Project, to discuss opportunities and review work in progress. A public open house was held on June 19, 2025, to share study findings and invite feedback on a proposed massing concept for Downtown. Feedback from staff and the public have informed refinements to the Alternative Development Concept in Section 5 of this report and the Recommendations in Section 6. 1.0 INTRODUCTION Page 19 of 88 2DRAFT FINAL REPORT URBAN STRATEGIES INC. Figure 1: Downtown Study Area. Page 20 of 88 3 DOWNTOWN AURORA COMMUNITY PLANNING PERMIT SYSTEM | DOWNTOWN URBAN DESIGN STUDY | DRAFT FINAL REPORT Figure 2: Historic Map of Downtown. Figure 3: Downtown Aurora 1940. Yonge Street has been the heart of Aurora since merchant Richard Machell opened a business at the corner of Wellington Street in 1804. Through the 19th century, the main street and surrounding neighbourhoods steadily grew. As the Town continued to grow outward, particularly in the last 50 years, new shopping centres have challenged Yonge Street’s economic role. Nevertheless, Downtown is home to many successful businesses and remains the Town’s civic heart, anchored by the Central Library and the new Aurora Cultural Centre, Museum and Town Square. Downtown’s many assets make it a desirable place to both visit and live, as demonstrated by the Aurora United Church and Amica Retirement Home nearing completion. The potential for additional residential intensification is significant and is supported by the studies, policies and zoning regulations summarized below. The principles and objectives of these documents provide a foundation for the Urban Design Study and have informed its recommendations. 2.0 BACKGROUND Page 21 of 88 4DRAFT FINAL REPORT URBAN STRATEGIES INC. Figure 4: Aurora Promenade Public Realm Framework (Excerpt).Figure 5. Public Realm Framework16PLANNING & DESIGN INC.PLANNING & DESIGN INC.Figure 5. Public Realm Framework16PLANNING & DESIGN INC.PLANNING & DESIGN INC.Figure 5. Public Realm Framework16PLANNING & DESIGN INC.PLANNING & DESIGN INC.The Promenade Concept Plan and Urban Design Strategy, completed in 2010, was based on a comprehensive study of Downtown and the larger Promenade extending north, south and east. The plan and strategy are based on a vision with eight pillars: • Distinct Heritage and Culture • Vibrant Places • Beautiful Spaces • Lifelong and Complete Community • Liveable and Stable Neighbourhoods • Balanced Modes of Movement • Great Design and Architecture • Towards a Sustainable Town The plan and strategy include an Urban Design Framework that acknowledges the valued character Downtown’s main street, historic residential streets, and civic or special streets. It also identifies opportunities for mid-block pedestrian connections and encourages rear service lanes to achieve a more pedestrian-friendly environment. Regarding land use and built form, the plan and strategy outline the following objectives for Downtown: • Protect and reinforce heritage ‘main street’ character and identity • Infill and redevelopment sensitive to heritage resources and adjacent neighbourhoods • Strengthening of the vibrant pedestrian-oriented retail environment with a focus on specialty shops and restaurants • Encouraging entertainment and cultural venues to reinforce the area’s attraction for residents and visitors • Enhancement of the public realm with a focus on creating an inviting pedestrian environment • Introduction of more residential uses • Introduction of rear lanes where possible • Improving parking capacity through consolidated rear surface parking areas and/or in an integrated public parking facility The plan and strategy identify retail, office, residential, institutional, and open space as appropriate uses in the Downtown with the stipulation that retail should be required on the ground floor of buildings on Yonge Street and Wellington Street. Retail uses should be restricted to a maximum of 2,400 square metres, and storefronts should be no wider that 15 metres. The plan and strategy recommended a maximum height of five storeys (six storeys north in Upper Downtown north of Wellington Street) and minimum three-metre step-backs above the third storey. The design guidelines in the Promenade Concept Plan and Urban Design Strategy cover a range of considerations, including building expression, heritage integration, grade level design, storefronts, parking, and sustainable design. »Aurora Promenade Concept Plan and Urban Design Strategy Figure 5. Public Realm Framework16PLANNING & DESIGN INC.PLANNING & DESIGN INC.Page 22 of 88 5 DOWNTOWN AURORA COMMUNITY PLANNING PERMIT SYSTEM | DOWNTOWN URBAN DESIGN STUDY | DRAFT FINAL REPORT Masters Row A l la u ra B lv d KnowlesCresCloss Sq Morland CresCollins Cres Ames CresBuchananCres Moorcrest Dr CedarCresForeht CresAlgonquinCr es Collis DrTreegrove Cir Patrick DrC r oss i n g BridgePlDavidson RdBoulding DrHolmanCresTi mp sonDr BeaconH allDrB r o o kland Ave Woodroof Cres DeerhornC resCandacVall eyDrC o pla ndTrCasemount StHarrison Ave SimmonsCre s Long Valley Rd McClennyDr CorbettCres Treegrove Cir Devins DrFi e l dingDrMarshview Ave Delattaye AveBrooks Ave McDonald Dr Nicklaus Dr Glenview Dr Al mCrtEngelhard Dr MurdockAve HarmonAve Barr CresValleyCres Cranberry Ln LanewoodDr HarrimanRdTribbling Cres OctoberLnHill Dr Mary St Hodg k i n s o n C r e s PineneedleD r JarvisAveDeergl enTerr D eerg le n Te rrSisman AveHilldaleRdDelayneDr TemperanceStStoddartDrWil l i s D r WillisDrClif fTrIndustryStSpruce StBenvilleCresStoneRd S to n e RdZokolDrTecumse h DrMurray DrMurrayDr B r u s h GrWalton DrJasperDrSeatonDrMcClel lanWayCornerRidgeRd CornerRidgeRd Bilbrough St Gilbank Dr SneddenAveBirkshire Dr WindhamTrBrittonTrMillcliffCirBatsonDrBatsonD rHo ll a n d view Tr Hol l i d g e B lv d JohnWestWayConoverAveG o l f L in k s D r Primea u Dr Raiford St Hillview Rd Steckley St Ostick St Hawthorne Ln BigwinDrTreeTopsLn AbbottAveRoyal Rd D odie St Mill StConnaught Ave Child Dr Milgate Pl Larmont StIrwin Ave Mugford Rd Mosley St Bowler St Cossar Dr Reuben St Catherine AveBanffDr Kennedy St EGeorgeSt WenderlyDrDunning Ave Maple St Mark St TimberlineTr EdwardStTyler St WellsStCentre St Fairway Dr NisbetDrLensmith DrBaycroftLnLuxtonAveHeathwoodHeights Dr McNally WayCousins Dr G l a s sD rMartell Gt Fife Rd Hollingshead Dr Kemano Rd Gilbert Dr I ndust r i al PkwyNLaurentideAveHalldorson Ave Richardson Dr Bridgenorth DrMea d o w o o d DrGurnettStAurora Heights Dr Cousins Dr EBerczySt McMasterAveT r illiu m D r HaidaDrMosaicsAveVictoriaStBorealis Ave Or c h a r d Heights Blvd Hollandview T r River Ridge Blvd Kennedy St W Willow Farm Ln WELLINGTON ST W VANDORF SDRD WELLINGTON ST E HENDERSON DR BAYVIEW AVEYONGE STVANDORF SDRD JohnWestW ayAuroraHeig h t s DrOrchard Heights Blvd OldYongeStBatson DrSpruce StMark St W alto n Dr Devins Dr K e m a n o Rd Willow F a rmLnMeadowoodDrOrchardHeightsBlvdK e ma noRdW hisper i ngPineTrGilbank Dr AuroraHeightsDr McLeod DrKennedyStW Ti m psonDrCranberry Ln TimberlineTr Seaton Dr M urray Dr Child DrG l a s s Dr TamaracTr Murray Dr Kennedy St W MurrayDrEdward St Edward StRichardsonDrT a m aracTrIndustrialPkwy S In dustrialPkwySIndustri a l P k w y S Engelhard DrMary StCentre St YONGE STBAYVIEW AVEST JOHN'S SDRD W BATHURST STWELLINGTON ST EWELLINGTON ST W TOWNSHIP OF KINGS Railway / G O Tr a n sit Li n e AURORA OFFICIAL PLAN SCHEDULE 'D1' The Aurora Promenade and Major Transit Station Area Secondary Plan Area Legend Downtown Downtown Shoulder 0 500 1,000250Meters Promenade General Major Transit Station Area (MTSA) Secondary Plan Boundary MTSA Boundary GO Station RailwayRailway/GO Transit LineFigure 5: Aurora Offical Plan - Schedule ‘D1’. Masters Row A l la u ra B lv d KnowlesCresCloss Sq Morland CresCollins Cres Am es CresBuchananCres Moorcrest Dr CedarCresForeht CresAlgonquinCres Collis DrTreegrove Cir Patrick DrC r o s s i n g Bridge PlDavidson RdBoulding DrHolmanCresT i mp s onDr BeaconH allDrB r o o kland Ave Woodroof Cres DeerhornCres CandacVal l eyDrCopla ndTrCasemount StHarrison Ave SimmonsCre s Long Valley Rd McClennyDrCorbettCres Treegrove Cir Devins DrFi e l dingDrMarshview Ave Delattaye AveBrooks Ave McDonald Dr Nickl aus Dr GlenviewD r Al mCrtEngelhard Dr MurdockAve HarmonAve Barr CresValleyCres Cranberry Ln LanewoodDr HarrimanRdTribblingCres OctoberLnHill D r Mary St HodgkinsonCres PineneedleD r JarvisAveDeergl enT err D eerg le n Te rrSisman AveHilldaleRdDelayneDr TemperanceStStoddartDrWil l is D r WillisDrCliffTr IndustryStSpruce StBenvilleCresStone Rd S to n e RdZokolDrTecumse h DrMurrayDrMurrayDr B r u s h GrWalton DrJasperDrSeatonDrMcClellanWayCornerRidgeRd CornerRidgeRd Bilbrough St Gilbank Dr SneddenAveBirkshire Dr WindhamTrBrittonTrMillcliffCirBatsonDrBatsonD rHo ll a n d view Tr Ho l l i d g e B l v d JohnWestWayConoverAveG o l f L i n k s D r Prim ea u D r Rai ford St Hillview Rd Steckley St Ostick St Haw th or ne Ln BigwinDrTreeTopsLn AbbottAveRoyal Rd D od ie St Mill StConnaught Ave Child Dr Milgate Pl Larmont StIrwin Ave Mugford Rd Mosley St Bowler St CossarDr Reuben St Catherine AveBanffDr Kennedy St EGeorgeSt WenderlyDrDunning Ave Maple St Mark St TimberlineTr EdwardStTyler St WellsStCentre St Fairway Dr NisbetDrLensmith DrBaycroftLnLuxtonAveHeathwoodHeightsDr McNally WayCousins Dr GlassDr Martell Gt Fife Rd Hollingshead Dr KemanoRd Gilbert Dr I ndust r i al PkwyNLaurentideAveHalldorson Ave Richardson Dr Bridgenorth DrMe a d o w o o d DrGurnettStAurora Heights Dr Co usins D r EBerczySt McMasterAveTrilliumDrHaidaDr MosaicsAveVictoriaStBorealis Ave OrchardHeightsBlvd Hollandview T r River Ridge Blvd Kennedy St W Willow Farm Ln WELLINGTON ST W VANDORF SDRD WELLINGTON ST E HENDERSON DR BAYVIEW AVEYONGE STVANDORF SDRD JohnWestW ayA urora Heig h t s DrOrchard Heights Blvd OldYongeStBatson DrSpruce StMark St W alto n Dr D evins Dr K e m a n o R d Wi llo w F a rmLnMeadowoodDrOrchardHeightsBlvdK e ma noRdW hisper i ngPineTrGilbank Dr AuroraHeightsDr McLeod DrKennedyStW TimpsonDr Cranberry Ln TimberlineTr Seaton Dr M urray Dr Child DrG l a s s Dr TamaracTr Murray Dr Kennedy St W MurrayDrEdward St Edward StRichardsonDrTamaracTr IndustrialPkwy S In dustrialPkwySIndus t r i a l P k w y S Engelhard DrMary StCentre St YONGE STBAYVIEW AVEST JOHN'S SDRD W BATHURST STWELLINGTON ST EWELLINGTON ST W TOWNSHIP OF KINGS Railway / G O Tr a n sit Li n e AURORA OFFICIAL PLAN SCHEDULE 'D1' The Aurora Promenade and Major Transit Station Area Secondary Plan Area Legend Downtown Downtown Shoulder 0 500 1,000250Meters Promenade General Major Transit Station Area (MTSA) Secondary Plan Boundary MTSA Boundary GO Station RailwayRailway/GO Transit Line »Town of Aurora Official Plan The Town’s current Official Plan was adopted by Council in January 2024 and approved by York Region in May 2024. Section 9 of the plan embeds much of the Aurora Promenade Concept Plan and Urban Design Strategy in policy. Policy 9.2(c) states that all development within the Aurora Promenade shall be consistent with the Concept Plan and Urban Design Strategy. Under the Downtown Designation delineated on Schedule ‘D1’, a wide range of commercial and institutional uses are permitted Downtown, and residential uses are also permitted but generally must be located above the first floor (a limited number of ancillary at-grade units may be permitted at the rear of sites). The ground floors of buildings along Yonge Street are intended for active uses that help enliven the adjacent street, such as retail and restaurants. Retail stores cannot have a frontage greater than 15 metres. Page 23 of 88 6DRAFT FINAL REPORT URBAN STRATEGIES INC. Masters Row A l la u ra B lv d KnowlesCresCloss Sq Morland CresCollins Cres A mes C resBuchananCresMoorcrest Dr CedarCresForeht CresAlgonquinCres Collis DrTreegrove Cir Patrick DrC r o ss i n g Bridge PlDavidson RdBoulding DrHolmanCresT i mp s onDr BeaconH allDrB r o o kland Ave Woodroof Cres DeerhornCres CandacVal l eyDrCopla ndTrCasemount StHarris on Ave SimmonsCre s Long Valley Rd McClennyDrCorbettCres Treegrove Cir Devins DrFi e l dingDrMarshview Ave Delattaye AveBrooks Ave McDonald Dr N icklaus D r GlenviewDr Al mCrtEngelhard Dr MurdockAve HarmonAve Barr CresValleyCres Cranberry Ln LanewoodDr HarrimanRdTribblingCres OctoberLnHi ll Dr Mary St HodgkinsonCres PineneedleD r JarvisAveDeergl enT err D eerg le n Te rrSisman AveHilldaleRdDelayneDr TemperanceStStoddartDrWil l is D r WillisDrCliffTr IndustryStSpruce StBenvilleCresStone Rd S to n e RdZokolDrTecumse h DrMurrayDrMurrayDr B r u s h GrWalton DrJasperDrSeatonDrMcClellanWayCornerRidgeRd CornerRidgeRd Bilbrough St Gilbank Dr SneddenAveWindhamTrBrittonTrMillcliffCirBatsonDrBatsonD rHo ll a n d view Tr Ho l l i d g e B l v d JohnWestWayConoverAveG o l f L i n k s D r Prim ea u Dr R aiford St Hillview Rd Steckley St Ostick St Haw th o rne L n BigwinDrTreeTopsLn AbbottAveRoyal Rd D o die St Mill StConnaught Ave Child Dr Milgate Pl Larmont StIrwin Ave Mugford Rd Mosley St Bowler St CossarDr Reuben St Catherine AveBanffDr Kenne dy St EGeorgeSt WenderlyDrD unning Ave Maple St Mark St TimberlineTr EdwardStTyler St WellsStCentre St Fairway Dr NisbetDrLensmith DrBaycroftLnLuxtonAveHeathwoodHeightsDr McNallyWayCousins Dr GlassDr M arte ll Gt Fife Rd H oll ingshead Dr KemanoRd G ilbert Dr I ndust r i al PkwyNLaurentideAveHalldorson Ave Richardson Dr Bridgenorth DrMe a d o w o o d DrGurnettStAurora Heights Dr Cou sins Dr EBerczySt McMasterAveTrilliumDrHaidaDr MosaicsAveVictoriaStBorealis Ave OrchardHeightsBlvd Hollandview T r River Ridge Blvd Kennedy St W Willow Farm Ln WELLINGTON ST W VANDORF SDRD WELLINGTON ST E HENDERSON DR BAYVIEW AVEYONGE STVANDORF SDRD JohnWestW ayA urora Heig h t s DrOrchard Heights Blvd OldYongeStBatson DrSpruce StMark St W alto n Dr Devins Dr K e m a n o R d Willow F a rmLnMeadowoodDrOrchardHeightsBlvdK e ma noRdW hisper i ngPineTrGilbank Dr AuroraHeightsDr McLeod DrKennedyStW TimpsonDr Cranberry Ln TimberlineTr Seaton Dr M urray Dr Child DrG l a s s Dr TamaracTr Murray Dr Kennedy St W MurrayDrEdward St Edward StRichardsonDrTamaracTr IndustrialPkwy S In dustrialPkwySIndust r i a l P k w y S Engelhard DrMary StCentre St YONGE STBAYVIEW AVEST JOHN'S SDRD W BATHURST STWELLINGTON ST EWELLINGTON ST W AURORA OFFICIAL PLAN SCHEDULE 'D2' The Aurora Promenade and Major Transit Station Area Building Heights Legend Minimum 2-storeys Maximum 6-storeys 0 500 1,000250Meters Minimum 2-storeys Maximum 5-storeys Minimum 2-storeys Maximum 3-storeys Maximum 7-storeys Transition 45 degree angle stepbacks and/or setbacks Secondary Plan Boundary MTSA Boundary GO Station RailwayRailway / GO Transit LineFigure 6: Aurora Offical Plan - Schedule ‘D2’. Masters Row A l la u ra B lv d KnowlesCresCloss Sq Morland CresCollins Cres Ames CresBuchananCres Moorcrest Dr CedarCresForeht CresAlgonquinCr es Collis DrTreegrove Cir Patrick DrC r ossi n g BridgePlDavidson RdBoulding DrHolmanCresTi mp s onDr BeaconH allDrB r o o kland Ave Woodroof Cres DeerhornCre sCandacVall eyDrC o pla ndTrCasemount StHarrison Ave SimmonsCre s Long Valley Rd McClennyDr CorbettCres Treegrove Cir Devins DrFi e l dingDrMarshview Ave Delattaye AveBrooks Ave McDonald Dr Nicklaus Dr Glenview Dr Al mCrtEngelhard Dr MurdockAve HarmonAve Barr CresValleyCres Cranberry Ln LanewoodDr HarrimanRdTribbling Cres OctoberLnHill Dr Mary St Hodg k in s o n C r e s PineneedleD r JarvisAveDeergl enTerr D eerg le n Te rrSisman AveHilldaleRdDelayneDr TemperanceStStoddartDrWil l i s D r WillisDrCliffTr IndustryStSpruce StBenvilleCresStoneRd S to n e RdZokolDrTecumse h DrMurray DrMurrayDr B r u s h GrWalton DrJasperDrSeatonDrMcCl el lanWayCornerRidgeRd CornerRidgeRd Bilbrough St Gilbank Dr SneddenAveWindhamTrBrittonTrMillcliffCirBatsonDrBatsonD rHo ll a n d view Tr Hol l i d g e B lvd JohnWestWayConoverAveG o l f L i n k s D r Prim ea u Dr Raiford St Hillview Rd Steckley St Ostick St Hawthorne Ln BigwinDrTreeTopsLn AbbottAveRoyal Rd D odie St Mill StConnaught Ave Child Dr Milgate Pl Larmont StIrwin Ave Mugford Rd Mosley St Bowler St Cossar Dr Reuben St Catherine AveBanffDr Kennedy St EGeorgeSt WenderlyDrDunning Ave Maple St Mark St TimberlineTr EdwardStTyler St WellsStCentre St Fairway Dr NisbetDrLensmith DrBaycroftLnLuxtonAveHeathwoodHeights Dr McNallyWayCousins Dr G l a s sDrMartell Gt Fife Rd Hollingshead Dr Kemano Rd Gilbert Dr I ndust r i al PkwyNLaurentideAveHalldorson Ave Richardson Dr Bridgenorth DrMead o w o o d DrGurnettStAurora Heights Dr Cousins Dr EBerczySt McMasterAveT r illiu m D r HaidaDrMosaicsAveVictoriaStBorealis Ave O r c h a r d Heights Blvd Hollandview T r River Ridge Blvd Kennedy St W Willow Farm Ln WELLINGTON ST W VANDORF SDRD WELLINGTON ST E HENDERSON DR BAYVIEW AVEYONGE STVANDORF SDRD JohnWestW ayAuroraHeig h t s DrOrchard Heights Blvd OldYongeStBatson DrSpruce StMark St W alto n Dr Devins Dr K e m a n o Rd Willow F a rmLnMeadowoodDrOrchardHeightsBlvdK e ma noRdW hisper i ngPineTrGilbank Dr AuroraHeightsDr McLeod DrKennedyStW T i m p sonDrCranberry Ln TimberlineTr Seaton Dr M urray Dr Child DrG l a s s Dr TamaracTr Murray Dr Kennedy St W MurrayDrEdward St Edward StRichardsonDrT a m aracTrIndustrialPkwy S In d ustrialPkwySIndustria l P k w y S Engelhard DrMary StCentre St YONGE STBAYVIEW AVEST JOHN'S SDRD W BATHURST STWELLINGTON ST EWELLINGTON ST W AURORA OFFICIAL PLAN SCHEDULE 'D2' The Aurora Promenade and Major Transit Station Area Building Heights Legend Minimum 2-storeys Maximum 6-storeys 0 500 1,000250Meters Minimum 2-storeys Maximum 5-storeys Minimum 2-storeys Maximum 3-storeys Maximum 7-storeys Transition 45 degree angle stepbacks and/or setbacks Secondary Plan Boundary MTSA Boundary GO Station RailwayRailway / GO Transit LineSchedule ‘D2’ establishes a minimum height of two storeys and a maximum height of five storeys within the Downtown Designation south of Wellington Street, with the maximum increasing to six storeys north of Wellington Street. Buildings taller than three storeys are subject to a step-back at the third storey. The bulk of buildings are to be built zero to one metre from front and exterior side lot lines on lots with less than 40 metres of frontage; build-to lines increase to one to three metres on lots of 40 metres or wider. Policies 9.3.2(d)-(f) set out design policies focused on the conservation and integration of heritage resources and respect for the character of existing buildings in the design of new ones. The maximum height across much of Downtown is five storeys, with six storeys permitted north of Wellington Street. The fourth and fifth storeys of buildings must be stepped back a minimum of three metres from the front wall. The Official Plan requires height transitions to adjacent low-rise neighbourhoods, but how this is to be achieved is not regulated in the Zoning By- law. The Official Plan also calls for laneways at the rear of properties on Yonge Street, where possible, to accommodate utilities and access to loading and parking. Page 24 of 88 7 DOWNTOWN AURORA COMMUNITY PLANNING PERMIT SYSTEM | DOWNTOWN URBAN DESIGN STUDY | DRAFT FINAL REPORT Figure 7: Promenade Zoning Map. »Comprehensive Zoning By-Law The land use and built form regulations for Downtown in the Town’s Zoning By-Law are consistent with the policies of the Official Plan. Most of Downtown is zoned Promenade Downtown (PD1), which permits a broad range of commercial and institutional uses as well as dwelling units above the first floor (see Table 1). Multiplexes and townhouses are not permitted. The maximum height is 18.5 metres provided the fourth and fifth storeys are set back a minimum of three metres from the front and exterior side walls of the building. Other zone requirements are contained in Table 2. Several properties zoned PD1 are subject to exceptions from the general provisions of the By-law. Notably, a maximum height of 22 metres is permitted on the site of the Amica Retirement Home, and a series of site-specific building step-backs at the front and rear are prescribed. Properties on the south side of Mosley Street are zoning Promenade Downtown – Special Mixed Density Residential (PD2), which permits a range of low-rise residential uses and a limited number of commercial uses. North of Mosley Street and west of Victoria Street, several properties are zoned R7, which permits detached, semi-detached, duplex and triplex dwellings. Other properties on the east side of Downtown, fronting Wellington Street and Victoria Street are zoned Promenade Downtown Shoulder – Central Commercial (PDS1), which permits a full range of commercial, institutional and residential uses and has the same zone requirements as those generally applicable in the PD1 zone. Page 25 of 88 8DRAFT FINAL REPORT URBAN STRATEGIES INC. Table 1: Promenade Permitted Uses. Table 2: Zone Requirements. Page 26 of 88 9 DOWNTOWN AURORA COMMUNITY PLANNING PERMIT SYSTEM | DOWNTOWN URBAN DESIGN STUDY | DRAFT FINAL REPORT Figure 8: Aurora Promenade Streetscape. »Aurora Promenade Streetscape Project In parallel with the Community Planning Permit System initiative for Downtown, the Town is also planning to enhance the Aurora Promenade streetscape on Yonge Street (between Wellington Street and Church Street). The design will include sidewalks, crosswalks, entry features, and signage. Improvements currently being studied include accessibility, light pole upgrades, street furniture, trees and other landscaping. Improvements to parking and traffic flow are also being considered. Upgrades to the public realm will be implemented in conjunction with the rehabilitation and replacement of critical utility infrastructure. The planned improvements to the streetscape of Yonge Street will support businesses and further encourage residential development Downtown. There may be opportunities for future development to optimize the improvements with ground-floor setbacks that widen the space available for walking, restaurant patios and retail displays. Page 27 of 88 10DRAFT FINAL REPORT URBAN STRATEGIES INC. Figure 9: Downtown’s Existing Urban Structure. To identify sites Downtown appropriate for new development and determine suitable approaches to the massing of new buildings, the Urban Design Study first looked at the key assets of Downtown—uses, buildings and spaces—that need to be maintained, respected and reinforced. The analysis of existing conditions revealed underutilized land between and behind assets, much of it used for parking but with the potential to accommodate significant residential intensification. The analysis also identified 3.0 DOWNTOWN TODAY: ASSETS AND OPPORTUNITIES opportunities to enhance the public realm for pedestrians with new connections, gathering spaces, and laneways. Below is a summary of key features and characteristics of Downtown, including the assets that make it a popular destination and desirable neighbourhood. The opportunities to reinforce assets and improve Downtown with new residential and mixed-use development are highlighted. Downtown Aurora has many assets that make it a popular destination and a desirable neighbourhood. There are also opportunities to grow and improve Downtown with more housing, businesses and places to visit. 1 2 3 4 5 6 Page 28 of 88 11 DOWNTOWN AURORA COMMUNITY PLANNING PERMIT SYSTEM | DOWNTOWN URBAN DESIGN STUDY | DRAFT FINAL REPORT Much of the historic main street remains intact, giving Downtown a valued character and making it a unique commercial destination within the town. Buildings are mostly 2-3 storeys. Maintaining and extending a streetwall up to 3 storeys, with storeys above this height pushed well back from the front wall, will preserve Yonge Street’s small-town feel. At the same time, allowing new buildings on properties without significant heritage to have a modest setback from the right-of-way would effectively widen the public realm for pedestrians. Source: https://engageaurora.ca/ 1 Source: Google Earth 2 Source: https://engageaurora.ca/ 3 Away from Yonge Street, on Mosley Street and Victoria Street, former churches and detached houses, some containing non-residential uses (day care, professional offices) contribute to the charm of Downtown. While some “gentle” intensification in this pocket of Downtown would be appropriate, historically significant buildings should be conserved, and the area’s residential character should be maintained. The lack of traditional storefronts and street trees, and the presence of parking lots, contribute to a pedestrian-unfriendly streetscape on Wellington Street. And neither buildings nor the public realm have been designed to highlight the important intersection of Yonge Street and Wellington. Redevelopment on both sides of the street that establishes a consistent streetwall, contains active uses on the ground floor, and includes streetscape improvements would extend the retail environment of Yonge Street. Buildings of 5-6 storeys would also add a significant amount of new housing Downtown. Assets and Opportunities Page 29 of 88 12DRAFT FINAL REPORT URBAN STRATEGIES INC. Source: Google Earth 4 Source: https://engageaurora.ca/ 5 Source: Google Earth 6 The new Town Square and Cultural Centre, joining the library, have significantly enhanced Downtown as a destination and gathering place. Mixed-use development on commercial sites to the west and south would bring more daily life to the Town Square, and redevelopment of the Town-owned property north of the library could bring more office workers and/or residents to Downtown. Parking lots for commercial and institutional uses occupy a significant amount of land behind buildings. New development will bring opportunities to accommodate parking for residents, businesses and the public underground, at grade in the base of buildings, or in parking structures tucked behind residential and mixed- use buildings. It’s easy to walk around Downtown, but heavy traffic on Yonge Street and Wellington Street can contribute to an uncomfortable pedestrian experience. More mid-block connections and intimate open spaces, like Machell’s Alley, would provide opportunities to get away from traffic noise and could accommodate restaurant patios. They would also help to define future development sites, providing secondary frontages. Page 30 of 88 13 DOWNTOWN AURORA COMMUNITY PLANNING PERMIT SYSTEM | DOWNTOWN URBAN DESIGN STUDY | DRAFT FINAL REPORT 4.0 GUIDING PRINCIPLES AND FRAMEWORK FOR CHANGE The Town’s Official Plan policies for Downtown and the analysis of existing conditions summarized in the previous sections informed the principles below, which were used to guide the massing study described in the next section. The principles also build on previous studies of Downtown and reflect fundamental principles of good urban design commonly applied to environments where a positive pedestrian experience and compatibility with existing development are paramount. 1. Enhance Downtown as a shopping, dining and entertainment destination by ensuring Yonge Street and Wellington Street are lined with commercial and institutional uses and creating new public space to gather and linger. 2. Grow Downtown as a neighbourhood with a range of housing choices in a variety of building types and forms. 3. Maintain and reinforce the historic character of Yonge Street by conserving heritage properties and limiting the height of new buildings to three storeys near the street. 4. Establish over time a continuous streetwall of three to four storeys on Wellington Street with mixed-use buildings to create a more pedestrian- friendly environment and extend the Downtown shopping and dining experience. Guiding Principles 5. Concentrate the mass of new development in the interior of blocks with greater height flexibility and gradual built form transitions to the surrounding streets and neighbourhoods. 6. Break up the massing of long buildings to create varied, interesting streetscapes and accommodate mid-block connections. 7. Integrate residential and commercial parking within developments and minimize surface parking. 8. Minimize the impact of driveways and service areas on the pedestrian realm by establishing rear laneways where possible and promoting shared driveways. Page 31 of 88 14DRAFT FINAL REPORT URBAN STRATEGIES INC. Figure 10: Emerging Framework for Change. The Framework for Change illustrated in Figure 10 was also developed to guide the massing study. Recognizing Downtown’s valued assets and opportunities for growth, the Framework identifies areas with significant potential for intensification based on the size of individual properties and the likelihood that small properties will continue to be assembled into large sites to optimize their development potential. The Framework also highlights opportunities for mid- block connections to enhance the pedestrian network, »Framework for Change provide intimate gathering spaces off Yonge Street and Wellington Street, and help define development sites. Over time, the two proposed east-west connections would improve access to parks and trails outside Downtown. The depth of assembled sites west of Yonge Street and proposed laneways through properties east of Yonge Street support the assumption that future development will be accessed by drivers from side streets. Laneways will help ensure access to parking and servicing areas does not diminish the pedestrian realm. Page 32 of 88 15 DOWNTOWN AURORA COMMUNITY PLANNING PERMIT SYSTEM | DOWNTOWN URBAN DESIGN STUDY | DRAFT FINAL REPORT The Community Planning Permit System for Downtown will combine rezoning, minor variance and site plan applications into a single streamlined approvals process. 5.0 MASSING STUDY A Community Planning Permit System for Downtown is intended to encourage the development of much-needed housing by streamlining the planning approvals process. Providing greater flexibility with respect to the built form of residential and mixed- use development can also encourage landowners to pursue intensification of their properties. With this goal in mind, the Urban Design Study team explored an alternative approach to massing future buildings that would result in a greater population density than is possible under current policies and zoning while respecting the historic character of Downtown. Guided by the principles and framework in Section 4, the massing study began with the 3D modeling of conceptual buildings that respect the current five-storey height limit across much of Downtown, six storeys on the north side of Wellington Street. The study focused on the assembled properties identified in the Framework for Change since they have the most capacity to efficiently accommodate new development. This “As-of-Right” Development Concept provided a base case for comparing an alternative concept, in terms of overall density and the visual experience of Downtown. Both the As-of-Right Development Concept and Alternative Development Concept are consistent in terms of land use. The ground floors of buildings on Yonge Street and Wellington Street contain commercial space, and the remaining portion of all new buildings have been massed to accommodate residential units (apartments and townhouses). Neither of the concepts would require the demolition of designated heritage buildings. Both concepts replace much of the off-street surface parking Downtown and assume future parking for residents, businesses and the public will be integrated with new development, mostly underground. Both concepts also assume parking, loading and service areas would be accessed directly from Temperance Street or, for buildings east of Yonge Street, from new rear laneways. The massing of buildings in the development concepts was informed by observations and mapping of existing surface and above-grade conditions across Downtown. Potential technical constraints to future development, such as environmental features, geotechnical and soil conditions, underground servicing infrastructure, and utility easements, were not considered. Prior to the preparation and approval of future development applications, site-specific technical studies will be required to confirm any constraints to redevelopment on individual sites. Zoning Minor Variance Site Plan Control Community Planning Permit System Page 33 of 88 16DRAFT FINAL REPORT URBAN STRATEGIES INC. Figure 11: The As-of-Right Development Concept assumes the assembly of smaller properties into larger ones will continue and ultimately result in a series of new 5-storey mixed-use and residential buildings across Downtown. The bird’s-eye views in Figures 12 and 13 conceptually illustrate what a series of five-storey and six-storey buildings constructed over time could look like, and Table 3 provides key statistics for the concept, including the estimated number of new housing units that could be accommodated. In addition to respecting the current height limits Downtown, the buildings also comply with the requirement for the portion of buildings above the third storey to be stepped back a minimum of three metres from the front and exterior side walls. Buildings along Yonge Street, south of Wellington Street, have no setback from the right-of-way. »As-of-Right Development Concept Plan View 0 SCALE 1:750 10025 20050 A B C D F G H I J E Wellington St Yonge StMosley St Victoria StTemperance StTyler St 6st6st6st6st 5st 5st 5st5st 5st 5st 5st 5st 5st 5st 5st 5st 5st 5st 0 SCALE 1:750 10025 20050 A B C D F G H I J E Wellington St Yonge StMosley St Victoria StTemperance StTyler St Page 34 of 88 17 DOWNTOWN AURORA COMMUNITY PLANNING PERMIT SYSTEM | DOWNTOWN URBAN DESIGN STUDY | DRAFT FINAL REPORT Figure 12: View looking northwest over Downtown. In the long-term, parking for both commercial and residential uses would be accommodated within future developments, either underground or in the base of buildings, behind other uses. Table 3: Key statistics for the concept. Aerial 3D views of the As-of-Right Development Concept Yonge StreetWelling t o n S t r e e t Mosle y S t r e e t Chur c h S t r e e t Taylor S t r e e t Key Statistics of the As-of-Right Development Concept Gross Floor Area of New Development 120,000 sqm Estimated Number of New Residential Units 1100 Estimated Total Commercial Floor Area 10,000 Average Density of New Development 1.9-2.9 FSI Maximum Height (new buildings)5 Storeys (6 Storeys North of Wellington Street) Setback from Yonge Street 0 metres Upper Floor Step-back from Yonge Street 3.0 metres above 3rd floor Page 35 of 88 18DRAFT FINAL REPORT URBAN STRATEGIES INC. Figure 13: View looking southeast over Downtown.Yonge StreetWel l i n g t o n S t r e e t Mosle y S t r e e t Churc h S t r e e t Taylo r S t r e e t Page 36 of 88 19 DOWNTOWN AURORA COMMUNITY PLANNING PERMIT SYSTEM | DOWNTOWN URBAN DESIGN STUDY | DRAFT FINAL REPORT Figure 14: View looking down Yonge Street from Wellington Street. Conserving heritage properties on Yonge Street will be critical to maintaining its historic character. Street-level Renderings of the As-of-Right Development Concept The street-level renderings in Figures 14 and 15 illustrate how a series of five-storey buildings would affect the character of Yonge Street and the pedestrian experience. Figure 16 is a rendered view looking south on Temperance Street. The views from Yonge Street show that even with the fourth and fifth storeys stepped back three metres from the lower floors of new buildings, the additional massing would significantly alter the built form character of the street, considering most of the existing historic buildings are two storeys. Page 37 of 88 20DRAFT FINAL REPORT URBAN STRATEGIES INC. Figure 15: View looking north on Yonge Street. Five-storey buildings, even with minimum 3-metre step-backs above the third storey, will change the experience of the street over time. Page 38 of 88 21 DOWNTOWN AURORA COMMUNITY PLANNING PERMIT SYSTEM | DOWNTOWN URBAN DESIGN STUDY | DRAFT FINAL REPORT Figure 16: View looking south on Temperance Street. Street trees and landscaped yards will help to maintain the character of streets surrounding Downtown. Page 39 of 88 22DRAFT FINAL REPORT URBAN STRATEGIES INC. The Alternative Development Concept responds to the depth of the blocks along Yonge Street and concentrates the massing of new buildings in the interior of sites, allowing for a more gradual transition in heights from Yonge Street, as illustrated in Figures 19 and 20. Stepbacks above the third storey along Yonge are increased from three metres to ten metres, where heights increase to five storeys. Above the fifth storey, the massing steps back another ten metres before increasing further to maximum heights of nine storeys west of Yonge Street and eight storeys east of Yonge Street where such heights would have minimal impact on adjacent properties. Further south, where the surrounding low-rise neighbourhoods extend into Downtown, the maximum heights are five and six storeys. Note, the maximum heights of buildings west of Yonge Street are measured from Temperance Street, which slopes down from both Wellington Street and Yonge Street. Measured from either of these streets, the heights would be one storey less. The Alternative Development Concept also differs from the As- of-Right Concept in that the new buildings on Yonge Street, except where an existing historic façade has been retained, are set back two metres from the right-of-way to provide more space for pedestrians and restaurant patios. The Alternative Concept increases the achievable density on some sites by up to 50% and yields approximately 155 more residential units and approximately 15% more density overall than the As-of-Right Concept. »Alternative Development Concept Figure 17: As also shown in the As-of-Right Concept, mid-block pedestrian connections and laneways provide a framework for future development and would enhance the public realm. Plan View Figure 18: The As-of-Right Development Concept assumes the assembly of smaller properties into larger ones will continue and ultimately result in a series of new 5-storey mixed-use and residential buildings across Downtown 0 SCALE 1:750 10025 20050 A B C D F G H I J E Wellington St Yonge StMosley St Tyler St Church St Victoria StTemperance St6st 6st6st6st6st 5st 8st 5st5st 9st 8st 6st 8st 5st 5st 5st 3st 6st 6st 5st 6st 0 SCALE 1:750 10025 20050 A B C D F G H I J E Wellington St Yonge StMosley St Tyler St Church St Victoria StTemperance StPage 40 of 88 23 DOWNTOWN AURORA COMMUNITY PLANNING PERMIT SYSTEM | DOWNTOWN URBAN DESIGN STUDY | DRAFT FINAL REPORT Table 4: Key statistics for the concept. Figure 19: View looking northwest over Downtown. Varying the maximum building height Downtown should result in a greater variety of housing types. Aerial 3D view of the Alternative Development Concept Yonge StreetWellingt o n S t r e e t Mosle y S t r e e t Chur c h S t r e e t Taylor S t r e e t Key Statistics of the Alternative Development Concept Gross Floor Area of New Development 134,300 sqm Estimated Number of New Residential Units 1260 Estimated Increase in Commercial Floor Area 8,600 Average Density of New Development 1.4-4.1 FSI Maximum Height (new buildings)9 Storeys (6 Storeys North of Wellington Street) Setback from Yonge Street 2 metres Upper Floor Step-back from Yonge Street 10.0 metres above 3rd floor Page 41 of 88 24DRAFT FINAL REPORT URBAN STRATEGIES INC. Figure 20: View looking southeast over Downtown.Yonge StreetWel l i n g t o n S t r e e t Mosle y S t r e e t Churc h S t r e e t Taylo r S t r e e t Page 42 of 88 25 DOWNTOWN AURORA COMMUNITY PLANNING PERMIT SYSTEM | DOWNTOWN URBAN DESIGN STUDY | DRAFT FINAL REPORT Street-level Renderings of the Alternative Development Concept Figure 21: View looking down Yonge Street from Wellington Street. Requiring the upper floors of new buildings along Yonge Street to be stepped back at least 10 metres would help preserve the street’s historic scale and character. As the street-level renderings in Figures 21 and 22 illustrate, the alternative massing approach moderates the visual impact of buildings over three storeys. The step- back of upper floors allows the three-storey facades to dominate the built form character of Yonge Street, and the portions of buildings above the fifth storey have a negligible impact on pedestrian views. In addition, Figure 22 shows how increased setbacks at street level allow restaurants and shops to bring more life to Yonge Street. Considering the west side of Temperance Street, north of Tyler Street, is half lined with industrial and commercial properties, taller buildings on the east side would have minimal impacts on the street’s character. Minimum three-metre step-backs above the fourth storey and landscaped front yards, as illustrated in Figure 23, will help ensure the pedestrian environment is inviting and comfortable. Page 43 of 88 26DRAFT FINAL REPORT URBAN STRATEGIES INC. Figure 22: View looking north on Yonge Street. This view shows that buildings up to 9 storeys in the interior of blocks would barely be visible from Yonge Street. Setbacks of 2 metres from front property lines will effectively widen the sidewalk and provide space for restaurant patios and retail displays. Page 44 of 88 27 DOWNTOWN AURORA COMMUNITY PLANNING PERMIT SYSTEM | DOWNTOWN URBAN DESIGN STUDY | DRAFT FINAL REPORT Figure 23: View looking south on Temperance Street. Buildings up to 9 storeys along Temperance Street, including townhouses, would enhance the streetscape. Page 45 of 88 28DRAFT FINAL REPORT URBAN STRATEGIES INC. As-of-Right Development Concept Alternative Development Concept Yonge StreetWellingt o n S t r e e t Mosle y S t r e e t Chur c h S t r e e t Taylor S t r e e t Yonge StreetWellingt o n S t r e e t Mosle y S t r e e t Churc h S t r e e t Taylor S t r e e t »Comparison of the Development Concepts View looking northwest over Downtown.View looking northwest over Downtown. The images below and on the next page comparing the Alternative Development Concept to the As-of-Right Concept demonstrate that by increasing required step-backs above the third storey along Yonge Street and permitting greater height toward the rear of sites, the valued character and pedestrian experience of Downtown will be maintained. Plan View.Plan View. Figure 24: The As-of-Right Development Concept assumes the assembly of smaller properties into larger ones will continue and ultimately result in a series of new 5-storey mixed-use and residential buildings across Downtown 0 SCALE 1:750 10025 20050 A B C D F G H I J E Wellington St Yonge StMosley St Tyler St Church St Victoria StTemperance St6st 6st6st6st6st 5st 8st 5st5st 9st 8st 6st 8st 5st 5st 5st 6st 6st 3st 5st 6st 0 SCALE 1:750 10025 20050 A B C D F G H I J E Wellington St Yonge StMosley St Tyler St Church St Victoria StTemperance St0 SCALE 1:750 10025 20050 A B C D F G H I J E Wellington St Yonge StMosley St Victoria StTemperance StTyler St 0 SCALE 1:750 10025 20050 A B C D F G H I J E Wellington St Yonge StMosley St Victoria StTemperance StTyler St 6st6st6st6st 5st 5st 5st5st 5st 5st 5st 5st 5st 5st 5st 5st 5st 5st Page 46 of 88 29 DOWNTOWN AURORA COMMUNITY PLANNING PERMIT SYSTEM | DOWNTOWN URBAN DESIGN STUDY | DRAFT FINAL REPORT View looking down Yonge Street from Wellington Street.View looking down Yonge Street from Wellington Street. View looking north on Yonge Street. View looking north on Yonge Street. View looking south on Temperance Street. View looking south on Temperance Street. As-of-Right Development Concept Alternative Development Concept Page 47 of 88 30DRAFT FINAL REPORT URBAN STRATEGIES INC. 6.0 RECOMMENDATIONS Land Use ˜̅ˆÃÃiV̈œ˜]̅ičÌiÀ˜>̈Ûi iÛiœ«“i˜Ì œ˜Vi«Ì`iÃVÀˆLi`>˜`ˆÕÃÌÀ>Ìi`ˆ˜-iV̈œ˜x«ÀœÛˆ`iÃ̅iL>Èà for recommended land use and built form regulations to be included in the Community Planning Permit By- law for Downtown. The section concludes with recommendations regarding parking, laneways, mid-block pedestrian connections, and other site planning and urban design matters. The recommendations address where variances from the regulations may be appropriate, acknowledging that under a CPP By-law, the Town will be classifying CPP applications based on the number and degree of variances from by-law provisions. Applications requiring no variances or minor variances may be approved by the Town’s Director of Planning and Development, whereas variances considered significant would require Council approval. 7…ˆi̅iÃÌÕ`Þ½ÃÀiVœ““i˜`>̈œ˜ÃvœVÕܘ̅i ** އ>Ü]ܓiœv̅i“܈ÀiµÕˆÀiVœ˜VÕÀÀi˜Ì amendments to the Town’s Official Plan’s policies applicable to the Aurora Promenade, notably those regarding maximum building heights and minimum and maximum setbacks. Note, in the event any of the recommendations below conflict with any requirements that may be imposed on a property under the Ontario Heritage Act, the latter requirements should prevail. The land uses assumed in the Alternative Development Concept are generally consistent with those currently permitted by the Town’s Official Plan and Zoning By-law. Although the concept assumes intensification will occur predominantly with residential uses, the ground floors of buildings fronting Yonge Street and Wellington Street were massed to accommodate commercial or institutional uses intended to help enliven the public realm. Office uses or other commercial or institutional uses could occupy the upper floors of the new buildings in the concept but may require wider floorplates and higher floor-to-ceiling heights (approximately four metres versus three metres). It is not expected that Downtown will attract significant multi-storey commercial office buildings given the availability of more suitable and accessible sites elsewhere in the Town. Figure 25 is a proposed land use map for the CPP By-law recommending an area where the by-law would apply and identifying the area as “Downtown Mixed Use” or “DMU.” Properties considered within Downtown but outside the DMU area and currently zoned PD1 or PDS1, where significant intensification would not be appropriate, would continue to be subject to Zoning By-law 6000-17.Figure 25: Land Use Map. Page 48 of 88 31 DOWNTOWN AURORA COMMUNITY PLANNING PERMIT SYSTEM | DOWNTOWN URBAN DESIGN STUDY | DRAFT FINAL REPORT Within the new DMU area, most of the uses currently permitted in a PD1 zone should continue to be permitted. The only currently permitted non- residential uses that would be more suitable in other parts of Aurora Promenade or elsewhere in the town are athletic fields, cemeteries, day care centres, funeral homes, garden centres, and private and public schools (note, some of these uses are permitted through Section 11.1 of the Zoning By-law). Regarding residential uses, the Zoning By-law only permits dwelling units above the first storey. Although dwelling units are not appropriate on the ground floors of buildings fronting Yonge Street and Wellington Street, they would be appropriate on ground floors along Temperance and Victoria streets and Downtown’s other side streets. In addition, townhouses and multiplex dwellings (i.e., triplexes, fourplexes) are not currently permitted in PD1 zones; however, these forms of housing would be appropriate on Downtown’s side streets as a transition from taller apartment and mixed-use buildings to the surrounding neighbourhoods, and to maintain a mix of housing types in the Downtown. It’s recommended the Town consider amending the Official Plan to clearly permit multi-unit residential uses everywhere Downtown except on the ground floors of buildings along Yonge Street and Wellington Street, rather than stating a limited number of ancillary at-grade units may be permitted at the rear of sites. These are the uses recommended to be permitted in the proposed DMU area: • Art Gallery • Bed and Breakfast • Clinic • Club • Commercial Schools • Dry Cleaning Establishment • Dry Cleaning Distribution Centre and Depot • Dwelling Units, provided no dwelling units are located on the ground floor of a building fronting Yonge Street or Wellington Street within 25 metres of the front lot line • Dwelling, Multiplex, provided the dwelling is not located within 25 metres of lot lines abutting Yonge Street and Wellington Street • Dwelling, Townhouse, provided the dwelling is not located within 25 metres of lot lines abutting Yonge Street and Wellington Street • Financial Institutions • Fitness Centre • Hospital • Hotel • Laundromat • Library, Public • Long Term Care Facility • Museum • Offices • Personal Services Shop • Pet Services • Place of Enertainment • Place of Worship • Private Park • Restaurants • Retail Stores, provided no single store is larger than 1,800 square metres GFA and no single store has frontage abutting a public street greater than 15 metres • Retirement Home • School, Post-Secondary • Service Shops • Studios • Veterinarian Clinic Proposed land uses not explicitly permitted by the CPP By-law should not be considered a minor variance from the by-law and should only be approved by Council. Page 49 of 88 32DRAFT FINAL REPORT URBAN STRATEGIES INC. More significant revisions to the current built form regulations applicable Downtown, specifically those regarding setbacks, heights and step-backs, are recommended for the new CPP By-law. Setbacks Table 5 recommends minimum and maximum setbacks for new buildings in the DMU area. Notwithstanding the minimum front yard and exterior side yard setbacks, where the façade of an existing building is being retained, the setback of the façade would be the minimum requirement. In addition, the by-law should identify where sight triangles may be required at intersections and state that front yard and exterior side yard requirements shall not apply where a build abuts a triangle. The recommended minimum front yard setbacks along Yonge Street and the east-west streets in the Downtown depart from the current minimum of zero metres, recognizing that the streetscapes »Built Form & Site Planning would benefit from additional space for pedestrians, restaurant patios and retail displays. The recommended minimum front yard setbacks along Temperance Street and Victoria Street will provide space for landscaping, stairs, porches and/or patios, which will give the streetscapes a residential character consistent with the other side of these streets. It is recommended the CPP By-law allow the Director of Planning and Development to permit variances of up to 10% from the above setback requirements. In the case of variances from front yard and exterior side yard requirements, Town staff should be satisfied a requested variance would result in a comfortable environment for pedestrians and appropriate space for proposed streetscape improvements in the private realm. In the case of variances from rear yard requirements, the impact on neighbouring properties in terms of shadows, sky views and loss of privacy should be assessed. Variances greater than 10% should be subject to Council approval. Abutting Streets Minimum Setback Maximum Setback Front Yard and Exterior Side Yard Yonge St or Wellington St 2 m 3 m Tyler St, Mosley St or Church St 1.5 m 2.5 m Temperance St or Victoria St 3 m 5 m Interior Side Yard n/a 0 m¹None Rear Yard n/a 7.5 m None ¹ Except on lots fronting Victoria Street, where the minimum required interior side yard setback should be 1.5 metres. Table 5: Recommended Setback Requirements. Page 50 of 88 33 DOWNTOWN AURORA COMMUNITY PLANNING PERMIT SYSTEM | DOWNTOWN URBAN DESIGN STUDY | DRAFT FINAL REPORT Heights and Step-backs Figure 26 is a map identifying the recommended minimum and maximum heights for future buildings. Consistent with the Alternative Development Concept, a maximum height of three storeys is recommended for the portion of buildings within 10 metres of the Yonge Street right-of-way south of Wellington Street. Effectively, this is a requirement for a minimum step-back of eight metres above the third storey of buildings constructed two metres from the front lot line (the recommended minimum setback). Beyond the eight-metre step-back, a maximum height of five storeys is recommended for the portion of buildings between 10 and 20 metres from the right- of-way, i.e., a further minimum step-back of 10 metres would be required above the fifth storey. Beyond the required step-backs from Yonge Street totaling a minimum of 18 metres, the recommended maximum heights vary from six storeys to nine storeys. Along Yonge Street north of Wellington Street, and along the east-west streets of Downtown— Wellington, Tyler, Mosley and Church—a minimum step-back of five metres above the third storey, measured from the lot line, is recommended. On the south side of Wellington Street, an additional minimum step-back of three metres should be required above the fifth storey for buildings greater than five storeys. Along Temperance Street, where the recommended minimum front yard setback is three metres, a minimum step-back above the fourth storey of eight metres from the right-of-way is recommended, i.e., three to five metres from the front wall of the building, depending on the front yard setback. This will help ensure there are appropriate built form transitions between buildings of potentially eight to nine storeys in the interior of the block to the adjacent low-rise neighbourhood. Along Victoria Street, a step-back of five metres from the front wall should be required above the third storey. Since variances to maximum heights could result in significant impacts to the character and experience of Downtown, generally they should be subject to Council approval. Where the maximum height is five storeys, however, the Director of Planning and Development should have the authority to approve a variance of one storey if staff are satisfied the additional storey would not have a significant adverse impact on the public realm and the pedestrian experience. In addition to limiting the overall height of new buildings, the CPP By-law should also require a minimum ground-floor height of four metres for buildings fronting Yonge Street and Wellington Street, to ensure they have the flexibility to accommodate a range of commercial or institutional uses over time. Note, where properties currently zoned PD1 and PDS1 within the proposed CPPS boundary have been granted exceptions to the general land use and built form provisions, it may be appropriate to carry forward the exceptions in the CPP By-law. In addition, portions of properties in the south end of the proposed CPPS area are zoned EP (Environmental Protection). Rather than carry this forward in the CPP By-law, it is recommended the by-law require an Environmental Impact Study where a property proposed for development is partially located within or adjacent to lands designated Environmental Protection in the Official Plan. Page 51 of 88 34DRAFT FINAL REPORT URBAN STRATEGIES INC. Figure 26: Heights and Step-backs Map. Page 52 of 88 35 DOWNTOWN AURORA COMMUNITY PLANNING PERMIT SYSTEM | DOWNTOWN URBAN DESIGN STUDY | DRAFT FINAL REPORT Rooftop Mechanical Equipment Mechanical equipment on the rooftop of a building can have a significant impact on the building’s overall appearance and the pedestrian experience. Significant residential and mixed-use developments in the Downtown should enclose mechanical equipment within a penthouse structure integrated into the overall design of the building. For all new development, the CPP By-law should require: • Rooftop mechanical equipment to be set back a minimum of three metres from the building edges and to not exceed a height of three metres, except elevator penthouses, which should not exceed five metres; • Rooftop mechanical equipment to be screened with solid screening designed to complement materials used for the building’s façade(s). Parking, Loading and Servicing Areas It was not within the scope of the Urban Design Study to assess whether the parking requirements applicable Downtown should be updated. However, the location and configuration of parking is an urban design matter. Currently, parking must be located in the rear yard of a site. It is recommended the CPP By-law go further than this and require parking to be provided in the rear yard, underground or in an above-grade structure integrated with other uses. More specifically, parking structures should not front a public street or open space and instead should be lined with other permitted uses to minimize the visual impact they have on the public realm. Like surface parking, loading and servicing areas can have adverse impacts on the living environment and pedestrian experience Downtown if not located and designed appropriately. The CPP By-law should require loading and servicing areas to be located at the rear or side of the building and be enclosed within the building where the rear or side abouts a public street or open space. Loading and servicing areas in the interior of a block should be screened from public view with walls and landscaping. Laneways As illustrated in the Framework for Change, in Section 4, and shown in the As-of-Right and Alternative Development Concepts, the Urban Design Study proposes that future development in the blocks east of Yonge Street, north and south of Mosley Street, be serviced by new public rear lanes. The introduction of rear lanes to these deep blocks will minimize the need for private driveways from streets thereby helping to minimize conflicts among vehicles, pedestrians and cyclists. It is recommended that the Town acquire any private land required for the laneways through dedications at the time of applications or by other means, and the CPP By-Law should require the laneway be implemented in conjunction with new development on adjacent lands. Mid-Block Pedestrian Connections The Framework for Change also identifies opportunities for extended and new mid-block pedestrian connections west and east of Yonge Street. These connections will not only make it easier to get around Downtown by walking or using mobility aids but may also provide additional public realm frontage for shops, restaurants and other businesses. The CPP By-law should include provisions to ensure mid-block connections feel safe and inviting: They should have a minimum width of eight metres where new buildings are proposed, and new development should frame and help enliven them with grade-related residential units, storefronts and/or other active uses. Page 53 of 88 36DRAFT FINAL REPORT URBAN STRATEGIES INC. In addition to incorporating the above recommendations regarding land use, built form, parking and site planning, the CPP By-law should require applicants to demonstrate their proposal generally is consistent with the Urban Design Guidelines in the Aurora Promenade Concept Plan and Urban Design Strategy, except where the guidelines may conflict with the recommendations. More specifically, the by-law should reference the following key guidelines to be considered in CPP applications. Façade Articulation and Materials • New buildings should respect the pattern of façade division by ensuring the horizontal and vertical architectural orders are aligned with neighbouring heritage buildings. • New buildings should have entries and display windows at regular intervals consistent with the established pattern on the block. • Windows should be vertically aligned from floor-to-floor and horizontally aligned with the neighbouring heritage buildings. • New buildings should include a cornice that is carefully aligned with neighbouring heritage significant buildings and of similar proportions. • New buildings should consider the pallet of materials and colours evident in existing heritage properties. • Building materials should be chosen for their functional and aesthetic quality and exterior finishes should exhibit quality of workmanship, sustainability and ease of maintenance. High quality materials like brick and stone masonry are highly encouraged as exterior cladding elements due to their functionality, aesthetic quality and compatibility. Materials should also be chosen for permanence. Vinyl siding, plywood, concrete block, darkly tinted and mirrored glass, and metal siding utilizing exposed fasteners should be discouraged. »Design Guidelines Storefronts • To reflect the existing character and context, storefronts should generally have a frontage in the range of 4.5 to 7.5 metres, but not greater than 15 metres. • Where retail frontages are greater than 7.5 metres, they should articulate narrow storefronts in the design of the façade. • Storefronts should have a high-level of transparency, with a minimum of 75% glazing to maximize visual animation. • Clear glass should be used for wall openings (e.g., windows and doors) along the street-level façade. Dark tinted, reflective or opaque glazing should be discouraged for storefronts. • An identifiable break or gap could be provided between the street-level uses and the upper floors of a building. This break or gap may consist of a change in material, change in fenestration, or similar means. • On corner sites, storefronts should address both street frontages through entries or glazing. Grade-Related Residential Units • Where townhouses or other forms of grade- related housing are proposed along the side streets of Downtown, to ensure they contribute to an inviting public realm separated from the private realm, the ground floor should be elevated a minimum of one metre. • Where a front porch or patio is proposed and encroaches into the required minimum setback, it should be elevated and set back a minimum of two metres from the sidewalk and partially screened with a low wall, metal rail or coniferous hedge for privacy. • Air conditioning units, heat pumps and other required utilities should be set back from the sidewalk and screened with a low wall and/or coniferous vegetation. Page 54 of 88 37 DOWNTOWN AURORA COMMUNITY PLANNING PERMIT SYSTEM | DOWNTOWN URBAN DESIGN STUDY | DRAFT FINAL REPORT Page 55 of 88 Town of AuroraCommunity Planning Permit By-law and Official Plan AmendmentSpecial Public Planning MeetingOctober 29, 2025Page 56 of 88 OverviewA Community Planning Permit By-law (CPP By-law) establishes the development policies and standards for a specified area and streamlines application processes by consolidating Zoning, Site Plan, and Minor Variances application processes into one. This combined application process is complemented with a shorter approval timeline of 45 days. Approval of the CPP By-law will repeal the current Zoning By-law and have the CPP By-law become the primary tool setting the development standards for the area. Page 57 of 88 Project HistoryOctober 15, 2019January 14, 2025June 10, 2025June 19, 2025October 6, 2025Council Passes Motion on CPP By-lawThe Council motion recognized the Downtown core as a significant area in the Town and that the CPP By-law could be used as a tool to streamline development approvals and promote collaborative and predictable community building.Project Initiation Report and Engage Aurora Page CreatedStaff report informing Council of the project and its initiation brought to the Committee of the Whole.Aurora Economic Development Corporation Meeting Presentation of the draft vision to the AEDC for comments. The AEDC was generally supportive, but also commented that as a long-term plan, the CPP could "go farther" in terms of permitting heights and development standards.Open HouseHeritage Advisory Committee MeetingPresentation of the draft vision to the public for comments Residents were generally supportive, with protection of the heritage facades and ensuring appropriate transitions being primary comments. Feedback was incorporated into the Downtown Urban Design Study Report and will be reflected in the By-law.Presentation of the draft vision to the Committee for comments. The Committee was generally supportive of the CPPS, noting that the heritage facades are better protected through enhanced step backs, even if that means greater heights in the area. Page 58 of 88 Proposed CPP By-Law• The By-law will largely mirror the permitted uses outlined in the current Zoning By-law (PD1 and PDS1 Zones).• The policies of the By-law are to be informed by the Downtown Urban Design Study.• Drawing from the recommendations provided through the study, the By-law will incorporate policies on, but not limited to, the: • Continued preservation of heritage buildings and façades;• Use of high-quality materials such as stone, wood, and brick; • Screening of loading spaces and rooftop mechanical equipment; • Increases in height that are complemented by significant increases in step backs; and• Enhancement of the pedestrian realm.• The By-law will also be able to set out any conditions for approvals and be used as a tool to enforce urban design standards and require community benefits, such as affordable housing, purpose-built rentals, public art, or heritage enhancement, amongst others.Page 59 of 88 Proposed CPP By-LawApplication ClassClass One Class Two Class ThreeClass TypeStandard Application Minor Variation Major VariationVariationsNo variation.• Minor variation of up to 10%.• Minor variation of design and materiality changes.Any significant variations such as increases to height. Approval AuthorityDirector of Planning and Development Services.Director of Planning and Development Services.Council. Timeline45 days. 45 days.Requires a separate application and OPA approval process.• Development applications are proposed to be categorized into three classes, with each class having varying application and approval processes.• The three class application process was developed through a municipal best practice review.• The passing of the CPP By-law will also grant a 5-year moratorium/freeze for major amendments, subject to Council discretion.Page 60 of 88 Next Steps1.Review and integrate comments received from this Public Planning Meeting.2.Prepare the final CPP By-law and OPA to present back to Council for consideration.3.Upon approval, issue Notices of Approval/Passing, with the By-law being subject to a 20-day appeal period.4.Provided there are no appeals, the CPP By-law comes into effect at the end of the 20-day appeal period.Page 61 of 88 Thank YouFor any questions, please contact: Dania Asahi Ogie, MScPlPolicy Plannerdaogie@aurora.ca365-500-3099Page 62 of 88 Downtown Aurora Community Planning Permit SystemUrban Design StudyPublic MeetingOctober 29, 2025Page 63 of 88 Downtown Then222222Yonge Street has a rich history as the heart and central business district of Aurora. As the town has grown, it has continued to accommodate vital commercial services and civic functions while maintaining its valued small-town identity.Page 64 of 88 Downtown TodayYonge StreetscapeTown SquareSurface ParkingWellington StreetscapeAdjacent NeighbourhoodsMachell’s Alley as mid-block connectionPage 65 of 88 Behind the buildings on Yonge Street are significant development opportunities, as the new Amica retirement home demonstrates.Downtown TodayTown SquareAmica Retirement HomePage 66 of 88 Urban Design Study Objectives5•Analyze opportunities for further intensification, new connections and placemaking•Model and assess new massing approaches aimed at encouraging development while maintaining the valued character of Downtown•Identify appropriate built form standards and other tools to be implemented through the Community Planning Permit SystemPage 67 of 88 Framework for ChangeThe proposed Framework for Change responds to the ongoing assembly of properties, identifying potential development sites within a framework of streets, laneways and pedestrian connections.Potential midblock connectionsRecent InvestmentLegendSurface ParkingHeritage AssetsStreet related pedestrian connectionsPotential Future Trail ExtensionRear LanewaysSites with assembled propertiesSites with unassembled propertiesPage 68 of 88 As-of-Right Development Concept*Assumptions for GFA: 15% Reduction GCA to GFA*Assumptions for unit size: 100 sqm/unit*Parking Assumptions:-Residential Parking: 1.0 spaces per unit (Inclusive of visitor parking)-Retail Parking: 3.5 spaces per 100m2-Assumes a 35 sqm per stall for parking (includes cores/ramps, etc.).5 st5 st5 st5 st 5 st5 st5 st5 st5 st5 st5 st5 st5 st5 st5 st6 st6 st6 st5 st6 stGross Floor Area of New Development120,000 sqmEstimated Number of New Residential Units1100Estimated Commercial Floor Area10,000Average Density of New Development1.9-2.9 FSIMaximum Height (new buildings)5 Storeys (6 Storeys North of Wellington Street)Setback from Yonge Street0 metresUpper Floor of Step-back from Yonge Street3.0 metres above 3rd floorKey Statistics of the As-of-Right Development Concept Page 69 of 88 View looking southeastAs-of-Right Development ConceptPage 70 of 88 View looking northwestAs-of-Right Development ConceptPage 71 of 88 View looking south down Yonge St from Wellington StAs-of-Right Development ConceptPage 72 of 88 View looking north up Yonge St from Mosley intersectionAs-of-Right Development ConceptPage 73 of 88 View looking south down Temperance St from WellingtonAs-of-Right Development ConceptPage 74 of 88 Alternative Development Concept*Assumptions for GFA: 15% Reduction GCA to GFA*Assumptions for unit size: 100 sqm/unit*Parking Assumptions:-Residential Parking: 1.0 spaces per unit (Inclusive of visitor parking)-Retail Parking: 3.5 spaces per 100m2-Assumes a 35 sqm per stall for parking (includes cores/ramps, etc.).9 st8 st8 st5 st4 st4 st5 st8 st5 st5 st5 st5 st5 st6 st6 st6 st3 st6 st6 st6 stGross Floor Area of New Development134,300 sqmEstimated Number of New Residential Units1260Estimated Commercial Floor Area8,600Average Density of New Development1.4-4.1 FSIMaximum Height (new buildings)9 Storeys (6 Storeys North of Wellington Street)Setback from Yonge Street2 metresUpper Floor of Step-back from Yonge Street10.0 metres above 3rd floorKey Statistics of the Alternative Development ConceptPage 75 of 88 View looking southeastAlternative Development ConceptPage 76 of 88 View looking northwestAlternative Development ConceptPage 77 of 88 View looking south down Yonge St from Wellington StAlternative Development ConceptPage 78 of 88 View looking north up Yonge St from Mosley intersectionAlternative Development ConceptPage 79 of 88 View looking south down Temperance St from WellingtonAlternative Development ConceptPage 80 of 88 19Summary of ConceptsAs-of-Right ConceptAlternative ConceptGross Floor Area of New Development12,000 sqmEstimated Number of New Residential Units1100Estimated Commercial Floor Area10,000Average Density of New Development1.9-2.9 FSIMaximum Height (new buildings)5 Storeys (6 Storeys North of Wellington Street)Setback from Yonge Street0 metresUpper Floor of Step-back from Yonge Street3.0 metres above 3rd floorGross Floor Area of New Development134,300 sqmEstimated Number of New Residential Units1260Estimated Commercial Floor Area8,600Average Density of New Development1.4-4.1 FSIMaximum Height (new buildings)9 Storeys (6 Storeys North of Wellington Street)Setback from Yonge Street2 metresUpper Floor of Step-back from Yonge Street10.0 metres above 3rd floorPage 81 of 88 20Summary of ConceptsAs-of-Right ConceptAlternative ConceptView south on YongeView south on TemperanceView north on YongePage 82 of 88 21RecommendationsLand Use•Continue to require commercial or institutional uses on the ground floors along Yonge Street and Wellington Street•Permit residential uses on the ground floors of buildings fronting Temperance, Victoria and Tyler streets•Permit townhouses and multiplexes on side streets•Major variances from permitted land uses in the CPP Bylaw should require Council approvalPage 83 of 88 22RecommendationsBuilt Form – Setbacks •Require new buildings to have a 2-3 metre setback from Yonge St and Wellington St to enhance the pedestrian realm and provide space for patios •Require 3-4 metre setbacks on Temperance St and Victoria St for landscaping in keeping with the character of adjacent neighbourhoodsAbutting StreetsMinimum SetbackMaximum SetbackFront Yard and Exterior Side YardYonge St or Wellington St2 m3 mTyler St, Mosley St or Church Street1.5 m2.5 mTemperance St or Victoria St3 m4 mInterior Side Yardn/a0 m1NoneRear Yardn/a 7.5 m None1Except on lots fronting Victoria Street, where the minimum required interior side yard setback should be 1.5 metres.Page 84 of 88 23RecommendationsBuilt Form – Height and Step-backs•Permit maximum heights of 6-9 storeys west of Yonge Street and 6-8 storeys east of Yonge•Require minimum step-backs from Yonge Street of 10 metres above the third storey and 10 metres above the fifth storey•Require a minimum step-back from Temperance Street of 7 metres above the fourth storey•Require a minimum step-back from Victoria Street of 8 metres above the third storeyPage 85 of 88 24RecommendationsOther Recommendations•Seek mid-block pedestrian connections in future development proposals•Introduce rear laneways east of Yonge Street•Require parking to be located in rear yards, underground or in above-ground structures•Require loading and servicing areas to be enclosed or screened•Require mechanical penthouses or enclosures to be set back from building edges and integrated into the design of the building•Continue to apply current design guidelines regarding façade articulation, building materials and storefronts•Preserve all heritage buildings and ensure they are integrated sensitively into future developmentPage 86 of 88 Thank you!Page 87 of 88 The Corporation of The Town of Aurora By-law Number XXXX-25 Being a By-law to confirm actions by Council resulting from a Special Council Public Planning meeting on October 29, 2025. The Council of the Corporation of The Town of Aurora hereby enacts as follows: 1. That the actions by Council at its Special Council Public Planning meeting held on October 29, 2025, in respect of each motion, resolution and other action passed and taken by the Council at the said meeting is hereby adopted, ratified and confirmed. 2. That the Mayor and the proper officers of the Town are hereby authorized and directed to do all things necessary to give effect to the said action or to obtain approvals where required and to execute all documents as may be necessary in that behalf and the Clerk is hereby authorized and directed to affix the corporate seal to all such documents. Enacted by Town of Aurora Council this 29th day of October, 2025. Tom Mrakas, Mayor Ishita Soneji, Deputy Town Clerk Page 88 of 88