2019 Growth and New Capital ProjectsAttachment 5 Summarized by Results of Council Discussions BUDGET COMMITTEE APPROVED Community Services 72443 AFLC - Pylon Sign 60,000 74013 Museum Collection Infrastructure 10,000 73324 Pet Cemetery Restoration 15,000 85,000$ Corporate Services 24012 By-Law Permit Parking Program 50,000 14058 Project Management Software 50,000 100,000$ Fire Services 21106 Pumper for Fire Hall 4-5 410,000 21114 Fire Master Plan 51,250 461,250$ Operational Services 73085 Arboretum Development 96,000 73296 Trails - BG Group Trail Connection 150,000 73319 Canine Commons Upgrades 35,000 34224 Screening of Surplus Soil and Compost 35,000 34713 Street Light Pole Identification 40,000 356,000$ Planning & Development Services 34707 Lighting Upgrade - Wellington, Berczy - West of John West Way 350,000 350,000$ 1,352,250$ CONDITIONAL APPROVAL - ADDITIONAL INFORMATION REQUIRED Community Services 72410 SARC - Gymnasium 9,400,000 81019 Library Square 35,000,000 74015 Cultural Services Master Plan 100,000 44,500,000$ 2019 Growth and New Capital Projects TOTAL PROJECT FUNDING APPROVED AS PRESENTED Corporate Services Sub Total Operational Services Sub Total Planning & Development Services Sub Total Community Services Sub Total Fire Services Sub Total Community Services Sub Total Project ID Project New 2019 Requests Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Operational Services 34187 3 Ton Truck 50,000 34188 New Snow Blower Attachments 150,000 34420 New Wide Area Mower 140,000 34422 Additional Vehicle - By-Law Services 60,000 34173 New Trackless Sidewalk Utility Vehicle 175,000 73169 Wildlife Park - Phase 1/2/3 1,000,000 73321 Cattle Crawl Underpass 750,000 2,325,000$ Planning and Development Services 81016 Aurora Promenade Streetscape Design & Implementation 730,000 34533 Traffic Calming Measures in School Zones 20,000 31179 Hillary House Parking Lot 135,300 Planning and Building Services Sub Total 885,300$ CONDITIONAL APPROVAL - MORE INFORMATION REQUIRED 47,710,300 49,062,550$ NOT APPROVED Operational Services 73322 Walkway - SARC to Salvation Army Property 55,000 55,000$ Planning and Development Services 34525 Yonge St Parking Plan 200,000 34534 John West Way - Traffic Light Update 300,000 Planning and Building Services Sub Total 500,000$ 555,000$ TOTAL 2019 GROWTH & NEW CAPITAL BUDGET 49,617,550 Operational Services Sub Total Operational Services Sub Total NOT APPROVED TOTAL 2019 GROWTH & NEW CAPITAL BUDGET Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 72443 AFLC - Pylon Sign Community Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. There is no pylon signage at the present time for this facility. Installation of a pylon sign will provide current communication regarding available programs, upcoming events and emergency notices to the citizens of the Town of Aurora. PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. The facility is a gathering spot for our Town youth in addition to offering programming for patrons of all ages. Pylon signage would improve our service levels by communicating these programs to everyone. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. Provision of a pylon sign would provide improved communication for program users together with notification of upcoming events. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. By not providing signage, we limit our visibility and ability to communicate specific programs and events. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures CONTRACTS 60,00060,000 60,000 60,000 60,000 60,000Expenditures Total Funding Development Charges Reserve Funds INDOOR REC DC CONT'N 54,00054,000 54,000 54,000 Other Funding Sources GROWTH & NEW RES CONT'N 6,0006,000 6,000 6,000 60,000 60,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 74013 Museum Collection Infrastructure Community Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. To purchase infrastructure to support our current museum operations. Additional equipment is needed to support the needs of the Aurora Collection including: exhibition/display fixtures including lights, mannequins and archival cases. PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. The collection continues to be at risk with many of the larger objects stored on the floor. The storage and exhibition spaces need to be continually monitored to mitigate damage caused by fluctuating environmental conditions. Additional display cases will allow the collection to be viewed in other areas throughout the Town. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. Stable environment for the collection to ensure its long term survival for future generations. Additional display cases will allow the collection to be viewed in other areas throughout the Town for the enjoyment of all citizens. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. Risk of further deterioration to the collection and loss of assets. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures EQUIPMENT & FURNISHINGS 10,000 35,000 10,000 15,000 35,000105,000 105,000 10,000 35,000 10,000 15,000 35,000 105,000 10,000 35,000 10,000 35,00015,000Expenditures Total Funding Other Funding Sources GROWTH & NEW RES CONT'N 10,000 35,000 10,000 15,000 35,000105,000 105,000 10,000 35,000 10,000 15,000 35,000 105,000 10,000 35,000 10,000 35,00015,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 73324 Pet Cemetery Restoration Community Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 Q2 2019 - Q3 2019 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. Assessment of the Woodland Pet Cemetery in 2016, revealed 385 grave sites. Early in 2018, volunteers and museum staff started working on removing debris from the site. A contractor was hired to begin restoring a small section of the cemetery which revealed a further 117 headstones. By the end of the summer more than 500 headstones were uncovered and a large area was still awaiting restoration. PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. A new trail is proposed along one side of the cemetery, offering visitors an opportunity to explore this historic asset. Due to the many hazards on the site, this currently is not feasible. The cemetery is located on hilly, uneven terrain. Trees have fallen on the site displacing graves and making access difficult. In addition, a thick coat of Japanese Spurge covers a large portion of the site and is obstructing many headstones, making navigation of the site dangerous. Staff also noted that a couple of headstones and other decorative elements that adorned individual graves had been removed. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. Happy Woodland Pet Cemetery is believed to be the first of its kind in Canada and is gathering information to submit an application to be designated a National Historic Site. There is a broad range of interest from both within and outside of the community. Once restored, the site could be leveraged as an asset to promote tourism. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. The physical deterioration of the site is a liability for the Town. Interest surrounding the site and the encroaching housing development will only result in more people accessing the site. The site is covered with downed trees and ground cover obscuring the stones and increasing the likelihood of an accident. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures CONTRACTS 15,00015,000 15,000 15,000 15,000 15,000Expenditures Total Funding Other Funding Sources GROWTH & NEW RES CONT'N 15,00015,000 15,000 15,000 15,000 15,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 24012 Bylaw Permit Parking Program Corporate Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. Implement a parking permit management solution for all types of parking permits, eg daily, weekly, monthly. This proposal includes AIMS Web+ which provides customers with a complete self service web solution.AIMS Web is configurable including integrated maps showing permit types and location available for purchase. Permits can be issued and printed on demand. AIMS integrates with numerous third party gate access and revenue control providers. PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. Responding to Council direction to investigate a parking permit system for the Town. Provides resident's with options for parking including permitting overnight parking during the winter, limited permitted parking at our facilities, parking of RV's or other types of seasonal vehicles in preparation of a vacation, special occasions, etc. AIMS Web+ is an online easy to use solution that is configurable and offers a suite of options. The solution integrates with the hand held devices used in the field by the parking control officers. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. Ability to manage parking permits. Provides resident's with online access to purchase permits. Integrates with hand helds, devices can be updated in the future to enable AIMS Mobile App with real time communication. Increased customer satisfaction and improved service level. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. This solution solves some of the resident based requests for overnight and speciality permitting. Not approving the project would eliminate the flexibility we could offer resident and could increase the frustration within the residential community. Other customer service focused municipalities offer this service and we would be lagging Budget Future202420222021202020192023Total Expenditures Estimated Expenditures CONTRACTS 50,00050,000 50,000 50,000 50,000 50,000Expenditures Total Funding Other Funding Sources GROWTH & NEW RES CONT'N 50,00050,000 50,000 50,000 50,000 50,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 14058 Project Management Software Corporate Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. Acquire and implement project management software for centralized and standardized project management reporting and tracking to be utilized by all departments. PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. The use of this tool will provide for better tracking of project information and reporting project status through reports and dashboards. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. Centralized repository of project details and standardization of project status and reporting. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. Continue to function in a decentralized, inefficient manner which would inhibit the ability to achieve a holistic view of the overall project portfolio status. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures CONSULTING 50,00050,000 50,000 50,000 50,000 50,000Expenditures Total Funding Other Funding Sources GROWTH & NEW RES CONT'N 50,00050,000 50,000 50,000 50,000 50,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 21106 Pumper for Fire Hall 4-5 Fire Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. Purchase of pumper for new Fire Hall 4-5. PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures EQUIPMENT - OTHER 410,000410,000 410,000 410,000 410,000 410,000Expenditures Total Funding Development Charges Reserve Funds FIRE SVCS DC CONT'N 410,000410,000 410,000 410,000 410,000 410,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 21114 Fire Master Plan - 2019 Fire Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. Central York Fire Services plans to undertake a fire services master plan. PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures CONSULTING 51,25051,250 51,250 51,250 51,250 51,250Expenditures Total Funding Development Charges Reserve Funds FIRE SVCS DC CONT'N 51,25051,250 51,250 51,250 51,250 51,250Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 73085 Arboretum Development Operational Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. To continue the Aurora Community Arboretum partnership project. In 2019, the ACA projects include: specimen tree procurement, plant material for 2019 volunteer community planting day, external maintenance and enhancement contract with Green-Leef, establishment of a nursery for the arboretum, educational and tree identification signage, equipment and tools, including rental of a tree space, pine plantation forest management program and wetland waterscape establishment. LINK TO STRATEGIC PLAN: Supporting environmental stewardship and sustainability - Objective 2: Promoting and advancing green initiatives. Continue to support and enhance community planting programs in appropriate locations. PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. The Aurora Community Arboretum (ACA) is seeking to continue their partnership with the Town of Aurora through further tree planting and enhancements and ongoing maintenance of the tree planting areas. The partnership began in 2007 with the understanding that the Town would consider approving $1.0M in funding over ten years. This partnership allowed staff to enhance the Community arboretum under the Adopt a Park program. With the approval of the 2018 capital budget , the Town has committed a total of $0.9M to the development of the Arboretum. The Arboretum Agreement was renewed for another 10 yrs ( 2018-2028) in January 2018. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. To provide a high quality public attraction/destination feature. To increase public participation and volunteering within the community. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures CONTRACTS 96,000 96,000 96,000 96,000 96,000 96,000 384,000960,000 960,000 96,000 96,000 96,000 96,000 96,000 96,000 384,000 960,000 96,000 96,000 96,000 96,000 96,000 384,00096,000Expenditures Total Funding Special Purpose Reserve Funds CIL PARKLAND CONTRIBUTION 48,000 48,000 48,000 48,000 48,000 48,000 192,000480,000 480,000 48,000 48,000 48,000 48,000 48,000 48,000 192,000 Other Funding Sources GROWTH & NEW RES CONT'N 48,000 48,000 48,000 48,000 48,000 48,000 192,000480,000 480,000 48,000 48,000 48,000 48,000 48,000 48,000 192,000 960,000 96,000 96,000 96,000 96,000 96,000 384,00096,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 73296 Trails - BG Group Trail Connection Operational Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 Q3 - Q4 2019 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. To provide trail connection from trails constructed by the developer through a Town owned non programmed park located on the north side of Hartwell Way, west of William Graham Dr. Trail to be constructed within the woodlot along the north end of the property. Trail is identified within the Trails Master Plan PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. To provide connectivity of the trails as per the Trails Master Plan within the 2C development Included in the 10 year Capital Plan PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. Trails rated number one interest in the Parks and Recreation Master Plan Survey. To provide a multi use trail for recreation, promoting health and well being of residents as well as an active Aurora. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures CONTRACTS 150,000150,000 150,000 150,000 150,000 150,000Expenditures Total Funding Special Purpose Reserve Funds CIL PARKLAND CONTRIBUTION 15,00015,000 15,000 15,000 Development Charges Reserve Funds PARKS DEV & FAC DC CONT'N 135,000135,000 135,000 135,000 150,000 150,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 73296 Trails - BG Group Trail Connection Operational Services Final Approved Budget 2019 Operating Impact 2025202420222021202020192023Total SALARIES - P/T PATHWAY MAINTENANCE MATERIALS 5,0005,000 SIGNAGE 500500 5,500 5,500Total Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 73319 Canine Commons Upgrades Operational Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 Q2 2019 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. Canine Commons is heavily used, particularly in the evenings and the users would like to see additional lighting installed in the park to allow for increased safety and useability during the evenings and winter months when daylight is limited. The Town installed a solar light outside the entrance a number of years ago but the buffer planting installed by the Arboretum to screen the park has grown up and is shadowing the light from the entrance area. We would like to keep the buffer planting as it provides a natural screen from Industrial Parkway. Parks will relocate the existing light within the park to get maximum performance out of it and purchase 2 additional solar lights to be installed in the park. In addition there is a request to provide a water service to allow for fresh water for PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. Installation of the lights will have little to no impact on staff with minimal increase in maintenance, however users will receive a great benefit. Water source to keeps pets hydrated. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. Increased safety within the park. Increase in useable hours of the park. Renewable power source by utilizing solar lights. Source of fresh water for pets during summer months during active exercise. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures CONTRACTS 35,00035,000 35,000 35,000 35,000 35,000Expenditures Total Funding Development Charges Reserve Funds PARKS DEV & FAC DC CONT'N 35,00035,000 35,000 35,000 35,000 35,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 34224 Screening of Surplus Soil and Compost Operational Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 Q2 through Q4 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. Screening of surplus soil that has accumulated on the Municipal property attached to the community garden site on Industrial Parkway South. Key goals include refining a large quantity of mixed soil that is currently unusable which once screened will result in a high quality useable soil product that can be utilized in the operations department for both parks and roads related projects. Clean up of an important municipal property for storage purposes. Performance measures include significant efficiencies in utilizing a large quantity of soil that would otherwise be PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. For the past 10 years staff have utilized an unused parcel of open space adjacent to the Community Gardens for the storage of surplus soil and a number of other organic materials such as waste garden plants, tree branches etc. This site provided a close and convenient location to store these materials, however these surplus materials have reached the site limitations and need to be removed. Once removed the site will no longer receive these materials. T here is a need to clean up this property and cease using the site for storage related needs. As the material has been left at the site for a considerable period of time, much of it has decomposed to a useable soil product which will be readily available for use. This will result in a cost saving of approximately $15,000 that PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. Benefits of the project include converting an unusable product into a high quality usable product that will be fully utilized in both the Parks and Roads operation. In addition, the costs associated with removing this material in its current state will significantly out weigh the costs of screening the material and keeping the material for operational purposes. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. Should the project not be approved, this un-useable material will continue to occupy the property and serve no useful purpose. At some point this material must be removed so that the land can be properly restored and better utilized by the Operational Services department. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures CONTRACTS 35,00035,000 35,000 35,000 35,000 35,000Expenditures Total Funding Special Purpose Reserve Funds TAX RATE STABILIZATION 35,00035,000 35,000 35,000 35,000 35,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 34713 Street Light Pole Identification Operational Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 RFQ Q1 2019 Project Completion Q3 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. This project involves labeling the entire inventory of street light poles with an identification number key goal is to complete a street light pole and fixture identification system to align with current municipal standards Objectives include standardization in the the maintenance of street lights and to enable matching of street light locations to the current GIS street light inventory database performance measures include improved efficiency and accuracy in communicating street light outages to the street light maintenance contractor. Improved customer service in resident's being able to include PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. Identifying street light poles is a standard business practise in many similar sized municipalities with a large inventory of street light poles and fixtures. With our current inventory of over 4,000 street lights, it is becoming increasingly more difficult to identify specific lights that require replacement without a proper identification number being displayed on the actual street light pole. This has led to multiple visits by both staff and contractors to investigate reported street light outages described in a general area as opposed to a specific street light. This is an inefficient and often confusing practise as it is difficult to describe a street light location without an individual identification number. Numbering these poles will significantly improve delivery of street light maintenance PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. With the vast number of street lights, the Town encourages residents to report street light outages as it is not possible for staff to view each and every street light on a daily or weekly basis. Numbering all street light poles will assist staff and residents in being able to report the specific pole where the light is out by its identification number and in turn staff can direct the street light repair contractor to the specific pole. This will result in IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. Continue to repair street lights based on reported outages that do not include specific information. Continue repeated site inspections required to verify outages and confusion in communicating with residents and the street light repair contractor. Continue to not meet common industry standards or best practises. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures CONTRACTS 40,00040,000 40,000 40,000 40,000 40,000Expenditures Total Funding Development Charges Reserve Funds ROADS & RELATED DC CONT'N 40,00040,000 40,000 40,000 40,000 40,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 34707 Lighting Upgrade - Wellington, Berczy to West of Mary Operational Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 Q2 2019 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. This project was previously approved and the excess funds were returned to source as there were delays in getting the necessary approvals. We know have the approvals to move forward with this project. To improve lighting on Wellington Street East from Berczy Street to 150m west of Mary. LINK TO STRATEGIC PLAN Supporting an exceptional quality of life for all - Objective 2: Invest in sustainable infrastructure - Maintain and expand infrastructure to support forecasted population growth through technology, waste management, roads, emergency services and accessibility. PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. Recent development in this area, including a High School , a commercial development and ongoing upgrades to the Go Transit train station have increased pedestrian volumes in this area. This portion of Wellington Street requires street lighting upgrades to make the area brighter. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. Improved lighting on the road and better pedestrian access. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures CONTRACTS 350,000350,000 350,000 350,000 350,000 350,000Expenditures Total Funding Development Charges Reserve Funds ROADS & RELATED DC CONT'N 315,000315,000 315,000 315,000 Infrastructure Sustainability Reserves RDS/SDWLKS/ST LGTS R&R 35,00035,000 35,000 35,000 350,000 350,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 34707 Lighting Upgrade - Wellington, Berczy to West of Mary Operational Services Final Approved Budget 2019 Gallery S:\Financial Services\F05 Budgets &Estimates\2013 Budget\Capital\Pictures\CP_34707_Combined.jpg Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 72410 SARC - Gymnasium Community Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 Project conditionally approved pending a further report to Council as per Budget Committee on February 19, 2019 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. In June 2018, staff presented a basic gymnasium addition at the Stronach Aurora Recreation Complex. The Parks Recreation Culture Services Advisory Committee recommended maximizing the space available. Council approved that recommendation and directed staff to report back during the 2019 budget deliberations. PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. Staff have consulted with Lake Simcoe Region Conservation Authority, sport user groups as well as internal staff. Sport user groups provided to staff the court dimensions and other considerations that would make this site suitable to host games such as program rooms, change rooms, bleachers and multiple courts. Internal staff highlighted the need for both program and office space to accommodate current and future demands. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures CONTRACTS 9,400,0009,400,000 9,400,000 9,400,000 9,400,000 9,400,000Expenditures Total Funding Development Charges Reserve Funds INDOOR REC DC CONT'N 8,460,0008,460,000 8,460,000 8,460,000 Other Funding Sources GROWTH & NEW RES CONT'N 940,000940,000 940,000 940,000 9,400,000 9,400,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 72410 SARC - Gymnasium Community Services Final Approved Budget 2019 Operating Impact 2025202420222021202020192023Total CONTRACTS CLEANING 5,000 5,000 5,000 5,00020,000 20,000 5,000 5,000 5,000 5,000Total Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 81019 Library Square Community Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 Project conditionally approved pending a report to Council as per Budget Committee on February 19, 2019 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. Council has already approved money for the construction of a parking lot and laneway as part of the revitilization of Library Square. In addition, through a detailed report to Council at a later date, staff is looking for the authority to proceed as well as the funding required to build an addition to 22 Church St as well as an outdoor space at Library Square. Staff have worked with consultants to refine the design, in consultation with our Cultural Partners. PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. In June 2018, Council approved that the current design for Library Square be approved; and that the Option 1 schematic design for expansion to the Church Street School including 3 floors be approved; and that the allocation of existing project funding for the tendering of the parking lot, the laneway and the components of the square which would provide connections to the square/library be approved, and that council commit to funding for the square and building, which will come back in the new year for final funding approval; and that the budget include a 1% contribution to the Town's Public Art Reserve fund in accordance with the Official Plan requirements; and that on the easter side of the property, at a minimum, three accessible parking spaces be PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures CONTRACTS 35,000,00035,000,000 35,000,000 35,000,000 35,000,000 35,000,000Expenditures Total Funding Council Discretionary Reserve Funds HYDRO SALE INVESTMENT CONT'N 21,500,00021,500,000 21,500,000 21,500,000 Other Funding Sources OTHER GRANTS 13,500,00013,500,000 13,500,000 13,500,000 35,000,000 35,000,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 74015 Cultural Services Master Plan Community Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 Project conditionally approved pending a further report to Council as per Budget Committee on February 19, 2019 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. To act as a placeholder for implementation of the Cultural Services Master Plan. PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures CONTRACTS 100,000 100,000 100,000 100,000 100,000 100,000 240,000840,000 840,000 100,000 100,000 100,000 100,000 100,000 100,000 240,000 840,000 100,000 100,000 100,000 100,000 100,000 240,000100,000Expenditures Total Funding Council Discretionary Reserve Funds HYDRO SALE INVESTMENT CONT'N 100,000 100,000 100,000 100,000 100,000 100,000 240,000840,000 840,000 100,000 100,000 100,000 100,000 100,000 100,000 240,000 840,000 100,000 100,000 100,000 100,000 100,000 240,000100,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 34187 3 Ton Truck Operational Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 Project conditionally approved pending a further report to Council as per Budget Committee on February 19, 2019 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. Additional 4 ton cab & chassis with dump bed for utility work in the Roads Department. This project was originally brought forward in 2018 requesting a 3 ton truck but upon further examination, it was determined that a 4 ton cab and chassis was required so additional money is being requested in 2019. PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. Additional medium sized utility truck is required to provide vehicle support for Roads staff to react to workload of Town's infrastructure. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. Utilizing right-sized vehicle will allow staff to perform work more effectively without taxing smaller sized vehicles. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. Increased wear and tear on undersized trucks, staff making increased trips to load unload smaller vehicle. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures EQUIPMENT - OTHER 50,00050,000 50,000 50,000 50,000 50,000Expenditures Total Funding Development Charges Reserve Funds ROADS & RELATED DC CONT'N 50,00050,000 50,000 50,000 50,000 50,000Funding Total Total Over (Under) Funded Operating Impact 2025202420222021202020192023Total FUEL COSTS 3,0003,000 3,000 3,000Total Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 34188 New Snow Blower Attachments Operational Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 Project conditionally approved pending a report to Council as per Budget Committee on February 19, 2019. PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. New additional equipment to facilitate snow removal from main arterial roads Key goals of the project are to perform windrow snow removal from arterial road curb lanes in a more safe and efficient process objectives include equipping existing machinery with a snow blower attachment to better utilize existing equipment in a more efficient process for snow removal Performance Measures include conducting winter snow removal on Yonge Street and other primary arterial roads in a more efficient and safe process PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. This project should be considered for approval based on the research staff has conducted and the benefits that will be derived from changing the current methods of removing snow from our arterial roads, particularly Yonge Street. Currently removing accumulated windrow snow from the curb lanes requires the use of a front end loader and several small support vehicles and equipment. Snow must be loaded into trucks from the rear of the truck resulting in spillage and loads that are not up to full capacity. Which in turn requires more trucks to move less snow, thereby reducing the efficiency and speed of the operation. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. Benefits of this project include more efficient snow removal process by loading trucks to capacity, less snow spillage over the sides of haulage vehicles, improved public and staff safety with reduction in snow spillage and improved method of loading vehicles. Reduction in time required to conduct snow removal operation and less impact to motorists when curb lane is closed down, less impact to the business community when snow is removed IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. Staff will continue to remove snow using the same process and methods as currently employed, any inconvenience to motorists and business community will continue to exist. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures EQUIPMENT - OTHER 150,000150,000 150,000 150,000 150,000 150,000Expenditures Total Funding Development Charges Reserve Funds ROADS & RELATED DC CONT'N 150,000150,000 150,000 150,000 150,000 150,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 34188 New Snow Blower Attachments Operational Services Final Approved Budget 2019 Gallery C:\Users\Jim Tree\Desktop\snow blower.docx.jpg Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 34420 New Wide Area Mower Operational Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 Project conditionally approved pending a further report to Council as per Budget Committee on February 19, 2019 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. New wide area mower required to sustain the service level standards for turf maintenance in our parks and sports fields. Between 2016-2018 Parks has assumed approximately 25 acres of land to maintain through development. By the end of 2020, with additional 2C parkland and the Hallmark property, there will be approximately an additional 20 acres to maintain. The addition of a second wide area would take pressure off and allow for back up when one mower is in for service or repairs. These mowers are integral to the operation and their performance is key in maintaining our maintenance levels. PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. Growth of Town and addition of new parkland and facilities. To maintain parks service level standards. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. Well maintained parks and sports fields within our community to support activity,good health and safe play IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. Loss of revenues due to unmaintained sports fields Possible exposure to liable due to unsafe fields Budget Future202420222021202020192023Total Expenditures Estimated Expenditures EQUIPMENT - OTHER 140,000140,000 140,000 140,000 140,000 140,000Expenditures Total Funding Development Charges Reserve Funds PARKS DEV & FAC DC CONT'N 126,000126,000 126,000 126,000 Other Funding Sources GROWTH & NEW RES CONT'N 14,00014,000 14,000 14,000 140,000 140,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 34420 New Wide Area Mower Operational Services Final Approved Budget 2019 Operating Impact 2025202420222021202020192023Total FUEL COSTS 1,8001,800 1,800 1,800Total Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 34422 Additional Vehicle - By Law Services Operational Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 Project conditionally approved pending a further report to Council as per Budget Committee on February 19, 2019.PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. To allow for the purchase of a new hybrid sedan vehicle which would allow officers in the By-Law department to patrol the Town for various by-law violations. An additional vehicle would allow for increased By-Law presence and education on both private and town owned property while ensuring the demands of a growing municipality are continuously met and exceeded. PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. Approval of this project would ensure that By-Law Services continues to meet the needs of a growing community. This project would see an increased presence of existing staff members in the town who will have the ability to respond to a wide range of by-law complaints, concerns and education campaigns while improving existing service. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. As part of this capital request, By-Law Services would request a Gas/Electric Hybrid sedan. This would support green initiatives within the community and significantly reduce fuel costs for the municipality. Given the extensive amount of time in which by-law vehicles spend on the road, it is estimated that savings would range from $1,500 - $3,000 per year in fuel costs. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. Increased use of existing vehicles would result in them reaching end of life sooner. Increased costs of maintenance on existing vehicles. Increase use of fleet services and resources. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures EQUIPMENT - OTHER 60,00060,000 60,000 60,000 60,000 60,000Expenditures Total Funding Development Charges Reserve Funds ROADS & RELATED DC CONT'N 60,00060,000 60,000 60,000 60,000 60,000Funding Total Total Over (Under) Funded Operating Impact 2025202420222021202020192023Total FUEL COSTS 3,0003,000 3,000 3,000Total Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 34173 New Trackless Sidewalk Utility Vehicle Operational Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 Project conditionally approved pending a further report to Council as per Budget Committee on February 19, 2019 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. Articulated Trackless multi purpose utility vehicle primarily dedicated to side walk snow removal Key goals include purchasing appropriate commercial /industrial equipment to facilitate snow and ice removal from sidewalks Objectives include the Town assuming one new additional sidewalk route in the 2C development area as an alternative to contracting the route to the private sector as well as supplementing the roads operation needs for additional snow and ice removal during difficult weather events associated with prolonged snow or ice storm events Performance measures include the ability to maintain winter sidewalk service level standards associated with new growth, more durable heavy duty commercial equipment with greater capabilities to operate effectively in difficult conditions. PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. This specialized equipment while more costly to purchase provides much greater ability to operate under heavy and difficult conditions. Trackless utility vehicles are specifically designed to meet the challenges associated with heavy snow and ice removal and are far more durable, less prone to breakdowns and more versatile due to the fact that they articulate which will also result in much less boulevard sod damage. Services levels will be increased during periods of difficult conditions as this equipment will far surpass the performance of the existing equipment in its ability to effectively clear sidewalks. The equipment will also serve as an example for the future sidewalk snow plowing operation as the current contract is set to expire in 2021. Staff are not completely satisfied with the performance of current contracted equipment and as such a decision must be made on the future of sidewalk snow removal , the equipment employed and whether or not to conduct the service in house or by contract. Purchasing this equipment will be an excellent opportunity to gauge this process. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. Benefits of purchasing this equipment include a significant increase in reliability and high performance. This equipment will be assigned to a new sidewalk in the 2C area using Town staff resources. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. Sidewalk snow removal will continue to be delivered by external contracted service providers with no opportunity to consider a change on how this service is delivered and the equipment being deployed to deliver this service. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures EQUIPMENT - OTHER 175,000175,000 175,000 175,000 175,000 175,000Expenditures Total Funding Development Charges Reserve Funds ROADS & RELATED DC CONT'N 175,000175,000 175,000 175,000 175,000 175,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 73169 Wildlife Park - Phase 1/2/3 Operational Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 Project conditionally approved pending a further report to Council as per Budget Committee on February 19, 2019 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. To co ntinue construction of the 3rd phase of the Community Wildlife Park. David Tomlinson had the vision for the CWP many years ago and after years of study and observation of the flora and fauna, he approached Council with the idea of establishing a Wildlife Park. Council endorsed the idea in 1998 and since then, land acquisition has occurred, development agreements have been negotiated and many studies have occurred with respect to hydrology. RFP PRS2016-21 - Aurora Community Wildlife Park Design and Implementation was awarded by Council through report PRS16-023 in June 2016. Design work is 90% complete and Parks will be issuing a tender for Phased Construction works in Q2 2019, starting with the trail construction in Q3. PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. This system of trails is integral to the 2C development lands and the trails systems help support essential links between green spaces and residential areas and is supported by the Trails Master Plan. The trails provide important connectivity for residents helping alleviate the reliance on automobiles, decrease carbon footprints and increase the health and wellness of the community objectives in both the Parks and Recreation Master Plan and Environmental Action Plan. The Wildlife Park supports the Strategic Plan goal of Supporting an Exceptional Quality of Life for All through its accomplishment of satisfying requirements in the key objectives with the goal statement: Develop a long-term needs assessment for recreation programs, services and operations to match the evolving needs of the growing and changing population. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. Will provide the residents with controlled access to a significant number of trails/boardwalks throughout the Wildlife Park which contains a provincially designated wetland, woodlands and grasslands. The park will also provide connectivity through its trail system to town amenities and other trails identified in the Trails Master Plan. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. Many years of planning and funding have been invested in the concept of the CWP and by not funding the next phase the vision, the work of many people would be lost. Leaving the lands without access may also encourage unwanted entry to sensitive areas of our natural environment. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures CONTRACTS 1,000,000 1,000,000 1,000,0003,000,000 3,000,000 1,000,000 1,000,000 1,000,000 3,000,000 1,000,000 1,000,000 1,000,000Expenditures Total Funding Special Purpose Reserve Funds CIL PARKLAND CONTRIBUTION 100,000 100,000 100,000300,000 300,000 100,000 100,000 100,000 Development Charges Reserve Funds PARKS DEV & FAC DC CONT'N 900,000 900,000 900,0002,700,000 2,700,000 900,000 900,000 900,000 3,000,000 1,000,000 1,000,000 1,000,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 73321 Cattle Crawl Underpass Operational Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 Project conditionally approved pending a further report to Council as per Budget Committee on February 19, 2019 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. This potential underpass is identified in the Trails Master Plan. It is a tunnel the runs under the CN tracks that was formerly utilized to provide livestock access from one side of the tracks to the other. It was filled in many year ago. Opening it up would provide residents access from the north side of the tracks to the southside into the new BG development and Yonge St. With the expansion of the rail line the Town has been in discussions with Metrolinx regarding the possibility of opening up the tunnel if feasible, as the tunnel is within their corridor. Metrolinx verbally indicated are willing to enter into a 50/50 cost share for an engineering study to see if the tunnel could be viable. Staff are awaiting a formal position. PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. Project supports the Trail Master plan objectives. TATC supported the potential of a cost share at the June 15, 2018 TATC meeting, recommending to Council the following. a) That staff continue to investigate cost sharing with Metrolinx regarding the cattle crawl underpass; and b) That the 2019 Capital Budget placeholder in the amount of $750,000 for railway crossings be specifically used for the cattle crawl underpass. Council carried the recommendation at the July 24,2018 Council meeting (minutes attached). PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. Connection from the residential northwest side Aurora to the southern development of the BG properties. This would provide residents with access to the Yonge St corridor for transit etc. Would support the Trails Master Plan where the potential for this crossing is identified. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. Loss of connectivity between residential developments Budget Future202420222021202020192023Total Expenditures Estimated Expenditures CONTRACTS 750,000750,000 750,000 750,000 750,000 750,000Expenditures Total Funding Special Purpose Reserve Funds CIL PARKLAND CONTRIBUTION 75,00075,000 75,000 75,000 Development Charges Reserve Funds PARKS DEV & FAC DC CONT'N 675,000675,000 675,000 675,000 750,000 750,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 81016 Aurora Promenade Streetscape Design & Implementation Plan Capital Works Planning & Development Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 Project conditionally approved pending a further report to Council as per Budget Committee on February 19, 2019 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. The Streetscape Plan was approved by Council on July 29, 2014. As part of Report No. PL15-022, staff proposed a scoped implementation plan that focused on improvements in the "Main Streets" area as identified in the Plan. This proposed scope of work included hard infrastructure improvements (i.e. new pavers, curbs...) in addition to new street furniture, additional landscaping, new street trees and improved signage. Given the potential for redevelopment in the "Main Streets" area, staff are recommending that the proposed hard infrastructure improvements be deferred. The current budget request would fund improvements such as new street furniture, additional landscaping, new street trees/planters and improved signage as proposed in the Streetscape Design PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. The proposed improvements are designed to beautify the Downtown and contribute to Downtown Revitalization. The type of public realm improvements are supported by Council policy and identified in the Aurora Promenade Concept Plan. The project would result in a service level improvement in the area. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. Improving the pedestrian experience in the historic downtown could be a catalyst for Downtown revitalization. This investment aligns well with the recent establishment of a BIA for the area as well as planned improvements in Library Square. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. None. Current service levels would continue. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures CONTRACTS 730,000730,000 730,000 730,000 730,000 730,000Expenditures Total Funding Other Funding Sources GROWTH & NEW RES CONT'N 730,000730,000 730,000 730,000 730,000 730,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 31179 Hillary House Parking Lot Planning & Development Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 Project conditionally approved pending a further report to Council as per Budget Committee on February 19, 2019 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. As per the Special Budget Public Consultation held January 14, 2019, the Aurora Historical Society has come forward and asked the Town to construct a parking lot at the rear of the Hillary House property on land that is currently owned by the Town and is used by the Parks Department as a maintenance yard. The historical society would be responsible for building a pathway from the parking lot to Hillary House. PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. The parking lot would provide a safer entrance off of Machell Avenue that would provide more parking spaces and allow for larger vehicles such as school buses and tour buses to access the property and there by increasing attendance. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. The parking lot would provide a safer entrance to Hillary House off of Machell Avenue instead of Yonge Street. In addition, the parking lot would be larger and therefore able to accomodate groups. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. By not approving construction of the parking lot, the ability of the Aurora Historical Society to grow its attendance and thus increase revenue would be limited. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures CONTRACTS 135,300135,300 135,300 135,300 135,300 135,300Expenditures Total Funding Other Funding Sources GROWTH & NEW RES CONT'N 135,300135,300 135,300 135,300 135,300 135,300Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 34533 Traffic Calming Measures in School Zones Planning & Development Services Final Approved Budget 2019 Description TARGET START DATE AND END DATE: Use format Q4 2017 - Q1 2018 Project conditionally approved pending a further report to Council as per Budget Committee on February 19, 2019 PROJECT DESCRIPTION: Provide a brief overview of the project and include the key goals, objectives and performance measures. The flexible sign is installed on the centreline of road and flexible posts on edge of roadway are optional (depending on road width and other existing constraints). It is designed to narrow the street and forces vehicles to slow down. The following locations can be considered for the implementation of the school zone centreline flexible sign pilot program: 1) Northern Lights PS and St. Jerome Catholic ES 2) Highview PS and Light of Christ Catholic ES 3) Devins Drive PS PROJECT JUSTIFICATION/CAPITAL SERVICE LEVEL IMPACT:Provide the reasons the project should be approved and what will be the impact of the project to service levels. The Town would like to implement a school zone centreline flexible sign pilot program as a continuous efforts to enhance safety for all road users within school zones. PROJECT BENEFITS:Explain the benefits of the project which could include Citizen/Client, compliance, financial, internal, learning & growth or utility benefits. The key benefits of centreline flexible sign are:1) Effective at reducing vehicle travelling speed.2) Low capital and operating costs compared to traditional physical traffic calming measures or other methods.3) Minimal impacts to emergency or transit vehicles (if implemented correctly).4)Durable and easy to implement. IMPACT TO THE ORGANIZATION IF THE PROJECT WAS NOT APPROVED:Please provide an explanation of what the outcomes would be if the project was not approved. The centreline flexible sign is designed and intended to reduce vehicle traveling speed in school zones. Therefore, if the program was not approved it may have an impact on road safety within school zones. Budget Future202420222021202020192023Total Expenditures Estimated Expenditures CONTRACTS 20,00020,000 20,000 20,000 20,000 20,000Expenditures Total Funding Other Funding Sources GROWTH & NEW RES CONT'N 20,00020,000 20,000 20,000 20,000 20,000Funding Total Total Over (Under) Funded Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019 Town of Aurora Capital Projects Project Department Version Year 34533 Traffic Calming Measures in School Zones Planning & Development Services Final Approved Budget 2019 Gallery Q:\_Departments_space\Works\Capital Projects\CP 34533 - School Zone Centreline Flexible Sign Pilot Program\CP_34533.jpg Budget Committee 2019 Budget FINAL Tuesday, March 26, 2019