Agenda - Committee of Adjustment - 20240912Town of Aurora
Committee of Adjustment
Meeting Agenda
Date:Thursday, September 12, 2024
Time:7 p.m.
Location:Video Conference
Meetings are available to the public via live stream on the Town’s YouTube channel. To participate
electronically, please visit aurora.ca/participation.
Pages
1.Call to Order
2.Land Acknowledgement
3.Approval of the Agenda 1
That the Agenda as circulated by the Secretary-Treasurer be approved.
4.Declarations of Pecuniary Interest and General Nature Thereof
5.Receipt of the Minutes
5.1 Committee of Adjustment Meeting Minutes of August 8, 2024, Meeting
Number 24-08
That the Committee of Adjustment Minutes from Meeting Number 24-08
be adopted as printed and circulated.
6.Presentation of Applications
6.1 MV-2024-01 - Liu - 2007 Vandorf Sideroad 5
6.2 MV-2024-20 - Irvine - 313 Ridge Rd 6
6.3 MV-2023-44 - The Biglieri Group - 100 Goulding Avenue 27
6.4 C-2024-02 - Cornerstone Growth Investment Corp. - 31 Kennedy St. W 41
6.5 MV-2024-17, MV-2024-18 - Cornerstone Growth Investment Corp - 31
Kennedy St. W
53
7.New Business
8.Adjournment
1
Town of Aurora
Committee of Adjustment
Meeting Minutes
Date:
Time:
Location:
Thursday, August 8, 2024
7 p.m.
Video Conference
Committee Members: David Mhango (Chair)
Chris Polsinelli
Jane Stevenson (Vice Chair)
Michael Visconti
Julian Yang
Other Attendees: Peter Fan, Secretary-Treasurer, Committee of Adjustment
Antonio Greco, Planner
_____________________________________________________________________
1. Call to Order
That the meeting be called to order at 7:03 PM.
2. Land Acknowledgement
The Town of Aurora acknowledges that the Anishinaabe (A-nishshaw-na-bee)
lands on which we live, and work are the traditional and treaty territory of the
Chippewas of Georgina Island, as well as many other Nations whose presence
here continues to this day. As the closest First Nation community to Aurora, we
recognize the special relationship the Chippewas have with the lands and waters
of this territory. They are the water protectors and environmental stewards of
these lands, and as a municipality we join them in these responsibilities.
Page 1 of 64
2
We further acknowledge that Aurora is part of the treaty lands of the
Mississaugas and Chippewas, recognized through Treaty #13 as well as the
Williams Treaties of 1923.
A shared understanding of the rich cultural heritage that has existed for
centuries, and how our collective past brought us to where we are today, will help
us walk together into a better future.
3. Approval of the Agenda
Moved by Jane Stevenson
Seconded by Julian Yang
That the Agenda as circulated by the Secretary-Treasurer be approved.
Carried
4. Declarations of Pecuniary Interest and General Nature Thereof
None.
5. Receipt of the Minutes
5.1 Committee of Adjustment Meeting Minutes of July 11, 2024, Meeting
Number 24-07
Moved by Michael Visconti
Seconded by Chris Polsinelli
That the Committee of Adjustment Minutes from Meeting Number 24-07
be adopted as printed and circulated.
Carried
6. Presentation of Applications
6.1 C-2024-03 - 1623 Wellington St. Dev Ltd. - 63 Sunday Dr
The purpose of the proposed consent application is to sever the subject
lands with frontages along a private laneway (Sunday Drive) as follows
(see Appendix ‘B’):
1. Proposed Severed Lands:
Part 1 of the Draft Plan of Severance, Lot area of 0.607 hectares (1.5
acres)
Page 2 of 64
3
1. Proposed Retained Lands:
Part 2 of Draft Plan of Severance, Lot area of 1.89 hectares (4.68 acres)
The Chair invited the Applicant or Owner to address the Committee. In
attendance was the agent Daniel Zhang and Daniel Orellana. The agent
provided a brief introduction and presentation to their application.
The Chair invited members of the public to provide comments. There were
no public delegates in attendance for this application.
The Committee inquired about the proposed use of the lands and whether
municipal services is available currently. The committee also confirmed if
whether the Ministry of Transportation Ontario had any concerns for the
proposed.
Moved by Michael Visconti
Seconded by Julian Yang
That the Consent application C-2024-03 be APPROVED
Carried
6.2 MV-2024-19 - Kwan Yee - 33 Urquhart Crt
The applicant is requesting relief from the requirements of the Town’s
Comprehensive Zoning By-law 6000-17, as amended, to facilitate the
construction of a one storey addition, a front porch, and an open-sided
roof porch. The following relief is being requested:
18. Section 18.1.2(i) states uncovered decks and minor additions
including open-sided roof porches and balconies may be permitted
on legally existing residential lots provided that do not exceed 50.0
square metres on the ground floor and are located outside the key
natural features and hydrologically sensitive features.
o The applicant is proposing to construct a 65.43 square metre
first storey addition, 44.78 square metre open-sided roof porch,
and 21.77 square metre front porch; therefore a total of 131.98
square metres.
The Chair invited the Applicant or Owner to address the Committee. In
attendance was the agent Ken Tai. The agent provided a brief introduction
and presentation to their application.
Page 3 of 64
4
The Chair invited members of the public to provide comments. There were
no public delegates in attendance for this application.
The Committee inquired about the foundations of the proposed, open
sided porch roof, and sought clarifications to a listed conditi on of
approval. The Committee also inquired to see if the septic system upgrade
and erosion control on site will be required as part of the proposed.
Moved by Chris Polsinelli
Seconded by Jane Stevenson
That the Minor Variance application MV-2024-19 be APPROVED
Carried
7. New Business
None.
8. Adjournment
Moved by Michael Visconti
That the meeting be adjourned at 7:38pm
Carried
Page 4 of 64
100 John West Way
Aurora, Ontario
L4G 6J1
(905) 727-3123
aurora.ca
Town of Aurora
Committee of Adjustment Report
No. MV-202 4 -01
_______________________________________________________________________________________
Subject: Minor Variance Application
Liu
2007 Vandorf Sideroad
CON 3 PT LOT 15
File: MV-2024-01
Prepared by: Katherine Gatzos, Planner
Department: Planning and Development Services
Date: September 12, 2024
_______________________________________________________________________________________
Application
Planning Staff are requesting a deferral of the above noted minor variance application for
2007 Vandorf Sideroad (MV-2024-01).
Additional time is needed for the Ontario Ministry of Transportation (MTO) to review the
subject application. The MTO has identified that a portion of the proposed development
is within the required setback from the MTO property line and requires that the proposal
be revised to ensure that no development is within the setback.
Staff recognize the importance of making informed decisions and believe the requested
deferral will enable the applicant to revise their plans that are compliant with MTO’s
requirements.
As a result, Staff are requesting the subject application be deferred for consideration,
pending MTO’s review and approval of the proposed development. The applicant has
been made aware of this and also supports the decision.
Page 5 of 64
100 John West Way
Aurora, Ontario
L4G 6J1
(905) 727-3123
aurora.ca
Town of Aurora
Committee of Adjustment Report
No. MV-202 4 -20
_______________________________________________________________________________________
Subject: Minor Variance Application
Irvine
313 Ridge Road
PLAN 132 PT LOT 21 RS65R796 PARTS 1-3
File: MV-2024-20
Prepared by: Antonio Greco, Senior Planner
Department: Planning and Development Services
Date: September 12, 2024
_______________________________________________________________________________________
Application
The applicant is requesting relief from the requirements of the Town’s Comprehensive
Zoning By-law 6000-17, as amended, to facilitate the construction of a one-storey
addition to the easterly side of the existing dwelling, a front covered porch, an expansion
to the existing outdoor rear deck and a one storey workshop/garage addition to the
westerly side of the existing dwelling. The following relief is being requested:
a) Section 14.1 of the Zoning By-law states no person shall use the land, including
expanding, enlarging or otherwise altering an existing use, building or structure,
for any use other than a use legally existing as of November 15, 2001, without
amendment to, or relief from the Zoning By-law.
The applicant is proposing to construct a one-storey addition, covered
porch and deck that did not exist prior to November 15, 2001, thereby
requiring a minor variance.
b) Section 14.1.b(i) of the Zoning By-law requires a minimum exterior side yard of
15.0 metres.
The applicant is proposing a one-storey addition and deck, which is 12.6
metres to the exterior side property line, thereby requiring a variance of 2.4
metres.
Page 6 of 64
September 12, 2024 2 of 10 Report No. MV-2024-20
c) Section 14.1.b(i) of the Zoning By-law requires a minimum front yard of 15.0
metres.
The applicant is proposing a one-storey garage addition, which is 13.8
metres to the front property line, thereby requiring a variance of 1.2
metres.
Background
Subject Property and Area Context
The subject property, municipally known as 313 Ridge Road, is located on the west side
of Yonge Street, just west of Ridge Hill Road and east of the Metrolinx GO Train railway
tracks. The subject property currently contains a one-storey detached dwelling, a private
driveway off Ridge Road, and mature vegetation. Existing mapping indicates the subject
property is outside of the LSRCA Regulated Area. The surrounding neighbourhood area
consists of larger estate lots, with the subject property having an approximate area of
4.7 hectares (11.6 acres) and a frontage of 153 metres (501 feet) along Ridge Hill Road
and 39 metres (127 Feet) along Ridge Road.
Furthermore, this mature estate residential neighbourhood along Ridge Road was
originally constructed in the late 1960s/early 1970s. This estate neighbourhood has
undergone further reconstruction in the late 1970s, through the creation of the
municipal road “Ridge Hill Road,” which serves as a cul-de-sac containing four estate
lots.
Surrounding Land Uses
The surrounding land uses for the subject property are as follows:
North: Estate residential single detached lots and wooded areas
South: Estate residential single detached lots
East: Estate residential single detached lots
West: Metrolinx GO Train railway
Proposal
The applicant is proposing to construct a one-storey addition to the easterly side of the
existing dwelling, a front covered porch, an expansion to the existing outdoor rear deck
and a one storey workshop/garage addition to the westerly side of the existing dwelling.
Page 7 of 64
September 12, 2024 3 of 10 Report No. MV-2024-20
Official Plan
The subject property is designated as “Estate Residential” by the Town of Aurora Yonge
Street South Secondary Plan (OPA 34) and as “Oak Ridges Moraine Settlement Area”
under OPA 48. One detached dwelling, accessory structures, and compatible home
occupations are permitted, as part of a recognized and developed community area.
Zoning
The subject lands are zoned “Rural – Oak Ridges Moraine (RU-ORM)” in the Town of
Aurora Zoning By-law 6000-17. The development of uncovered decks and minor
additions to existing dwellings are permitted on legally existing residential lots with
existing dwellings in the RU-ORM zone.
Preliminary Zoning Review
A Preliminary Zoning Review (PZR) has been completed by the Town of Aurora’s
Building Division. The PZR identified the required variances, and no other non-
compliance was identified.
Applicant’s stated reason(s) for not complying with the Zoning By-law
As stated on the minor variance application form, the applicant is seeking to enhance
wheelchair accessibility within the existing home, and it is not possible to enlarge or
alter the existing dwelling without relief from the Zoning By-law.
Planning Comments
Planning Staff have evaluated Minor Variance Application MV-2024-20 pursuant to the
prescribed tests as set out in Section 45 (1) of the Planning Act, as follows:
a) The proposed variance meets the general intent of the Official Plan
The intent of the “Estate Residential” designation is to ensure a low-density residential
setting is maintained. The Oak Ridges Moraine (ORM) “Settlement Area” designation
also recognizes the subject property as an established and developed community able
to support residential uses. The purpose of the Oak Ridges Moraine Conservation Plan
is to provide for continued development within existing urban settlement areas and
recognizing existing rural settlements. The Settlement Area is intended to
accommodate residential uses including expansions to existing buildings and
associated accessory structures. This estate residential neighbourhood was
Page 8 of 64
September 12, 2024 4 of 10 Report No. MV-2024-20
constructed in the 1970s and has undergone various property specific redevelopments
over the years.
The proposed minor variance application respects the Estate Residential and Oak
Ridges Moraine policies, thus not constituting overdevelopment of the site. The subject
property has a lot area of 4.7 hectares (11.6 acres) which is significantly larger than the
surrounding properties in the neighbourhood. That said, the proposed development will
continue to maintain over 94% of the lot area being in an open, landscaped, or natural
condition. The subject property is not within any minimum vegetation protection zone or
key natural heritage/hydrological features. As such, Staff does not anticipate any
adverse impacts to surrounding natural heritage system. Staff are of the opinion that
the requested variances are in keeping with the general intent of the Official Plan.
b) The proposed variance meets the general intent of the Zoning By-law
The overall intent of the Rural – Oak Ridges Moraine Rural General Zone (RU-ORM)
designation is to recognize existing residential uses while ensuring that further
development is limited as to not result in adverse negative impacts to the ecological
integrity of the Oak Ridges Moraine.
A summary of the variances requested and how they meet the general intent of the
zoning is as follows:
The expansion or altering an existing use, building or structure, for any use other than a
use legally existing as of November 15, 2001, without amendment to, or relief from the
Zoning By-law:
The Oak Ridges Moraine portion of the RU-ORM zoning designation recognizes that
minor alterations to existing residential lots may be needed to support specific family
housing needs, however, must be done so in a manner that respects the surrounding
natural heritage systems. The subject property has been a legal lot of record since the
early 1970s, containing a single detached dwelling. That said, the surrounding estate
residential neighbourhood has evolved overtime, through the redevelopment of older
smaller dwellings, to newer estate mansions. Furthermore, the existing residential
dwelling and proposed variances are not located within any key natural heritage or
hydrologically sensitive features, nor their required protection zones.
The proposal allows for the expansion of the existing residential use to accommodate
specific family housing needs and enhance wheelchair accessibility throughout the
entire home. The design of the proposed additions is done so in a manner that in the
Page 9 of 64
September 12, 2024 5 of 10 Report No. MV-2024-20
opinion of Staff respects the existing estate neighbourhood character and surrounding
natural heritage and hydrologically sensitive features of the Oak Ridges Moraine.
Minimum Exterior Side Yard:
The intent of the exterior side yard setback provision is to maintain an appropriate
distance of development to a road, allow for unencumbered movement between the
front and rear yards, and to ensure adequate sight lines are provided. The proposed
exterior side yard reduction of 2.4 metres continues to meet the general intent of the
Zoning By-law and maintains an adequate development distance to the adjacent
municipal road, Ridge Hill Road. Furthermore, the presence of mature vegetation along
the easterly side yard provides for sufficient screening and will not have any adverse
impacts from a streetscape/sightline perspective. As mentioned previously, the
surrounding neighbourhood consists of estate lots which benefits from larger lot areas,
contributing to adequate spatial separation to abutting neighbouring properties. In
addition, the subject property contains a lot area of 11.6 acres, with unencumbered
movement to all front and side yards. There is clear access to the entirety of the
property and the proposed minor variances will not create any hindrances.
Staff are of the opinion that the proposed exterior side yard setback variance is
sufficient and continues to respect the overall intent of the Zoning By-law.
Minimum Front Yard:
The intent of the minimum front yard setback provision is to ensure there is consistency
between dwellings from a streetscape perspective and a relatively uniform presence
from the street edge. Staff believe that despite the reduction in front yard setback, there
is still adequate spatial separation and uniformity along the street. The proposed
garage/workshop addition will maintain a 13.8 metre setback to the front property line,
which also contains mature vegetation for additional screening. Furthermore, there is an
additional 12.3 metre setback from the front property line to the street line (Ridge
Road). The subject property is one of three homes that are found at the end of Ridge
Road, therefore, the proposed reduction will not have any adverse impacts or
disturbances. Staff are of the opinion that the proposed front yard setback is adequate
and provides sufficient separation to the front property line and Ridge Road. The
orientation of the proposed addition is advantageous in terms of maximizing the
existing orientation of the dwelling, while aligning it to capitalize on the existing
driveway, while allowing for enhanced vehicular manoeuverability.
Staff are satisfied that the proposed front yard setback variance will not result in
overdevelopment of the site, nor will it negatively impact on-site infiltration and
therefore maintains the intent and purpose of the Zoning By-law.
Page 10 of 64
September 12, 2024 6 of 10 Report No. MV-2024-20
c) The proposed variance is considered desirable for the appropriate development of the
land
The subject property is located within the Settlement Area and are permitted for urban
residential uses. The proposed variances are considered desirable for the appropriate
development of the land and permits the construction of a one storey addition on the
east and west side of the existing one-storey dwelling, an expansion to the existing
outdoor rear deck, and a new covered front porch. The proposed development is not
anticipated to have any adverse impacts on local natural heritage features or systems,
nor any negative impacts to the public realm or streetscape. The property is not part of
the LSRCA Regulated Area, and appropriate conditions have been developed as per the
attached Appendix ‘A’.
The proposed development will result in one tree removal on the southwest corner of the
proposed garage/workshop addition. The appropriate conditions of approval have also
been developed to ensure any tree removals are evaluated through an Evaluation Report
prepared by a Certified Arborist or Professional Registered Forester outlining all aspects
of the impacts that this proposal will have on existing trees. That said, majority of the
proposed works is wholly contained within areas comprised of manicured lawns,
hardscaped gardens, and an impervious driveway thus ensuring that site disturbance is
minimal. The proposed additions and front porch have been designed in a manner that
respects the surrounding estate residential neighbourhood character relating to building
scale, massing, orientation and materiality.
As such, Staff are of the opinion that the requested variance is considered desirable and
appropriate development of the property.
d) The proposed variance is considered minor in nature
The question of the minor in nature of a proposed variance can be related to its scale
and impact on adjacent properties, not necessarily its numerical value. In the opinion of
Staff, the requested variance is considered to be minor and is not expected to have any
adverse effects on the subject lands, neighbouring properties, or the character of the
existing neighbourhood as a whole.
The proposed easterly addition and deck will continue to provide for a substantial buffer
of over 53 metres from the closest abutting property at 259 Ridge Hill Road. Existing
vegetation can be found along the easterly property line, which will also serve as a
screening buffer to the municipal road and abutting property. The proposed front yard
setback to the garage/workshop addition is considered minor, especially when
evaluating the lot size of the subject property and surrounding neighbourhood. Even
Page 11 of 64
September 12, 2024 7 of 10 Report No. MV-2024-20
with the reduction in front yard setback, there is a substantial buffer to the street line
(Ridge Road) which would only serve as an access entry for two other homes.
Furthermore, when considering the additional distance from Ridge Road to the actual
dwellings at 302 and 340 Ridge Road, the buffer is over 60 metres, thus not creating any
adverse impacts to the surrounding area. The subject property will continue to function
as a residential lot and will not negatively impact neighbouring properties.
As such, Staff are of the opinion that the requested variances are minor in nature.
Additional Comments
The minor variance application was circulated to Town Department/Divisions and to
external agencies for review and comment. The following comments were provided:
Department or Agency Comments
Building Division Preliminary Zoning Review was completed.
No objections.
Engineering Division No objections.
Operational Services (Parks) No objections.
Operational Services
(Public Works) No objections.
Central York Fire Services No objections.
York Region No objections.
LSRCA No objections.
Alectra No objections.
Public Correspondence
Written submissions were not received at the time of writing of this report. Should written
submissions be received after the writing of this report, the Secretary Treasurer will
provide the submission(s) to Committee members at the meeting.
Page 12 of 64
September 12, 2024 8 of 10 Report No. MV-2024-20
Conclusion
Planning staff have reviewed the application with respect to the Section 45 (1) if the
Planning Act, R.S.O, 1990, c.P.13, as amended, and are of the opinion that the requested
variance meets the four tests of the Planning Act for granting of minor variances. Staff
recommend approval of the requested variances, subject to the conditions outlined in
Appendix ‘A’.
Attachments
Appendix ‘A’ – Recommended Conditions of Approval
Appendix ‘B’ – Site Plan and Elevations
Page 13 of 64
September 12, 2024 9 of 10 Report No. MV-2024-20
Appendix ‘A’ – Recommended Conditions of Approval
Planning and Development Services:
1. That the variance only applies to the subject property, in conformity with the plan(s)
attached as ‘Appendix B’ to this Staff Report, to the satisfaction of the Director of
Planning and Development Services or their designate.
2. That the Owner obtain a Road Occupancy Permit through the Town of Aurora Public
Works Department.
Operational Services – Parks Division:
3. That the owner shall be required to provide an Evaluation Report prepared by a Certified
Arborist or Professional Registered Forester outlining all aspects of the impacts that
this proposal will have on existing trees. The report shall include the following:
a. An assessment of existing trees (5cm trunk diameter and greater) by size, species
and condition including trees on adjacent properties whose structure or root zone
may be impacted by construction.
b. Identification of all tree injuries and tree removals, if any.
c. Identification of all tree protection measures including recommendations on the
mitigation of negative effects to trees during and post construction, including
applicable maintenance requirements.
d. Provision of monitoring of the site work through a series of site visits by the
Arborist/Forester to ensure protection/preservation measures remain in
compliance throughout the duration of the project. Monitoring shall occur
i. At commencement of work to certify all tree protection measures are in place,
ii. During site work to confirm protection measures are in place and
to oversee arboricultural works as required, and
iii. Post construction assessment. Each site visit is to be documented and any
resulting action items required by the Arborist /Forester shall be implemented
and confirmed on site forthwith by the Arborist /Forester following each visit.
e. A monetary evaluation in accordance with the Town’s Tree Compensation Policies
for all trees designated to be removed.
Page 14 of 64
September 12, 2024 10 of 10 Report No. MV-2024-20
4. The Owner shall be required to provide a tree compensation and a replanting plan in
accordance with the Town of Aurora Tree Compensation Policies to the satisfaction
of the Director of Operational Services as compensation for trees removed to facilitate
construction. Compensation planting shall be completed prior to release of the
financial securities.
5. The owner shall agree to comply with the Aurora Tree Permit By-law # 5850 -16 prior
to the removal of any trees on the property.
6. The owner shall be required to provide financial securities based on the total value of
the Tree Compensation evaluation and all Arboriculture works as defined by the Town
and the Owner’s Arborist/ Forester, to the satisfaction of the Director of Operational
Services.
7. All the above shall be included as terms and conditions in a Letter of Undertaking with
the Town of Aurora to guarantee compliance with the Conditions of Approval and all
related site works.
Page 15 of 64
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXPROPOSEDWORKSHOP/GARAGEADDITION(157.33 m2)EXISTING1-STOREYDWELLING(81.3 m2)PROPOSEDADDITION(4.71 m2)EXISTINGDECKEXISTINGCOVERED DECKPROPOSEDCOVEREDPORCHEXISTING ASPHALTDRIVEWAYSTAIRSPROPOSEDDRIVEWAYEXTENSIONEXISTINGWOOD SHED48'-0"[14630]30'-0"[9144]29'-0"[8839]11'-0"[3353]38'-5"[11713]2'-8"[813]11'-0"[3340]23'-0"[7004]16'-0"[4877]20'-0"[6091]9'-4"[2847]19'-8"[5998]17'-10"[5446]8'-3"[2521]15'-0"[4574]18'-2"[5547]45'-4"[13825]43'-0"[13110]41'-7"[12670]51'-9"[15762]8'-2"[2487]2'-9"[851]PROPERTY LINEPROPERTY LINEPROPERTY LINEXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXN78°58'10"W171.81N44°12
'10
"E38.72
N1
4
°
2
8
'
3
0
"
E
33
.
9
7N78°13'55"W10.06N1
4
°
2
7
'
4
5
"
E
22
2
.
9
5
N73°14'30"E253.06N16°59'20"W
153.51N73°09'40"E73.24BLOCK 21REGISTED PLAN 132PART 1, PLAN 65R - 796PART 2, PLAN 65R - 796PA
R
T
3
,
P
L
A
N
6
5
R
-
7
9
6
RIDGE ROADSOUTHWESTCORNER OF BLOCK 21REGISTERED PLAN 132LIMIT BETWEEN REGISTERED
PLANS 132 AND M-28LIMIT BETWEEN REGISTEREDPLANS 132 AND M-4245'-4"
[13.83]PROPOSEDWORKSHOP/GARAGEADDITIONEXISTING1-STOREYDWELLINGEXISTING DRIVEWAYR24'-7"[R7.50]R24'
-7
"
[R7
.50
]655'-5"FRONTAGE [199.77]43'-0"[13.11]41'-7"[12.67]334'-11"[102.09]579'-0"[176.47]51'-812"[15762]
586'-1"
[178.63]PLEASE NOTE THAT INFORMATIONON THE SITE PLAN IS THE PROPERTYOF LAND SURVEYOR JASONCHUN-HO OF PEARSON+PEARSON SURVEYING LTD. AND ISUSED WITH THEIR PERMISSION.NPROPOSED-SITE PLANAS SHOWNKACCPA101NO.DATEREVISIONIT IS THE RESPONSIBILITY OF THE APPROPRIATECONTRACTOR TO CHECK AND VERIFY ALLDIMENSIONS ON SITE AND REPORT ALL ERRORSAND OR OMISSIONS TO THE ARCHITECT.ALL CONTRACTORS MUST COMPLY WITH ALLPERTINENT CODES AND BY-LAWS.DO NOT SCALE DRAWINGS.THIS DRAWING MAY NOT BE USED FORCONSTRUCTION UNTIL SIGNED.COPYRIGHT RESERVED.CSPACEARCHITECTURE5B-8841 GEORGE BOLTON PKWY, BOLTON, ON L7E 2X8T: 647.588.1784 E: info@cspace.caPROPOSED ENLARGED SITE PLAN 1A101SCALE: 1:50023.183807.03.241FOR ZONING REVIEW2024.04.302REVISED FOR ZONING REVIEW2024.06.273ISSUED FOR MINOR VARIANCE2024.07.184REISSUED FOR ZONING REVIEW2024.07.31RIDGE ROAD- ADDITION &INTERIOR ALTERATIONS313 RIDGE ROADAURORA, ONTARIOPROPOSED SITE PLAN 4A101SCALE: 1:2000PROPOSED SITE STATISTICS 2A101SiteKEY PLAN 3A101REISSUED FOR ZONING REVIEW2024.07.312PR20240802Aug. 6, 2024TOWN OF AURORA PLANNING & DEVELOPMENT SERVICES BUILDING DIVISIONPERMIT NO.: DATE:PRELIMINARY ZONING REVIEWAPPROVED BY: Melissa Bozanin60Page 16 of 64
DNACOILEMDNRAMP DOWN3'2" RAILING HTCAB.DNOPENTOBELOWBENCH7'5" CLNG HTSLOPED-DNCEILINGDWPORCHDECKAANEXISTING -FLOOR PLANAS SHOWNKACCPA2 1NO.DATEREVISIONIT IS THE RESPONSIBILITY OF THE APPROPRIATECONTRACTOR TO CHECK AND VERIFY ALLDIMENSIONS ON SITE AND REPORT ALL ERRORSAND OR OMISSIONS TO THE ARCHITECT.ALL CONTRACTORS MUST COMPLY WITH ALLPERTINENT CODES AND BY-LAWS.DO NOT SCALE DRAWINGS.THIS DRAWING MAY NOT BE USED FORCONSTRUCTION UNTIL SIGNED.COPYRIGHT RESERVED.CSPACEARCHITECTURE5B-8841 GEORGE BOLTON PKWY, BOLTON, ON L7E 2X8T: 647.588.1784 E: info@cspace.ca23.183807.03.241FOR ZONING REVIEW2024.04.30RIDGE ROAD- ADDITION &INTERIOR ALTERATIONS313 RIDGE ROADAURORA, ONTARIOEXISTING FLOOR PLANS1A2 1SCALE: 1/8" = 1'-0"201201REISSUED FOR ZONING REVIEW2024.07.312Page 17 of 64
PORCH17'-6"x 8'-0"EMDNRAMP DOWNDNOPENTOBELOWSLOPED-DNCEILINGWIDENED DOOR EXISTING WINDOWAALAUNDRY/MUDROOM10'-6"x10'-9"WORKSHOP28'-0"x16'-0"GARAGE28'-0"x30'-0"KITCHEN11'-0"x7'-11"OFFICE/GUEST11'-2"x18'-0"PRIMARY BEDROOM11'-0"x11'-0"BENCH & HOOKS CURB-LESS SHOWER ENSUITE11'-0"x10'-6"DINING14'-0"x 10'-6"BATH7'-10"x5'-6"LIVING11'-8"x 7'-2"NEW DOOR NEW WINDOW NEW WINDOW DN78"x42" NEW WINDOWEXISTINGWINDOWDN1:10SLOPEWORKSHOPBENCH/TABLECLOSET HEATPUMPSHELF NEW DECK20'-"x 16'-0"NEW DOOR DENOTES EXISTING WALLS TOREMAINDENOTES NEW CONSTRUCTIONNPROPOSED-FLOOR PLANAS SHOWNKACCPA2 1NO.DATEREVISIONIT IS THE RESPONSIBILITY OF THE APPROPRIATECONTRACTOR TO CHECK AND VERIFY ALLDIMENSIONS ON SITE AND REPORT ALL ERRORSAND OR OMISSIONS TO THE ARCHITECT.ALL CONTRACTORS MUST COMPLY WITH ALLPERTINENT CODES AND BY-LAWS.DO NOT SCALE DRAWINGS.THIS DRAWING MAY NOT BE USED FORCONSTRUCTION UNTIL SIGNED.COPYRIGHT RESERVED.CSPACEARCHITECTURE5B-8841 GEORGE BOLTON PKWY, BOLTON, ON L7E 2X8T: 647.588.1784 E: info@cspace.caPROPOSED FLOOR PLAN 1A2 1SCALE: 1/8" = 1'-0"23.183807.03.241FOR ZONING REVIEW2024.04.30RIDGE ROAD- ADDITION &INTERIOR ALTERATIONS313 RIDGE ROADAURORA, ONTARIO11REISSUED FOR ZONING REVIEW2024.07.312Page 18 of 64
GROUND FFL.U/S SOFFITEXISTING-MIDPOINT OF ROOF7'-6"
[2286]
15'-6"
[4725]APPROX. GRADEEXISTING-FRONT ELEVATIONAS SHOWNKACCPA301NO.DATEREVISIONIT IS THE RESPONSIBILITY OF THE APPROPRIATECONTRACTOR TO CHECK AND VERIFY ALLDIMENSIONS ON SITE AND REPORT ALL ERRORSAND OR OMISSIONS TO THE ARCHITECT.ALL CONTRACTORS MUST COMPLY WITH ALLPERTINENT CODES AND BY-LAWS.DO NOT SCALE DRAWINGS.THIS DRAWING MAY NOT BE USED FORCONSTRUCTION UNTIL SIGNED.COPYRIGHT RESERVED.CSPACEARCHITECTURE5B-8841 GEORGE BOLTON PKWY, BOLTON, ON L7E 2X8T: 647.588.1784 E: info@cspace.ca23.183807.03.241FOR ZONING REVIEW2024.04.30RIDGE ROAD- ADDITION &INTERIOR ALTERATIONS313 RIDGE ROADAURORA, ONTARIOEXISTING FRONT ELEVATION1A301SCALE: 1/8" = 1'-0"REISSUED FOR ZONING REVIEW2024.07.312Page 19 of 64
GROUND FFL.U/S SOFFITEXISTING-MIDPOINT OF ROOF7'-6"
[2286]
15'-6"
[4725]APPROX. GRADEEXISTING-RIGHT ELEVATIONAS SHOWNKACCPA302NO.DATEREVISIONIT IS THE RESPONSIBILITY OF THE APPROPRIATECONTRACTOR TO CHECK AND VERIFY ALLDIMENSIONS ON SITE AND REPORT ALL ERRORSAND OR OMISSIONS TO THE ARCHITECT.ALL CONTRACTORS MUST COMPLY WITH ALLPERTINENT CODES AND BY-LAWS.DO NOT SCALE DRAWINGS.THIS DRAWING MAY NOT BE USED FORCONSTRUCTION UNTIL SIGNED.COPYRIGHT RESERVED.CSPACEARCHITECTURE5B-8841 GEORGE BOLTON PKWY, BOLTON, ON L7E 2X8T: 647.588.1784 E: info@cspace.ca23.183807.03.241FOR ZONING REVIEW2024.04.30RIDGE ROAD- ADDITION &INTERIOR ALTERATIONS313 RIDGE ROADAURORA, ONTARIOEXISTING RIGHT ELEVATION1A302SCALE: 1/8" = 1'-0"REISSUED FOR ZONING REVIEW2024.07.312Page 20 of 64
GROUND FFL.U/S SOFFITEXISTING-MIDPOINT OF ROOF7'-6"
[2286]
15'-6"
[4725]APPROX. GRADEEXISTING -REAR ELEVATIONAS SHOWNKACCPA303NO.DATEREVISIONIT IS THE RESPONSIBILITY OF THE APPROPRIATECONTRACTOR TO CHECK AND VERIFY ALLDIMENSIONS ON SITE AND REPORT ALL ERRORSAND OR OMISSIONS TO THE ARCHITECT.ALL CONTRACTORS MUST COMPLY WITH ALLPERTINENT CODES AND BY-LAWS.DO NOT SCALE DRAWINGS.THIS DRAWING MAY NOT BE USED FORCONSTRUCTION UNTIL SIGNED.COPYRIGHT RESERVED.CSPACEARCHITECTURE5B-8841 GEORGE BOLTON PKWY, BOLTON, ON L7E 2X8T: 647.588.1784 E: info@cspace.ca23.183807.03.241FOR ZONING REVIEW2024.04.30RIDGE ROAD- ADDITION &INTERIOR ALTERATIONS313 RIDGE ROADAURORA, ONTARIOEXISTING REAR ELEVATION1A303SCALE: 1/8" = 1'-0"REISSUED FOR ZONING REVIEW2024.07.312Page 21 of 64
GROUND FFL.U/S SOFFITEXISTING-MIDPOINT OF ROOF7'-6"
[2286]
15'-6"
[4725]APPROX. GRADEEXISTING-LEFT ELEVATIONAS SHOWNKACCPA304NO.DATEREVISIONIT IS THE RESPONSIBILITY OF THE APPROPRIATECONTRACTOR TO CHECK AND VERIFY ALLDIMENSIONS ON SITE AND REPORT ALL ERRORSAND OR OMISSIONS TO THE ARCHITECT.ALL CONTRACTORS MUST COMPLY WITH ALLPERTINENT CODES AND BY-LAWS.DO NOT SCALE DRAWINGS.THIS DRAWING MAY NOT BE USED FORCONSTRUCTION UNTIL SIGNED.COPYRIGHT RESERVED.CSPACEARCHITECTURE5B-8841 GEORGE BOLTON PKWY, BOLTON, ON L7E 2X8T: 647.588.1784 E: info@cspace.ca23.183807.03.241FOR ZONING REVIEW2024.04.30RIDGE ROAD- ADDITION &INTERIOR ALTERATIONS313 RIDGE ROADAURORA, ONTARIOEXISTING LEFT ELEVATION1A304SCALE: 1/8" = 1'-0"REISSUED FOR ZONING REVIEW2024.07.312Page 22 of 64
GROUND FFL.GARAGE FFL.U/S SOFFITEXISTING-MIDPOINT OF ROOFPROPOSED-MIDPOINT OF ROOFAPPROX. GRADE AT GARAGE16'-33
4"
[5.00m]
7'-6"
[2.25m]
9'-2"
[2.75m]
15'-6"
[4.75m]APPROX. GRADE AT HOUSENPROPOSED-FRONT ELEVATIONAS SHOWNKACCPA311NO.DATEREVISIONIT IS THE RESPONSIBILITY OF THE APPROPRIATECONTRACTOR TO CHECK AND VERIFY ALLDIMENSIONS ON SITE AND REPORT ALL ERRORSAND OR OMISSIONS TO THE ARCHITECT.ALL CONTRACTORS MUST COMPLY WITH ALLPERTINENT CODES AND BY-LAWS.DO NOT SCALE DRAWINGS.THIS DRAWING MAY NOT BE USED FORCONSTRUCTION UNTIL SIGNED.COPYRIGHT RESERVED.CSPACEARCHITECTURE5B-8841 GEORGE BOLTON PKWY, BOLTON, ON L7E 2X8T: 647.588.1784 E: info@cspace.caFRONT ELEVATION1A311SCALE: 1/8" = 1'-0"23.183807.03.241FOR ZONING REVIEW2024.04.30RIDGE ROAD- ADDITION &INTERIOR ALTERATIONS313 RIDGE ROADAURORA, ONTARIOREISSUED FOR ZONING REVIEW2024.07.312Page 23 of 64
GROUND FFL.GARAGE FFL.U/S SOFFITEXISTING-MIDPOINT OF ROOFPROPOSED-MIDPOINT OF ROOFAPPROX. GRADE AT GARAGE16'-33
4"
[5.00m]
7'-6"
[2.25m]
9'-2"
[2.75m]
15'-6"
[4.75m]APPROX. GRADE AT HOUSEPROPOSED-LEFT ELEVATIONAS SHOWNKACCPA312NO.DATEREVISIONIT IS THE RESPONSIBILITY OF THE APPROPRIATECONTRACTOR TO CHECK AND VERIFY ALLDIMENSIONS ON SITE AND REPORT ALL ERRORSAND OR OMISSIONS TO THE ARCHITECT.ALL CONTRACTORS MUST COMPLY WITH ALLPERTINENT CODES AND BY-LAWS.DO NOT SCALE DRAWINGS.THIS DRAWING MAY NOT BE USED FORCONSTRUCTION UNTIL SIGNED.COPYRIGHT RESERVED.CSPACEARCHITECTURE5B-8841 GEORGE BOLTON PKWY, BOLTON, ON L7E 2X8T: 647.588.1784 E: info@cspace.caPROPOSED LEFT ELEVATION1A312SCALE: 1/8" = 1'-0"23.183807.03.241FOR ZONING REVIEW2024.04.30RIDGE ROAD- ADDITION &INTERIOR ALTERATIONS313 RIDGE ROADAURORA, ONTARIOREISSUED FOR ZONING REVIEW2024.07.312Page 24 of 64
GROUND FFL.GARAGE FFL.U/S SOFFITEXISTING-MIDPOINT OF ROOFPROPOSED-MIDPOINT OF ROOFAPPROX. GRADE AT GARAGE16'-33
4"
[5.00m]
7'-6"
[2.25m]
9'-2"
[2.75m]
15'-6"
[4.75m]APPROX. GRADE AT HOUSEPROPOSED-REAR ELEVATIONAS SHOWNKACCPA313NO.DATEREVISIONIT IS THE RESPONSIBILITY OF THE APPROPRIATECONTRACTOR TO CHECK AND VERIFY ALLDIMENSIONS ON SITE AND REPORT ALL ERRORSAND OR OMISSIONS TO THE ARCHITECT.ALL CONTRACTORS MUST COMPLY WITH ALLPERTINENT CODES AND BY-LAWS.DO NOT SCALE DRAWINGS.THIS DRAWING MAY NOT BE USED FORCONSTRUCTION UNTIL SIGNED.COPYRIGHT RESERVED.CSPACEARCHITECTURE5B-8841 GEORGE BOLTON PKWY, BOLTON, ON L7E 2X8T: 647.588.1784 E: info@cspace.caPROPOSED REAR ELEVATION1A313SCALE: 1/8" = 1'-0"23.183807.03.241FOR ZONING REVIEW2024.04.30RIDGE ROAD- ADDITION &INTERIOR ALTERATIONS313 RIDGE ROADAURORA, ONTARIOREISSUED FOR ZONING REVIEW2024.07.312Page 25 of 64
GROUND FFL.GARAGE FFL.U/S SOFFITEXISTING-MIDPOINT OF ROOFPROPOSED-MIDPOINT OF ROOFAPPROX. GRADE AT GARAGE16'-33
4"
[5.00m]
7'-6"
[2.25m]
9'-2"
[2.75m]
15'-6"
[4.75m]APPROX. GRADE AT HOUSEPROPOSED-RIGHT ELEVATIONAS SHOWNKACCPA314NO.DATEREVISIONIT IS THE RESPONSIBILITY OF THE APPROPRIATECONTRACTOR TO CHECK AND VERIFY ALLDIMENSIONS ON SITE AND REPORT ALL ERRORSAND OR OMISSIONS TO THE ARCHITECT.ALL CONTRACTORS MUST COMPLY WITH ALLPERTINENT CODES AND BY-LAWS.DO NOT SCALE DRAWINGS.THIS DRAWING MAY NOT BE USED FORCONSTRUCTION UNTIL SIGNED.COPYRIGHT RESERVED.CSPACEARCHITECTURE5B-8841 GEORGE BOLTON PKWY, BOLTON, ON L7E 2X8T: 647.588.1784 E: info@cspace.caPROPOSED RIGHT ELEVATION1A314SCALE: 1/8" = 1'-0"23.183807.03.241FOR ZONING REVIEW2024.04.30RIDGE ROAD- ADDITION &INTERIOR ALTERATIONS313 RIDGE ROADAURORA, ONTARIOREISSUED FOR ZONING REVIEW2024.07.312Page 26 of 64
100 John West Way
Aurora, Ontario
L4G 6J1
(905) 727-3123
aurora.ca
Town of Aurora
Committee of Adjustment Report
No. MV-202 3 -44
_______________________________________________________________________________________
Subject: Minor Variance Application
The Biglieri Group
100 Goulding Avenue
PLAN 65M-3974, Lot 4
File: MV-2023-44
Related File: SP-2023-01
Prepared by: Kenny Ng, Planner
Department: Planning and Development Services
Date: September 12, 2024
_______________________________________________________________________________________
Application
The applicant is requesting relief from the requirements of the Town’s Comprehensive
Zoning By-law 6000-17, as amended, to facilitate the development of a 3-storey
industrial/office building with accessory restaurant use. The proposed site plan is
attached as Appendix ‘B’ to this report for reference.
The following relief is being requested:
a) Section 10.2 of the Zoning By-law 6000-17 states that the maximum building
height be 13.5 metres. The applicant is proposing 17.3 metres, thereby requiring
a variance of 3.8 metres.
b) Section 24.338.2.1 of the Zoning By-law 6000-17 states that the maximum Floor
Area Ratio for Office Use to be 17%. The applicant is proposing 35%, thereby
requiring a variance of 18%.
Background
Subject Property and Area Context
The subject lands are municipally known as 100 Goulding Avenue, located west of
Goulding Avenue, on the north side of Don Hillock Drive. The subject lands have an
Page 27 of 64
September 12, 2024 2 of 9 Report No. MV-2023-44
approximate lot area of 0.8 hectares (1.98 acres), and an approximate lot frontage of 82
m (269 ft) along Don Hillock Drive and approximately 81 m (265. 75 ft) of frontage along
Goulding Avenue. The subject lands are currently vacant with some vegetation along the
north lot line. The subject lands are within a business park area south of Wellington Street
East, consisting of a mix of uses including commercial plazas, retail stores, personal
service shops, offices and warehouses.
Proposal
The applicant is requesting the subject variances to facilitate a three-storey office
building/industrial with accessory restaurant use. The proposed building has a gross
floor area of 5,782.00 m2 (62,238.97 ft2), and a proposed height of 17.3 m. The industrial
and restaurant uses will occupy the ground floor of the building, with a floor area of
2,339.94 m2 (25,187.73 ft2), which makes up for 40% of the total GFA, with the rest being
office use. The applicant has submitted a site plan application (SP-2023-01) for the
proposed development, which is currently under review. For the site plan application to
proceed, approval of the subject minor variance application is required.
Official Plan
The subject property is designated ‘Business Park’ by the Town of Aurora Official Plan
(OPA 30) which is an employment area designation. The intent of the Business Park
designation is to provide opportunities for a mix of high quality employment uses geared
generally to satisfying the needs of residents, businesses and employees in the Town of
Aurora and the Region. Industrial, business/professional office uses are permitted
without restriction, while limited retail and service commercial uses are permitted
provided the use is wholly contained within an enclosed building, and do not exceed 20%
of the Gross Floor Area of the Premises.
Zoning
The subject lands are zoned “E-BP (338) Business Park Exception Zone” under the Town
of Aurora Zoning By-law 6000-17, as amended. This zoning permits the use of business
offices and industrial units. The site specific zoning provision restricts the Maximum
Floor Area Ratio for Office Use to be 17%.
Preliminary Zoning Review
A Preliminary Zoning Review (PZR) has been completed by the Town of Aurora’s
Building Division. The PZR identified the required variances and no other non-
compliance was identified.
Page 28 of 64
September 12, 2024 3 of 9 Report No. MV-2023-44
Applicant’s stated reason(s) for not complying with the Zoning By-law
As stated by the applicant, “The intent of the Business Park Zone is to support and
promote the provision of business and professional office spaces. However, the Subject
Site is subject to Zoning Exception 338, which limits the Floor Area Ratio (FAR) for
Office use within the E-BP zone to a maximum of 17%. Therefore, the current Zoning By-
law does not seem to conform to the higher order policies of the OP or Secondary Plan.”
Planning Comments
Planning Staff have evaluated Minor Variance Application MV-2023-44 pursuant to the
prescribed tests as set out in Section 45 (1) of the Planning Act, as follows:
a) The proposed variances meet the general intent of the Official Plan
The subject property is designated ‘Business Park’ by the Town of Aurora Official Plan
and Bayview Northeast Area 2B Secondary Plan. The intent of the designation is to permit
an integrated mix of employment activities and businesses that occur within highly visible
buildings and sites, that are designed and landscaped to present a high quality, prestige
image.
Business Park policies further stipulate that buildings shall generally be low to mid-rise in
built form and shall generally not exceed four storeys in height. In considering the height
variance, it is noted that the proposed office/industrial building would only require the
variance in the easterly portion of the building, which is proposed at three storeys, or 17.03
metres. The built form of the proposed building is in compliance with the Official Plan
policy despite not being able to meet the numerical requirement as set out by the zoning
provision. The westerly portion is proposed to be two storeys in height, and is well within
the maximum height requirement. The height difference of the building provides an
appealing transition and structural articulation that further increases its aesthetic value.
It is staff’s opinion that the proposed building is able to maintain the objective of the
‘Business Park’ designation with a built form that is appropriate considering the
surrounding context, and will also help contribute to local job creation and employment
growth within the Town.
The Official Plan encourages placing business and professional offices in higher density
and taller buildings abutting the Highway 404 frontage to maximize their visual exposure.
Whereas the interior locations will generally be accommodating lower order prestige
industrial uses. Despite this, staff note that the designation permits business and
professional offices as a principal use without any specific restriction with regard to
maximum Floor Area Ratio (FAR) for office use. In considering the proposed variance to
Page 29 of 64
September 12, 2024 4 of 9 Report No. MV-2023-44
increase FAR from 17% to 35% for the office use, staff note that the proposed building will
be accommodating a mix of uses, including both industrial and office use, with restaurant
as an accessory use. Despite not locating alongside Highway 404, Goulding Avenue is
classified as a Collector Road in the Town Official Plan, the proposed professional office
use within a taller building will serve the purpose of providing a desirable, attractive
streetscape within the business park subdivision.
The proposed variances will facilitate the development of an appropriately scaled, mixed-
use building and provide employment opportunities on designated employment lands.
The proposed office use is a permitted principal use in the Business Park designation
without any restriction on the FAR for office use. The proposed development will ensure
the protected employment land will be used to its fullest and highest potential and that
projected employment growth can be met. As such, staff are of the opinion that the
requested variances meet the general intent of the Official Plan.
b) The proposed variances meet the general intent of the Zoning By-law
The subject property is zoned “E-BP (338) Business Park Exception Zone” by the Town of
Aurora Zoning By-law 6000-17, as amended. The current zoning permits a wide variety of
uses including industrial, hotel, motel, research and training facilities and offices.
Restaurants are permitted as an accessory use within a building in which the principal use
is an Office.
Height Variance
The intent of the maximum height restriction is to restrict overbuilding and incompatibility
concerns, to achieve a uniform, aesthetically pleasing streetscape. The requested
increase in height is not significant and is only applicable on the east side of the proposed
building. Specifically, the additional height which exceeds the required 13.5 metres
comes from the proposed parapet which is only present on portion of the building fronting
onto Goulding Avenue. The built form remains at 2 and 3 storeys and the slight increase
in height is not expected to result in an incompatible built form or character with existing
or future surrounding buildings. The character of the surrounding business park
environment is maintained, while sufficient setbacks to adjacent properties are provided
which result in minimal visual impacts.
Floor Area Ratio (FAR) variance
The intent of the site-specific Floor Area Ratio regulation for office use derives from the
Business Park designation policy, to encourage professional and business offices to be
situated along Highway 404 to ensure maximized exposure, and that a mix of us es can
be provided within the whole business park. When the original Hallgrove Business Park
Page 30 of 64
September 12, 2024 5 of 9 Report No. MV-2023-44
subdivision was created, the FAR limit for office use was created and implemented on all
of the interior lots within the business park to ensure that purely office use within the
interior lot would generally not be permitted. The site-specific zoning provision specifies
that the maximum permitted Floor Area Ratio for an office use shall be 17%. Although an
increase from the Floor Area Ratio requirement has been requested, the use of office as
mentioned, is permitted under this zoning category.
Floor Area Ratio is defined as the gross floor area of all buildings on a lot expressed as a
percentage of the lot area. For the purpose of calculating Floor Area Ratio, gross floor
area shall mean the aggregate of the floor areas of a building above or below grade,
measured between the exterior faces of the exterior walls of the building at each floor
level but excluding car parking areas within the building.
Considering that ‘Office’ is a permitted use and that majority of the zoning performance
standards (lot coverage, and yard setbacks) are being met, the proposed building would
fit within the preferred building envelope in a Business Park zone and would not have any
compatibility concerns. The absence of any FAR restriction regarding office use in the
Business Park designation also indicates that the proposed increase in FAR for the office
use will not result in a building/use that is incompatible or undesirable in the overall
business park area. Moreover, the proposed development is planned to be a mixed-use
building that accommodates for industrial, office and restaurant use. The proposal meets
the overall goals and intentions of the Business Park designation in that it allows for a mix
of uses that can help serve the overall functionality of the business park.
Despite not locating directly adjacent to the Highway 404, the proposed building fronts
onto Goulding Avenue, which is identified as a collector road in the Town Official Plan and
functions as a local gateway into the business park. The proposed building’s taller height
and higher floor area dedicated to office use will not be a concern, as it will have relatively
high exposure to adjacent business users and visitors.
Furthermore, there are existing office buildings (47 Don Hillock Drive, 126 Don Hillock
Drive) that share the same site-specific zoning in close proximity of the subject lands,
which have Floor Area Ratio of office space which exceed the 17% limit restriction.
Specifically, 47 Don Hillock Drive (York Regional Police Investigative Support Services
Facility) has 15,845 m² of floor area allocated towards office use. This equates into a total
Floor Area Ratio of 74% of office space for this property. Whereas 126 Don Hillock is an
office building entirely, with 3,149 m² of office space, which equates to a FAR of 34.9%.
Both buildings have applied for similar variance application for FAR limit in the past, and
have obtained associated zoning relief for the requirement.
Page 31 of 64
September 12, 2024 6 of 9 Report No. MV-2023-44
Staff are of the opinion that the requested variances meet the general intent of the Zoning
By-law.
c) The proposed variances are considered desirable for the appropriate development of
the land
The proposed development aligns with the principles as set out in the Town’s Bayview
Northeast Area 2B Secondary Plan in that it provides for professional office, industrial
and supporting commercial uses to generate employment opportunities for residents.
The built form of the proposed office building is compatible with the surrounding
development context, while the increase in height will not negatively impact the
appearance of the building or the surrounding area, but assist in generating local
economic development and employment opportunities.
The subject property is in an appropriate location to accommodate for increased office
use, as it is in close proximity to arterial roads/highways, a variety of transit options and
commercial/retail spaces. The proposed office as a principal use will maintain
consistency amongst buildings in the immediate vicinity of the subject lands, of which
contain business and professional offices. The proposed increase in FAR to 35% is
considered desirable and appropriate for the development of the subject property, as it
conforms to the intent of the Business Park designation and results in a moderately sized
building that is consistent with the surrounding community.
In evaluating the proposed building, the scale of the building is comparable to other
employment-based buildings in close proximity. Staff are of the opinion that permitting
the variances will allow for the development of an office/industrial building that is
complimentary to the area.
Staff are of the opinion that the requested variances are considered desirable for the
appropriate development of the property.
d) The proposed variances are considered minor in nature
In evaluating the impact and scale of the requested variances, they are considered to be
minor in the overall context for the subject development and the surrounding business
park area. The increase in height will create negligible visual impact or other related
design/massing concerns, while the increase in FAR for office use is not expected to
generate any traffic related or land use incompatibility concerns. The functionality of the
site will not be negatively affected by the proposed variances, as the proposed use will
assist in generating new local employment opportunities to benefit the economy. In
addition, no objections have been made from the Town’s Traffic/Transportation Analyst
pertaining to any traffic or transportation related matters.
Page 32 of 64
September 12, 2024 7 of 9 Report No. MV-2023-44
Staff are of the opinion that the requested variances are minor in nature.
Additional Comments
The minor variance application was circulated to Town Department/Divisions and to
external agencies for review and comment. The following comments were provided:
Department or Agency
Comments
Building Division
Preliminary Zoning Review was completed. No
objections.
Engineering Division No objections.
Transportation No objections.
Operational Services (Parks) No objections.
Operational Services
(Public Works)
No objections.
Central York Fire Services No objections.
York Region No objections.
LSRCA No objections.
Public Correspondence
Written submissions were not received at the time of writing of this report. Should written
submissions be received after the writing of this report, the Secretary Treasurer will
provide the submission(s) to Committee members at the meeting.
Conclusion
Planning staff have reviewed the application with respect to the Section 45 (1) of the
Planning Act, R.S.O, 1990, c.P.13, as amended, and are of the opinion that the requested
variance meets the four tests of the Planning Act for granting of minor variances. Please
refer to Appendix ‘A’ for recommended conditions of approval for the requested variance.
Page 33 of 64
September 12, 2024 8 of 9 Report No. MV-2023-44
Attachments
Appendix ‘A’ – Recommended Conditions of Approval
Appendix ‘B’ – Site Plan
Page 34 of 64
September 12, 2024 9 of 9 Report No. MV-2023-44
Appendix ‘A’ – Recommended Conditions of Approval
The following conditions are required to be satisfied should application MV-2023-44 be
approved by the Committee of Adjustment:
1. That the variance only applies to the subject property, in conformity with the
plan(s) attached as ‘Appendix B’ to this Staff Report, to the satisfaction of the
Director of Planning and Development Services or designate.
Page 35 of 64
SITE ANALYSIS (SPA)ZONING:E - BP (338)LOT AREA:8,008.37 S.M.1.98 ACRES)BUILDING AREA (INDUST. / OFFICE / REST.):GROUND FLOOR:2,339.94 S.M.(25,187.73 S.F.)2ND FLOOR (OFFICE):2,365.30 S.M.(25,460.71 S.F.)3RD FLOOR (OFFICE):1,076.76 S.M.(11,590.53 S.F.)TOTAL GFA:5,782.00 S.M.(62,238.97 S.F.)COVERAGE:29.22%F.S.I.:0.70LOADING DOCK LOCATIONSENTRANCE & EXIT VESTIBULESDIRECTION OF TRAFFIC FLOWSYMBOL LEGENDMAN DOOR LOCATIONSDRIVE-IN LOCATIONSSNOW STORAGEPROPERTY LINEAPSACCESSIBLE PARKING SIGNAFSBICYCLE RACK-LAYOUT CONFORMS TO"GUIDELINES FOR DESIGN &MANAGEMENT OF BICYCLE PARKINGFACILITIES".ALTERNATIVE FUELING STATIONGARBAGE ROOMEASEMENTFIRE-ROUTERDA.P.F.A.F.H.LANDSCAPE ISLANDS :150 CONC. CURB CONT. AS SHOWNC/W LANDSCAPE - SEE LANDSCAPEDWG.PAINTED ISLANDS :PAINTED TRAFFIC ISLAND COLOURAS PER PAINT SPEC.LIGHT DUTY ASPHALT PAVING:CAR PARKING AND DRIVEWAYS SEESITE SERVICE & GRADING DWGS FORDETAILSHEAVY DUTY ASPHALT PAVING:TRUCKING ROUTE SEE SITE SERVICE& GRADING DWGS FOR DETAILS.FIRE DEPT. CONNECTIONCURB-CUTS FOR ACCESSIBLEACCESSACCESSIBLE PARKING STALLROOF DRAINFIRE ANNUNCIATOR PANELFIRE ALARMGELECTRICAL ROOMEMECHANICAL ROOMMCCCART CORALFDCCANADA POST FACILITYLIGHTING REFERENCE (REFER TOELECTRICAL DRAWINGS)FRSFIRE-ROUTE SIGNIMPRESSED ASPHALTDESIGNATEDFIRE-ROUTEFIRE HYDRANT AND VALVE(REFER TO TYPICAL SITE PLANDETAILS)EVELECTRIC VEHICLE CHARGINGSTATIONSSSTOP SIGNREGIONAL MUNICIPALITY OF YORKTOWN OF AURORALOT 4, REGISTERED PLAN 65M-3974PLAN OF SURVEYYOUNG & YOUNG SURVEYING INC.SHOWING TOPOGRAPHIC FEATURESONTARIO LAND SURVEYORSDATE: JANUARY, 12 2022.D O N H I L L O C K D R I V EG O U L D I N G A V E N U ED O N H I L L O C K D R I V EG O U L D I N G A V E N U E 292285.307.007.005.303.005.303.00 7.00
7.00 5.30 3.00
2.702.702.7017.30
22.6015.308.508.00FIRE-ROUTEFIRE-ROUTE5.30152.00
2.00
2.3052.0454.3017.30
3.403.40
4.00
2.402.40
1.50 1.50DRIVE UPDOORDRIVE UPDOORDRIVE UPDOOR20.0014.3020.00
32.2119.436.256.255.00PROPOSED2 STOREYBUILDINGPROPOSED3 STOREYBUILDINGBLDG 'A'PROPOSED2 STOREYBUILDINGFIRE DEPT.CONNECTION26.98DRIVE UPDOORDRIVE UPDOORDRIVE UPDOORPROPOSED NEWTRANSFORMERPADBABA2.401.50F.H.SNOW STORAGE37.67 S.M. (405.49 S.F.)SNOW STORAGE44.94 S.M. (483.75 S.F.)SNOW STORAGE41.45 S.M. (446.18 S.F.)SNOW STORAGE32.42 S.M.(348.98 S.F.)SNOWSTORAGE32.40 S.M.(348.76 S.F.)6 BICYCLEPARKINGBENCH12EXISTING FIREHYDRANT15.30R=12.00R=15.00R=9.00R=12.00R=15.00R
=
9
.
0
0
R=
1
2
.
0
0
R=
9
.
0
0
R=
1
5
.
0
0EXISTING ALECTRAPAD MOUNTEDSWITCHGEARF.F.E. = 296.75F.F.E. = 296.455% SLOPECONCRETESNOW STORAGE32.40 S.M. (348.76 S.F.)RETAINING WALL W/METAL GUARD(SEE CIVIL DWGS.)RETAINING WALL W/METAL GUARD(SEE CIVIL DWGS.)BENCHBENCHR=4.50R=6.00R=6.00R=6.001.20
CLCLSSSS2.98TO U/GPARKINGGROrGARBAGERECYCLINGORGANICSB3.00BENCHB3.0082.70 11.12 EARTH BINCONTAINMENTSYSTEM (4 - EB 500)ON CONCRETESLAB101.8 HIGHBOARD ONBOARD WOODSCREEN200 DIA.CONC.FILLEDBOLLARDGRROrFRSFRSFRSFRSFRSFRSSSGROUND SIGN1.501.50GROUNDSIGN1.501.50TOE WALL (SEECIVIL DWGS.)F.F.E.296.50F.F.E.296.35EVEVEVEVEVTOE WALL (SEECIVIL DWGS.)TOE WALL (SEECIVIL DWGS.)F.F.E.296.20ONTARIO BUILDING CODE DATA MATRIXPART 3 BUILDINGCODEREFERENCE3.00BUILDING CODEVERSION:O. REG. 332/12LAST AMENDMENT:O. REG. 191/143.01PROJECT TYPE:NEWCHANGE OF USEADDITIONADDITION AND RENOVATIONRENOVATION(A) 1.1.2.3.02MAJOR OCCUPANCYCLASSIFICATION:OCCUPANCYUSEGRD. & SEC. FL. - GROUP F2----3.1.2.1.(1)3.03SUPERIMPOSEDMAJOROCCUPANCIES:NOYESDESCRIPTION:GROUP F2 & GROUP D3.2.2.7.DESCRIPTION:SHELL BUILDING 'A'3.04BUILDINGAREA (M²)DESCRIPTION:GROUND FLOOR---EXISTING:----NEW:2,339.94---TOTAL:-TOTAL(A) 1.4.1.2.3.05GROSS AREA (M²)DESCRIPTION:EXISTING:---NEW:TOTAL:-TOTAL(A) 1.4.1.2.3.06MEZZANINE AREA (M²)DESCRIPTION:NOT APPLICABLE---EXISTING:----NEW:----TOTAL:-------TOTAL3.2.1.1.3.07BUILDING HEIGHT30(A) 1.4.1.2. & 3.2.1.1.STOREY ABOVE GRADESTOREY BELOW GRADE13.50(M) ABOVE GRADE3.08BUILDING HEIGHTNOYES3.2.6.3.09NUMBER OFSTREETS/ FIREFIGHTER ACCESS3.2.2.10. & 3.2.5.2STREET (S)3.10BUILDINGCLASSIFICATION:(SIZE ANDCONSTRUCTIONRELATIVE TOOCCUPANCY)3.2.2.70GROUP/DIVF23.2.2.20.-83.3.11SPRINKLER SYSTEMREQUIREDNOT REQUIREDPROPOSED:ENTIRE BUILDINGSELECTED FLOOR AREASIN LIEU OF ROOF RATINGSELECTED COMPARTMENTSBASEMENTNONE3.2.1.5. & 3.2.2.17.3.12STANDPIPE SYSTEM3.2.9.REQUIREDNOT REQUIRED3.13FIRE ALARMSYSTEM3.2.4.REQUIREDNOT REQUIREDPROPOSED:SINGLE STAGETWO STAGENONE3.14WATER SERVICE/SUPPLY ISADEQUATENOYES3.15CONSTRUCTIONTYPE:RESTRICTION:COMBUSTIBLE PERMITTEDNON-COMBUSTIBLE REQUIREDACTUAL:COMBUSTIBLENON-COMBUSTIBLECOMBINATIONHEAVY TIMBER CONSTRUCTION:NOYES3.2.2.20. - 83. & 3.2.1.4.3.16IMPORTANCECATEGORY:LOWLOW HUMAN OCCUPANCYMINOR STORAGE BUILDINGPOST-DISASTER SHELTERNORMALHIGHEXPLOSIVE OR HAZARDOUSSUBSTANCES4.1.2.1.(3) & T4.1.2.1.BPOST-DISASTER3.17SEISMIC HAZARDINDEX:(Ie Fa Sa (0.2)) =-SEISMIC DESIGN REQUIRE FOR TABLE 4.1.1.18. ITEMS 6-21:(Ie Fa Sa (0.2)) 0.35 OR POST-DISASTER)NOYES4.1.2.1.(3)4.1.8.18.(2)>_3.18OCCUPANT LOADFLOOR LEVEL/AREA:GROUND - 38 PERSONSSECOND - 38 PERSONSTHIRD - 40 PERSONSTOTAL - 116 PERSONSOCCUPANCY TYPE:----BASED ON:----OCCUPANT LOAD(PERSONS):----3.1.17.3.19BARRIER-FREEDESIGNYESEXPLANATION:NO-3.8.3.20HAZARDOUSSUBSTANCES:YESEXPLANATION:NO-3.3.1.2. & 3.3.1.19.3.21REQUIRED FIRERESISTANCERATINGSHORIZONTAL ASSEMBLYFLOORS OVER BASEMENTRATING1HR3.2.2.20. - .83. & 3.2.1.4.SUPPORTINGASSEMBLY (H)-NONCOMBUSTIBLEIN LIEU OF RATING?NOYESN/A3.22SPATIALSEPARATIONWALL3.2.3.EBFAREA(M2)L.D.(M)L/HORH/LREQUIREDFRR (H)NORTH469.6917.30-3.23PLUMBING FIXTUREREQUIREMENTSRATIO:3.7.4.MALE : FEMALE = 50:50 EXCEPT AS NOTED OTHERWISEFLOORLEVEL/AREAOCCUPANT LOADOBC REFERENCEFIXTURESREQUIREDFIXTURESPROVIDEDNOT APPLICABLE----3.24ENERGYEFFICIENCYCOMPLIANCE PATH:EXISTING3.25NOTES:---TO BE DETERMINED ONCE TENANT MIX IS DEFINEDSOUTH469.6917.30-EAST753.1022.60-WEST488.7415.30-FLOORS-NOYESN/AMEZZANINE-NOYESN/AROOF-NOYESN/ACLIMATIC ZONE:-PERMITTEDMAX % OFOPENINGSPROPOSED% OFOPENINGSCONSTRUCTIONTYPEREQUIREDCLADDINGTYPEREQUIREDNONCOMBUSTIBLENONCOMBUSTIBLENONCOMBUSTIBLENONCOMBUSTIBLENONCOMBUSTIBLENONCOMBUSTIBLENONCOMBUSTIBLENONCOMBUSTIBLE--SHELL BUILDING1HRN/AN/A------1,076.76-5,782.001,076.76-GROUND FLOORSECOND FLOORTHIRD FLOOR-1111100100100100THIRD. FL. - GROUP D5,782.002,339.942,339.942,339.942,339.942,365.302,339.942,365.30BEVEVEVEVEVNET GFA: (EXCLUDING STAIRWELLS & ELEVATOR SHAFTS)GROUND FLOOR:UNIT 100 - 103 (INDUST.)436.88 S.M.(4,702.69 S.F.)UNIT 104 - 104A (MGT. OFF.)106.51 S.M.(1,146.50 S.F.)UNIT 105 (REST.)208.04 S.M.(2,239.40 S.F.)UNIT 106 - 107 (INDUST.)201.67 S.M.(2,170.83 S.F.)LOBBY84.48 S.M.(909.36 S.F.)SERVICE CORRIDOR93.26 S.M.(1,003.88 S.F.)UNIT 108 - 109 (INDUST.)201.67 S.M.(2,170.83 S.F.)UNIT 110 (REST.)208.04 S.M.(2,239.40 S.F.)UNIT 111 (INDUST.)126.24 S.M.(1,358.88 S.F.)UNIT 112 - 113 (INDUST.)214.44 S.M.(2,308.29 S.F.)UNIT 114 - 115 (INDUST.)222.44 S.M.(2,394.40 S.F.)TOTAL GROUND FLOOR:2,103.67 S.M.(22,644.46 S.F.)SECOND FLOOR:UNIT 200 (OFFICE)1,008.89 S.M.(10,859.96 S.F.)UNIT 201 - 205 (OFFICE)343.65 S.M.(3,699.14 S.F.)UNIT 206 - 210 (OFFICE)257.48 S.M.(2,771.58 S.F.)TOTAL SECOND FLOOR:1,610.02 S.M.(17,330.68 S.F.)THIRD FLOOR:UNIT 300 (OFFICE)1,018.81 S.M.(10,966.74 S.F.)TOTAL GFA:4,732.50 S.M.(50,941.87 S.F.)F.S.I. (NET):0.59PARKING REQUIRED (NET):100.00 S.M. @ 3 CAR / 100 S.M.3 SPACES2,700.00 S.M. @ 2 CAR / 100 S.M.54 SPACES1,932.50 S.M. @ 1 CAR / 100 S.M.20 SPACESTOTAL PARKING REQUIRED:77 SPACESPARKING PROVIDED:GROUND:104 SPACESUNDERGROUND:55 SPACESTOTAL PARKING:159 SPACESACCESSIBLE PARKING REQ'D:1 + 3% OF 80 = 5 SPACESACCESSIBLE PARKING PROV'D:3 TYPE A5 TYPE BTOTAL RESTAURANTS:8.79% OF G.F.A.TOTAL OFFICE:57.80% OF G.F.A.TOTAL INDUSTRIAL:29.65% OF G.F.A.SERVICE CORRIDOR:1.97% OF G.F.A.LOBBY:1.79% OF G.F.ATOTAL:100% OF G.F.A.BUILDING HEIGHT:15.5m (3 STOREYS)PAVED AREA:4,198.00 S.M. (52.42%)LANDSCAPE AREA:1,470.43 S.M. (18.36%)SNOW STORAGE AREA:221.28 S.M. (5.27% OF PAVED AREA)EV STATIONS20 STATIONSBICYCLE PARKING6 SPACES (0.6 x 1.8)Issued for Site Plan ApprovalIssued for Pricing and BudgetingIssued for Record Set of Dwgs.Issued for Building PermitIssued for TenderingIssued for ConstructionSHEET NO. DATE OFA-100DWG.CHKD BYDRAWN BYSCALEDRAWING NAMEDWLRDGPROJECT NO.22010NO. DATE REVISIONS BYDRAWING ISSUEIssued for Design ApprovalPARTICULARSDATEBYPROJECT1:250PROPOSEDCOMMERCIAL DEVELOPMENTJULY 24, 2024SITE PLANA-1001SCALE: 1:250SPALAST PLOTTING DATE: JULY 24, 2024 100 GOULDING AVENUEAURORA, ONTARIOSITE PLANW:/22010 - Ind. Warehouse - 100 Goulding Ave. (Aurora)/2. Drawings/2.5.1. Architectural/SPA/Site Plan/2024/07.24.24CITY FILE #ACTUAL CONSTRUCTION NORTHThis drawing, as an instrument of service, is provided by and is the property ofVenchiarutti Gagliardi Architect Inc. The contractor must verify and accept responsibilityfor all dimensions and conditions on site and must notify Venchiarutti Gagliardi ArchitectInc. of any variations from the supplied information.Venchiarutti Gagliardi Architect Inc. is not responsible for the accuracy of survey,structural, mechanical, electrical, etc, engineering information shown on this drawing.Refer to the appropriate engineering drawings before proceeding with the work.Construction must conform to all applicable codes and requirements of authorities havingjurisdiction. This drawing is not to be scaled.Venchiarutti Gagliardi Architect Inc. is not responsible for any environmental conditions,geotechnical conditions or any pollutants found on siteAll architectural symbols indicated are graphic representations only.This drawing is not to be used for construction purposes until the architectural seal issigned by the Architect of RecordKEY MAPN.T.S.SITE DETAILA-1002SCALE: N.T.S.A-1002Page 36 of 64
KAEFBCDGHJ7155152233107222333296.95296.75101077717SIGNAGESIGNAGESIGNAGESIGNAGESIGNAGESIGNAGESIGNAGESIGNAGE44SIGNAGE100A.1B.1C.1D.1F.1G.1H.1J.1296.751700050004250 4250 2000GROUNDFLOOR T.O.PARAPET1500 T.O. HIGHPARAPET313.75312.25310.25TOP OFSTEELTHIRDFLOOR306.00SECONDFLOOR301.7549113611108612349715182231010832143296.30296.75296.507SIGNAGE7296.20296.5077421656785678SIGNAGESIGNAGESIGNAGESIGNAGE88151748.17.16.15.13.1296.7517000 TOP OFSTEEL4250 4250 2000THIRDFLOORSECONDFLOORGROUNDFLOOR T.O.PARAPET15005000 T.O. HIGHPARAPET313.75296.455300 312.25310.25306.00301.75301.75296.35296.2016050 T.O.PARAPET312.25310.25TOP OFSTEEL5550 4250 4250 2000THIRDFLOOR306.00SECONDFLOOR301.75GROUNDFLOOR306.80T.O.PARAPET3KAAxBxCxDxEFFxGxHxJx1881010322296.3077296.45296.00296.2022GASMETERGASMETER111161616296.4517300 TOP OFSTEEL5300 4250 4250 2000THIRDFLOORSECONDFLOORGROUNDFLOOR T.O.PARAPET1500 T.O. HIGHPARAPET313.75296.205550
SECONDFLOOR301.75GROUNDFLOOR312.25310.25306.00301.75NOTES:1. ALL ROOF TOP HVAC UNITSARE LOCATED BEHIND HIGHPARAPETS & ARE NOT VISIBLE.2. ALL DOORS EQUIPED W/180 DEG. PEEP HOLE VIEWER.3. PLYWOOD BACKING FORSIGNAGE (SHOWN DOTTED).4567891113611108296.45296.5728231620 1940
123497152231010832914377296.50296.75296.60296.00296.20774SIGNAGE5678SIGNAGESIGNAGESIGNAGESIGNAGESIGNAGE8151748.17.16.15.13.14.1296.35296.2017550 T.O.PARAPET4250 4250 2000GROUNDFLOOR 1500
5000
296.75301.75T.O. HIGHPARAPET313.755550 312.25310.25TOP OFSTEELTHIRDFLOOR306.00SECONDFLOOR301.75296.4515700 T.O.PARAPET5200 4250 4250 2000GROUNDFLOORT.O.PARAPET312.25310.25TOP OFSTEELTHIRDFLOOR306.00SECONDFLOOR301.75306.80PRODUCT: 'FEATHER FRIENDLY' BY 3MDOT SIZE: 5mm (MINIMUM)HORIZONTAL SPACING LESS THAN50mm ON CENTERWINDOW FILM SHALL BE APPLIED ONTHE EXTERIOR SURFACE OF GLASS1BLDG 'A' - EAST ELEVATION2SCALE: 1:200BLDG 'A' - NORTH ELEVATION (TRUCK COURT)5SCALE: 1:200BLDG 'A' - SOUTH ELEVATION (TRUCK COURT)4SCALE: 1:200BLDG 'A' - WEST ELEVATIONA-300SCALE: 1:200A-300A-300A-300Issued for Site Plan ApprovalIssued for Pricing and BudgetingIssued for Record Set of Dwgs.Issued for Building PermitIssued for TenderingIssued for ConstructionSHEET NO. DATE OFA-300DWG.CHKD BYDRAWN BYSCALEDRAWING NAMEDWLRDGPROJECT NO.22010NO. DATE REVISIONS BYDRAWING ISSUEIssued for Design ApprovalPARTICULARSDATEBYPROJECT1:125PROPOSEDCOMMERCIAL DEVELOPMENT100 GOULDING AVENUEAURORA, ONTARIOELEVATIONSCITY FILE #This drawing, as an instrument of service, is provided by and is the property ofVenchiarutti Gagliardi Architect Inc. The contractor must verify and accept responsibilityfor all dimensions and conditions on site and must notify Venchiarutti Gagliardi ArchitectInc. of any variations from the supplied information.Venchiarutti Gagliardi Architect Inc. is not responsible for the accuracy of survey,structural, mechanical, electrical, etc, engineering information shown on this drawing.Refer to the appropriate engineering drawings before proceeding with the work.Construction must conform to all applicable codes and requirements of authorities havingjurisdiction. This drawing is not to be scaled.Venchiarutti Gagliardi Architect Inc. is not responsible for any environmental conditions,geotechnical conditions or any pollutants found on siteAll architectural symbols indicated are graphic representations only.This drawing is not to be used for construction purposes until the architectural seal issigned by the Architect of Record3SCALE: 1:200BLDG 'A' - SOUTH ELEVATIONA-3006SCALE: 1:200BLDG 'A' - NORTH ELEVATIONA-30052436789101EXTERIOR MATERIALS & FINISHES:PRE-CAST PANELS - WHITE AGGREGATELIGHT CHARCOAL TINT (VISION) WINDOW IN ANOD. ALUM.DARK CHARCOAL TINT (SPANDREL) WINDOW IN ANOD. ALUM.SIGNAGE BY TENANTDOUBLE 914 x 2134 CLEAR ANOD. ALUM. ENTRANCE DOORSC/W TEMPERED GLASS W/ AUTOMATIC DOOR OPERATOR965 x 2134 H.M. DOOR & FRAME (PAINTED WHITE)ROOF SCUPPERFIRE DEPARTMENT CONNECTION1112WALL PACK LIGHTING13ARCHITECTURAL PRE-CAST PANELS - WHITE AGGREGATE FINISH(MEDIUM SANDBLAST)ROOF TOP UNIT3048 x 3048 SECTIONAL OVERHEAD DOOR - WHITECOMPOSITE ALUMINUM PANEL14ROOF TOP SCREEN15965 x 2134 CLEAR ANOD. ALUM. ENTRANCE DOORSC/W TEMPERED GLASS W/ AUTOMATIC DOOR OPERATOR162 - 686 x 2134 H.M. DOOR & FRAME (PAINTED WHITE)17CLEAR ANODIZED ACM CANOPY184876 x 2438 SECTIONAL OVERHEAD DOOR - WHITESPAJULY 22, 2024LAST PLOTTING DATE: JULY 22, 2024W:/22010 - Ind. Warehouse - 100 Goulding Ave. (Aurora)/2. Drawings/2.5.1.Architectural/SPA/Floor Plans, Elevations, Sections & Details/2024/07.22.24Page 37 of 64
123456789123456789AABCEFGHKBxDxFxGxJxKAxCxHxEFDJ8.17.16.15.13.1A.1B.1C.1D.1F.1G.1H.1J.18.17.16.15.13.14.1DRIVE UPDOORDRIVE UPDOORDRIVE UPDOORDRIVE UPDOORDRIVE UPDOORDRIVE UPDOORBLDG "A"2,339.94 S.M.(25,187.73 S.F.)F.F.E. = 296.45F.F.E. = 296.20F.F.E. = 296.75LOBBYVEST.C.O.P.C.O.P.STAIR #114 UPSTAIR #214 UP9 UPRESTAURANT208.04 S.M.(2,239.40 S.F.)RESTAURANT208.04 S.M.(2,239.40 S.F.)INDUSTRIAL201.67 S.M.(2,170.83 S.F.)INDUSTRIAL201.67 S.M.(2,170.83 S.F.)INDUSTRIAL436.88 S.M.(4,702.69 S.F.)INDUSTRIAL222.44 S.M.(2,394.40 S.F.)MNGT. OFFICE106.51 S.M.(1,146.50 S.F.)F.F.E. = 296.50INDUSTRIAL126.24 S.M.(1,358.88 S.F.)18 DN18 DN7 UPF.F.E. = 296.35INDUSTRIAL214.44 S.M.(2,308.29 S.F.)DRIVE UPDOORDRIVE UPDOORSERVICE CORR.
46.63 S.M.
(501.94 S.F.)
SERVICE CORR.
46.63 S.M.
(501.94 S.F.)30 UPOPEN TO ABOVE30 UP30 UP30 UP31 UP31 UP30 UP30 UP30 UPOPEN TO ABOVE52042450551479002621523542284228422842284005204245055147900262172504228422842284228400450
54304
3987 4037 4037 40375000 45039874037
450 2000047504800 4800 4800 45020000475048004800400143045052500040050524800
4037 4037
FIRE DEPT.CONNECTION296.75296.655% SLOPE296.20296.00296.20296.45296.30296.95296.302000 2000
3000BBBAAAAAAAAAAAA2400AABAAAAB2400ELEV. 2 (GRND.TO 3RD FLR.)ELEV. 1 (BSMNTTO 3RD FLR.)3000296.502700 2700
2300STORAGEGARAVENTAGENESIS OPACACCESSIBLE LIFT296.70UNIT 100UNIT 101UNIT 102UNIT 103UNIT 104UNIT 104AUNIT 107UNIT 106UNIT 105UNIT 109UNIT 108UNIT 110UNIT 115UNIT 114UNIT 113UNIT 112UNIT 1112026202620262026201528932026 2026 2026 2026 2026 2026 23002026 2026 28932026202620262026296.45INTERIOR WALL TYPE:WALL LEGEND:ONE HOUR FIRE RATED ULC-W40716 TYPE X DRYWALLEACH SIDE OF 150 METAL STUDSW/ BATT INSULATIONW-1200 CONCRETE BLOCK WALLW-213 DRYWALL EACH SIDE OF92 METAL STUDSW-3A-2001SCALE: 1:125GROUND FLOOR PLAN (BLDG 'A')Issued for Site Plan ApprovalIssued for Pricing and BudgetingIssued for Record Set of Dwgs.Issued for Building PermitIssued for TenderingIssued for ConstructionSHEET NO. DATE OFA-200DWG.CHKD BYDRAWN BYSCALEDRAWING NAMEDWLRDGPROJECT NO.22010NO. DATE REVISIONS BYDRAWING ISSUEIssued for Design ApprovalPARTICULARSDATEBYPROJECT1:125100 GOULDING AVENUEAURORA, ONTARIOGROUND FLOOR PLANCITY FILE #ACTUAL CONSTRUCTION NORTHThis drawing, as an instrument of service, is provided by and is the property ofVenchiarutti Gagliardi Architect Inc. The contractor must verify and accept responsibilityfor all dimensions and conditions on site and must notify Venchiarutti Gagliardi ArchitectInc. of any variations from the supplied information.Venchiarutti Gagliardi Architect Inc. is not responsible for the accuracy of survey,structural, mechanical, electrical, etc, engineering information shown on this drawing.Refer to the appropriate engineering drawings before proceeding with the work.Construction must conform to all applicable codes and requirements of authorities havingjurisdiction. This drawing is not to be scaled.Venchiarutti Gagliardi Architect Inc. is not responsible for any environmental conditions,geotechnical conditions or any pollutants found on siteAll architectural symbols indicated are graphic representations only.This drawing is not to be used for construction purposes until the architectural seal issigned by the Architect of RecordAALL EXTERIOR DOORSTO HAVE AUTOMATICDOOR OPENERSBREST / SEATING AREA(SEE LANDSCAPEDWGS.)PROPOSEDCOMMERCIAL DEVELOPMENTSPAJULY 24, 2024LAST PLOTTING DATE: JULY 24, 2024W:/22010 - Ind. Warehouse - 100 Goulding Ave. (Aurora)/2. Drawings/2.5.1.Architectural/SPA/Floor Plans, Elevations, Sections & Details/2024/07.24.24Page 38 of 64
2,158.29 S.M.(23,232.40 S.F.)12 UPBLDG "A"C.O.P.C.O.P.STAIR #1DNSTAIR #2 OFFICE SPACE 11,008.89 S.M.(10,859.96 S.F.)12 UPDNOFFICESPACE 3257.48 S.M.(2,771.58 S.F.)OFFICESPACE 2343.65 S.M.(3,699.14 S.F.)30 DN OPEN TO BELOW30 DN30 DN30 DN31 DN30 DN30 DN30 DN31 DN OPEN TO BELOWJAN. RM./ STOR.UNIT 200UNIT 208123456789123456789AABCEFGHKBxDxFxGxJxKAxCxHxEFDJ8.17.16.15.13.1A.1B.1C.1D.1F.1G.1H.1J.18.17.16.15.13.14.152042450551479002621523542284228422842284005204245055147900262172504228422842284228400450
54304
3987 4037 4037 40375000 45039874037
450 2000047504800 4800 4800 45020000475048004800400143045052500040050524800
4037 4037202620262026202620152893202620262026202620262026 2026 2026 28932026202620262026UNIT 203UNIT 202UNIT 201UNIT 205UNIT 204UNIT 209UNIT 210UNIT 206UNIT 207A-2011SCALE: 1:125SECOND FLOOR PLAN (BLDG 'A')Issued for Site Plan ApprovalIssued for Pricing and BudgetingIssued for Record Set of Dwgs.Issued for Building PermitIssued for TenderingIssued for ConstructionSHEET NO. DATE OFA-201DWG.CHKD BYDRAWN BYSCALEDRAWING NAMEDWLRDGPROJECT NO.22010NO. DATE REVISIONS BYDRAWING ISSUEIssued for Design ApprovalPARTICULARSDATEBYPROJECT1:125100 GOULDING AVENUEAURORA, ONTARIOSECOND FLOOR PLANCITY FILE #ACTUAL CONSTRUCTION NORTHThis drawing, as an instrument of service, is provided by and is the property ofVenchiarutti Gagliardi Architect Inc. The contractor must verify and accept responsibilityfor all dimensions and conditions on site and must notify Venchiarutti Gagliardi ArchitectInc. of any variations from the supplied information.Venchiarutti Gagliardi Architect Inc. is not responsible for the accuracy of survey,structural, mechanical, electrical, etc, engineering information shown on this drawing.Refer to the appropriate engineering drawings before proceeding with the work.Construction must conform to all applicable codes and requirements of authorities havingjurisdiction. This drawing is not to be scaled.Venchiarutti Gagliardi Architect Inc. is not responsible for any environmental conditions,geotechnical conditions or any pollutants found on siteAll architectural symbols indicated are graphic representations only.This drawing is not to be used for construction purposes until the architectural seal issigned by the Architect of RecordPROPOSEDCOMMERCIAL DEVELOPMENTSPAJULY 24, 2024LAST PLOTTING DATE: JULY 24, 2024W:/22010 - Ind. Warehouse - 100 Goulding Ave. (Aurora)/2. Drawings/2.5.1.Architectural/SPA/Floor Plans, Elevations, Sections & Details/2024/07.24.24Page 39 of 64
R.S.R.S.R.D.R.D.R.S.R.S.R.S.R.S.1.5m ROOF SCREEN1.5m ROOF SCREENR.D.R.D. 1,076.76 S.M.(11,590.53 S.F.)BLDG "A"STAIR #212 DNSTAIR #1ROOFLADDER12 DNOFFICE USE1,018.81 S.M.(10,966.74 S.F.)C.O.P.C.O.P.R.S.R.S.R.S.R.S.ROOF CONSTRUCTIONCOOL WHITE 2 PLYMOD. BIT. MEMBRANEJAN. RM./ STOR.UNIT 300123456789123456789AABCEFGHKBxDxFxGxJxKAxCxHxEFDJ8.17.16.15.13.1A.1B.1C.1D.1F.1G.1H.1J.18.17.16.15.13.14.152042450551479002621523542284228422842284005204245055147900262172504228422842284228400450
54304
3987 4037 4037 40375000 45039874037
450 2000047504800 4800 4800 45020000475048004800400143045052500040050524800
4037 4037202620262026202620152893202620262026202620262026 2026 2026 28932026202620262026A-2021SCALE: 1:125THIRD FLOOR PLAN (BLDG 'A')Issued for Site Plan ApprovalIssued for Pricing and BudgetingIssued for Record Set of Dwgs.Issued for Building PermitIssued for TenderingIssued for ConstructionSHEET NO. DATE OFA-202DWG.CHKD BYDRAWN BYSCALEDRAWING NAMEDWLRDGPROJECT NO.NO. DATE REVISIONS BYDRAWING ISSUEIssued for Design ApprovalPARTICULARSDATEBYPROJECT1:125100 GOULDING AVENUEAURORA, ONTARIOTHIRD FLOOR PLANCITY FILE #ACTUAL CONSTRUCTION NORTHThis drawing, as an instrument of service, is provided by and is the property ofVenchiarutti Gagliardi Architect Inc. The contractor must verify and accept responsibilityfor all dimensions and conditions on site and must notify Venchiarutti Gagliardi ArchitectInc. of any variations from the supplied information.Venchiarutti Gagliardi Architect Inc. is not responsible for the accuracy of survey,structural, mechanical, electrical, etc, engineering information shown on this drawing.Refer to the appropriate engineering drawings before proceeding with the work.Construction must conform to all applicable codes and requirements of authorities havingjurisdiction. This drawing is not to be scaled.Venchiarutti Gagliardi Architect Inc. is not responsible for any environmental conditions,geotechnical conditions or any pollutants found on siteAll architectural symbols indicated are graphic representations only.This drawing is not to be used for construction purposes until the architectural seal issigned by the Architect of Record22010PROPOSEDCOMMERCIAL DEVELOPMENTSPAJULY 22, 2024LAST PLOTTING DATE: JULY 22, 2024W:/22010 - Ind. Warehouse - 100 Goulding Ave. (Aurora)/2. Drawings/2.5.1.Architectural/SPA/Floor Plans, Elevations, Sections & Details/2024/07.22.24Page 40 of 64
100 John West Way
Aurora, Ontario
L4G 6J1
(905) 727-3123
aurora.ca
Town of Aurora
Committee of Adjustment Report
No. C -202 4 -02
_______________________________________________________________________________________
Subject: Consent Application
Cornerstone Growth Investment Corp.
31 Kennedy Street West
PT LT 43 PL 246 Aurora PT 1, 65R12910; Aurora
File: C-2024-02
Related Planning Application(s): MV-2024-17 & MV-2024-18
Prepared by: Felix Chau, Planner
Department: Planning and Development Services
Date: September 12, 2024
_______________________________________________________________________________________
Application
The purpose of the proposed consent application is to sever the subject lands with
frontages along Kennedy Street West as follows (see Appendix ‘B’):
a) Proposed Severed Lands:
Part 1 of the Draft Plan of Severance (western portion)
A lot area of 432.7 m2 (4650 ft2) and a lot frontage of 15.26 m (50.1 ft)
b) Proposed Retained Lands:
Part 2 of the Draft Plan of Severance (eastern portion)
A lot area of 446.7 m2 (4808.2 ft2) and a lot frontage of 15.25 m
Background
Subject Property and Area Context
The subject property, municipally known as 31 Kennedy Street West, is located on the
south side of Kennedy Street West, west of Temperance Stret. The subject property
contains a total lot area of 879.4 m2 (9465.8 ft2), with a lot frontage of 30.5 m (100.1 ft)
along Kennedy Street West. The existing property contains a one-storey single detached
dwelling and rear detached garage with an access driveway from Kennedy Street West.
Page 41 of 64
September 12, 2024 2 of 9 Report No. C-2024-02
Proposal
The applicant is proposing to sever a 432.7 m2 parcel of land on the western portion to
create a new residential lot. The severed and retained parcels are shown on the proposed
severance plan attached as Appendix ‘B’. There is no proposed construction currently
associated with this application, however the applicant is proposing to demolish a portion
of the existing detached dwelling which straddles the proposed lot line (refer to Appendix
‘B’). A demolition permit has been issued by the Building Division. The severed lot will
remain vacant with residential use permissions. The applicant has provided a “Buildable
Footprint” drawing which demonstrates that a new detached dwelling can meet all
required setbacks on the severed lot, while maintaining appropriate driveway access from
Kennedy Street West (refer to Appendix ‘C’).
The consent application proposes to sever the property as follows:
Part Lot Area Lot Frontage
Existing Lot
(31 Kennedy Street
West)
1 & 2 879.4 m2 30.5 m
Proposed Severed
Parcel 1 432.7 m2 15.26 m
Proposed Retained
Parcel 2 446.7 m2 15.25 m
Related Planning Applications
The applicant has concurrently submitted two minor variance applications (MV-2024-17
and MV-2024-18) for review by the Committee of Adjustment. The minor variance
applications relate to reducing the lot area of the new parcel fabric of the site and
reducing the minimum interior side yard setback for the existing detached dwelling to the
proposed property line.
Bill 23 – the More Homes Built Faster Act
Bill 23 amended the Planning Act to support the province’s goal of adding 1.5 million new
homes in Ontario by 2031. The intent of the legislation is to assist the province in meeting
planned minimum housing and density targets. Infill developments are specifically seen
Page 42 of 64
September 12, 2024 3 of 9 Report No. C-2024-02
as assisting with creating housing opportunities through the gentle intensification of
traditionally lower density residential areas. The province has also implemented as-of-
right permissions for other forms of housing including additional residential units, with
lots now able to contain upwards of 3 units.
Official Plan
The subject property is designated “Stable Neighbourhoods” by the Town of Aurora
Official Plan. Single detached dwellings are permitted under this designation.
Zoning
The subject lands are zoned “Detached Special Mixed Density Residential R7-SN (497)
Exception Zone” under Zoning By-law 6000-17, as amended. This zoning permits single
detached dwellings, and requires new lots for single detached dwellings to have a
minimum lot area of 460 m2 and a minimum lot frontage of 15 m. The proposed lots meet
the zoning requirements for lot frontage, however variances for lot area are required for
both the proposed retained and severed parcel. The applicant has demonstrated that a
new detached dwelling, with a maximum lot coverage of 150 m2, can meet all required
setbacks on the severed lot. Any future development on the proposed vacant lot must
comply with the R7-SN (497) zoning permissions or be facilitated through relief to the
Zoning By-law.
Preliminary Zoning Review
A Preliminary Zoning Review (PZR) was undertaken by the Building Services Division prior
to submission of the subject application. Building Staff have reviewed the proposed
consent application and have determined that minor variances regarding lot area are
required to facilitate the proposed consent. As previously mentioned, an additional
variance is required to the minimum interior side yard setback for the existing single
detached dwelling, as further outlined in the related minor variance report.
Planning Comments
When considering an application for consent to sever lands, regard shall be had to the
criteria of Section 51 (24) of the Planning Act. This includes, amongst other things:
Matters of Provincial Interest
Conformity with the Official Plan and adjacent plans of subdivision
Suitability of the land for the purpose in which it is to be subdivided
The dimension and shape of the proposed lots
Page 43 of 64
September 12, 2024 4 of 9 Report No. C-2024-02
Adequacy of utilities and municipal services
Number and adequacy of highways
Matters of Provincial Interest
Staff are satisfied that the proposed consent application is consistent with the Provincial
Policy Statement and conforms with applicable provincial plans, as the consent is to
facilitate an underutilized lot with residential permissions as part of creating new, gentle
intensification housing opportunities in line with provincial objective. The consent
application implements the amendments made through Bill 23 and creates mores
attainable housing through residential intensification. Staff believe that the consent
application demonstrates good planning and strives to provide alternative solutions to
assist in the creation of new, infill housing opportunities.
Conformity with the Official Plan and Adjacent Plans of Subdivision
The proposed consent application will add opportunities for new residential development
that assists the Town with implementing provincial and regional growth targets. The
proposal will add options for gentle intensification and supports complete community
development by providing housing opportunities near commercial and social service
amenities, parks and public transportation.
The proposed severance will create lots that are consistent with the lot frontages and
built form of the surrounding lots that frame the Kennedy Street West and Temperance
Street intersection. The surrounding land use are predominantly low density residential
which feature single detached dwellings. The existing lot frontage of 30.5 m is nearly
double the frontage of the adjacent lots, which range from approximately 15.0 m to
18.0 m. The proposed lot frontages of 15.26 m and 15.25 m are more consistent with the
existing lot frontages of the surrounding lots. Appropriate vehicular access is maintained
for the retained parcel from Kennedy Street West. As demonstrated through the Buildable
Footprint drawing (Appendix C), sufficient frontage for a vehicular accessway is provided
for the severed parcel. Staff have no concerns with the anticipated driveway, however it
will require an entrance permit.
Suitability of the land and adequacy of utilities, services, highways and access
The proposed new residential lot and overall development is located in close proximity to
a variety of local amenities and public transportation opportunities. The Aurora
Downtown Promenade (Yonge Street corridor) is located slightly east of the property and
Page 44 of 64
September 12, 2024 5 of 9 Report No. C-2024-02
the Aurora GO Station is located northeast of the subject property, allowing future
residents to be within general walking distance of a major transit station area. As
previously mentioned, appropriate access will be provided from Kennedy Street West for
both the severed and retained lots.
It is Staff’s opinion that local services and access to transit is adequately accommodated
for to serve the proposed consent application. The Town’s Engineering Staff have
confirmed that municipal services are available to accommodate the new residential lot.
Dimension and shape of the proposed lot
It is Staff’s opinion that the proposed consent application is generally compatible with
the surrounding area regarding the dimensions and shapes of the proposed severed and
retained lots. The lots immediately east of the subject lots along the south side of
Kennedy Street West have lot areas of approximately 500 m2 to 465 m2. While they are
slightly larger in size, the lot frontages remain consistent, ranging from approximately
15 m and 18 m. The proposed lots are slightly shallower in depth due to an angles rear
lot line.
The proposed consent will facilitate two residential lots which are consistent with the
surrounding lots, adding gentle intensification in an appropriate manner as envisioned by
provincial legislation. Planning staff are of the opinion that the dimension and shape of
the proposed lots is appropriate (subject to the approval of related Minor Variance
Applications MV-2024-17 and MV-2024-18), and desirable as part of the use of land.
Additional Comments
The consent application was circulated to Town Departments/Divisions and to external
agencies for review and comment. The following comments were provided:
Department or Agency Comments
Building Division Preliminary Zoning Review was completed.
No objection.
Engineering Division No objection.
Operational Services (Parks) No objection.
Operations (Public Works) No comments received at the time of writing this
report.
Page 45 of 64
September 12, 2024 6 of 9 Report No. C-2024-02
Department or Agency Comments
Central York Fire Services No comments received at the time of writing this
report.
York Region No comments received at the time of writing this
report.
LSRCA No objection.
Alectra No objection.
HydroOne No objection.
Public Correspondence
One (1) written submission was received at the time of writing of this report. Should
written submissions be received after the writing of this report, the Secretary Treasurer
will provide the submission(s) to Committee members at the meeting.
Conclusion
Staff have reviewed the application with respect to the Section 51(24) of the Planning Act,
R.S.O, 1990, c.P.13, as amended, the Provincial Policy Statement, Provincial Plans and the
Town’s Official Plan and are satisfied with the proposed consent application.
Based on the aforementioned, Staff have no objection to approving the Consent
application File. C-2024-02, subject to the conditions attached (Appendix ‘A’).
Attachments
Appendix ‘A’ – Recommended Conditions of Approval
Appendix ‘B’ – Proposed Severance Plan
Appendix ‘C’ – Buildable Footprint
Appendix ‘D’ – Lot Area Context Map
Page 46 of 64
September 12, 2024 7 of 9 Report No. C-2024-02
Appendix ‘A’ – Recommended Conditions of Approval
Planning and Development Services:
1. That the consent only applies to the subject property in conformity with the plans
attached as Appendix ‘B’ to this report, to the satisfaction of the Director of
Planning and Development Services.
2. That the Owner provide written confirmation of no outstanding payment of
property taxes owing to date for the subject property, to the satisfaction of the
Secretary-Treasurer.
3. Submission to the Secretary-Treasurer of four (4) white prints of a deposited
Reference Plan for review showing the subject lands, which conforms
substantially to the application form and sketch as submitted with this application
(Appendix ‘B’). One copy of the deposited reference plan must be submitted to the
Town prior to the issuance of the Certificate of Official. Please note, if the
transaction in respect of which the consent was given is not carried out within the
two-year period following issuance of the Certificate of Official, the consent
effectively will lapse [Planning Act, R.S.O. 1990, c.P.13, as amended, s. 53 (43)].
4. Submission to the Secretary-Treasurer of the required draft transfers to effect the
severance applied for under Files C-2024-02 in duplicate, conveying the subject
lands, and issuance by the Secretary Treasurer of the certificate required under
subsection 53(42) of the Planning Act. Subsection 50 (3 or 5) of the Planning Act,
R.S.O 1990, as amended, applies to any subsequent conveyance of or transaction
involving the parcel of land that is the subject of this consent.
5. That the Owner pay the Legal Services Fees ($238.00) regarding the Town’s cost
to obtain a Parcel Abstract/PIN as per the Application, and written confirmation be
provided to the satisfaction of the Secretary-Treasurer. The cheque is payable to
“The Corporation of the Town of Aurora” quoting file number C-2023-09 and
delivered to the attention of Legal Services, 100 John West Way, Box 1000, Aurora,
ON L4G 6J1.
6. That the Owner enter into a Letter of Undertaking to acknowledge the
understanding that the Owner will be required to pay cash-in-lieu of Parkland,
development charges, municipal service connection fees and any other fees as
required and applicable per the Town’s Fees and Charges By-law to the
satisfaction of the Director of Planning and Development Services.
Page 47 of 64
September 12, 2024 8 of 9 Report No. C-2024-02
7. That the Owner obtain relief from the provisions of the Zoning By-law as set forth
in the concurrent and related minor variance applications MV-2024-17 and MV-
2024-18.
8. That the Owner obtains a Demolition Permit from the Building Division to ensure
that no part of any existing structures is encumbered by the proposed lot line.
9. Fulfilment of all of the above conditions shall occur within two (2) years of the date
that notice of the decision was given under Section 50(17) or 50(24) of the
Planning Act. R.S.O. 1990, c.P.13, or the consent will lapse.
Operational Services (Parks):
10. That the owner shall be required to provide an Evaluation Report prepared by a
Certified Arborist or Professional Registered Forester outlining all aspects of and
impacts to the existing trees on the proposed severed and retained lots. The report
shall include the following:
a. An assessment of existing trees (5cm trunk diameter and greater) by size,
species and condition including trees on adjacent properties whose
structure or root zone may be impacted by construction.
b. Identification of all tree injuries and tree removals, if any.
c. Identification of all tree protection measures including recommendations
on the mitigation of negative effects to trees during and post construction,
including applicable maintenance requirements.
d. Provision of monitoring of the site work through a series of site visits by the
Arborist/Forester to ensure protection/preservation measures remain in
compliance throughout the duration of the project. Monitoring shall occur
i) at commencement of work to certify all tree protection measures are in
place, ii) during site work to confirm protection measures are in place and
to oversee arboricultural works as required, and iii) post construction
assessment. Each site visit is to be documented and any resulting action
items required by the Arborist /Forester shall be implemented and
confirmed on site forthwith by the Arborist /Forester following each visit.
e. A monetary evaluation in accordance with the Town’s Tree Compensation
Policies for all trees designated to be removed.
11. The Owner shall be required to provide a tree compensation and a replanting plan
in accordance with the Town of Aurora Tree Compensation Policies to the
satisfaction of the Director of Operational Services as compensation for trees
Page 48 of 64
September 12, 2024 9 of 9 Report No. C-2024-02
removed to facilitate construction. Compensation planting shall be completed
prior to release of the financial securities.
12. The owner shall agree to comply with the Aurora Tree Permit By-law # 5850 -16
prior to the removal of any trees on the property.
13. The owner shall be required to provide financial securities based on the total value
of the Tree Compensation evaluation and all Arboriculture works as defined by the
Town and the Owner’s Arborist/ Forester, to the satisfaction of the Director of
Operational Services.
14. All the above shall be included as terms and conditions in a Letter of Undertaking
with the Town of Aurora to guarantee compliance with the Conditions of Approval
and all related site works.
Page 49 of 64
IBW
S U R V E Y O R S
A-046164
to be severed to be retained
Area to be demolished as previously
approved #PR20240170
PR20240405 May 14, 2024
TOWN OF AURORA
PLANNING & DEVELOPMENT SERVICES
BUILDING DIVISION
PERMIT NO.: DATE:
PRELIMINARY ZONING REVIEW
APPROVED BY: Ashley Vanderwal
Page 50 of 64
Page 51 of 64
Proposed Severed Lot
432.7 m2
Proposed Retained Lot
446.7 m2
KENNEDY STREET WEST
TEMPERANCE STREETLot Area:
506.3 m2
Lot Area:
464.5 m2
Lot Frontage:
15.2 m
Lot Frontage:
18 m
Proposed
Lot Frontage:
15.2 m
Proposed
Lot Frontage:
15.2 m
Page 52 of 64
100 John West Way
Aurora, Ontario
L4G 6J1
(905) 727-3123
aurora.ca
Town of Aurora
Committee of Adjustment Report
No. MV-202 4 -17 & MV -2024 -18
_______________________________________________________________________________________
Subject: Minor Variance Application
Cornerstone Growth Investment Corp.
31 Kennedy Street West
PT LT 43 PL 246 Aurora PT 1, 65R12910; Aurora
Files: MV-2024-17 & MV-2024-18
Related Planning Application(s): C-2024-02
Prepared by: Felix Chau, Planner
Department: Planning and Development Services
Date: September 12, 2024
_______________________________________________________________________________________
Application
The applicant is requesting relief from the requirements of the Town’s Comprehensive
Zoning By-law 6000-17, as amended, to facilitate the creation of one (1) new residential
lot through Consent Application C-2024-02. The following relief is being requested:
MV-2024-17 – Part 1 – Proposed Severed Lot (western portion):
a) Section 7.2 of the Zoning By-law requires a minimum lot area of 460.0 m2. The
applicant is proposing a lot area of 432.7 m2.
MV-2024-18 – Part 2 – Proposed Retained Lot (eastern portion):
b) Section 7.2 of the Zoning By-law requires a minimum lot area of 460.0 m2. The
applicant is proposing a lot area of 446.7 m2.
c) Section 24.497.3.2 of the Zoning By-law requires a minimum interior side yard of
1.5 m. The existing one-storey detached dwelling is 1.2 m to the proposed interior
side property line.
Page 53 of 64
September 12, 2024 2 of 9 Report No. MV-2024-17 & MV-2024-18
Background
Subject Property and Area Context
The subject property, municipally known as 31 Kennedy Street West, is located on the
south side of Kennedy Street West, west of Temperance Street. The subject property
contains a total lot area of 879.4 m2 (9465.8 ft2), with a lot frontage of 30.5 m (100.1 ft)
along Kennedy Street West. The existing property contains a one-storey single detached
dwelling and rear detached garage with an access driveway from Kennedy Street West.
Proposal
A consent application (C-2024-02) is being presented concurrently for review by the
Committee of Adjustment, which proposes to sever the existing property and create two
(2) distinct parcels. There is no proposed construction currently associated with this
application, however the Building Division has issued a demolition permit to demolish a
portion of the existing detached dwelling which straddles the proposed lot line (refer to
Appendix ‘B’). The proposed severed lot will remain vacant with residential use
permissions. The applicant has provided a “Buildable Footprint” drawing which
demonstrates that a new detached dwelling can meet all required setbacks on the
severed lot, while maintaining appropriate driveway access from Kennedy Street West
(refer to Appendix ‘C’).
Bill 23 – the More Homes Built Faster Act
Bill 23 amended the Planning Act to support the province’s goal of adding 1.5 million new
homes in Ontario by 2031. The intent of the legislation is to assist the province in meeting
planned minimum housing and density targets. Infill developments are specifically seen
as assisting with creating housing opportunities through the gentle intensification of
traditionally lower density residential areas. The province has also implemented as-of-
right permissions for other forms of housing including additional residential units, with
lots now able to contain upwards of 3 units.
Official Plan
The subject property is designated “Stable Neighbourhoods” by the Town of Aurora
Official Plan. Single detached dwellings are permitted under this designation.
Page 54 of 64
September 12, 2024 3 of 9 Report No. MV-2024-17 & MV-2024-18
Zoning
The subject lands are zoned “Detached Special Mixed Density Residential R7-SN (497)
Exception Zone” under Zoning By-law 6000-17, as amended. This zoning permits single
detached dwellings, and requires new lots for single detached dwellings to have a
minimum lot area of 460 m2 and a minimum lot frontage of 15 m.
Related Planning Applications
There is a concurrent consent application (C-2024-02) on the subject lands, which
proposes to sever and create an additional residential lot. The consent and minor
variance applications are required to be heard concurrently by the Committee of
Adjustment, as the variances at hand are applicable provided the consent is in force, and
the consent application is simultaneously dependent on receiving relief from the required
lot area variance in particular. Appropriate conditions of approval are in place to link both
applications.
Preliminary Zoning Review
A Preliminary Zoning Review (PZR) has been completed by the Town of Aurora’s Building
Division. Building Staff have reviewed the proposed minor variance applications and have
determined that minor variances are required to facilitate the proposed consent.
Applicant’s stated reason(s) for not complying with the Zoning By-law
The applicant has stated the following on the application form:
“The aim of our gentle densification project is to create a new lot of a similar size as the
retained lot. And as much as possible, similar to the immediate neighbouring lots. If one
lot was much larger, or smaller than the other, we feel that it would be less desirable to
the neighbourhood.
The current proposal is to have the retained lot with an area of 446.7 m2 and a frontage
of 15.25 m. The newly created lot will have an area of 432.7 m2 and a frontage of 15.26 m.
The two lots will have almost identical frontages. If we were to make the newly created
lot larger 460 m2, it will impact the size of the retained lot (419.4 m2) and likely their
frontages. Having a large and a small lot will be less visually desirable to the
neighbourhood.”
Page 55 of 64
September 12, 2024 4 of 9 Report No. MV-2024-17 & MV-2024-18
Planning Comments
Planning Staff have evaluated Minor Variance Applications MV-2024-17 and MV-2024-18
pursuant to the prescribed tests as set out in Section 45 (1) of the Planning Act, as
follows:
a) The proposed variance meets the general intent of the Official Plan
The intent of the ‘Stable Neighbourhoods’ Official Plan designation is to ensure that
residential neighbourhoods are protected from incompatible forms of development, while
allowing the neighbourhoods to be enhanced over time. The designation permits ground-
oriented residential development, which includes single detached dwellings, and focuses
on ensuring new development is designed in an appropriate and high-quality manner to
enhance the streetscape.
The underlying priority is for new development and infill housing opportunities to be
introduced in a complementary manner, particularly from an architectural design and
compatibility perspective. Any new construction will be subject to the urban design
guidelines for Stable Neighbourhoods. Staff are of the opinion that the requested
variances will facilitate greater housing options in the community, while being designed
in a manner that is of high-quality and that will enhance the local streetscape – along the
intersection of Kennedy Street West and Temperance Street that currently features single
detached dwellings.
Additionally, new policy frameworks around encouraging housing opportunities means
the development is appropriate in terms of it addressing near and long-term housing
needs within the community. Overall, Staff are therefore of the opinion that the proposed
variances meet the general intent of the Official Plan.
b) The proposed variance meets the general intent of the Zoning By-law
The Subject lands are zoned “Detached Special Mixed Density Residential R7-SN (497)
Exception Zone” under Zoning By-law 6000-17, as amended. The intent of the zoning is
to ensure that the streetscape and public realm are maintained with high-quality and
compatible forms of development.
A summary of the variances requested and how they meet the general intent of the zoning
is as follows:
Page 56 of 64
September 12, 2024 5 of 9 Report No. MV-2024-17 & MV-2024-18
Minimum Lot Area:
The intent of the minimum lot area provision is to ensure that lots are appropriately sized
and consistent with the streetscape and neighbourhood pattern. The lot area of the
severed and retained lots are 432.7 m2 and 446.7 m2 respectively, whereas the by-law
requires a minimum lot area of 460 m2 to accommodate lots for single detached
dwellings.
The existing lot is 879.4 m2 in size, which cannot accommodate for two (2) 460 m2 lots.
The minimum lot area deficiency for both the severed and retained lots is a result of the
applicant’s efforts to provide for two (2) lots compatible in size and shape with the
surrounding lots. In Staff’s view, minimum lot area deficiencies of 27.3 m2 and 13.3 m2
maintain the intent of the By-law provision as both the severed and retained lots will be
more appropriately sized and consistent with the streetscape and neighbourhood pattern
than the existing 879.4 m2 lot. The lots are not proposed to be identical in size due to the
applicant’s desire to maintain a significant portion of the existing detached dwelling on
the retained lot – the location of the proposed lot line is strategically placed to maximize
the size of both lots while maintaining an adequate interior side yard setback from the
detached dwelling to the proposed lot line.
Despite the deficiency in lot area, the required lot frontage is complied with, with
appropriate access off Kennedy Street West maintained. The lots immediately east of the
subject lots along the south side of Kennedy Street West have lot areas of approximately
500 m2 to 465 m2. While they are slightly larger in size, the lot frontages remain consistent,
ranging from approximately 15 m and 18 m. The proposed lots are slightly shallower in
depth due to an angles rear lot line.
The redevelopment of the site will enhance the character and streetscape of the
neighbourhood, while providing new housing opportunities in line with the direction of the
province. Overall, Staff have no concerns with the subject variances.
Minimum Interior Side Yard (MV-2024-18 – Part 2 only):
The intent of the minimum interior side yard setback provision is to ensure there is
appropriate and adequate spacing between lots for privacy, landscaping, access and
drainage. As previously mentioned, the Building Division has issued a demolition permit
to demolish a portion of the existing detached dwelling which straddles the proposed lot
line. The demolition will result in an interior side yard setback of 1.2 m from the nearest
side wall of the existing detached dwelling to the proposed lot line.
Page 57 of 64
September 12, 2024 6 of 9 Report No. MV-2024-17 & MV-2024-18
The proposed reduction of the minimum interior side yard setback on the west side yard
is a function of the location of the proposed lot line and design of the existing detached
dwelling to be retained. As previously mentioned, the location of the proposed lot line is
strategically placed in order to maximize the size of both lots while preserving a 1.2 m
side yard setback from the portion of the detached dwelling. The portion of the detached
dwelling to be demolished is a jut-out from an otherwise flush side wall. Furthermore, an
existing detached garage is located on the east side of the property, behind the existing
detached dwelling, and will be preserved. The existing vehicular access and paved
driveway which encompass the entire east side yard are to be preserved, which prevents
any potential manoeuvring of the detached dwelling structure on the east side of the
property. The Town’s Engineering Division has reviewed the applications and have no
concerns or objections.
It is Staff’s opinion that a reduction of the minimum interior side yard setback from 1.5 m
to 1.2 m maintains the intent of the By-law provision and as such, Staff have no concerns
with the subject variance.
c) The proposed variance is considered desirable for the appropriate development of the
land
As discussed above, Staff are satisfied the proposal appropriately responds to recent
legislation that encourages infill housing development. The proposal facilitates the
creation of a new residential additional lot for the local community to serve current and
future generations. The retention of the existing detached dwelling eliminates any
immediate visual impact to the streetscape. At the time in which a structure is proposed
for the vacant lot, it must comply with the provisions of the Zoning By-law or be subject
to further planning approvals. Furthermore, the proposed variances comply with the
Stable Neighbourhood Urban Design Guidelines.
The appropriate conditions of approval have also been developed to avoid any potential
adverse impacts and ensure the orderly development of the site. In the opinion of Staff,
the proposal represents gentle intensification that provides housing opportunities as
directed by the Region and Province. Overall, it is the opinion of Staff that the proposed
variances are considered desirable for the appropriate development of the land.
d) The proposed variance is considered minor in nature
In the opinion of Staff, the requested variances are considered to be minor in nature and
are not expected to have any significant adverse effects on the subject lands,
neighbouring properties, or the overall streetscape. Properties adjacent to the subject
Page 58 of 64
September 12, 2024 7 of 9 Report No. MV-2024-17 & MV-2024-18
property are similarly sized and feature detached dwellings and associated accessory
structures.
The province through Bill 23 has enabled gentle intensification through existing
residential neighbourhoods. The proposed introduces an opportunity for residential lot
creation in a manner that still respects the overall neighbourhood character and scale.
Overall, it is the opinion of Staff that the proposed variances are minor in nature.
Additional Comments
The minor variance application was circulated to Town Department/Divisions and to
external agencies for review and comment. The following comments were provided:
Department or Agency Comments
Building Division Preliminary Zoning Review was completed.
No objection.
Engineering Division No objection.
Operational Services (Parks) No objection.
Operations (Public Works) No comments received at the time of writing this
report.
Central York Fire Services No comments received at the time of writing this
report.
York Region No comments received at the time of writing this
report.
LSRCA No objection.
Alectra No objection.
HydroOne No objection.
Public Correspondence
One (1) written submission was received at the time of writing of this report. Should
written submissions be received after the writing of this report, the Secretary Treasurer
will provide the submission(s) to Committee members at the meeting.
Page 59 of 64
September 12, 2024 8 of 9 Report No. MV-2024-17 & MV-2024-18
Conclusion
Planning Staff have reviewed the application with respect to the Section 45(1) of the
Planning Act, R.S.O, 1990, c.P.13, as amended, and are of the opinion that the requested
variance meets the four tests of the Planning Act for granting minor variances. Staff
recommend approval of the requested variances subject to the conditions outlines in
Appendix ‘A’.
Attachments
Appendix ‘A’ – Recommended Conditions of Approval
Appendix ‘B’ – Proposed Severance Plan
Appendix ‘C’ – Buildable Footprint
Appendix ‘D’ – Lot Area Context Map
Page 60 of 64
September 12, 2024 9 of 9 Report No. MV-2024-17 & MV-2024-18
Appendix ‘A’ – Conditions of Approval
Planning and Development Services:
1. That the variances only apply to the subject property in conformity with the plans
attached as Appendix ‘B’ to this Staff Report, to the satisfaction of the Director of
Planning and Development Services or designate.
2. That the Owner obtain the necessary provisional consent approval as set forth in
the concurrent and related consent application C-2024-02, to the satisfaction of
the Director of Planning and Development Services or designate.
Page 61 of 64
IBW
S U R V E Y O R S
A-046164
to be severed to be retained
Area to be demolished as previously
approved #PR20240170
PR20240405 May 14, 2024
TOWN OF AURORA
PLANNING & DEVELOPMENT SERVICES
BUILDING DIVISION
PERMIT NO.: DATE:
PRELIMINARY ZONING REVIEW
APPROVED BY: Ashley Vanderwal
Page 62 of 64
Page 63 of 64
Proposed Severed Lot
432.7 m2
Proposed Retained Lot
446.7 m2
KENNEDY STREET WEST
TEMPERANCE STREETLot Area:
506.3 m2
Lot Area:
464.5 m2
Lot Frontage:
15.2 m
Lot Frontage:
18 m
Proposed
Lot Frontage:
15.2 m
Proposed
Lot Frontage:
15.2 m
Page 64 of 64