Loading...
Agenda - Committee of Adjustment - 20221208Town of Aurora Committee of Adjustment Meeting Agenda Date:Thursday, December 8, 2022 Time:7:00 p.m. Location:Video Conference Aurora Council and Committee meetings are live streamed on the Town’s YouTube Channel. For information on how to participate in this meeting please visit aurora.ca/participation. Pages 1.Call to Order 2.Land Acknowledgement 3.Approval of the Agenda That the Agenda as circulated by the Secretary-Treasurer be approved. 4.Declarations of Pecuniary Interest and General Nature Thereof 5.Receipt of the Minutes 5.1 Committee of Adjustment Meeting Minutes of November 10, 2022, Meeting Number 22-11 That the Committee of Adjustment Minutes from Meeting Number 22-11 be adopted as circulated. 6.Presentation of Applications 6.1 MV-2022-40 - Hilsenteger - 3 Jarvis Avenue (*Application deferred at the request of the applicant)  6.2 MV-2022-41- Kohan - 5 Corbett Cres (*Application deferred at the request of the applicant)  6.3 MV-2022-39 -Armes - 78 Centre street 1 6.4 MV-2022-42 - Jeffs - 23 Hawthorne Lane 16 6.5 MV-2022-46 - Torabi - 52 Child Dr 22 6.6 MV-2022-43 - Pazienza- 49 Jasper Drive 36 6.7 MV-2022-47- 2815503 Ontario Ltd- 32 Don Hillock Dr 50 7.New Business 8.Adjournment 100 John West Way Aurora, Ontario L4G 6J1 (905) 727-3123 aurora.ca Town of Aurora Committee of Adjustment Report No. MV-202 2 -39 _______________________________________________________________________________________ Subject: Minor Variance Application Stephen Armes 78 Centre Street MV-2022-39 Prepared by: Sean Lapenna, Planner Department: Planning and Development Services Date: December 8, 2022 _______________________________________________________________________________________ Application The applicant is requesting relief from the Town’s Comprehensive Zoning By-law 6000- 17, as amended, to facilitate the development of a one-storey, single vehicle detached garage with a Gross Floor Area of approximately 300.0 ft² (28.0 m²) and a building height of 13.0 ft (3.84 m). The garage is proposed to be constructed atop of the existing driveway on the property and along the west side property line. PROPOSED VARIANCE The following relief from the requirements of the Town’s Zoning By-law 6000-17, as amended, is requested: a) Section 7.2 of the Zoning By-law requires a minimum interior side yard setback of 1.2 metres. The applicant is proposing a detached garage, which is 0.28 metres to the interior side property line. Background Subject Property and Area Context The subject lands are municipally known as 78 Centre Street and are located north of Wellington Street East, east of Yonge Street and on the north side of Centre Street. The subject lands currently accommodate an existing two storey single-detached dwelling Page 1 of 63 December 8, 2022 2 of 9 Report No. MV-2022-39 with an outdoor in-ground swimming pool, three sheds, a gazebo, as well as a mature tree located in the front yard. The subject lands have an approximate lot area of 1,114.21 m² (11,994.0 ft²) and a lot frontage of 20.19 m (66.25 ft). 78 Centre Street is located within the Town of Aurora’s Northeast Old Aurora Heritage Conservation District. In the event of Minor Variance approval, the owner would be required to obtain a future approval in the form of a Heritage permit for the exterior alterations and new construction of the proposed detached garage. Official Plan The subject property is designated ‘Stable Neighbourhoods’ by the Town of Aurora Official Plan. Stable Neighbourhoods are to be protected from incompatible forms of development, but are permitted to evolve over time. All new development shall be compatible with its surrounding context. Zoning The subject lands are zoned R7 (Special Mixed Density Residential Zone) by the Town of Aurora Zoning By-law #6000-17, as amended, which permits Accessory Structures such as Detached Garages. Preliminary Zoning Review A Preliminary Zoning Review (PZR) has been completed by the Building Division. The PZR identified the required variance, and no other non-compliance was identified. Applicant’s stated reasons(s) for not complying with the Zoning By-law The applicant is proposing a 25 x 12 detached garage where one corner of garage has a 0.28 m distance to the property line (as per the initial review the By-law requires 1.2 m, the applicant strongly believe this is minor and can propose such development). Planning Comments Planning staff have reviewed the requested variance as per the four tests in section 45(1) of the Planning Act. a) The proposed variance meets the general intent and purpose of the Official Plan. The intent of the ‘Stable Neighbourhoods’ designation is to ensure that all new development will be protected from incompatible forms of development and, at the same time, are permitted to evolve and be enhanced over time. Page 2 of 63 December 8, 2022 3 of 9 Report No. MV-2022-39 The Official Plan requires new development and site alterations to be sympathetic to the form and character of abutting existing residential development and to be compatible with regard to building scale and urban design. Staff are of the opinion that the proposal is compatible with the built form in the neighbourhood. It is therefore the opinion of Planning staff that the proposed variance maintains the general intent of the Official Plan. b) The proposed variance meets the general intent and purpose of the Zoning By-law. The subject lands are zoned ‘R7 (Special Mixed Density Residential Zone)’ by the Town of Aurora Zoning By-law #6000-17, as amended where accessory structures such as Detached Garages are permitted. The purpose of setback requirements under the by-law is to ensure that adequate separation is provided between buildings on abutting properties. The neighbouring property located to the west (74 Centre Street) previously received approval to permit the construction of a double duplex. Staff note that the approved plans for the duplex building at 74 Centre Street has a minimum 2.50 m side yard setback along the mutually shared side yard property line. As such, a combined separation distance between the two buildings on each property at it’s closest point will be 2.78 m, thus resulting in an adequate separation distance between the two buildings, as the by-law intends. Based on the above staff are of the opinion that the requested variance meets the general intent and purpose of the zoning by-law. c) The variance is considered desirable for the appropriate development or use of the land. Planning Staff note that several of the neighbouring properties in the immediate vicinity also have existing detached garages located along their side yards (including the neighbouring property located to the east, at 82 Centre Street). As such, staff consider the garage as proposed to be consistent with this existing built form in the surround ing area. The Town’s Engineering Services Division is looking to confirm that the existing drainage pattern will be maintained. In addition to this, they are also looking to confirm that the proposed site works will not result in any adverse impacts on neighbouring properties. They also require confirmation as to where the proposed garage eaves will outlet, to ensure that storm water is not discharged directly onto adjacent properties. As such, Engineering Services has included conditions of approval requiring the owner to submit a detailed lot grading and drainage plan (including erosion and sediment control Page 3 of 63 December 8, 2022 4 of 9 Report No. MV-2022-39 measures) as well as a section plan, confirming the proposed garage overhang and gutter in relation to the side yard property line. Given the conditions imposed by Engineering Services, nature, scale and location of the garage, staff have no concerns. Based on the above, staff consider the requested variance to be desirable for the appropriate development and use of the lands. d) The variance is considered to be minor in nature. Staff note that the setback distance of 0.28 m to the side yard property line applies only to the north-west corner of the detached garage and that the separation distance between the garage and property line gradually increases from north to south. The submitted plans also reflect that there will be no windows located on the west side of the detached garage, facing the neighbouring property. Windows have only been placed on the east side of the garage, facing the rear yard of the subject property. As such, staff are of the opinion that any potential impacts in regards to privacy have been mitigated. Although the proposed garage is located closer to the side yard property line than the by- law permits, staff are of the opinion that the garage is not considered to be visually obtrusive. Finally, the garage is non-habitable space and is intended to be used for storage purposes only. Based on the above, staff considers the variance to be minor in nature. The minor variance application was circulated internally and to external agencies for review and comment. The following comments were provided: Additional Comments The minor variance application was circulated internally and to external agencies for review and comment. The following comments were provided: Department / Agency Comments Provided Engineering Services Engineering Division has reviewed the above noted application and offer our comments as follows: 1. Detailed lot grading and drainage plan (including erosion and sediment control measures) in accordance with the Town’s grading criteria shall be submitted for review and information. The said plans Page 4 of 63 December 8, 2022 5 of 9 Report No. MV-2022-39 shall demonstrate that the existing drainage pattern will be maintained, and the proposed site works will not cause any adverse impacts on the neighbouring properties. The plans shall show where the proposed garage eaves will outlet and to ensure that the storm water is not discharged directly onto the adjacent properties. 2. It appears that the proposed garage overhang and gutter encroach to the neighbour property. Please provide a section plan showing the proposed garage overhang, gutter and the property line offsets for our information. Building Division Preliminary Zoning Review conducted. No comments provided specifically on the application at the time of writing of this report. Accessibility Advisor No comments provided at the time of writing of this report. Traffic Analyst No comments provided at the time of writing of this report. Operational Services – Parks We have reviewed the documentation for the property associated with the above noted application. The application does not reference impact to existing trees, however there are trees situated on the subject property/adjacent property that may require removal and/or may be impacted by excavation or disturbance due to construction of garage. In view of the above staff recommend that the Committee impose conditions if this application is approved. Please see Appendix ‘A’ for recommended conditions of approval. Operational Services – Public Works No comments provided at the time of writing of this report. Central York Fire Services No comments provided at the time of writing of this report. The Regional Municipality of York The Regional Municipality of York has completed its review of the above minor variance and has no comment. Lake Simcoe Region Conservation Authority The LSRCA will not be providing formal comments nor will we be collecting an LSRCA review fee. The subject application does not warrant a technical review as it pertains to natural heritage, or contain lands which are regulated by the LSRCA Alectra Utilities We have reviewed the proposed Variance application and have no objections to its approval, subject to the following comments: Page 5 of 63 December 8, 2022 6 of 9 Report No. MV-2022-39 Alectra Utilities (formerly PowerStream) has received and reviewed the proposed Variance Application. This review, however, does not imply any approval of the project or plan. All proposed billboards, signs, and other structures associated with the project or plan must maintain minimum clearances to the existing overhead or underground electrical distribution system as specified by the applicable standards, codes and acts referenced. In the event that construction commences, and the clearance between any component of the work/structure and the adjacent existing overhead and underground electrical distribution system violates the Occupational Health and Safety Act, the customer will be responsible for 100% of the costs associated with Alectra making the work area safe. All construction work will be required to stop until the safe limits of approach can be established. In the event construction is completed, and the clearance between the constructed structure and the adjacent existing overhead and underground electrical distribution system violates the any of applicable standards, acts or codes referenced, the customer will be responsible for 100% of Alectra’s cost for any relocation work Hydro One No comments provided at the time of writing of this report. Public Correspondence One written submission was received at the time of writing of this report. The following is a summary of the comments received: - A neighoubouring resident provided a written submission stating they are satisfied with the proposed variance and have no concerns. After reviewing the application, the written submission stated that the proposed variance is appropriate and should be approved. Should additional written submissions be received after the writing of this report, the Secretary Treasurer will provide the submission(s) to Committee members at the meeting. Page 6 of 63 December 8, 2022 7 of 9 Report No. MV-2022-39 Conclusion Planning staff have reviewed the application with respect to the Section 45(1) of the Planning Act, R.S.O, 1990, c.P.13, as amended, and recommend approval subject to conditions of approval. The onus is ultimately on the applicant to demonstrate why they should be granted relief from the requirements of the zoning by-law and how they satisfy the four tests of the Planning Act for the granting of minor variance approval. Conditions of approval have been attached as Appendix ‘A’ should Committee wish to issue Minor Variance approval. Attachments Appendix ‘A’ – Recommended Conditions of Approval Appendix ‘B’ - Site Plan & Elevations Appendix ‘A’ – Recommended Conditions of Approval The following conditions are required to be satisfied should application MV-2022-39 be approved by the Committee of Adjustment: Page 7 of 63 December 8, 2022 8 of 9 Report No. MV-2022-39 1. That the variance only applies to the subject property, in substantial conformity with the plan(s) attached as ‘Appendix B’ to this Staff Report and dated October 17, 2022 to the satisfaction of the Director of Planning and Development Services. 2. That the owner provide a detailed lot grading and drainage plan (including erosion and sediment control measures) in accordance with the Town’s grading criteria, demonstrating that the existing drainage pattern will be maintained, and that the proposed site works will not cause any adverse impacts on the neighbouring properties. The plan shall show where the proposed garage eaves will outlet and to ensure that the storm water is not discharged directly onto the adjacent properties, to the satisfaction of the Director of Planning and Development Services. 3. That the owner provide a section plan showing the proposed garage overhang, gutter and the property line offsets, to the satisfaction of the Director of Planning and Development Services. 4. That the owner may be required to provide an Evaluation Report prepared by a Certified Arborist or Professional Registered Forester outlining all aspects of the impacts that this proposal will have on existing and current remaining vegetation, The report shall include recommendations and an action plan on the mitigation of negative effects to vegetation , during and post construction periods as well as measures aimed at tree health care and protection for trees effected by the project and any remaining trees in the vicinity of the project that require applicable maintenance. 5. In addition the report shall include a schedule of monitoring the ongoing site work through a series of scheduled site visits by the Arborist / Forester during and post construction to ensure the vegetation preservation measures remain in compliance throughout the project, each site visit to be documented and any resulting action items required by the Arborist /Forester shall be implemented and confirmed on site forthwith by the Arborist /Forester following each visit. 6. The owner may be required to provide vegetation compensation and a replanting plan in accordance with the Town of Aurora TREE REMOVAL/PRUNING AND COMPENSATION POLICY to the satisfaction of the Director of Operational Services as compensation for trees removed to facilitate construction. Compensation planting shall be completed prior to release of the financial securities. 7. The owner shall agree to comply with the Aurora Tree Permit By-law # 5850 -16 prior to the removal of any trees on the property. Page 8 of 63 December 8, 2022 9 of 9 Report No. MV-2022-39 8. The owner shall agree to provide financial securities based on the total value of the Tree Compensation evaluation and all Arboriculture works as defined by the Town and the Owners Arborist/ Forester. To the satisfaction of the Director of Parks and Recreation. 9. All of the above shall be included as terms and conditions in a Letter of Undertaking with the Town of Aurora to guarantee compliance with the Conditions of Approval and all related site works Page 9 of 63 78 Centre St Aurora, ON L4G 1J8 ---------------------------------------------------------------------------------------- DRAWING LIST: SURVEY PROVIDED (FOR REFERENCE ONLY) A00 Cover Page A01 Site Plan A02 Garage Layout A03 East & North Elevations A04 West & South Elevations A05 Sections/Detail PROPOSED NEW GARAGE NEW PROPOSED GARAGE CONCRETE SLAB ATTACHED TO POOL SLAB 10" BOARD & BATTEN FINISH 2X6 WALLS CONSTUCTION 15645 BAYVIEW AVE, ON, AURORA,L4G 0S3 Scale Project Name Date Drawn by Checked by Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail 1 : 96 2022-10-17 6:42:44 PMA00 Cover Page 78 Center St 78 Centre St Aurora, ON L4G 1J8 Proposing New Garage ASE+J INC E.J 2 3D VIEW No.Description Date Oct. 17, 2022DATE: TOWN OF AURORA PLANNING AND DEVELOPMENT SERVICES Development Planning Division RECEIVED 1SUBMISSION No. Page 10 of 63 GARAGE Door and window positioned may have a ± 4" tolerance aproximate. Location to be coordinated on site New shed walls 10" Board & batten finish, 2x6 construction walls with drywall finished 28 cm28366762 CENTER LINE OF PAVEMENTCONCRETE SIDEWALKEXISTING POOL IRON FENCECURB83 cm83366SCOPE OF THE JOB 435SETBACKFRONT SETBACK 3870 cm 3870 EXISTING REAR SETBACK 3135 cm 3135 NEW REAR SETBACK NEW SETBACK SETBACK235NEW CONSTRUCTION WALLS (BOARD AND BATTEN FINISH) WINDOWS AND DOORS MAY BE RESIZED AND COORDINATED ON SITE 15645 BAYVIEW AVE, ON, AURORA,L4G 0S3 Scale Project Name Date Drawn by Checked by Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail 1 : 150 2022-10-17 6:42:45 PMA1 Site Plan 78 Center St 78 Centre St Aurora, ON L4G 1J8 Proposing New Garage M.A E.J LOT AREA 1114.21 SQM EXISTING PROPOSED LOT COVRAGE 35 % AS PER ZONING BY LAW # 6000-17 HOUSE INTERIOR SIDE YARD 0.28 M HEIGHT 10 M ZONING BY LAS REQ 35% AS PER BY LAW ZONING INFORMATION AS PER ZBA # 6000-17 ZONING INFORMATION THE SUBJECTED PROPERTY ZONE IS AS -R7 10.15 % 113.20 SQM GARAGE TOTAL COVRAGE 2.51 % 28 SQM 14.58 % 162.50 SQM SETBACK PROPOSED ON GARAGE SIDE FRONY SETBACK REAR SET BACK INTERIOR SIDE YARD EXISTING SHED/S 1.92 % 21.30 SQM 1.5 M ZONING BY LAW REQ 4.35 M-EXISTING 31.35 MSETBACK PROPOSED ON REAR38.70 M-EXISTING 7.5 M ZONING BY LAW REQ EXISTING -NO TOUCH EXISTING -NO TOUCH EXISTING -NO TOUCH No.Description Date 2 PERSPECTIVE Oct. 17, 2022DATE: TOWN OF AURORA PLANNING AND DEVELOPMENT SERVICES Development Planning Division RECEIVED 1SUBMISSION No. Page 11 of 63 2 A5 A A B B 2 2 1 1 762 366762 36691135322323Door and window positioned may have a ± 4" tolerance aproximate. Location to be coordinated on site New shed walls 10" Board & batten finish, 2x6 construction walls with drywall finished 3 A5 279LINTEL 2/38x286 LINTEL 2/38x286 LINTEL 2/38x286 LINTEL2/38x286LINTEL2/38x286A B 2 2 1 1 3 A5 38x89 Roof Rafter @ 400 .O.C 40 40 40 40 40 40 40 40 40 38x89 Ridge Board Wall Ties 38x89 Framing @ 1200 O.C 120 120 120 120 120 Gutter Facial Garage Door Lintel 2/38x286 15645 BAYVIEW AVE, ON, AURORA,L4G 0S3 Scale Project Name Date Drawn by Checked by Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail As indicated 2022-10-17 6:42:45 PMA2 Garage & Roof Layout 78 Center St 78 Centre St Aurora, ON L4G 1J8 Proposing New Garage M.A E.J 1 : 501Garage Plan No.Description Date 1 : 482RCP-ROOF Oct. 17, 2022DATE: TOWN OF AURORA PLANNING AND DEVELOPMENT SERVICES Development Planning Division RECEIVED 1SUBMISSION No. Page 12 of 63 RCP-ROOF 7 OVERHANG 305 ROOF RIDGE 391 AB 342 29838491 NEW CONSTRUCTION WALLS 10" BOARD AND BATTEN FINISH 577 1000 33 O.HO.H 33 ROOF TO BE DESIGN AS PER OBC AND PROPER SNOW LOAD 75mm POURED CONCRETE SLAB 3 A5 366 RCP-ROOF 7 OVERHANG 305 2 A5 ROOF RIDGE 391 2 1 [No Slope] 741 298384NEW CONSTRUCTION WALLS 10" BOARD AND BATTEN FINISH ROOF TO BE DESIGN AS PER OBC AND PROPER SNOW LOAD 33 33 O.H O.H 762 15645 BAYVIEW AVE, ON, AURORA,L4G 0S3 Scale Project Name Date Drawn by Checked by Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail 1 : 50 2022-10-17 6:42:46 PMA3 East & North Elevations 78 Center St 78 Centre St Aurora, ON L4G 1J8 Proposing New Garage M.A E.J1 : 501East 1 : 502North No.Description Date Oct. 17, 2022DATE: TOWN OF AURORA PLANNING AND DEVELOPMENT SERVICES Development Planning Division RECEIVED 1SUBMISSION No. Page 13 of 63 RCP-ROOF 7 OVERHANG 305 2 A5 ROOF RIDGE 391 21 [No Slope] 741 NEW CONSTRUCTION WALLS 10" BOARD AND BATTEN FINISH ROOF TO BE DESIGN AS PER OBC AND PROPER SNOW LOAD 33 33 O.H O.H 91 15291 15291 152512130298384762 RCP-ROOF 7 OVERHANG 305 ROOF RIDGE 391 A B NEW CONSTRUCTION WALLS 10" BOARD AND BATTEN FINISH ROOF TO BE DESIGN AS PER OBC AND PROPER SNOW LOAD 342 33 33 577 1000 O.H O.H 2983843 A5 SLAB EDGE 366 15645 BAYVIEW AVE, ON, AURORA,L4G 0S3 Scale Project Name Date Drawn by Checked by Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail 1 : 50 2022-10-17 6:42:46 PMA4 West & South Elevations 78 Center St 78 Centre St Aurora, ON L4G 1J8 Proposing New Garage M.A E.J 1 : 501South 1 : 502West No.Description Date Oct. 17, 2022DATE: TOWN OF AURORA PLANNING AND DEVELOPMENT SERVICES Development Planning Division RECEIVED 1SUBMISSION No. Page 14 of 63 RCP-ROOF 7 A 1000 1000 75mm POURED CONC. SLAB 52 MPa & 28 DAYS 5%-8% AIR ENTRAIMENT OPTIONAL WWM REINFORCINS 100mm COMPACTED GRANULAR FILL WOOD SILL PLATE FASTENED TO FOUNDATION WALL W/MINIMUN 12.7mm DIAMETER ANCHOR BOLTS EMBEDDED MIN. 100mm IN CONCRETE @2400mm O.C. MAX. & PROVIDE CAULKING OR GASKET BETWEEN PLATE & FOUNDATION WALL 30 BEAR ON UNDISTURBED SOIL522X6 PLY 1/2" P.T PLYWOOD BOARD & BATTEN FINISH EX. POOLCONCRETE PATH RCP-ROOF 7 OVERHANG 305 ROOF RIDGE 391 A5 1 A B ROOF TO BE DESIGN AS PER OBC AND PROPER SNOW LOAD 342 577 1000 308 211107 33 33 15251O.H O.H 2983842x6 walls construction 366 425 38x89 Ridge Board RCP-ROOF 7 OVERHANG 305 ROOF RIDGE 391 21 741 [No Slope] 2x6 construction walls 10" board and batten finish drywall inside 762 823 ROOF L 15645 BAYVIEW AVE, ON, AURORA,L4G 0S3 Scale Project Name Date Drawn by Checked by Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail As indicated 2022-10-17 6:42:46 PMA5 Sections/Detail 78 Center St 78 Centre St Aurora, ON L4G 1J8 Proposing New Garage M.A E.J 1 : 201salb detail 1 : 502Section 1 1 : 503Section 2 No.Description Date Wall Ties 38x89 Framing @ 1200 O.C Roof Rafter Table Oct. 17, 2022DATE: TOWN OF AURORA PLANNING AND DEVELOPMENT SERVICES Development Planning Division RECEIVED 1SUBMISSION No. Page 15 of 63 100 John West Way Aurora, Ontario L4G 6J1 (905) 727-3123 aurora.ca Town of Aurora Committee of Adjustment Report No. MV-202 2 -42 _______________________________________________________________________________________ Subject: Minor Variance Application Jeffs 23 Hawthorne Lane Plan 597 Lot 16 File: MV-2022-42 Prepared by: Rosanna Punit, Planner Department: Planning and Development Services Date: December 8, 2022 _______________________________________________________________________________________ Application The applicant is requesting relief from the requirements of the Town’s Comprehensive Zoning By-law 6000-17, as amended, to recognize an existing rear yard storage shed. PROPOSED VARIANCE The following relief is being requested: a) Section 7.2 of the Zoning By-law requires a minimum interior side yard of 3.0 metres. The applicant is proposing a storage shed, which is 1.0 metres to the interior property line. Background Subject Property and Area Context The subject property is located on the south side of Hawthorne Lane, a two-storey dwelling is located on the property, with attached garage. There is a swimming pool located in the rear yard. The storage shed is located within the rear yard, in the south east corner of the property. There is mature vegetation within the east interior side yard that appear to abut both properties (23 & 21 Hawthorne Lane). The property has an approximate area of 934 m2 (10,000 sq ft) and an approximate lot frontage of 22m (72 ft). Page 16 of 63 December 8, 2022 2 of 5 Report No. MV-2022-42 Proposal The owner applied for a building permit in 2019. The building permit was not completed in 2019, as side yard setbacks were not provided on the plans submitted, a Notice of Refusal was sent to the owner in 2019 requesting this information in order to proceed with the Building permit. In September 2022, a Town Building Inspector followed up on the Notice of Refusal and confirmed that the storage shed had been built. The inspector requested the missing information to be provided (side setbacks) to proceed with the building permits process. Official Plan The subject property is designated “Stable Neighbourhoods” by the Town of Aurora’s Official Plan, which seeks to ensure that residential neighbourhoods are protected from incompatible forms of development, while allowing the neighbourhoods to be enhanced over time. Further, the Stable Neighbourhoods designation provides for single detached dwellings as a permitted use. Zoning The property is zoned R2(2) “Detached Second Density Residential Zone, Exception Two”. Exception two refers to minimum lot area and lot frontage requirements. Preliminary Zoning Review A Preliminary Zoning Review (PZR) has been completed by the Town of Aurora’s Building Division. The PZR identified the required variance, and no other non-compliance was identified. Applicant’s stated reason(s) for not complying with the Zoning By-law As stated on the application form, “we have a drainage ditch that would prevent if from being built. The grade would be too steep to drive my lawn tractor into the shed. I don’t want to impede the water flow at the bottom of the garden”. Planning Comments Planning Staff have evaluated Minor Variance Application MV- 2022-42 pursuant to the prescribed tests as set out in Section 45(1) of the Planning Act, as follows: a) The proposed variance meets the general intent of the Official Plan Page 17 of 63 December 8, 2022 3 of 5 Report No. MV-2022-42 The intent of the Official Plan is to ensure neighbourhoods are protected from incompatible forms of development, while allowing the neighbourhoods to be enhanced over time. The Official Plan states that new development abutting existing residential development shall be sympathetic to the form and character of existing development. Staff are of the opinion that the general intent of the Official Plan is being maintained. b) The proposed variance meets the general intent of the Zoning By-law The intent of the side yard setback provision is to ensure that appropriate and adequate spacing between buildings is provided for privacy, landscaping, access, and drainage. The applicant is requesting an (east) interior side yard setback of 1.0m (3 ft) whereas the Zoning By-law requires an interior side yard setback of 3.0 (9.8 ft), relating to an existing storage shed. There is an existing hedge located on the east side of the property line, which provides for privacy of the abutting neighbour. Staff note that the storage shed is located on slightly higher ground, due to the grading of the lands. Large armour stone has been placed on the north side of the storage shed. Engineering Staff have provided comments stating, no objections to the variance provided that the stormwater (drainage) from the proposed site works will not cause any adverse impacts on the neighbouring properties. There have been no complaints to the Town regarding drainage issues. Staff are of the opinion that the requested variance is in keeping with the intent of the Zoning By-law and provides for privacy, spacing between dwellings and drainage of the lands. c) The proposed variance is considered desirable for the appropriate development of the land Staff are of the opinion that the storage shed does not negatively impact the existing neighbourhood character. Staff are of the opinion that the requested variance is desirable for the appropriate development of the land. d) The proposed variance is considered minor in nature The storage shed is considered moderate in scale and the requested variance is not anticipated to result in any negative impacts to the neighbourhood or abutting properties. As such, Staff are of the opinion that the requested variance is minor in nature. Page 18 of 63 December 8, 2022 4 of 5 Report No. MV-2022-42 Additional Comments The minor variance application was circulated to Town Department/Divisions and to external agencies for review and comment. The following comments were provided: Department or Agency Comments Building Division Preliminary Zoning Review was completed October 14, 2022. Engineering Division We have reviewed the above noted application and have no objections to it provided that the stormwater (drainage) from the proposed site works will not cause any adverse impacts on the neighbouring properties (dated: November 22, 2022) Operational Services (Parks) We have reviewed the documentation for the property associated with the above noted application and have no formal comments (dated November 25, 2022). Operational Services (Public Works) No comments received at the time of writing this report. Central York Fire Services No comments received at the time of writing this report. York Region Comments provided stating no comment (dated: November 22, 2022) LSRCA Not commenting on application as it is located outside the area governed by O. Reg. 179/06 under the Conservation Authorities Act (dated: November 11, 2022). Alectra Application has been received with no objections to its approval, subject to the following comments: All proposed billboards, signs, and other structures associated with the project or plan must maintain minimum clearances to the existing overhead or underground electrical distribution system as specified by the applicable standards, codes and acts referenced. Page 19 of 63 December 8, 2022 5 of 5 Report No. MV-2022-42 Department or Agency Comments In the event that construction commences, and the clearance between any component of the work/structure and the adjacent existing overhead and underground electrical distribution system violates the Occupational Health and Safety Act, the customer will be responsible for 100% of the costs associated with Alectra making the work area safe. All construction work will be required to stop until the safe limits of approach can be established. In the event construction is completed, and the clearance between the constructed structure and the adjacent existing overhead and underground electrical distribution system violates the any of applicable standards, acts or codes referenced, the customer will be responsible for 100% of Alectra’s cost for any relocation work. (dated: November 15, 2022). Public Correspondence Written submissions were not received at the time of writing of this report. Should written submissions be received after the writing of this report, the Secretary Treasurer will provide the submission(s) to Committee members at the meeting. Conclusion Planning staff have reviewed the application with respect to the Section 45(1) if the Planning Act, R.S.O, 1990, c.P.13, as amended, and are of the opinion that the requested variance meets the four tests of the Planning Act for granting of minor variances . Staff recommend approval of the requested variance. Page 20 of 63 PR20191193 Oct. 14, 2022 TOWN OF AURORA PLANNING & DEVELOPMENT SERVICES BUILDING DIVISION PERMIT NO.: DATE: PRELIMINARY ZONING REVIEW Hana HossainAPPROVED BY: Oct. 19, 2022DATE: TOWN OF AURORA PLANNING AND DEVELOPMENT SERVICESDevelopment Planning Division RECEIVED Page 21 of 63 100 John West Way Aurora, Ontario L4G 6J1 (905) 727-3123 aurora.ca Town of Aurora Committee of Adjustment Report No. MV-202 2 -46 _______________________________________________________________________________________ Subject: Minor Variance Application Torabi 52 Child Drive PLAN 514 LOT 404 File: MV-2022-46 Prepared by: Rosanna Punit, Planner Department: Planning and Development Services Date: December 8, 2022 _______________________________________________________________________________________ Application The applicant is requesting relief from the Town’s Comprehensive Zoning By-law 6000- 17, as amended, to facilitate a new two storey dwelling. The proposed two storey dwelling has a total GFA of approximately 370m2 (4,000 ft2), inclusive of garage. The garage is proposed to be fronting onto Baldwin Road. PROPOSED VARIANCE The following relief is being requested: a) Section 7.2 of the Zoning By-law requires a minimum exterior side yard setback of 6.0 metres. The applicant is proposing a two storey detached dwelling with an attached garage (proposed variance relates to the garage portion only), which is 4.1 metres to the exterior side property line; and b) Section 24.497.3.2 of the Zoning By-law requires a minimum interior side yard setback of 3.0 metres beyond the main rear wall of the adjacent dwelling. The applicant is proposing a two storey detached dwelling, which is 1.5m to the interior side property line. Page 22 of 63 December 8, 2022 2 of 8 Report No. MV-2022-46 Background Subject Property and Area Context The subject property, municipally known as 52 Child Drive, is generally located west of Yonge Street and north of Henderson Drive. The property is located on the north side of Child Drive. The subject property is a corner lot located at the north-west corner of Child Drive and Baldwin Drive, within the Regency Acres Stable Neighbourhood Area. The subject property has a lot area of approximately 718m2 (7,729 ft2) and a lot frontage of approximately 18m (60 ft). The surrounding neighbourhood is in transition and is generally characterized by one and two storey dwellings, with instances of new infill development. The subject property currently contains a one-storey detached dwelling with attached garage. A row of mature cedar trees are located at the rear property line. The property also contains a swimming pool in the rear yard and gazebo. There are two sheds located within the east side yard. There is a mature tree in the front yard which is proposed to be protected during construction. Official Plan The subject property is designated “Stable Neighbourhoods” by the Town of Aurora’s Official Plan, which seeks to ensure that residential neighbourhoods are protected from incompatible forms of development, while allowing the neighbourhoods to be enhanced over time. Further, the Stable Neighbourhoods designation provides for single detached dwellings as a permitted use. Zoning The subject property is zoned “R3-SN (497)” (Detached Third Density Residential Exception 497 Zone) by Zoning By-law 6000-17, as amended, which permits single detached dwellings. The subject property is subject to the Town’s Stable Neighbourhood zoning provisions and the proposed development is subject to Site Plan Approval as per By-law 6106-18, as amended. A Site Plan Application has been submitted to the Town and is currently under review. Preliminary Zoning Review A Preliminary Zoning Review (PZR) has been completed by the Town of Aurora’s Building Division. The PZR identified the required variances and no other non- compliance was identified. Page 23 of 63 December 8, 2022 3 of 8 Report No. MV-2022-46 Applicant’s stated reason(s) for not complying with the Zoning By-law As stated on the application form, “Exterior side yard setback is large at 6m, we compiled with house, only asking for single storey garage to be setback” Planning Comments Planning Staff have evaluated Minor Variance Application MV-2022-46 pursuant to the prescribed tests as set out in Section45(1) of the Planning Act, as follows: a) The proposed variances meet the general intent of the Official Plan The intent of the Official Plan is to ensure that residential neighbourhoods are protected from incompatible forms of development, while allowing the neighbourhoods to be enhanced over time. The Regency Acres Neighbourhood is generally characterized by one to two storey dwellings. The Official Plan states that new development abutting existing residential development shall be sympathetic to the form and character of existing development with regards to building scale and urban design. A Site Plan Application is currently under review by Planning staff where matters relating to site and building design, etc. will be addressed. Staff are of the opinion that the requested variance will facilitate the development of a new dwelling that is compatible with and generally in keeping with the low-density residential form and character of the neighbourhood. b) The proposed variances meet the general intent of the Zoning By-law The intent of the interior and exterior side yard setback provision is to ensure that appropriate and adequate spacing between buildings is provided for privacy, landscaping, access, and drainage. The applicant is requesting a 4.1 metre (13 ft) exterior side yard setback (west side of the property), which relates to the garage portion only, whereas 6.0m (20ft) is required as per the Zoning By-law, as amended. 52 Child Drive is a corner lot, the garage is proposed to be fronting onto Baldwin Road. The proposed driveway for 52 Child Drive will closely line up with the dwelling located at 8 Baldwin Road. Given the applicant complies with the rear yard setback and there are existing mature cedar trees at the rear property line, staff are of the opinion that that decreased exterior side yard setback maintains privacy of the abutting property (52 Johnson Road) and does not negatively affect the overall streetscape of the neighbourhood. Page 24 of 63 December 8, 2022 4 of 8 Report No. MV-2022-46 The proposed (east) interior side yard setback of 1.5m relates specifically to the extension of the proposed dwelling beyond the neighbouring dwelling at 50 Child Drive. The current sheds on the property within the east side yard have an approximate side setback of 1.2m (4 ft). The new dwelling at 52 Child Drive is proposed to be 1.5m (5 feet) interior side setback, staff are of the opinion that this provides increased privacy than what is currently on the property. The new dwelling at 52 Child Drive extends approximately 2.74m (9 ft) from the neighbouring dwelling (50 Child Drive). The proposed dwelling at 52 Child Drive does not have any side entrances within the interior side yard setback, adding to privacy of the abutting property. There is a window proposed to be located on the ground floor of 52 Child Drive, staff are of the opinion, that the property fence would provide for privacy of this window. Staff are of the opinion that the requested variances meets the general intent of the Zoning By-law and has minimal impacts on the streetscape and privacy of the abutting properties. c) The proposed variances is considered desirable for the appropriate development of the land The neighbourhood of Regency Acres is currently a neighbourhood in transition with instances of new infill dwellings that are two storeys with attached garages. Staff are of the opinion that the requested exterior and interior side yard setback are appropriate for the development of the land. Staff are of the opinion that the variances are desirable and does not adversely affect the overall neighbourhood character. d) The proposed variances are considered minor in nature The proposed dwelling is considered moderate in scale and are not anticipated to result in any negative impacts to surrounding properties or the neighbourhood. As such, Staff are of the opinion that the requested variances are minor in nature. Page 25 of 63 December 8, 2022 5 of 8 Report No. MV-2022-46 Additional Comments The minor variance application was circulated to Town Department/Divisions and to external agencies for review and comment. The following comments were provided: Department or Agency Comments Building Division Preliminary Zoning Review was completed on November 10, 2022. Engineering Division We have reviewed the application and have no objections. (dated: November 15, 2022) Operational Services (Parks) We have reviewed the documentation for the property associated with the above noted application and have no formal comments as these are being addressed with through Stable Neighbourhood Application SPR 2022-21 (dated: November 24, 2022). Operational Services (Public Works) No comments received at the time of writing this report. Central York Fire Services No comments received at the time of writing this report. York Region Comments provided stating no comments with proposed application (dated: November 22, 2022) Transportation We advise the proponent that any vehicles parked on the driveway that extend over the municipal right-of- way (i.e. future sidewalk or the travelled portion of Baldwin Road), may be subject to tagging and towing from Town of Aurora By-law Services. (dated: November 16, 2022). LSRCA Not commenting, as the application does not warrant technical review as it pertains to natural heritage, or contain lands which are regulated by the LSRCA (dated: November 11, 2022). Alectra Application has been received with no objections to its approval, subject to the following comments: All proposed billboards, signs, and other structures associated with the project or plan must maintain Page 26 of 63 December 8, 2022 6 of 8 Report No. MV-2022-46 Department or Agency Comments minimum clearances to the existing overhead or underground electrical distribution system as specified by the applicable standards, codes and acts referenced. In the event that construction commences, and the clearance between any component of the work/structure and the adjacent existing overhead and underground electrical distribution system violates the Occupational Health and Safety Act, the customer will be responsible for 100% of the costs associated with Alectra making the work area safe. All construction work will be required to stop until the safe limits of approach can be established. In the event construction is completed, and the clearance between the constructed structure and the adjacent existing overhead and underground electrical distribution system violates the any of applicable standards, acts or codes referenced, the customer will be responsible for 100% of Alectra’s cost for any relocation work. (dated: November 15, 2022) Public Correspondence Written submissions were not received at the time of writing of this report. Should written submissions be received after the writing of this report, the Secretary Treasurer will provide the submission(s) to Committee members at the meeting. Conclusion Planning staff have reviewed the application with respect to the Section 45(1) of the Planning Act, R.S.O, 1990, c.P.13, as amended, and are of the opinion that the requested variances does meet the four tests of the Planning Act for granting of minor variances. Staff recommend approval of the requested variances subject to the conditions outlined in Appendix ‘A’. Page 27 of 63 December 8, 2022 7 of 8 Report No. MV-2022-46 Attachments Appendix ‘A’ – Recommended Condition of Approval Appendix ‘B’ – Site Plan Page 28 of 63 December 8, 2022 8 of 8 Report No. MV-2022-46 Appendix ‘A’ – Condition of Approval The following condition is required to be satisfied should application MV-2021-46 be approved by the Committee of Adjustment: 1. That the owner obtains Stable Neighborhood Site Plan approval as per By-law 6106-18, as amended, to the satisfaction of the Director of Planning and Development Services or designate; Page 29 of 63 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXOH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOH282.38282.40282.53282.525'-0" [1.52m]18'-113 4" [5.78m] 24'-1114" [7.60m]20'-0" [6.10m]13'-714" [4.15m]13'-7" [4.14m]32'-33 4" [9.85m]5'-1" [1.55m]37'-214" [11.34m]PROPOSEDDRIVEWAYPROPOSEDWALK-WAY7'-0" [2.13m]19'-8" [5.99m] 9'-014" [2.75m]TREE PROTECTIONBASEMENTTERRACEPROJECT NORTHTRUE NORTHSITE PLAN INFORMATION TAKEN FROM:PART 1 PLAN OF LOT 404REGISTERED PLAN 514IN THE TOWN OF AURORAREGIONAL MUNICIPALITY OF YORKBY: GUIDO V. CONSOLI O.L.S. - 12 APRIL 2022ISSUED BYNo.DATEREVISION/SUBMISSIONDRAWING NUMBERPROJECT NUMBERDATESCALECHECKED BYDRAWN BYMAY 2022TGCHILD DRIVERESIDENCE52 CHILD DRIVE, AURORA, ONT., L4G 1Y5THIS DRAWING IS NOT TO BE SCALED.REFER TO APPROPRIATE SURVEY, STRUCTURAL, MECHANICAL, ELECTRICAL, LANDSCAPE, ETC. CONSULTANT DRAWINGS BEFORE PROCEEDING WITH THE WORK.CONSTRUCTION MUST CONFORM TO ALL APPLICABLE CODES AND REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION.THE CONTRACTOR WORKING FROM DRAWINGS NOT SPECIFICALLY MARKED "FOR PERMIT/CONSTRUCTION" MUST ASSUME FULL RESPONSIBILITY AND BEAR COSTS FORANY CORRECTIONS OR DAMAGES RESULTING FROM THEIR WORK.THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS PROVIDED BY AND IS THE PROPERTY OF THE DESIGNER 'GORAL DESIGN' AND ENGINEER 'ON FILE'.THE CONTRACTOR SHALL VERIFY AND ACCEPT RESPONSIBILITY FOR ALL DIMENSIONS AND CONDITIONS ON SITE AND SHALL NOTIFY THE APPROPRIATE CONSULTANTOF ANY VARIATIONS FROM THE SUPPLIED INFORMATION.THESE DRAWINGS HAVE BEEN PREPARED FOR BUILDING PERMIT PURPOSES ONLY. THE DESIGNER AND ENGINEER ARE NOT RESPONSIBLE FOR GENERAL REVIEWDURING CONSTRUCTION UNLESS A SEPARATE AGREEMENT IS MADE. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING AND ASSUMED STRUCTURALCONDITIONS. IN THE EVENT THAT THE CONTRACTOR FINDS A DISCREPANCY WITH THE APPROVED PERMIT CONSTRUCTION DRAWINGS AND/OR THE ASSUMEDCONDITIONS, THE CONTRACTOR SHALL NOTIFY THE OWNER OF THE PROJECT AND/OR THE APPROPRIATE CONTRACTED CONSULTANTS WHO ARE RESPONSIBLE FORGENERAL REVIEW DURING CONSTRUCTION. THE DESIGNER AND THE ENGINEER WHO HAVE SEALED THESE DRAWINGS ARE NOT RESPONSIBLE FOR GENERAL REVIEWDURING CONSTRUCTION.THE AS-BUILT INFORMATION PROVIDED IN THESE DRAWINGS IS FOR INFORMATION PURPOSES ONLY. ALL DIMENSIONS ARE CALCULATED FROM ON SITE OBSERVATIONSREPRESENTING EXISTING CONDITIONS. THE INFORMATION PROVIDED MUST BE CONFIRMED PRIOR TO CONSTRUCTION, ENLARGEMENT OR ALTERATION OF ANY PART,OR IN WHOLE, OF THE EXISTING BUILDING. THE OWNER OF THE PROPERTY WILL NOT HOLD THE DESIGNER AND ENGINEER LIABLE FOR THE WORK DONE BY OTHERS.DRAWING TITLE1.10.AUG.2021STABLE NEIGHBOURHOOD APPLICATIONTGGORAL DESIGN T: 647.505.9632 E: tgoral@goraldesign.ca 22010A-1.1N.T.S.SITE PLANPROJECT STATISTICSZONINGRL3-0GROSS FLOOR AREASITE AREABYLAWEXISTING718.07 m² (7,729.22 ft²)PROPOSEDFIRST FLOORSECOND FLOOR52 CHILD DRIVE AURORA,ONTARIOBUILDING SETBACKSFRONT (SOUTH)SIDE (WEST)REAR (NORTH)SIDE (EAST)5.78 m4.14 mBUILDING HEIGHT9 mTOTAL342.33 m² (3,684.76 ft²)LOT COVERAGE35%30.8% (221.22 m²)178.92 m² (1,925.88 ft²)163.41 m² (1,758.88 ft²)1.52 m6.0 m6.0 m1.5 m7.5 mGARAGE36.17 m² (389.28 ft²)9.85 mPR20221302Nov. 10, 2022TOWN OF AURORA PLANNING & DEVELOPMENT SERVICES BUILDING DIVISIONPERMIT NO.: DATE:PRELIMINARY ZONING REVIEWAshley VanderwalAPPROVED BY:Nov. 10, 2022DATE: TOWN OF AURORAPLANNING AND DEVELOPMENT SERVICESDevelopment Planning DivisionRECEIVEDPage 30 of 63 1'-4" [0.41m]1'-4" [0.41m]1'-4" [0.41m]1'-4" [0.41m]ISSUED BYNo.DATEREVISION/SUBMISSIONDRAWING NUMBERPROJECT NUMBERDATESCALECHECKED BYDRAWN BYMAY 2022TGCHILD DRIVERESIDENCE52 CHILD DRIVE, AURORA, ONT., L4G 1Y5THIS DRAWING IS NOT TO BE SCALED.REFER TO APPROPRIATE SURVEY, STRUCTURAL, MECHANICAL, ELECTRICAL, LANDSCAPE, ETC. CONSULTANT DRAWINGS BEFORE PROCEEDING WITH THE WORK.CONSTRUCTION MUST CONFORM TO ALL APPLICABLE CODES AND REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION.THE CONTRACTOR WORKING FROM DRAWINGS NOT SPECIFICALLY MARKED "FOR PERMIT/CONSTRUCTION" MUST ASSUME FULL RESPONSIBILITY AND BEAR COSTS FORANY CORRECTIONS OR DAMAGES RESULTING FROM THEIR WORK.THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS PROVIDED BY AND IS THE PROPERTY OF THE DESIGNER 'GORAL DESIGN' AND ENGINEER 'ON FILE'.THE CONTRACTOR SHALL VERIFY AND ACCEPT RESPONSIBILITY FOR ALL DIMENSIONS AND CONDITIONS ON SITE AND SHALL NOTIFY THE APPROPRIATE CONSULTANTOF ANY VARIATIONS FROM THE SUPPLIED INFORMATION.THESE DRAWINGS HAVE BEEN PREPARED FOR BUILDING PERMIT PURPOSES ONLY. THE DESIGNER AND ENGINEER ARE NOT RESPONSIBLE FOR GENERAL REVIEWDURING CONSTRUCTION UNLESS A SEPARATE AGREEMENT IS MADE. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING AND ASSUMED STRUCTURALCONDITIONS. IN THE EVENT THAT THE CONTRACTOR FINDS A DISCREPANCY WITH THE APPROVED PERMIT CONSTRUCTION DRAWINGS AND/OR THE ASSUMEDCONDITIONS, THE CONTRACTOR SHALL NOTIFY THE OWNER OF THE PROJECT AND/OR THE APPROPRIATE CONTRACTED CONSULTANTS WHO ARE RESPONSIBLE FORGENERAL REVIEW DURING CONSTRUCTION. THE DESIGNER AND THE ENGINEER WHO HAVE SEALED THESE DRAWINGS ARE NOT RESPONSIBLE FOR GENERAL REVIEWDURING CONSTRUCTION.THE AS-BUILT INFORMATION PROVIDED IN THESE DRAWINGS IS FOR INFORMATION PURPOSES ONLY. ALL DIMENSIONS ARE CALCULATED FROM ON SITE OBSERVATIONSREPRESENTING EXISTING CONDITIONS. THE INFORMATION PROVIDED MUST BE CONFIRMED PRIOR TO CONSTRUCTION, ENLARGEMENT OR ALTERATION OF ANY PART,OR IN WHOLE, OF THE EXISTING BUILDING. THE OWNER OF THE PROPERTY WILL NOT HOLD THE DESIGNER AND ENGINEER LIABLE FOR THE WORK DONE BY OTHERS.DRAWING TITLE1.10.AUG.2021STABLE NEIGHBOURHOOD APPLICATIONTGGORAL DESIGN T: 647.505.9632 E: tgoral@goraldesign.ca 22010A-3.51/4" - 1'-0"ROOF PLANPR20221302Nov. 10, 2022TOWN OF AURORA PLANNING & DEVELOPMENT SERVICES BUILDING DIVISIONPERMIT NO.: DATE:PRELIMINARY ZONING REVIEWAshley VanderwalAPPROVED BY:Page 31 of 63 FIN. BASEMENT FLOORFIN. GROUND FLOORU/S OF CEILINGU/S OF CEILINGU/S OF CEILINGFIN. SECOND FLOOR11'-0" [3.35m] 10'-11 4" [3.08m] 9'-0" [2.74m]1'-114" [0.34m]9'-0" [2.74m]1'-114" [0.34m] 12'-114" [3.69m]283.15PEAK OF ROOF9'-012" [2.76m] 32'-43 4" [9.88m]MID ROOF27'-91 4" [8.47m]282.46AVG. GRADEPRECAST PANELSBEIJE-GRAY (COLOUR)ASPHALT SHINGLES(PEWTER COLOUR)PRECAST BANDBEIJE-GRAY (COLOUR)STONE PANELSBEIJE-GRAY (COLOUR)PRECAST TRIMBEIJE-GRAY (COLOUR)3.5" BRICK VENEERBEIJE-GRAY (COLOUR)STUCCO ROOF DECORBEIJE-GRAY (COLOUR)PRECAST TRIMBEIJE-GRAY (COLOUR)NEW ALUMINUM R.W.L., FASCIA,GUTTER & VENTED SOFFIT (BLACK COLOUR)PRECAST TRIMBEIJE-GRAY (COLOUR)ISSUED BYNo.DATEREVISION/SUBMISSIONDRAWING NUMBERPROJECT NUMBERDATESCALECHECKED BYDRAWN BYMAY 2022TGCHILD DRIVERESIDENCE52 CHILD DRIVE, AURORA, ONT., L4G 1Y5THIS DRAWING IS NOT TO BE SCALED.REFER TO APPROPRIATE SURVEY, STRUCTURAL, MECHANICAL, ELECTRICAL, LANDSCAPE, ETC. CONSULTANT DRAWINGS BEFORE PROCEEDING WITH THE WORK.CONSTRUCTION MUST CONFORM TO ALL APPLICABLE CODES AND REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION.THE CONTRACTOR WORKING FROM DRAWINGS NOT SPECIFICALLY MARKED "FOR PERMIT/CONSTRUCTION" MUST ASSUME FULL RESPONSIBILITY AND BEAR COSTS FORANY CORRECTIONS OR DAMAGES RESULTING FROM THEIR WORK.THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS PROVIDED BY AND IS THE PROPERTY OF THE DESIGNER 'GORAL DESIGN' AND ENGINEER 'ON FILE'.THE CONTRACTOR SHALL VERIFY AND ACCEPT RESPONSIBILITY FOR ALL DIMENSIONS AND CONDITIONS ON SITE AND SHALL NOTIFY THE APPROPRIATE CONSULTANTOF ANY VARIATIONS FROM THE SUPPLIED INFORMATION.THESE DRAWINGS HAVE BEEN PREPARED FOR BUILDING PERMIT PURPOSES ONLY. THE DESIGNER AND ENGINEER ARE NOT RESPONSIBLE FOR GENERAL REVIEWDURING CONSTRUCTION UNLESS A SEPARATE AGREEMENT IS MADE. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING AND ASSUMED STRUCTURALCONDITIONS. IN THE EVENT THAT THE CONTRACTOR FINDS A DISCREPANCY WITH THE APPROVED PERMIT CONSTRUCTION DRAWINGS AND/OR THE ASSUMEDCONDITIONS, THE CONTRACTOR SHALL NOTIFY THE OWNER OF THE PROJECT AND/OR THE APPROPRIATE CONTRACTED CONSULTANTS WHO ARE RESPONSIBLE FORGENERAL REVIEW DURING CONSTRUCTION. THE DESIGNER AND THE ENGINEER WHO HAVE SEALED THESE DRAWINGS ARE NOT RESPONSIBLE FOR GENERAL REVIEWDURING CONSTRUCTION.THE AS-BUILT INFORMATION PROVIDED IN THESE DRAWINGS IS FOR INFORMATION PURPOSES ONLY. ALL DIMENSIONS ARE CALCULATED FROM ON SITE OBSERVATIONSREPRESENTING EXISTING CONDITIONS. THE INFORMATION PROVIDED MUST BE CONFIRMED PRIOR TO CONSTRUCTION, ENLARGEMENT OR ALTERATION OF ANY PART,OR IN WHOLE, OF THE EXISTING BUILDING. THE OWNER OF THE PROPERTY WILL NOT HOLD THE DESIGNER AND ENGINEER LIABLE FOR THE WORK DONE BY OTHERS.DRAWING TITLE1.10.AUG.2021STABLE NEIGHBOURHOOD APPLICATIONTGGORAL DESIGN T: 647.505.9632 E: tgoral@goraldesign.ca 22010A-4.11/4" - 1'-0"ELEVATIONPR20221302Nov. 10, 2022TOWN OF AURORA PLANNING & DEVELOPMENT SERVICES BUILDING DIVISIONPERMIT NO.: DATE:PRELIMINARY ZONING REVIEWAshley VanderwalAPPROVED BY:Page 32 of 63 FIN. BASEMENT FLOORFIN. GROUND FLOORU/S OF CEILINGU/S OF CEILINGU/S OF CEILINGFIN. SECOND FLOOR11'-0" [3.35m] 10'-11 4" [3.08m] 9'-0" [2.74m]1'-114" [0.34m]9'-0" [2.74m]1'-114" [0.34m] 12'-114" [3.69m]PEAK OF ROOF9'-012" [2.76m]PRECAST PANELSBEIJE-GRAY (COLOUR)ASPHALT SHINGLES(PEWTER COLOUR)PRECAST TRIMBEIJE-GRAY (COLOUR)3.5" BRICK VENEERBEIJE-GRAY (COLOUR)PRECAST TRIMBEIJE-GRAY (COLOUR)NEW ALUMINUM R.W.L., FASCIA,GUTTER & VENTED SOFFIT (BLACK COLOUR)PRECAST TRIMBEIJE-GRAY (COLOUR)3.5" BRICK VENEERBEIJE-GRAY (COLOUR)STONE PANELSBEIJE-GRAY (COLOUR)ISSUED BYNo.DATEREVISION/SUBMISSIONDRAWING NUMBERPROJECT NUMBERDATESCALECHECKED BYDRAWN BYMAY 2022TGCHILD DRIVERESIDENCE52 CHILD DRIVE, AURORA, ONT., L4G 1Y5THIS DRAWING IS NOT TO BE SCALED.REFER TO APPROPRIATE SURVEY, STRUCTURAL, MECHANICAL, ELECTRICAL, LANDSCAPE, ETC. CONSULTANT DRAWINGS BEFORE PROCEEDING WITH THE WORK.CONSTRUCTION MUST CONFORM TO ALL APPLICABLE CODES AND REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION.THE CONTRACTOR WORKING FROM DRAWINGS NOT SPECIFICALLY MARKED "FOR PERMIT/CONSTRUCTION" MUST ASSUME FULL RESPONSIBILITY AND BEAR COSTS FORANY CORRECTIONS OR DAMAGES RESULTING FROM THEIR WORK.THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS PROVIDED BY AND IS THE PROPERTY OF THE DESIGNER 'GORAL DESIGN' AND ENGINEER 'ON FILE'.THE CONTRACTOR SHALL VERIFY AND ACCEPT RESPONSIBILITY FOR ALL DIMENSIONS AND CONDITIONS ON SITE AND SHALL NOTIFY THE APPROPRIATE CONSULTANTOF ANY VARIATIONS FROM THE SUPPLIED INFORMATION.THESE DRAWINGS HAVE BEEN PREPARED FOR BUILDING PERMIT PURPOSES ONLY. THE DESIGNER AND ENGINEER ARE NOT RESPONSIBLE FOR GENERAL REVIEWDURING CONSTRUCTION UNLESS A SEPARATE AGREEMENT IS MADE. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING AND ASSUMED STRUCTURALCONDITIONS. IN THE EVENT THAT THE CONTRACTOR FINDS A DISCREPANCY WITH THE APPROVED PERMIT CONSTRUCTION DRAWINGS AND/OR THE ASSUMEDCONDITIONS, THE CONTRACTOR SHALL NOTIFY THE OWNER OF THE PROJECT AND/OR THE APPROPRIATE CONTRACTED CONSULTANTS WHO ARE RESPONSIBLE FORGENERAL REVIEW DURING CONSTRUCTION. THE DESIGNER AND THE ENGINEER WHO HAVE SEALED THESE DRAWINGS ARE NOT RESPONSIBLE FOR GENERAL REVIEWDURING CONSTRUCTION.THE AS-BUILT INFORMATION PROVIDED IN THESE DRAWINGS IS FOR INFORMATION PURPOSES ONLY. ALL DIMENSIONS ARE CALCULATED FROM ON SITE OBSERVATIONSREPRESENTING EXISTING CONDITIONS. THE INFORMATION PROVIDED MUST BE CONFIRMED PRIOR TO CONSTRUCTION, ENLARGEMENT OR ALTERATION OF ANY PART,OR IN WHOLE, OF THE EXISTING BUILDING. THE OWNER OF THE PROPERTY WILL NOT HOLD THE DESIGNER AND ENGINEER LIABLE FOR THE WORK DONE BY OTHERS.DRAWING TITLE1.10.AUG.2021STABLE NEIGHBOURHOOD APPLICATIONTGGORAL DESIGN T: 647.505.9632 E: tgoral@goraldesign.ca 22010A-4.21/4" - 1'-0"ELEVATIONPR20221302Nov. 10, 2022TOWN OF AURORA PLANNING & DEVELOPMENT SERVICES BUILDING DIVISIONPERMIT NO.: DATE:PRELIMINARY ZONING REVIEWAshley VanderwalAPPROVED BY:Page 33 of 63 FIN. BASEMENT FLOORFIN. GROUND FLOORU/S OF CEILINGU/S OF CEILINGU/S OF CEILINGFIN. SECOND FLOOR11'-0" [3.35m] 10'-11 4" [3.08m] 9'-0" [2.74m]1'-114" [0.34m]9'-0" [2.74m]1'-114" [0.34m] 12'-114" [3.69m]PEAK OF ROOF9'-012" [2.76m]ISSUED BYNo.DATEREVISION/SUBMISSIONDRAWING NUMBERPROJECT NUMBERDATESCALECHECKED BYDRAWN BYMAY 2022TGCHILD DRIVERESIDENCE52 CHILD DRIVE, AURORA, ONT., L4G 1Y5THIS DRAWING IS NOT TO BE SCALED.REFER TO APPROPRIATE SURVEY, STRUCTURAL, MECHANICAL, ELECTRICAL, LANDSCAPE, ETC. CONSULTANT DRAWINGS BEFORE PROCEEDING WITH THE WORK.CONSTRUCTION MUST CONFORM TO ALL APPLICABLE CODES AND REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION.THE CONTRACTOR WORKING FROM DRAWINGS NOT SPECIFICALLY MARKED "FOR PERMIT/CONSTRUCTION" MUST ASSUME FULL RESPONSIBILITY AND BEAR COSTS FORANY CORRECTIONS OR DAMAGES RESULTING FROM THEIR WORK.THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS PROVIDED BY AND IS THE PROPERTY OF THE DESIGNER 'GORAL DESIGN' AND ENGINEER 'ON FILE'.THE CONTRACTOR SHALL VERIFY AND ACCEPT RESPONSIBILITY FOR ALL DIMENSIONS AND CONDITIONS ON SITE AND SHALL NOTIFY THE APPROPRIATE CONSULTANTOF ANY VARIATIONS FROM THE SUPPLIED INFORMATION.THESE DRAWINGS HAVE BEEN PREPARED FOR BUILDING PERMIT PURPOSES ONLY. THE DESIGNER AND ENGINEER ARE NOT RESPONSIBLE FOR GENERAL REVIEWDURING CONSTRUCTION UNLESS A SEPARATE AGREEMENT IS MADE. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING AND ASSUMED STRUCTURALCONDITIONS. IN THE EVENT THAT THE CONTRACTOR FINDS A DISCREPANCY WITH THE APPROVED PERMIT CONSTRUCTION DRAWINGS AND/OR THE ASSUMEDCONDITIONS, THE CONTRACTOR SHALL NOTIFY THE OWNER OF THE PROJECT AND/OR THE APPROPRIATE CONTRACTED CONSULTANTS WHO ARE RESPONSIBLE FORGENERAL REVIEW DURING CONSTRUCTION. THE DESIGNER AND THE ENGINEER WHO HAVE SEALED THESE DRAWINGS ARE NOT RESPONSIBLE FOR GENERAL REVIEWDURING CONSTRUCTION.THE AS-BUILT INFORMATION PROVIDED IN THESE DRAWINGS IS FOR INFORMATION PURPOSES ONLY. ALL DIMENSIONS ARE CALCULATED FROM ON SITE OBSERVATIONSREPRESENTING EXISTING CONDITIONS. THE INFORMATION PROVIDED MUST BE CONFIRMED PRIOR TO CONSTRUCTION, ENLARGEMENT OR ALTERATION OF ANY PART,OR IN WHOLE, OF THE EXISTING BUILDING. THE OWNER OF THE PROPERTY WILL NOT HOLD THE DESIGNER AND ENGINEER LIABLE FOR THE WORK DONE BY OTHERS.DRAWING TITLE1.10.AUG.2021STABLE NEIGHBOURHOOD APPLICATIONTGGORAL DESIGN T: 647.505.9632 E: tgoral@goraldesign.ca 22010A-4.31/4" - 1'-0"ELEVATIONPR20221302Nov. 10, 2022TOWN OF AURORA PLANNING & DEVELOPMENT SERVICES BUILDING DIVISIONPERMIT NO.: DATE:PRELIMINARY ZONING REVIEWAshley VanderwalAPPROVED BY:Page 34 of 63 FIN. BASEMENT FLOORFIN. GROUND FLOORU/S OF CEILINGU/S OF CEILINGU/S OF CEILINGFIN. SECOND FLOOR11'-0" [3.35m] 10'-11 4" [3.08m] 9'-0" [2.74m]1'-114" [0.34m]9'-0" [2.74m]1'-114" [0.34m] 12'-114" [3.69m]PEAK OF ROOF9'-012" [2.76m]1'-0" [0.30m]PRECAST PANELSBEIJE-GRAY (COLOUR)ASPHALT SHINGLES(PEWTER COLOUR)PRECAST TRIMBEIJE-GRAY (COLOUR)3.5" BRICK VENEERBEIJE-GRAY (COLOUR)PRECAST TRIMBEIJE-GRAY (COLOUR)NEW ALUMINUM R.W.L., FASCIA,GUTTER & VENTED SOFFIT (BLACK COLOUR)PRECAST TRIMBEIJE-GRAY (COLOUR)3.5" BRICK VENEERBEIJE-GRAY (COLOUR)STONE PANELSBEIJE-GRAY (COLOUR)ISSUED BYNo.DATEREVISION/SUBMISSIONDRAWING NUMBERPROJECT NUMBERDATESCALECHECKED BYDRAWN BYMAY 2022TGCHILD DRIVERESIDENCE52 CHILD DRIVE, AURORA, ONT., L4G 1Y5THIS DRAWING IS NOT TO BE SCALED.REFER TO APPROPRIATE SURVEY, STRUCTURAL, MECHANICAL, ELECTRICAL, LANDSCAPE, ETC. CONSULTANT DRAWINGS BEFORE PROCEEDING WITH THE WORK.CONSTRUCTION MUST CONFORM TO ALL APPLICABLE CODES AND REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION.THE CONTRACTOR WORKING FROM DRAWINGS NOT SPECIFICALLY MARKED "FOR PERMIT/CONSTRUCTION" MUST ASSUME FULL RESPONSIBILITY AND BEAR COSTS FORANY CORRECTIONS OR DAMAGES RESULTING FROM THEIR WORK.THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS PROVIDED BY AND IS THE PROPERTY OF THE DESIGNER 'GORAL DESIGN' AND ENGINEER 'ON FILE'.THE CONTRACTOR SHALL VERIFY AND ACCEPT RESPONSIBILITY FOR ALL DIMENSIONS AND CONDITIONS ON SITE AND SHALL NOTIFY THE APPROPRIATE CONSULTANTOF ANY VARIATIONS FROM THE SUPPLIED INFORMATION.THESE DRAWINGS HAVE BEEN PREPARED FOR BUILDING PERMIT PURPOSES ONLY. THE DESIGNER AND ENGINEER ARE NOT RESPONSIBLE FOR GENERAL REVIEWDURING CONSTRUCTION UNLESS A SEPARATE AGREEMENT IS MADE. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING AND ASSUMED STRUCTURALCONDITIONS. IN THE EVENT THAT THE CONTRACTOR FINDS A DISCREPANCY WITH THE APPROVED PERMIT CONSTRUCTION DRAWINGS AND/OR THE ASSUMEDCONDITIONS, THE CONTRACTOR SHALL NOTIFY THE OWNER OF THE PROJECT AND/OR THE APPROPRIATE CONTRACTED CONSULTANTS WHO ARE RESPONSIBLE FORGENERAL REVIEW DURING CONSTRUCTION. THE DESIGNER AND THE ENGINEER WHO HAVE SEALED THESE DRAWINGS ARE NOT RESPONSIBLE FOR GENERAL REVIEWDURING CONSTRUCTION.THE AS-BUILT INFORMATION PROVIDED IN THESE DRAWINGS IS FOR INFORMATION PURPOSES ONLY. ALL DIMENSIONS ARE CALCULATED FROM ON SITE OBSERVATIONSREPRESENTING EXISTING CONDITIONS. THE INFORMATION PROVIDED MUST BE CONFIRMED PRIOR TO CONSTRUCTION, ENLARGEMENT OR ALTERATION OF ANY PART,OR IN WHOLE, OF THE EXISTING BUILDING. THE OWNER OF THE PROPERTY WILL NOT HOLD THE DESIGNER AND ENGINEER LIABLE FOR THE WORK DONE BY OTHERS.DRAWING TITLE1.10.AUG.2021STABLE NEIGHBOURHOOD APPLICATIONTGGORAL DESIGN T: 647.505.9632 E: tgoral@goraldesign.ca 22010A-4.41/4" - 1'-0"ELEVATIONPR20221302Nov. 10, 2022TOWN OF AURORA PLANNING & DEVELOPMENT SERVICES BUILDING DIVISIONPERMIT NO.: DATE:PRELIMINARY ZONING REVIEWAshley VanderwalAPPROVED BY:Page 35 of 63 100 John West Way Aurora, Ontario L4G 6J1 (905) 727-3123 aurora.ca Town of Aurora Committee of Adjustment Report No. MV-202 2 -43 _______________________________________________________________________________________ Subject: Minor Variance Application Pazienza 49 Jasper Drive PLAN 517 LOT 173 File: MV-2022-43 Prepared by: Kenny Ng, Planner Department: Planning and Development Services Date: December 8, 2022 ______________________________________________________________________________________ Application The applicant is requesting relief from the requirements of the Town’s Comprehensive Zoning By-law 6000-17, as amended, to facilitate the construction of a two-storey detached dwelling. The applicant is proposing to demolish the existing dwelling and construct a two-storey single detached dwelling, with a gross floor area of approximately 315.8 m2 (3399.24 ft2). The proposed dwelling includes an attached garage, a covered porch, and four bedrooms on the second floor. The proposed garage will accommodate two vehicles, and storage. A conceptual site plan and elevations are attached as Appendix ‘B’ to this report. PROPOSED VARIANCE The following relief is being requested: a) Section 24.497.3.2 of the Zoning By-law requires a minimum interior side yard setback of 3.0 metres beyond the main rear wall of the adjacent dwelling, whereas the applicant is proposing 2.3 metres to the northerly interior side yard. b) Section 24.497.3.2 of the Zoning By-law requires a minimum interior side yard setback of 3.0 metres beyond the main rear wall of the adjacent dwelling, whereas the applicant is proposing 2.3 metres to the southerly interior side yard. Page 36 of 63 December 8, 2022 2 of 8 Report No. MV-2022-43 Background Subject Property and Area Context The subject lands are municipally known as 49 Jasper Drive and are located on the north of Wellington Street West, east of Jasper Drive. The subject lands have an approximate lot area of 643 m2 (6921.19 ft2), and an approximate lot frontage of 15.84 m (51.96 ft). The subject lands currently contain a one-storey single-detached dwelling with an approximate gross area of 96.43 m2 (1037.96 ft2), and a driveway. Mature trees and vegetation also exist on the subject lands. Official Plan The subject property is designated “Stable Neighbourhoods” by the Town of Aurora Official Plan which protects residential neighbourhoods from incompatible forms of development and, at the same time, permits them to evolve and enhance over time. Zoning The subject property is zoned “R3-SN(497) (Detached Third Density Residential – Stable Neighbourhoods Exception 497 Zone) by Zoning By-law 6000-17, as amended, which permits single detached dwellings. The subject property is located within the Aurora Heights Stable Neighbourhoods Site Plan Control Area. A Site Plan Application has been submitted, and is currently under technical review. Related Planning Applications Stable Neighbourhood Application, SPR-2022-07, under technical review. Preliminary Zoning Review A Preliminary Zoning Review (PZR) has been completed by the Town of Aurora’s Building Division. The PZR identified the required variances and no other non- compliance was identified. Applicant’s stated reason(s) for not complying with the Zoning By-law As stated on the application form, “Rear setback meets the required setback but, because this is a pie shaped lot, the width at the front is reduced thus creating side yard variances.” Page 37 of 63 December 8, 2022 3 of 8 Report No. MV-2022-43 Planning Comments Planning Staff have evaluated Minor Variance Application MV-2022-43 pursuant to the prescribed tests as set out in Section 45 (1) of the Planning Act, as follows: a) The proposed variance meets the general intent of the Official Plan The intent of the Stable Neighbourhood designation is to ensure that the mature neighbourhoods are protected from incompatible forms of development, while also permitted to evolve and be enhanced over time. New development shall be compatible with its surrounding context. It is Planning Staff’s opinion that the proposed variances will not result in any significant negative impact on the character and streetscape of the existing residential neighbourhood. The neighbourhood is characterized by generally one to two-storey dwellings, mature vegetation is present in the front and side yard of the property. The side yard setbacks are marginally varied, while the proposed dwelling and requested variances will maintain an adequate area of soft landscaping in the front and rear yard. The proposed porch will extend beyond the front face of the main wall of the building which will enhance the streetscape, thus allowing for a modest, compatible building in the existing neighbourhood. The proposed dwelling is in keeping with the surrounding context and character of the host neighbourhood, and as such, Staff are of the opinion that the proposed variances meet the general intent of the Official Plan. b) The proposed variance meets the general intent of the Zoning By-law The general intent of the side yard setback is to ensure that adequate separation is provided between properties and that compatibility are maintained within the neighbourhood. The intent of additional setback distance beyond the main rear wall of the adjacent dwelling is to ensure that neighbouring properties’ privacy is protected and that adequate separation distance is maintained. The proposed development has taken took privacy into consideration, as there are limited window openings on both sides of the building. The proposed windows are also generally very limited in size (small bathroom window on both sides with an additional facing north) and are proposed to be in the front half of the building, not the rear portion which is part of the building that encroaches in to the three metres side yard setback distance. The proposed dwelling will largely follow the zone requirements with minimal modifications. The spacing between the proposed dwelling and abutting properties are marginally varied, while the privacy, density, open space, built form and character are Page 38 of 63 December 8, 2022 4 of 8 Report No. MV-2022-43 fundamentally in-keeping with the surrounding neighbourhood and would not incur incompatibility. The lot is irregularly shaped, with a pie-shaped lot fabric, the setback distance further increases as the building goes further back. Adequate side yard space remain allowing for maneuverability and accessibility. Staff are of the opinion that the requested variances meet the general intent of the Zoning By-law. c) The proposed variance is considered desirable for the appropriate development of the land The minor variances requested to accommodate the proposed dwelling have been considered in the context of the site and the adjacent neighbourhood. It is in the opinion of staff that even with the reduced side yard setback on both sides, the property will continue to be in keeping with other surrounding residential properties within the neighbourhood at-large. The proposed dwelling is of modest size and height and its proposed location is not anticipated to result in significant visual obstruction and impact to the public realm. Staff do not anticipate that the variances as requested will result in any negative impacts and that the appearance of the property will remain compatible with properties in the vicinity. Furthermore, a site plan application is currently under staff review for the proposed development to ensure the final design, building materials and architectural style are compatible and sympathetic with the surrounding neighbourhood. Staff are of the opinion that the proposed variances are considered desirable for the appropriate development of the property. d) The proposed variance is considered minor in nature In considering the scale and size of the proposed dwelling, there is minimal impact resulting from the reduced side yard setbacks given that the reduction is not too large overall. The proposed encroachment into the side yard space is not anticipated to result in detrimental impacts to the adjacent neighbourhood in terms of additional shade potential, privacy, spacing and openness, stormwater runoff concern and the availability of amenity space. It is Planning Staff’s opinion that the streetscape will largely remain unaltered as the slight encroachment into the side yard will not be discernable from the public realm perspective. Staff are of the opinion that the proposed variances are minor in nature. Page 39 of 63 December 8, 2022 5 of 8 Report No. MV-2022-43 Additional Comments The minor variance application was circulated to Town Department/Divisions and to external agencies for review and comment. The following comments were provided: Department or Agency Comments Building Division Preliminary Zoning Review was completed on October 18, 2022 to confirm the variance required for the proposed development. Engineering Division Comments provided stating no comments/concerns with proposed application (dated November 22, 2022). Operational Services (Parks) Comments provided stating the application does not reference impact to existing trees, however there are trees situated on the subject property/adjacent property that may require removal and/or may be impacted by excavation or disturbance due to construction of house. (dated November 21, 2022) Parks staff recommend that the Committee impose conditions if this application is approved. (Refer to Appendix ‘A’ for recommended conditions of approval) Operational Services (Public Works) No comments received at the time of writing this report. Central York Fire Services No comments received at the time of writing this report. York Region Comments provided stating no comments/concerns with proposed application (dated November 22, 2022). LSRCA Comments provided stating no comments/concerns with proposed application (dated November 22, 2022). Page 40 of 63 December 8, 2022 6 of 8 Report No. MV-2022-43 Department or Agency Comments Alectra Comments provided stating no objections to its approval, subject to comments in letter (dated November 15, 2022) Public Correspondence One (1) written submission was received at the time of writing of this report, which is summarized below including responses to the comments: Concern with overbuilding, privacy and views The mass and bulk of the proposed dwelling is considered to be slightly larger than houses located adjacent to the subject property, however, the property adheres to all other zoning requirements. The proposed dwelling is of an average size of a modern suburban detached house and its overall built form, height, scale and massing is not too egregious that it would result in incompatibility with the general neighbourhood at- large. Despite the proposed building extending sizably beyond the rear wall of neighbouring properties, the neighbouring properties both contain detached garage that are located considerably closer to the subject property. Additionally, the proposed dwelling is situated in a pie-shaped lot which allows for more open side yard space as it extends to the rear, with limited window openings on the side wall, thus alleviate the concern for loss of privacy and view. Concern with drainage, tree loss The proposed dwelling is currently under site plan review, and technical issues such as drainage, preservation of trees and compensation of tree loss will be appropriately addressed prior to site plan approval and subsequent issuance of building permit. Concern with maintenance The proposed side yard is considered to be adequate to provide for ease of access regarding regular maintenance. Lawn care, snow clearance and other necessary equipment can still be transferred to the back yard without difficulty. Concern with Air and Subterranean Rights The proposed dwelling conforms to all other zoning requirements including height, lot coverage and minimum side yard setback of 1.5 metres. The variances requested are to accommodate the portion of building that extends beyond the rear wall of neighbouring properties. In considering that the building meets with the minimum interior side yard Page 41 of 63 December 8, 2022 7 of 8 Report No. MV-2022-43 requirement, air and subterranean rights of neighbouring properties are generally undisturbed. Concern with traffic and parking The proposed development meets the parking requirement of a single detached dwelling and does not contemplate any increase in its overall density, thereby not resulting in any intensification. Concern with the proposed building’s compatibility The proposed building is largely in-keeping with the character of the neighbourhood in that the building footprint and height are in-keeping with the stable neighbourhood zoning requirements, while the proposed architectural style, building materials and siting would not erode the aesthetics of the streetscape. Additionally, the final design and material usage will be monitored through the site plan process to ensure that the proposed complies with applicable urban design guidelines. Should additional written submissions be received after the writing of this report, the Secretary Treasurer will provide the submission(s) to Committee members at the meeting. Conclusion Planning staff have reviewed the application with respect to the Section 45(1) of the Planning Act, R.S.O, 1990, c.P.13, as amended, and are of the opinion that the requested variance meets the four tests the Planning Act for granting of minor variances. Please refer to Appendix ‘A’ for recommended conditions of approval for the requested variance. Attachments Appendix ‘A’ – Recommended Conditions of Approval Appendix ‘B’ – Site Plan Page 42 of 63 December 8, 2022 8 of 8 Report No. MV-2022-43 Appendix ‘A’ – Recommended Conditions of Approval The following conditions are required to be satisfied should application MV-2022-43 be approved by the Committee of Adjustment: 1. That the variance only applies to the subject property, in subst antial conformity with the plan(s) attached as ‘Appendix B’ to this Staff Report, to the satisfaction of the Director of Planning and Development Services or designate; and, 2. That the Owner shall enter into a Letter of Undertaking with the Town of Aurora, to ensure that the development and site alteration occurs in accordance with the conditions of minor variance approval, and to guarantee compliance with all related site work, to the satisfaction of Town of Aurora Director of Planning and Development; and, 3. That the owner shall provide an Evaluation Report prepared by a Certified Arborist or Professional Registered Forester outlining all aspects of the impacts that this proposal will have on existing and current remaining vegetation. The report shall include recommendations and an action plan on the mitigation of negative effects to vegetation, during and post construction periods, as well as measures aimed at tree health care and protection for trees effected by the project and any remaining trees in the vicinity of the project that require applicable maintenance. The report shall include a schedule of monitoring the ongoing site work through a series of scheduled site visits by the Arborist / Forester during and post construction to ensure the vegetation preservation measures remain in compliance throughout the project, each site visit to be documented and any resulting action items required by the Arborist /Forester shall be implemented and confirmed on site forthwith by the Arborist /Forester following each visit; and, 4. That the Owner shall provide vegetation compensation and a replanting plan in accordance with the Town of Aurora TREE REMOVAL/PRUNING AND COMPENSATION POLICY to the satisfaction of the Director of Operational Services as compensation for trees removed to facilitate construction. Compensation planting shall be completed prior to release of the financial securities; and, 5. The Owner shall agree to comply with the Aurora Tree Permit By-law #5850-16 prior to the removal of any trees on the property. Page 43 of 63 PR20221180Oct. 18, 2022TOWN OF AURORA PLANNING & DEVELOPMENT SERVICES BUILDING DIVISIONPERMIT NO.:DATE:PRELIMINARY ZONING REVIEWAshley VanderwalAPPROVED BY:Oct. 26, 2022DATE: TOWN OF AURORAPLANNING AND DEVELOPMENT SERVICESDevelopment Planning DivisionRECEIVEDAppendix BPage 44 of 63 PR20221180Oct. 18, 2022TOWN OF AURORA PLANNING & DEVELOPMENT SERVICES BUILDING DIVISIONPERMIT NO.: DATE:PRELIMINARY ZONING REVIEWAshley VanderwalAPPROVED BY:Oct. 26, 2022DATE: TOWN OF AURORAPLANNING AND DEVELOPMENT SERVICESDevelopment Planning DivisionRECEIVEDPage 45 of 63 PR20221180Oct. 18, 2022TOWN OF AURORA PLANNING & DEVELOPMENT SERVICES BUILDING DIVISIONPERMIT NO.: DATE:PRELIMINARY ZONING REVIEWAshley VanderwalAPPROVED BY:Page 46 of 63 PR20221180Oct. 18, 2022TOWN OF AURORA PLANNING & DEVELOPMENT SERVICES BUILDING DIVISIONPERMIT NO.: DATE:PRELIMINARY ZONING REVIEWAshley VanderwalAPPROVED BY:Page 47 of 63 PR20221180Oct. 18, 2022TOWN OF AURORA PLANNING & DEVELOPMENT SERVICES BUILDING DIVISIONPERMIT NO.: DATE:PRELIMINARY ZONING REVIEWAshley VanderwalAPPROVED BY:Page 48 of 63 PR20221180Oct. 18, 2022TOWN OF AURORA PLANNING & DEVELOPMENT SERVICES BUILDING DIVISIONPERMIT NO.: DATE:PRELIMINARY ZONING REVIEWAshley VanderwalAPPROVED BY:Page 49 of 63 100 John West Way Aurora, Ontario L4G 6J1 (905) 727-3123 aurora.ca Town of Aurora Committee of Adjustment Report No. MV-202 2 -47 _______________________________________________________________________________________ Subject: Minor Variance Application Jonathan Litavski Ltd. c/o Adrian Litavski 32 Don Hillock Drive MV-2022-47 Related File: SP-2021-14 Prepared by: Sean Lapenna, Planner Department: Planning and Development Services Date: December 8, 2022 _______________________________________________________________________________________ Application The applicant is requesting relief from the Town’s Comprehensive Zoning By-law 6000- 17, as amended, to facilitate the construction of a new one-storey, seven-unit Industrial Building with a total Gross Floor Area of 3,104.22 m² (33,414 ft²) which includes 60 parking spaces (including 2 barrier free spaces) and a building height of 11.659 m (38.0 ft). PROPOSED VARIANCE The proposed variance application proposes a reduced width for a maneuvering aisle for 90-degree parking, on the east side of the property. The following relief from the requirements of the Town’s Zoning By-law 6000-17, as amended, is requested: Section 5.3 “Required Maneuvering Space” of the Zoning By-law 6000-17 requires that the minimum width of maneuvering aisles for 90-degree parking is 7.0 meters. The applicant is proposing 6.0 meters on the east side of the property. Note: As shown on the Site Plan, the proposed variance only applies to the one driveway aisle on the eastern portion of the property. The remaining proposed driveway will comply with the Town’s Zoning by-law. Page 50 of 63 December 8, 2022 2 of 7 Report No. MV-2022-47 Background Subject Property and Area Context The subject lands are municipally known as 32 Don Hillock Drive and are located south of Wellington Street East, east of Leslie Street and on the north side of Don Hillock Drive. The subject property is currently vacant. It has an approximate lot area of 7558.18 m ² (81.356 ft²) and a lot frontage of 84.02 m (276.0 ft). Official Plan The subject property is designated ‘Business Park’ by the Town of Aurora Official Plan (OPA 30). The Business Park designation is intended to provide for a mix of high quality employment uses and a variety of supporting commercial and community facilities, geared generally to satisfying the needs of residents, business and employees in the Town of Aurora and the Region. Zoning The subject property is zoned ‘Business Park [E-BP (338)] Exception 338 Zone’ under Zoning By-law 6000-17, as amended, which permits Industrial Uses. Preliminary Zoning Review A Preliminary Zoning Review (PZR) has been completed by the Town of Aurora’s Building Division. The PZR identified the required variance and no other non-compliance was identified. Applicant’s stated reason(s) for not complying with the Zoning By-law Based on the nature of the industrial uses envisioned for this site, a minimum GFA is required for the business to function. As such, the proposed minor variance is required to facilitate the re-development of the subject lands. Planning Comments Planning Staff have reviewed the requested variance as per the four (4) tests in section 45(1) of the Planning Act. Page 51 of 63 December 8, 2022 3 of 7 Report No. MV-2022-47 a) The proposed variance meets the general intent and purpose of the Official Plan Section 3.5.1 d) iii) of OPA 30 requires that on-site circulation provide convenient pedestrian and vehicular access to parking areas, loading spaces, building entrances, adjacent streets, and possible future transit routes. Adequate width will still be provided to accommodate truck and vehicle movements through the east side maneuvering aisle. Planning Staff are of the opinion that the decreased width for the eastern maneuvering aisle as requested will allow for convenient vehicular access onsite to parking areas, loading spaces and building entrances as intended through OPA 30. It is therefore the opinion of Planning staff that the proposed variance maintains the general intent and purpose of the Official Plan. b) The proposed variance meets the general intent and purpose of the Zoning By-law The intent of the maneuvering space requirement outlined in Section 5.3 of the Zoning By-law is to regulate the width and design of maneuvering aisles for driveway purposes to ensure that there is satisfactory space for anticipated vehicular access and movements, to ensure there are no adverse impacts on sidewalks or roadways, that adequate space for parking remains available and that the development is compatible with the surrounding area. The maneuvering aisle to be provided will not impede traffic movements for the proposed future industrial development. A sidewalk has also been provided which is located between the building and parking area along the east side of the pr operty, enabling access for future employees and visitors from these parking spaces, to the future building itself. Staff also note that the designated fire route will continue to comply with the Ontario Building Code requirement of 6.0 m in width, which has been used for other similar industrial developments in Town through the planning application approval process. Planning Staff are therefore of the opinion that the decreased width of the east side maneuvering aisle as proposed will not result in any negative impacts and that the general intent and purpose of the Zoning By-law is met. c) The variance is considered desirable for the appropriate development or use of the land Page 52 of 63 December 8, 2022 4 of 7 Report No. MV-2022-47 In addition to the Transportation Letter submitted as part of the subject Minor Variance application (Prepared by WSP Engineering and dated November 4, 2022) the applicant also submitted a Transportation Impact Study (Prepared by WSP Engineering and dated November 15, 2021) with the associated Site Plan application currently under review by Town Staff (SP-2021-14). Through their review of the materials included with the subject minor variance application as well as the submitted Transportation Impact Study submitted as part of the site plan application, the Town’s Traffic Analyst has expressed no objection to the width of the maneuvering aisle as proposed. Staff also note that approval of the subject minor variance will not impede traffic movements for larger sized vehicles including waste collection and emergency services vehicles, including the designated fire route for fire truck access and movement. It is the opinion of Planning Staff that the maneuvering aisle along the east side will provide sufficient access onsite for traffic movements overall and will not hinder the ability for employees and visitors to the property to maneuver and navigate through the property as necessary, as staff consider this space overall to be appropriately sized. Staff are of the opinion that the variance as proposed is considered to be desirable for the appropriate development and use of the land. d) The variance is considered minor in nature Permitting a decreased maneuvering aisle of 6.0 m (20.0 ft) when the by-law requirement is 7.0 m (23.0 ft) is not viewed by staff as a significant departure from the zoning by-law. The site from a circulation and pedestrian connectivity standpoint in the opinion of staff will not be negatively impacted. Staff are of the opinion that the configuration of the driveways and maneuvering aisles have been designed in a manner whereby overall functionality from a traffic management perspective will not result in any conflicts, as safe and efficient inbound and outbound traffic movements will still be accommodated. Approval of this Minor Variance is not anticipated to result in any negative impacts to the overall built form proposed through the associated site plan application, nor any of the surrounding land uses. Staff note that the maneuvering aisle on the west side will continue to meet the minimum 7.0 m width requirement, for the 90 degree angle parking located within that area of the site. Staff also advise that all other applicable by-law requirements are still being met. This would include setbacks, building height, lot coverage as well as onsite parking requirements. As such, no other variances have been requested. Page 53 of 63 December 8, 2022 5 of 7 Report No. MV-2022-47 Staff therefore consider the variance to be minor in nature. Additional Comments The minor variance application was circulated internally and to external agencies for review and comment. The following comments were provided: Department / Agency Comments Provided Engineering Services We have reviewed the above noted application and have no objections. Building Division Preliminary Zoning Review conducted. No comments provided specifically on the application at the time of writing of this report. Accessibility Advisor No comments provided at the time of writing of this report. Traffic Analyst I’ve reviewed the functionality of the proposed driveway width as part of the site plan application. The vehicle maneuvering diagram is acceptable and I have no further comments. Operational Services – Parks We have reviewed the documentation for the property associated with the above noted application and have no formal comments. Operational Services – Public Works No comments provided at the time of writing of this report Central York Fire Services No comments provided at the time of writing of this report The Regional Municipality of York No comments provided at the time of writing of this report Lake Simcoe Region Conservation Authority The LSRCA will not be providing formal comments nor will we be collecting an LSRCA review fee. The subject application does not warrant a technical review as it pertains to natural heritage, or contain lands which are regulated by the LSRCA. Alectra Utilities We have reviewed the proposed Variance application and have no objections to its approval, subject to the following comments: Alectra Utilities (formerly PowerStream) has received and reviewed the proposed Variance Application. This review, however, does not imply any approval of the project or plan. All proposed billboards, signs, and other structures associated with the project or plan must maintain minimum clearances to the existing overhead or underground electrical distribution system as specified by the applicable standards, Page 54 of 63 December 8, 2022 6 of 7 Report No. MV-2022-47 codes and acts referenced. In the event that construction commences, and the clearance between any component of the work/structure and the adjacent existing overhead and underground electrical distribution system violates the Occupational Health and Safety Act, the customer will be responsible for 100% of the costs associated with Alectra making the work area safe. All construction work will be required to stop until the safe limits of approach can be established. In the event construction is completed, and the clearance between the constructed structure and the adjacent existing overhead and underground electrical distribution system violates the any of applicable standards, acts or codes referenced, the customer will be responsible for 100% of Alectra’s cost for any relocation work Hydro One No comments provided at the time of writing of this report Public Correspondence Written submissions were not received at the time of writing of this report. Should written submissions be received after the writing of this report, the Secretary Treasurer will provide the submission(s) to Committee members at the meeting. Conclusion Planning staff have reviewed the application with respect to the Section 45(1) of the Planning Act, R.S.O, 1990, c.P.13, as amended, and recommend approval subject to a condition of approval. Please refer to Appendix ‘A’ for the recommended condition of approval for the requested variance. Attachments Appendix ‘A’ – Recommended Condition of Approval Appendix ‘B’ - Site Plan Appendix ‘A’ – Recommended Condition of Approval The following condition is required to be satisfied should application MV -2022-47 be approved by the Committee of Adjustment: Page 55 of 63 December 8, 2022 7 of 7 Report No. MV-2022-47 1. That the variance only applies to the subject property, in substantial conformity with the site plan attached as ‘Appendix B’ to this Staff Report and dated November 4 2022, to the satisfaction of the Director of Planning and Development Services. Page 56 of 63 ItemData Matrix Part 3 or 9OBC ReferenceFirm Name:Certificate of Practice Number:Address:Name of Project:Location of Project:Ontario Building CodeX1 04N/A-1.1.2 [A]1 storey industrialGROUP F2 GROUP F2: 3.2.2.72X3.1.2.1.(1)1.4.1.2. [A]3.2.2.10. & 3.2.5.5.3.2.2.20. - .83.3.2.2.20. - .83.3.2.1.5.3.2.2.17.3.2.9.3.2.4.3.2.5.7.3.2.6.3.2.2.20. - .83.3.2.1.1.(3) - (8)3.1.17.3.8.3.3.1.2. & 3.3.1.19.Project Description:Major Occupancy(s):Building GFA (m²)Number of StoreysNumber of Streets/Access RoutesBuilding ClassificationSprinkler System ProposedStandpipe requiredFire Alarm requiredWater Service/Supply is AdequateHigh BuildingPermitted ConstructionActual ConstructionMezzanine(s) Area (m²)Occupant load based onBarrier-free DesignHazardous SubstancesPART 11PART 3 PART 9NewAdditionAlterationChange of Use123567891011121314151617Above GradeBelow GradeEntire BuildingBasement and Group E Occupancies OnlyIn Lieu of Roof RatingNot RequiredYes NoYes NoYes NoYes NoNon-Combustible BothCombustibleNon-Combustible BothCombustiblem²/PersonDesign of BuildingYesNo (Explain)Yes NoZ SQUARE CONSULTING INC.5220PCIG - Tiger32 Don Hillock Dr. Aurora, OntarioT 416 502 1616Toronto, Ontario M2H 3B31100 Gordon Baker RoadReferences are to Division B unless noted [A] for Division A or [C] for Division C.XXXXXXXX1.4.1.2. [A] & 3.2.1.1.3104.22 m²New Total 3104.22 m²Existing0m²XTBD by future tendent's fit up permit1.1.2 [A] & 9.10.1.39.10.2.1.4.1.2. [A]1.4.1.2. [A] & 9.10.4.9.10.209.10.8.29.10.8.2N/A9.10.18N/AN/A9.10.69.10.4.19.9.1.39.5.29.10.1.3 (4)411.1 to 11.4Gross Area3104.22 m²New Total 3104.22 m²Existing0 m²1.4.1.2. [A] 1.4.1.2. [A]18Plumbing Fixture RequirementsRatio: Male: Female =50:50 Except as noted otherwiseFloor Level/ AreaOccupant LoadFixtures RequiredFixtures Provided3.7.4.83.(2).TBD by future tendent's fit up permitSITE STATISTICS Proposed zoning: 124278109365dcba14131211bacbabaefghicdLot frontage and area Total gross floor area (sqm)Building setbacks from property lines (m)South (front)West (side)East (side)North (rear)Building area and lot coverage GFA and floor area ratioBuilding height (m)Number of storiesProposed number of unitsProposed size and uses of units:Mech. & Elec.Unit #1 Unit #2Unit #3Unit #4Unit #5Unit #6Unit #7GFALandscaped StripsParking spaces (Multiple unit buildings within Business Park Zone):Required number of parking spaces: Proposed number of parking spaces:Number of barrier free parking spaces (4%): Loading spaces (E-BP, Business Park Zone):Required number of loading spaces: Proposed number of loading spaces:Adjacent property zones and uses: E-BP, Business Park Zone84.02 m, 7558.18 sqm3104.226.4822.6816.529.663104.22 sqm, 41.07%3104.22 sqm, 0.4111.661725.41437.90437.11437.56437.41437.41437.41457.013104.223m @ East, West, North6060237 type B (11.0m x 3.5m) E-BP, Business Park ZoneP R O J E C TS C A L ED R A W NR E V I E W E DI S S U E R E C O R DR E V I S I O N R E C O R DNote: This drawing is the property of the Architect and may not be reproduced orused without the expressed consent of the Architect. The Contractor is responsiblefor checking and verifying all levels and dimensions and shall report alldiscrepancies to the Architect and obtain clarification prior to commencing work.forZ SQUARE CONSULTING INC.1100 GORDON BAKER RDNORTH YORK, ONTARIOM2H 3B3info@zsquareconsulting.com1-416-502-161610/24/2022 12:24:50 PMAs indicated32 Don Hillock Dr. Aurora,Ontario32 Don Hillock Dr. Aurora,OntarioOBC MATRIX & SITESTATISTICSMr Ding21034TJNZA000No. Description Date3 Issued for SPA 2021-11-094 Issued for Coordination 2022-04-225 Reissued for SPA 2022-05-246 Reissued for SPA 2022-11-041 : 100OBC MATRIXArea Schedule (Gross Building)Name Area Area (SF)M / E 25.41 m² 273.54 SFUnit 1 437.90 m² 4713.49 SFUnit 2 437.11 m² 4705.00 SFUnit 3 437.56 m² 4709.84 SFUnit 4 437.41 m² 4708.28 SFUnit 5 437.41 m² 4708.28 SFUnit 6 437.41 m² 4708.28 SFUnit 7 454.00 m² 4886.79 SF3104.22 m² 33413.50 SFArchitectural Drawing ListSheet Number Sheet NameA000 OBC MATRIX & SITE STATISTICSA001 SITE PLANA002 GROUND FLOOR PLANA003 ROOF PLANA004 BUILDING ELEVATIONSA005 BUILDING SECTIONSA006 MASSINGGrand total: 7KEY PLANL e s l i e S t Don Hillock DrWellington St ESITENNov. 8, 2022DATE: TOWN OF AURORAPLANNING AND DEVELOPMENT SERVICESDevelopment Planning DivisionRECEIVEDPage 57 of 63 UPUPUPUPUPUPUPUPUPUP6.5HSUTAC-2017 (CA)(c) 2021 Transoft Solutions, Inc. All rights reserved.HSUTAC-2017 (CA)(c) 2021 Transoft Solutions, Inc. All rights reserved.HSUTAC-2017 (CA)(c) 2022 Transoft Solutions, Inc. All rights reserved.HSUTAC-2017 (CA)(c) 2022 Transoft Solutions, Inc. All rights reserved.HSUTAC-2017 (CA)(c) 2022 Transoft Solutions, Inc. All rights reserved.HSUREDG TORONTO 2017 (CA)(c) 2022 Transoft Solutions, Inc. All rights reserved.HSU TAC-2017 (CA) (c) 2022 Transoft Solutions, Inc. All rights reserved.HSUTAC-2017 (CA)(c) 2022 Transoft Solutions, Inc. All rights reserved.HSUTAC-2017 (CA)N71°34'30"EN70°54'25"E47.22N71°51'40"E21.0015.79N83°17'25"E5.8678.26N71°29'00"EN18°30'25"W88.61N18°29'20"W90.13ete CurbConcrete CurbConcrete CurbLOT 2GISTERED PLAN 65M - 3974OT 1PIN 03642 - 3197PIN 03642 - 2340T 20, CONCESSION 3PIN 03642 - 5926PIN 03642 - 2370Bottom of SlopeTop of SlopeTop of SlopePost & Wire FencePost & Wire FencePWF1.40NPWF0.20NPWF0.15SPWF0.13NPWF0.19NPWF0.47NPWF0.11NPWF0.15NPWF0.54NPWF0.10NNo FencePWF0.06WPWFOn LinePWFOn LinePWF0.73NPost & Wire FencePost & Wire FencePost & Wire FencePWF0.05NPWF0.05NCBMHWaterWellCBCBWaterWellFHCBLSMHMHMHWaterWellBell BoxTRAFFIC SIGNMHTRAFFIC SIGNMHWVMH3.333.37SIB(RPE)SIB(RPE)SIB(RPE)SIB(RPE)IB(L&P)IB(OU)SSIB(L&P)IB(L&P)IB(L&P)IB(P1&M)(M)(M)21.90(P1&M)N70°53'10"E(P1)47.20(P1)(M)N71°50'00"E(P1)21.40(M)21.43(P1)0.40(P1&Set)(M)21.03(P1)6.11(P1,P2&Set)(P1&M)11.38(P1&M)N71°29'50"E(P1&Set)(P1&M)(M)78.28(P1)4.97(M)5.00(P1)(REFERENCE BEARING)156.98(M) 157.01(P1)0.24(M)0.31(P1)6.13(M)(M)88.58(P1)N18°29'20"W(P1)(P1&M)(P1&M)5.00(P1&M)(P1&M)On Line(Base)0.02SBent0.05E(P1&M)DON HILLOCK DRIVE290.54290.46290.55290.69290.86291.02291.31290.97290.66290.66290.36290.34289.97289.97289.67289.64289.22289.05288.43288.53288.13288.20287.307.1187.13286.89287.25286.78287.10287.85288.30288.77289.11289.46289.88290.24290.06286.90287.31287.45287.91288.26287.69287.03287.50287.67290.74291.19291.38291.78292.45292.89294.03294.24294.54294.81294.82294.50294.95294.90295.08294.67294.32294.76294.85294.92295.00294.72294.62287.74287.99288.38288.59288.93289.54290.18290.84290.91291.51292.00292.50292.68292.45292.42291.89291.26290.71290.04289.37289.26289.25289.14289.14288.69288.47288.13287.93287.69288.54291.21293.80293.24292.56293.39293.93294.24294.44294.54294.61294.63294.73291.76292.50293.07293.51293.76293.97294.07294.21294.30293.96293.50293.17293.03292.73292.30291.76291.13290.53289.98289.61289.38289.06288.51288.35288.17288.58288.70289.06289.33289.95290.54290.86291.35291.81292.15292.30292.44292.57293.36292.95294.51289.74290.19290.47290.61290.97291.78292.38290.77290.49291.75293.04293.62292.29291.89291.67291.48291.21290.71290.32289.89292.93292.70293.22293.21293.23293.12293.42293.26294.68293.73294.39294.83294.83294.88294.83294.77293.56294.79292.81293.91293.83294.49288.52293.72290.79290.08290.09289.34288.22287.88289.99292.60292.23292.98294.02292.63294.81294 7294.88(Top)292.40290.82290.82290.79290.82289.86288.10UPUPUPUPUPUPUPUPUPUPDYH 9.2%(BO)2.0%(BO)1.0%(BO)5.3%(BO)1.4%(BO)7.3%(BO)292.25(BO)293.46(BO)293.65(BO)293.76(BO)294.49(BO)290.45290.50290.47290.50 290.55290.45290.70290.52290.50290.50291.88292.15292.00290.55289.64289.62290.70289.25289.35289.25289.35289.20289.35289.28289.40288.90289.05288.50288.70289.08289.20288.78288.34288.15288.40288.64289.50289.80289.50289.50289.50289.502 8 9 .5 0 (T W )289.50289.48289.13289.50289.50289.50289.50289.50289.15288.80288.80290.68290.35290.00291.70290.70290.70291.83288.80289.15290.05(BW)290.00290.35290.70290.70290.70290.70290.70290.65(BW)290.35(BW)290.35290.65(TC)290.50290.65(TC)290.50290.65(TC)292.06291.99292.35292.44290.84290.58289.602 8 8 .7 4 (B W )2 8 8 .8 0 (B W )2 8 9 .0 9 (B W )2 8 9 .1 5 (B W )2 8 9 .5 0 (B W )2 8 9 .3 9 (T W )2 8 9 .0 9 (T W )2 8 9 .0 4 (T W )2 8 8 .7 4 (T W )288.56287.96(TC)288.52(TC)291.95(TC)292.02(TC)292.31(TC)292.38(TC)291.22(TW)290.96289.93290.00290.70289.502 8 9 .2 4 (T W )2 8 8 .9 0 (T W )290.00(BW)291.41(BW)289.65(TC)289.79290.50290.50291.72291.64291.87(TC)289.90289.94289.80288.95289.00289.85290.00291.79(TC)291.82291.09290.00(BW)2 8 8.80291.68(BW)290.65(TC)290.35(BW)289.88(TC)290.85(TC)290.69(TC)290.60(TC)290.70(TC)290.65(TC)290.73(TC)292.30(TC)290.85(TC)289.75(TC)289.45(TC)289.25(TC)289.30(TC)289.23(TC)289.15(TC)289.05(TC)288.85(TC)288.49(TC)292.03(BW)292.20(BW)292.21(BW)292.05(BW)291.90(BW)292.00(BW)291.95(BW)291.07290.00(BW)291.45291.60(TW)291.50291.58292.24(TC)293.53(BW)292.03(BW)290.75(BW)292.88(BW)292.14(BW)290.70290.50289.73288.88(TC)288.73(SW)290.47290.65290.62290.52289.24(TC)288.90 (TC)288.14291.00(TW)292.55(TW)293.61(TW)294.13(TW)293.91(TW)294.64(TW)291.74(BW)291.51(BW)291.19(BW)290.80(BW)EX. 400mm DIAPVC WATERMAINEX.HYDRANTEX. 400mmVALVE CHAMBEREX. 200mm DIAWATERMAINUNIT #1FFE=290.00UNIT #2FFE=290.35UNIT #3FFE=290.70UNIT #4FFE=290.70UNIT #5FFE=290.70UNIT #6FFE=290.70UNIT #7FFE=290.70DON HILLOCK DRIVENORTH REFER TO ENGINEERING DRAWINGSPREPARED BY HUSSON, DATED APRIL 16,2020MC(EX)N INV:283.28(975)NE INV:283.86(375)E INV:283.01(1200)W INV:283.69(525)2.3%10.7%1.7%1.7%1.2%0.4%4.2%1.1%2.0%2.1%1.4%2.0%2.8%1.4%2.1%1.6%1.4%1.3%1 .5%1.5%1.9% 1 .4 %2.1%2.8%1.3%2.2%4.8%1.4%1.4%2.0%4.1%2.7%4.4%4.5%2.4%1.5 %3.4%5.5%1.5%1.3%1.2%2.9%1.2%1 .7 %4.4%2.8%2.0%3.1%1.7%5.0%2.5%0.6%0.6%0.7%1.3%4.2%1.0%5.0%1.0%5.0%1.0%1.0%1.0%1.0%1.5%1.0%4.0%4.3%5.0%1 .0 %5.0%1.3%4.0%5.0%1.7%1.7%1.2%3.2%4.6%3.6%0.7%0.6%0.6%2.1%3.0%5.0%4.5%4.5%5.0%4.5%0.6%4.7%1.3%1.9%1.9%1.1%0.7%1.5%4.4%4.9%291.90(EX)291.97(EX)292.26(EX)292.33(EX)287.91(EX)287.31(EX)288.47(EX)291.26(EX)292.24(EX)291.54(EX)290.48(EX)290.73(EX) 290.93(EX)295.03(EX)294.70(EX)294.79(EX)294.86(EX)294.92(EX)294.91(EX)294.61(EX)293.53(EX)293.33(EX)291.41(EX)290.87(EX)289.12(EX)290.24(EX)290.34(EX)292.03(EX)289.30(EX)289.60(EX)289.55(EX)290.83(EX)291.22(EX)291.52(EX)292.02(EX)290.08(EX)289.79(EX)289.30(EX)288.78(EX)288.30(EX)290.19(EX)289.87(EX)288.88(EX)288.14(EX)289.78(EX)289.75(EX)290.19(EX)292289.352.852.583.662.611.250.250.940.990.680.7966°287.72R 120005300 6000 3000300060001505303000 5300 6000TYP. B290.35290.70290.70290.00288.80291.55289.50288.80RETAINING WALL W/ GUARDRAILELECTRICALUNIT 2UNIT 3UNIT 4UNIT 7UNIT 1UNIT 5UNIT 6EXISTING FIRE HYDRANT290.70290.70290.70290.00TYP.2700TYP.53003650 1500 2700TYPE A TYPE B53002700RETAINING WALLRETAINING WALLTRANSFORMERSIAMESE CONNECTION290.00290.70290.70RETAINING WALLWEST SETBACK22.68BUILDING FRONTAGE44.82EAST SETBACK16.52FRONT SETBACK6.48BUILDING LENGTH73.58REAR SETBACK9.6622.6844.8216.529.6873.585.324500290.001989LOT FRONTAGE84.02DON HILLOCK DRIVEPROPERTY LINEPROPERTY LINEPROPERTY LINEPROPERTY LINELOT DEPTH90.12STANDARD PARKING: 295.8478.304.44STANDARD PARKING: 22BARRIER-FREE PARKING: 2FIRE ROUTEFIRE ROUTEFIRE ROUTER 12000RETAINING WALLCURB RAMPLANDSCAPING STRIPLANDSCAPING STRIPLANDSCAPING STRIP3 5 0 011000TYP. BTYP. BTYP. BTYP. BTYP. BTYP. BPYLON SIGN3 5 0 011000 STEEL GUARD RAILING700053003002 7 0 0 3 5 0 0 2 7 0 0 3 4 9 9 2 7 0 05300300 530030053003002 7 0 0 3 5 0 0 53003003 5 0 0 2 7 0 0 8 8 9 30053008 8 9 2 7 0 05300300 2 7 0 0 2 7 0 0 3 5 0 0 SRANDARD PARKING : 8STANDARD PARKING : 1BIKE STALL : 3MOUNTABLE CURB CURB TO BE DESIGNED AS PER OPSD 600.011CURB TO BE DESIGNED AS PER OPSD 600.011STOP SIGN CARPOOL ONLY SIGN DO NOT ENTER SIGN FIRE ROUTE SIGNACCESSIBLE PARKING SIGNFIRE ROUTE SIGNONE WAY SIGNCURB TO BE DESIGNED AS PER OPSD 600.011154818616DISTANCE BETWEEN FIRE ROUTE AND ENTRANCEDISTANCE BETWEEN FIRE HYDRANT AND SIAMESE CONNECTION5%WALKWAY4%WALKWAYTactile Board19541729Fire RouteFire RouteFire RouteBollards2000GARBAGE BIN AREA ENCLOSED BY 1.8M HIGHT WOOD FENCE WITH GATE (BY-LAW 6429-22)18001800GARBAGE BIN AREA ENCLOSED BY 1.8M HIGHT WOOD FENCE WITH GATE (BY-LAW 6429-22)6.50PARKING NOTES:1. MINIMUM PARKING SPACE SIZES (UNLESS OTHERWISE NOTED): 2700mm WIDE X 5300mm LONG (NO SIDES OBSTRUCTED) 3000mm WIDE X 5300mm LONG (ONE SIDE OBSTRUCTED) 3300mm WIDE X 5300mm LONG (TWO SIDE OBSTRUCTED)2. MAINTAIN MINIMUM DRIVE AISLE WIDTH OF 6000mm UNLESS OTHERWISE NOTED.3. MAINTAIN MINIMUM HEADROOM CLEARANCE OF 2100mm THROUGHOUT.36505300LOCATE SIGN AT THECENTRE OF EACH SPACEBF PARKING TYPE A27007000PARALLEL PARKING6001800BIKE PARKING27005300STANDARD PARKING27005300LOCATE SIGN AT THECENTRE OF EACH SPACEBF PARKING TYPE BLOADING SPACE: TYPE B:11000(L) X 3500(W) X 4000(H)11000350060003500LOADING SPACE: TYPE C:6000(L) X 3500(W) X 3000(H)P R O J E C T S C A L E D R A W N R E V I E W E DI S S U E R E C O R DR E V I S I O N R E C O R DNote: This drawing is the property of the Architect and may not be reproduced orused without the expressed consent of the Architect. The Contractor is responsiblefor checking and verifying all levels and dimensions and shall report alldiscrepancies to the Architect and obtain clarification prior to commencing work.forZ SQUARE CONSULTING INC.1100 GORDON BAKER RDNORTH YORK, ONTARIOM2H 3B3info@zsquareconsulting.com1-416-502-161610/24/2022 12:25:04 PMAs indicated32 Don Hillock Dr. Aurora,Ontario32 Don Hillock Dr. Aurora,OntarioSITE PLANMr Ding21034TJNZA0011 : 200SITE PLAN1No. Description Date1 Issued for Coordination 2021-09-272 Issued for Review 2021-10-203 Issued for SPA 2021-11-094 Issued for Coordination 2022-04-225 Reissued for SPA 2022-05-246 Reissued for SPA 2022-11-04Page 58 of 63 UPUPUPUPUPUPUPUPUPUPUPUPUPUPUPUPUPABCDE123456787z7yE77x422 m²4540.19 SFUNIT 202423 m²4552.91 SFUNIT 303423 m²4552.91 SFUNIT 404433 m²4662.50 SFUNIT 707418 m²4502.99 SFUNIT 10121 m²220.88 SFELECTRICAL085%4%423 m²4552.91 SFUNIT 505423 m²4552.91 SFUNIT 6063396106911557152021230512917164352912913%6z6y6x5z5y5x4z4y4x3z3y3x2z2y2x1z1y1xE6E5E4E3E2E144973324406103631036310363103631036310363105664263001155449733241155449733244061155449733244061155449733244061155449733244061155449733244064065182406518240651824065182406518240651821A0052A00573878290.00290.35290.35291.55290.00290.70290.70290.70290.70290.70290.70290.00290.00RETAINING WALLRETAINING WALLCURB RAMP60006000TYPE A TYPE BSTANDARD PARKING: 22BARRIER-FREE PARKING: 245905250FLOOR DRAIN289.40289.75290.10290.10290.10290.10290.10REAINING WALL / GUARDRAIL22661966BIKE STALL: 3T Y P . B T Y P . B T Y P . B T Y P . B T Y P . B T Y P . B T Y P . B 198618001800P R O J E C T S C A L E D R A W N R E V I E W E DI S S U E R E C O R DR E V I S I O N R E C O R DNote: This drawing is the property of the Architect and may not be reproduced orused without the expressed consent of the Architect. The Contractor is responsiblefor checking and verifying all levels and dimensions and shall report alldiscrepancies to the Architect and obtain clarification prior to commencing work.forZ SQUARE CONSULTING INC.1100 GORDON BAKER RDNORTH YORK, ONTARIOM2H 3B3info@zsquareconsulting.com1-416-502-161610/24/2022 12:25:07 PM1 : 15032 Don Hillock Dr. Aurora,Ontario32 Don Hillock Dr. Aurora,OntarioGROUND FLOOR PLANMr Ding21034TJNZA0021 : 150GROUND FLOOR1No. Description Date2 Issued for Review 2021-10-203 Issued for SPA 2021-11-094 Issued for Coordination 2022-04-225 Reissued for SPA 2022-05-246 Reissued for SPA 2022-11-04Page 59 of 63 ABCDE123456787z7yE77xFLAT ROOFFUTURE ROOF TOP UNITFUTURE ROOF TOP UNITFUTURE ROOF TOP UNITFUTURE ROOF TOP UNITFUTURE ROOF TOP UNITFUTURE ROOF TOP UNITFUTURE ROOF TOP UNITFUTURE ROOF TOP UNIT406103631036310363103631036310363105667267387833961069115571520212305991300448196z6y6x5z5y5x4z4y4x3z3y3x2z2y2x1z1y1xE6E5E4E3E2E11A0052A0052%2%[No Slope][No Slope][No Slope]2%2%2%2%2%299.85SCUPPER120mm ABOVE ROOF FINISH26984ROOF DRAINROOF DRAINROOF DRAINROOF DRAINROOF DRAINROOF DRAINROOF DRAINROOF DRAINSCUPPER120mm ABOVE ROOF FINISH26984SCUPPER120mm ABOVE ROOF FINISHSCUPPER120mm ABOVE ROOF FINISH2%2%2%2 %2%2%2%2%P R O J E C T S C A L E D R A W N R E V I E W E DI S S U E R E C O R DR E V I S I O N R E C O R DNote: This drawing is the property of the Architect and may not be reproduced orused without the expressed consent of the Architect. The Contractor is responsiblefor checking and verifying all levels and dimensions and shall report alldiscrepancies to the Architect and obtain clarification prior to commencing work.forZ SQUARE CONSULTING INC.1100 GORDON BAKER RDNORTH YORK, ONTARIOM2H 3B3info@zsquareconsulting.com1-416-502-161610/24/2022 12:25:08 PM1 : 15032 Don Hillock Dr. Aurora,Ontario32 Don Hillock Dr. Aurora,OntarioROOF PLANMr Ding21034TJNZA0031 : 150ROOF PLAN1No. Description Date2 Issued for Review 2021-10-203 Issued for SPA 2021-11-094 Issued for Coordination 2022-04-225 Reissued for SPA 2022-05-246 Reissued for SPA 2022-11-04NOTE: ROOF TOP UNIT LOCATION REFER TO MEP DRAWING.Page 60 of 63 GRADE288.80GROUND FLOOR290.0012345678TOP OF ROOF299.85TOP OF PARAPET300.4661010672444243832007001200BUILDING HEIGHT11659PC2PC1GAGASPSP2A005GACSPPC1SPSPGRADE288.80GROUND FLOOR290.00ABCDETOP OF ROOF299.85TOP OF PARAPET300.46BUILDING HEIGHT116591200 700 3200 2438 3511 610PC2C1A005GRADE288.80GROUND FLOOR290.0012345678BUILDING HEIGHT11659TOP OF ROOF299.85TOP OF PARAPET300.46PC2CPT1PT2610984912002A005GRADE288.80GROUND FLOOR290.00ABCDEBUILDING HEIGHT11659TOP OF ROOF299.85TOP OF PARAPET300.46PC2PC1GACPT1610106724442438390012001A005CPC2SIAMESE CONNECTIONSPRETAINING WALLPT1PAINT COLOR 1PT2PAINT COLOR 2SPSPANDROGAGLAZINGPC2PRECAST CONCRETE 2PC1PRECAST CONCRETE 1CCONCRETE FINISHING (XPS)P R O J E C T S C A L E D R A W N R E V I E W E DI S S U E R E C O R DR E V I S I O N R E C O R DNote: This drawing is the property of the Architect and may not be reproduced orused without the expressed consent of the Architect. The Contractor is responsiblefor checking and verifying all levels and dimensions and shall report alldiscrepancies to the Architect and obtain clarification prior to commencing work.forZ SQUARE CONSULTING INC.1100 GORDON BAKER RDNORTH YORK, ONTARIOM2H 3B3info@zsquareconsulting.com1-416-502-161610/24/2022 12:25:14 PMAs indicated32 Don Hillock Dr. Aurora,Ontario32 Don Hillock Dr. Aurora,OntarioBUILDING ELEVATIONSMr Ding21034TJNZA0041 : 150EAST ELEVATION11 : 150NORTH ELEVATION41 : 150WEST ELEVATION21 : 150SOUTH ELEVATION3No. Description Date2 Issued for Review 2021-10-203 Issued for SPA 2021-11-094 Issued for Coordination 2022-04-225 Reissued for SPA 2022-05-246 Reissued for SPA 2022-11-04Page 61 of 63 GRADE288.80GROUND FLOOR290.0012345678TOP OF ROOF299.85TOP OF PARAPET300.462A005ELECTRICALUNIT 1UNIT 2UNIT 3UNIT 4UNIT 5UNIT 6UNIT 7BUILDING HEIGHT116596109149700120011' - 7 3/4"35508' - 0"24388' - 0 1/4"2444350290.00290.35291.0028' - 9 3/4"878227' - 8"84329' - 6 1/4"29008' - 0"24388' - 0 1/4"244425' - 6 1/2"7782350GRADE288.80GROUND FLOOR290.00ABCDETOP OF ROOF299.85TOP OF PARAPET300.461A005ELECTRICAL UNIT 16109849BUILDING HEIGHT116591200290.00289.4060060028' - 9 3/4"878224446338P R O J E C T S C A L E D R A W N R E V I E W E DI S S U E R E C O R DR E V I S I O N R E C O R DNote: This drawing is the property of the Architect and may not be reproduced orused without the expressed consent of the Architect. The Contractor is responsiblefor checking and verifying all levels and dimensions and shall report alldiscrepancies to the Architect and obtain clarification prior to commencing work.forZ SQUARE CONSULTING INC.1100 GORDON BAKER RDNORTH YORK, ONTARIOM2H 3B3info@zsquareconsulting.com1-416-502-161610/24/2022 12:25:15 PM1 : 15032 Don Hillock Dr. Aurora,Ontario32 Don Hillock Dr. Aurora,OntarioBUILDING SECTIONSMr Ding21034TJNZA005No. Description Date2 Issued for Review 2021-10-203 Issued for SPA 2021-11-094 Issued for Coordination 2022-04-225 Reissued for SPA 2022-05-246 Reissued for SPA 2022-11-041 : 150BUILDING SECTION 111 : 150BUILDING SECTION 22Page 62 of 63 NPARKING LOT7 UNITS INDUSTRIAL BUILDINGRETAINING WALLLOADING SPACEPARKING LOTMAIN ENTRANCESRETAINING WALLBARRIER FREE RAMPM/E ROOM ENTRANCERETAINING WALLPROPERTY LINELANDSCAPING STRIPSLANDSCAPINGSIDEWALKSIDEWALKPYLON SIGNBIKE STALLBARRIER FREE PARKINGDon Hillock DrP R O J E C T S C A L E D R A W N R E V I E W E DI S S U E R E C O R DR E V I S I O N R E C O R DNote: This drawing is the property of the Architect and may not be reproduced orused without the expressed consent of the Architect. The Contractor is responsiblefor checking and verifying all levels and dimensions and shall report alldiscrepancies to the Architect and obtain clarification prior to commencing work.forZ SQUARE CONSULTING INC.1100 GORDON BAKER RDNORTH YORK, ONTARIOM2H 3B3info@zsquareconsulting.com1-416-502-161610/24/2022 12:25:22 PM32 Don Hillock Dr. Aurora,Ontario32 Don Hillock Dr. Aurora,OntarioMASSINGMr Ding21034TJNZA006No. Description Date2 Issued for Review 2021-10-203 Issued for SPA 2021-11-094 Issued for Coordination 2022-04-225 Reissued for SPA 2022-05-246 Reissued for SPA 2022-11-04AXONOMETRIC VIEW13D-VIEW 1 (North)23D-VIEW 2 (West)3Page 63 of 63