Agenda - Special General Committee - 20051215SPECIAL GENERAL
COMMITFEE AGENDA
2006 OPERATING BUDGETIST DRAFT
BUDGET 2nd DRAFT
N0.05-28
TNURSDAY, DECEMBER 15, 2005
6:00 P.M.
COUNCIL CHAMBERS
AURORA TOWN HALL
PUBLIC RELEASE
14/12/05
TOWN OF AURORA
SPECIAL GENERAL COMMITTEE MEETING
2006 - 2008 Capital Plan - Draft 2 and
2006 - 2008 Operating Budget - Draft 1
AGENDA
NO. 05-28
Thursday, December 15, 2005
6:00 p.m.
Council Chambers
Mayor Jones in the Chair.
I DECLARATIONS OF PECUNIARY INTEREST
11 APPROVAL OFAGENDA
RECOMMENDED:
THAT the content of the Agenda as previously distributed by staff be
approved as presented.
III DELEGATIONS
Special General Committee Meeting No. 05-28 Page 2
Thursday, December 15, 2005
IV ITEMS REQUIRING SEPARATE DISCUSSION
1. TR05-039 – 2006 Capital Budget (pg. 1a)
RE: 2nd Draft – 2006-2008 Capital Plan
and
Memorandum from the Director of Financial Services/Treasurer
Re: 1st Draft - 2006-2008 Operating Budget Plan with Additions
(Revisions to various pages of the proposed 2006 Operating Budget)
RECOMMENDED:
THAT report TR05-39 be received and referred to the 2006 Budget.
NOTE: To view a complete copy of the 2nd Draft – 2006-2008 Capital and 1st Draft –
2006-2008 Operating Budget Plan, please visit our website www.e-aurora.ca or
visit the Aurora Public Library or the Town Hall during business hours.
2. Correspondence from Mr. Stephen Granger, resident (pg. 83)
Re: 2006 Feedback for Review by Town of Aurora
RECOMMENDED:
THAT the correspondence be received for information.
V ADJOURNMENT
SPECIAL GENERAL COMMITTEE — BUDGET — DECEMBER 15, 2005
----------------------------------------
LGEN1)1TEP3 _A
TOWN OF AURORA
Special General Committee REPORT No. TR05-039
SUBJECT: 2006 Capital Budget
FROM: L. John Gutteridge, Director of Finance/Treasurer
DATE: December 14, 2006
RECOMMENDATIONS
THAT report no. TR05-39 be received and referred to the 2006 Budget.
BACKGROUND
Please find attached replacement pages for your budget book.
These changes all revolve around the capital program. As discussed at our last budget
meeting we identified that if we did all of the Capital Projects as put forward by the
Directors it would result in some of our reserves being in such a deficit that we would be
unable to recover. As a result we have deleted a number of the Capital Projects and
deferred them to 2007.
On the new pages we are providing the Capital Projects that are on the white sheets are
the projects we are recommending.
The projects on the yellow sheets are the projects we are recommending be deferred to
2007.
Please review the Capital Projects, if the budget gets passed with these projects in the
budget we will be preceding with this work immediately upon approval of the budget.
Page one and two of the hand out is the summary sheet of the capital program, the
projects in the shaded section are the projects that are being deleted from the 2006 budget
and referred to the 2007 budget.
The total of the projects being recommended in the 2006 budget amount to
$10,412,283.00.
I A
SPECIAL GENERAL COMMITTEE — BUDGET — DECEMBER 15, 2005
December 15, 2005 - 2 - Report No. TR05-039
A report on capital and the impact on Reserves and Reserve Funds will be presented at
the meeting on December 15, 2006.
COMMENTS
OPTIONS
FINANCIAL IMPLICATIONS
CONCLUSIONS
LINK TO STRATEGIC PLAN
Goal "A" — To Maintain a Well Managed and Fiscally Responsible Municipality.
ATTACHMENTS
Revised Capital Budget
PRE -SUBMISSION REVIEW
Reviewed by: SMT Committee December 7, 2006
Prepared by: L. John Gutteridge, Director of Finance/Treasurer
Joh Gutteridge `
Director of Finance/Treasurer Ext- 4111
CAPITAL PLANTON06ALMN {DRAFT 21
CAPITAL FORECAST -- 2006
SUMMARY BY DEPARTMENTAL RANKING
0epartmenlal
Other
Reserve
Ranking
Project Description
Project ID
Gross Cost Financing
Reserves
Funds
Administration
Corporate
1
By-law Enforcement Vehicle - Buy out
13002
10,000
10,000
2
Management System - Website
13006
30.000
30,000
3
Promotional "Lure" Folders & Community Profile
13004
20,000
20,000
4
Town Entry Signage
13005
20,000
20,000
5
Downtown Commercial District Signage
13003
30,000
30,000
6
Highway 404/Wellington Street East Landmark Entrance Featu
13007
80,000
80,000
Total - Corporate
190,000
80,000
110,000
0
Treasury
1
Financing - Fire Pumpers (2)
14011
400,000
400,000
2
Financial System Replacement
14002
40,000
40,000
3
Information Technology
14005
200,000
200,000
Total - Treasury
640,000
0
640,000
0
Total -Administration
830000
80,000
750,000
0
Works
2006 Projects
1
Reconstruction, Project # 2, 2005
31020
43,000
18,000
25,000
2
New Fuel Pumps
34206
10,000
3,000
7,000
3
Wellington East Sidewalk / Bikeway
31034
1,533,000
153,300
1,379,700
4
REPLACEMENT OF TWO PICK UP TRUCKS
34119
80,000
5,000
55,000
5
Reconstruction Project #2, 2006
31030
1,298,000
756,000
542,000
6
REPLACEMENT OF DUMP TRUCKISNOW PLOW
34115
190,000
20,000
- 170,000
7
Reconstruction Project #1, 2006
31029
1,800,000
930,000
870,000
8
WORK'S YARD BUILDING RENOVATIONS
34209
60,000
25,000
35,000
9
Street Light Operating & Maintenance Study
34703
75,000
75,000
10
Contract Administration and Inspection
31028
71,783
71,783
11
REPLACEMENT OF 1 TON DUMP TRUCK (#17)
34120
80,000
8,000
72,000
12
Video Surveillance System
34208
20,000
15,000
5,000
6,240,783
1,962,083
415,000
2,863,700
Total- Works
5,265,783
1,964,583
415,000
2,888,200
Storm Sewer
2006 Projects
Infrastructure Management System
42013
150,000
150,000
WASTEWATER INFRAS REHAB PROGRAM
42022
260,000
250,000
SWM Facility Retrofits - NW-1 and NC-2
42023
600,000
600,000
Sediment Removal from SWM facilities
42024
100,000
100,000
Total - Storm Sewer
1,100,000
0
0
1 100,000
Water
2006 Projects
STRUCTURAL WATERMAIN RELINING - COMRIF PROGRM
43029
350,000
350,000
Mainline Valve Rehab & Exercising
43024
50,000
50,000
Cathodic Watermain Protection
43023
50,000
50,000
WATER SERVICE BOX REHABILITATION
43026
50,000
50,000
Total -Water
500,000
0
0
500,000
Leisure
2006 Projects
1 ACC Ice Surface and Dasher Board Replacement
72042
450,000
450,000
1 Town Hall Security System
72039
50,000
50,000
1 Installation of Security Monitoring Devices -Aurora Rec Compk
72046
25,000
25,000
1 Aurora Central Library Security System
72041
25,000
25,000
2 2b Buffer/Future Wildlife Park Edge Planting
73072
247,000
247,000
1 Aurora Leisure Complex Fitness Move
72047
237,000
237,000
1 Aurora Leisure Complex Pool Filter Tank
71025
32,000
32,000,
-1-
FIIe:S:\Treasury\F05 Budgets &Estimates\2006 Budget\capital 06 ranking-D2.xls Date:14112/2005
CAPITAL PLAWONNALRON {DRAFT 21
CAPITAL FORECAST -- 2006
SUMMARY BY DEPARTMENTAL RANKING
Departmental
Other
Reserve
Ranking
Project Description
Proect ID
Gross Cost
Financing
Reserves
Funds
8
1
Leisure Complex - exterior restoration
72023
12,000
12,000
9
1
ACC 1 Auditorium / Kitchen Up -grade
72018
23,000
23,000
10
1
Theatre Aurora Capital Improvements
72043
30,000
30,000
11
1
Roller Shades Town Hall
72040
30,000
30,000
12
1
Installation of a Fire Supression System - Church St. School
72048
109,000
109,000
1
2
Sheppards Bush Sports Field
73069
650,000
65,000
585,000
2
2
Trail Connection St Johns to Newmarket
73068
260,000
10,300
-
239,700
3
2
Machell Park Playground Replacement
73067
75,000
75,000
4
2
Backhoe Loader
71033
145,000
8,000
137,000
5
2
Cenotaph Fencing Replacement
73064
20,000
20,000
2,410,000
330,300
1,126,000
963,700
Total - Leisure 4,664 000 464,800 1,791,800 2,417,400
Library Operations
2006 Projects
Collection Development - Growth Related
77001
50,000
50,000
Library Information System
77003
11,500
11,500
Systems Development
77004
20.000
20,000
Self Check -Out Service
77008
60,000
60,000
Strategic Directions
77009
25,000
25,000
Digital Micrographic Scanner- Printer
77006
15,000
15,000
Total - Library Operations
181,500
0 131,500
50,000
Planning
Growth - Related Studies
81001
150,000
150,000
Total - Planning
150,000
0 0
150,000
Grand Total 12,691,283
2,499,383
3,088,300
7 103,600
Capital Projects for200610,412,283
2,372,383
2,422,500
6,617,400
-- deferred to 2007 2 279 000
127,000
665,800
1,486,200
12,691,283
2,499,383
3,088,300
7,103,600
-2-
FIIe:S:\Treasury\F05 Budgets &Estimates\2006 Budget\capital 06 ranking-D2.xls Date:1411212005
Project ID :
Project Name
Department:
Service ! Program
Year of Initiation
Flexible:
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
on
Pa a No:
13002
3y-law Enforcement Vehicle - Buy out
Administration
Cor orate
2006
Yes
Equipment - Other 10,000 10,000 {
Total Estimated Expenditures 10,00o to,o0o E
Estimated Fnancmg
MunicipalCapital 1(
Total Estimated Fnan
10 000 �
—3—
Project ID :
Project Name
Department:
Service / Program:
Year of Initiation :
Flexible:
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
13006
Management System - Website
Administration
Cor orate
2006
No
Purchase of content managment system modules to increase the functionality, interactivity and
efficiency of the Town's website.
Additional website functionality will affect efficiencies in several areas of the corporation
including; increased parking revenue, decreased staff processing time of parking tickets;
decreased staff processing time on program registrations and decreased telephone inquiries.
Stakeholders will enjoy increased levels in the areas of program registration, parking ticket, tax
and water billing payment methods and options, special event information, job and resume posting
options as well as subscriber newsletter option.
Modules to be purchased and customized include:
- On-line payments (parking tickets, water and taxes) $7.600
- On-line Registration / payment
$7,500
- Interactive Community Calendar
$4,500
- Newsletter
$1.000
-Job Posting
$4,500
- On-line Discussion Formums / Polling
$5,000
moo"
�`
s
Descrrp�ron
�U6�
Von,
Estimated Expenditures
Equipment - Other
30 000 30,000 1
Total Estimated Expenditures
30,000 30,000_
Estimated Fnancmgmwmm
t
{
Municipal Capital a
30,000 30,000 ,
Reserves
; 3Q000 000 30
Total Estimated Financing
30,0001 30,0001
-4-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name:
Department:
Service / Program
Year of Initiation
Flexible:
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
13004
Promotional "Lure" Folders & Community Profile
Administration
Cor orate
2006
No
Economic Development: To update the existing economic development promotional/marketing
folders to incorporate the Town's new logo and tagline, as well as new projects under construction
or imminent such as the State Farm Head Office and the Whitwell Development The updated
folders will replace the supply currently being used by the Economic development Division, which
is now at a low level and will need to be reprinted. The Community Profile, which was lasted
updated by Planning Department staff in late 1999, is an important component of the materials
included in the folder.
Utilized by the Economic Development Division as the key communications tool for promoting the
Town of Aurora locally, nationally and internationally to potential business investors. Staff
believes that producing a cohesive and professional marketing document is critical in promoting
the message about the benefits of locating a business in Aurora. Incorporating the new logo and
tagline is essential in communicating a consistent brand through the folder. The Community
Profile is an important information document that augments the functionality of the folder and
marketing materials.
Both materials need to be updated in order to cohesively provide a single promotional message to the investment
community. The Community Profile document will support and augment recently produced publications already
included in the marketing folder.
Estimated
Reserves
Total Estimated
-5-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name :
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
13005
Town Entry Signage
Department:
lAdministration
Service / Program
lCorporate
Year of Initiation
12006
Flexible:
I Yes
.Lt��170.�=
Economic Development: To update various entry signs to the Town of Aurora with the new logo
and tagline.
Consistency in communicating the Town's new brand and marketing message. Also, improve the
visual impact of Town signage upon entering the community.
There are a number of Town entrance signs that are outdated and require new graphics and Information. Two signs
of are particular interest to Town staff. The first is the'Welcome to Aurora' sign on the east side of Yonge Street,
south of Edward Street. The panels on this sign should be updated to reflect the Town's new logo and tagline, as
well as from a colour perspective. A second sign is that indicating the Town Hall location, at the corner of
Wellington Street E. and John West Way. This sign should also be upgraded with the new logo and tagline. A third
location Is at the south end of the Town, at Industrial Parkway S. and Yonge Street. Staff has been approach by
GO Transit to work with the Town to put logos on the CN rail bridge that crosses Yonge Street. These plans have
been in the works for some time but will now be revised with the new logo and tagline, This is a very strategic
location for a welcome to the community sign opportunity.
S
Total
Estimated Financing
Municipal -Capital 20,00- 20,000 ;
000
Project ID :
Proj act Name:
Department:
Service / Program
Year of Initiation
Flexible:
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
13003
Downtown Commercial District Signage
Administration
Cor orate
2006
Yes
Economic Development: To erect 3 downtown commercial district signs to assist in creating
distinct retail/commercial districts in the downtown area along Yonge Street Each sign would
have a specific heritage district name and have a separate panel to advertise upcoming
events/celebrations within that area.
Assist local merchants with Yonge Street addresses to increase their profile and recognition
based on District identity. Will allow customers (pedestrians/motorist) to more easily determine a
businesses' location on Yonge Street and within the downtown. Will help distinguish the
downtown commercial core from other areas through themed signage.
This initiative was included in the Actions/Initiatives contained in the approved 2003 Economic Development
Strategy. Temed signage in the downtown that is associated with this retail/commercial area will create distinct
districts that can be profiled. Merchants in the downtown core require additional assistance from the Town as other
areas in Aurora develop as new retail/commercial destination points (i.e., Bayview Ave.).
Estimated Financing
Municipal,Capdal ,.__
30,OOD
-7-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
t3007
Highway 404/Wellington Street East Landmark Entrance Feature
Department: lAdministration
Service / Program lCorporate
Year of Initiation 12006
Flexible: Yes
To design and construct a landmark entrance feature in the Highway 404 and Wellington St E.
Location to demarcate the easterly gateway to the Town. The feature should incorporate the Town's
new logo and tagline and welcome visitors into the community. It would also frame the eastern
face of the community from the Highway announcing the prominence of the Town of Aurora.
Funding for this item has already been secured by Town staff through a contribution from
Whitwell/First Professional Developments. The Economic Development Division has been given
carriage of this project by the CAO and a working staff team will be organized shortly in order to
undertake the project
Increase the marketing and promotion of the Town through a visual landmark feature. It will help
distinguish the prominence of the Town Iand promote the Town's emerging urban edge to passing
motorists.
This initiative was included in the approved 2003 Economic Development Strategy in the section addressing the
Town's image. Although developments such as State Farm and First professional will eventually alter the character
of this eastern edge of Aurora, landscaping and design schemes such as a landmark are necessary to prioritize and
implement corridor upgrading.
Estimated Expenditures
Contracts 80,000 80,000: ;
Total Estimated Expenditures 80,00o so 000
Estimated inancm.
.:..... .�...,... ..... .. .,..... ... E
Contnbutions from Developers _ 80 000 80 000
Total Estimated
ME
Project ID :
Project Name
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
14011
financing - Fire Pumpers (2)
Department:
lAdministration
Service / Program
ITreasury
Year of Initiation
12006
Flexible:
I Yes
of 2 new Fire
provide the Town of Aurora's share
- pumpers.
of two (2) new pumpers for the Fire Department.
000
Estimated Financing _
Fire Services Capital „ 400'00p i 400 0001
_i. _... .... __ ..,.
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
14002
=financial System Replacement
Department: lAdministration
Service / Program ITreasury
Year of Initiation 12006
Flexible: I Yes
To acquire the purchasing module for the Vadim system. This was scheduled for 2006 and is
needed to improve efficiencies in purchasing and the corporation.
Will improve the Purchasing operation and provide and maintain history for improving unit pricing.
There is an annual cost for software support however if we do not automate we will have to hire
an additional staff for the purchasing department
Automates the purchasing process for the Town.
Estimated
-10-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
14005
nformation Technology
Department: lAdministration
Service / Program ITreasury
Year of Initiation 12006
Flexible: I Yes
Program: MIS — Continuation of the corporate -wide initiative to upgrade network information
technology.
Advances in information technology continue to support and enhance the efficiency of business
processes on a corporate -wide basis.
Server Evergreening $10,000; Additional Servers Required to Support New Applications $20,000; Network Security
Enhancements 11,000; CCTV monitoring for remote sites via DVR device $10,000; Evergreening PC Replacement
$45,000; Printer Replacement $15,000; Large format scanner/plotter GIS/PW $25,000; LCD Projector $8,000;
License increases - Adobe Illustrator, Writer, Distiller, Quark Express, ArcView, MS Project, Visual Studio $11,000;
Class - $11,000, Microsoft Annualized Licensing $20,000, Tablet Acquisition $14,000.
Estimated Expenditures
Equipment - Other 1 800,000 200 000 200,000; 200,000 200,000;
Total Estimated Expenditures ! 800,0001 200,0001 200,000 200,000200,000'
� I
Intimated Financing ( ;
Munic al Capdal ,_.. _ §29,999! , 200,000, 200,000 200,000' 200,000'
Total Estimated Financing 1 800.0001 200.0001 200.000E 200.0001 200.0001.
-11-
CAPITAL PLAN 2006-2009 {DRAFT 2)
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a Nc:
31020
Reconstruction, Project # 2, 2005
Department: Works
Service 1 Program : Works
Year of Initiation 12005
Flexible: I Yes
's-�q ',3'�4--v,ts.T.v' x. :53..:.�+-r..�"a.�m,.:_� 4 a �yS� �� 4e�-✓-'w�"--=
Program: Roads — Reconstruction of Fairway Drive from Murray Drive to Stoddart Drive, Eldon
Crescent, Glenview Drive, and east end of Devlin Place. To provide funding for the reconstruction
of the roadways, watermain, and sewer infrastructure.
The
lessen maintenance
Costs for roadworks and underground infrastructure as per the costs contained in the 10-Year Capital Plan. These
portions of these four streets that are being reconstructed are proposed to be tendered as part of one larger
contract rather than separate smaller contracts, in order to achieve economies of scale. Only the oldest portion of
Devlin Place, adjacent to Murray Drive, is being reconstructed.
---.erg =.
RbEMEMM
MEMO
Des iptJon _ _ Pro[ocfion==QQ�OQ� 20Q8= 7Q6Q
Estimated Expenditures I
Contracts 43,0001 43,000
Total Estimated Expenditures 43,000j 43,0001
Estimated Financing
Contribution from General 18 000# 18 000
Other Financing 18,000 18 000
Storm Sewers 25 000 25 000
ate d
—12—
Project ID:
Project Name
Department:
Service / Program
Year of Initiation
Flexible:
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
34206
Jew Fuel Pumps
Works
Works
2006
Yes
Program: Equipment —To replace existing 30 year old fuel pumps at Work Yard. Additional $10K
requested for 2006 as per recommendations from Fleet Management Study.
- Increased Safety and Fuel Delivery System
- Decrease non-compliance issues with Fuel Handling Regulations
Existing gas and diesel fuel pumps at 9 Scanlon Crt, have reached their useable service life and have been
experiencing increased breakdowns. Continuous uninterupted fuel delivery is vital for all Public Works, Parks,
Liesure and Fire Services operations.
Estimated Expenditures
Equipment Other f 10,000 0,000
Total Estimated Expenditures I 10.00010.000
Estimated Fnancing
I
Municipal Capital
3,000
3,000
Reserves
3 000
3,900=
Storm Sewers ., w _.._ . _..- ... .......
4 000
4,000 i
Water & Sewer _ , _ _ ,.
3,000 .^ „
_ 3 000
Reserve Funds
7 000
7 000
Total Estimated Financina 1
110.0001
10.000f I
-13-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Proj act Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
31034
Wellington East Sidewalk / Bikeway
Department: lWorks
Service / Program lWorks
Year of Initiation 12006
Flexible: Yes
To provide funding for the construction of Sidewalk/Bikewa
between Bayview Avenue and the new Recreation Centre.
on Wellington Street East
This project is included in the Town's DC By-law, and will result in the extension of pedestrian and cycling facilities
and streetlights east of Bayview Avenue along Wellington Street to serve development in the 2B area out to the
new Recreation Centre. These facilities will be extended east to Leslie Street in the future.
Expenditures
Contracts 1,533,000j 1,533,000; !
Total Estimated Expenditures ( 1,533,OOmi 1,533.000
Estimated Financing _ _ -
Other „Grants
_._
153,300I ,. _ 153 300
379 700 3
Reserve Funds 1,379,700 1,379,700
700 t i
Develo ment Char es 1 1
79,700j
Total Estimated Fnancinq 1 1.533.0001 1.533.0001 I
—14—
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name :
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
34119
REPLACEMENT OF TWO PICK UP TRUCKS
Department:
Works
Service / Program:
lWorks
Year of Initiation
12006
Flexible:
Yes
To replace two current 1995 pick up trucks (No. 3 & 5) with a new units, in keeping with Fleet
Management Replacement Program.
Increase cost effectiveness and overall public presence by replacing aging high maintenance and
unsightly equipment with new fuel efficient modern vehicles. Decrease maintenace requirements
and vehicle down time, as well as reduce liability by eliminating potential vehicle failure on public
roadways.
There are two current Public Works pick up trucks that have now reached their usefull and cost effective service
life and have been scheduled for replacement as part of the Fleet Replacement Program. One unit is used by the
mechanical staff to service equipment on the road and to pick up parts, and the other one by roads/traffic staff for
general roads related maintenace activities. These vehicles are not an addition to the fleet, rather just
replacements.
ant- Other
Estimated
Estimated Financing
Sale of Equipment _ _5 8
Other Financing ; 5,0
Public Works Equipment
Estimated
-15-
Project ID :
Project Name
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
31030
Department: Works
Service / Program lWorks
Year of Initiation 12006
Flexible: Yes
N
4
Program: Roads - Reconstruction of Hill Drive. To provide funding for the reconstruction of the
roasway,watermain, and sewer infrastructure.
i
Estimated Financing -m
Contribution from General 1273
Other Grants 628 7
Storm Sewers
Water & Sewer
27 000 I _ 27 D00
15 000 515,000
-16-
Project ID :
Project Name
Department:
Service / Program
Year of Initiation
Flexible:
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PRW ECT
34115
REPLACEMENT OF DUMP TRUCK/SNOW PLOW
Works
Works
2006
Yes
To replace a current 1988 dump truck/snow plow (No. 23) with a new unit, in accordance with Fleet
Management Replacement Program.
Increase cost effectiveness to the Town by replacing an aging, high maintenance unit with a new
modern vehicle with liquid de-icing capabilities. Decrease maintenace requirements and
A current 1988 model dump truck/snow plow has now reached it's usefull and cost effective service life and has
been scheduled for replacement as part of the Fleet Replacement Program. This new unit will have the industry
standard liquid de-icing capabilities in keeping with the Town's Salt Management Plan. Not an addition to the
fleet.... Replacement.
�=_ —���_ •.�,_�=�-.i��,_PRt7JE�T,G=�`RN�s�-
��FI _lvlt�G_ �' =-="��m.____�,.
-
Ak
DesCr pti�i�._. _
P iectron008
q0> 0. Qa w m
Estimated'
..----
..;..... _
. ...._.....,. _.__.........._ .. u_ _....
Equipment - Other
190,000
190,0001
,
Total Estimated Expenditures
190,0001
190,000
;
Estimated Financing
Sale of Equipment
_ . 20 000
20,000
j
Other FinancinR
20 000
20 0001
Public Works Equipment _ .
170 000
170 090
Reserves
170,000
170,000
Total Estimated Financing
I 190,000,
190,0001
I
-17-
Project ID:
Project Name
Department:
Service 1 Program
Year of Initiation :
Flexible:
CAPITAL PLAN 2006-2009 {DRAFT 2}
TOWN OF AURORA
CAPITAL BUDGET' - ANALYSIS BY PROJECT
31029
Reconstruction Project #1, 2006
Works
Works
2006
Yes
Roads - Reconstruction of Mark Street, Oak Court, Cedar Crescent, and Birch Court To provide
funding for the reconstruction of the roadways, watermains, and sewer infrastructure
The reconstruction of this infrastructure
Estimated Financing
Contribution from General
Other Fa inncing_
maintenance
i _Finn nnn f -
9: 000 930 000
30{ _ 9,000 930,00,0 t
27,00 27 000
843,0 843 000
-18-
CAPITAL PLAN 2006-2009 {DRAFT 21
11 &1TAT 1 Z Kola0111 7_1
Project ID :
Project Name
Department:
Service / Program
Year of Initiation
Flexible:
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
34209
WORK'S YARD BUILDING RENOVATIONS
Works
Works
2006
Yes
APR Jam' D�.^t�illP N
1013
2A IN=
provide updated facilities at 9
use
staff.
The current washroom facilities used by Public Works field staff is over 25 years old and requires replacement of
aging plumbing fixtures and showers, as well as the overall structural improvement of the facility.
"Y _ _:�"'�-' _� l?Ri:;?�J C�ts()S7►N�'�AwID�Fi
a
� -� f-� �� � ~--�� =�-
=Ib
0..,
�=OR
ben rpUo� PFo
ectiii
20Q6
I
Q008
200
Intimated Expenditures �
Contrails
180,000
60,000! 60.0001
60,000 E
Total Estimated6rpenditures
180,000
60000
60,0001
60000j
Estimated Financmg
mm
Municipal Capital. _ , _, .w ,. __
75 000�
. 25 0001
,. , 25. 000 !
25 000
Reserves
75r000'
25r000
25r000E
25�000€
Storm Sewers , „
30,000
10. 000 <<,
,___ 10,000
10 0001
....._.,.w _ „
Water &Sewer _._.._ .......
75 000
..,..
.....
25 000
_. ,
m._ 25,000
25,000 G
. _,.
Rese...rve Funds
105,000
35,000
35 000
35,000�
Total Estimated Financing I
18o,0001
60 000 1
60,0001
60,000,
-1 9-
CAPITAL PLAN 2006-2009 {DRAFT 2}
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGE' - ANALYSIS BY PROJECT
F34-703
Street Light Operating & Maintenance Study
Department: Works
Service I Program Works
Year of Initiation
Flexible: Yes
MPil' TO optimize and review maintenance operations of street lighting infrastructure to ensure ESA
co
WEBB
provide
account of maintenance
with respect to system costs and
practices.
billings.
Estimated Financing —
_
Municipal gapital 75.000 76-09-0t
-
ated
—20—
Project ID:
Project Name
Department:
Service i Program
Year of Initiation
Flexible:
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
31028
'ontract Administration and Inspection
Works
Works
2005
Yes
Salaries/benefits for Public Works Engineering staff to be assigned to 2006 and subsequent years'
Capital Works Projects for Construction Inspection/Contract Administration.
Fulltime Salaries 251,9471 59 819 62,419 64,0541 65,655
_...._,_,_ W . ,....,_._...,. -
- _...____.._ _....._
Employee Benefits 50 3901 11 964 12,4841 12,8111 13,131
Total Estimated Expenditures 1 3023-471 71.7831 749031 76.865E 78.786
Estimated Financing ;
m
Contribution from General , „ , ._ w... 302 337 71,783174 903 76 8651„ 78 7
_,_-_.__i
Total Estimated Financing 1 302.3371 71.M1 74.003i 76.8651 78.7861
-21-
CAPITAL PLAN 2006-2009 {DRAFT 2)
TOWN OF AURORA
Project ID :
Project Name :
CAPITAL BUDGET - ANALYSIS BY PROJECT
34120
Department: Works
Service / Program lWorks
Year of Initiation 12006
Flexible: Yes
To replace a current 1995 -1 ton dump truck (No. 17) with a new unit in keeping with Fleet
Management Replacement Program.
Increase cost effectiveness and overall public presence by replacing an aging high maintenance
and unsightly piece of equipment with a new modern vehicle. Decrease maintenace requirements
and vehicle down time, as well as reduce liability by eliminating potential vehicle failure on public
roadways.
The current 1 ton dump truck (#17) is used by Public Works for general road maintenance related activities such as
pot hole repairs, and has now reached it's usefull and cost effective service life. In keeping with the Fleet
Replacement Program, this vehicle is now scheduled for replacement.This vehicle is not an addition to the fleet,
rather lust a replacement.
Equipment - Other 80,000 80,000I
Total Estimated Expenditures I ao.000 so.000? I
Estimated Financing
Sale of Egwpment ._.,
Other Financmg
Reserves
-22-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
34208
Adeo Surveillance System
Department: lWorks
Service / Program 1works
Year of Initiation 12006
Flexible: 1yes
-
-''`.
To provide 24 hour yard security to discourage illegal after hours dumping of hazardous materials,
facility break ins and equipment vandalism.
Increase performance because staff will not have to spend the required time and cost to properly
dispose of the illegally dumped materials. Decrease liability to the Town.
1-�� TiQNS[�IIS�HLL<G�iTS'Z ,�—��� �-=�v'"•�-� .:��"��"
Increased incidents of illegal public drop off of hazardous materials at the gates to the Public Works Yard, as well
as break ins and trespassing have now warranted the need for a 24 hour CCTV survaillance system to discourage
such activities and help protect the Town with respect to public liability potential M.O.E. fines for illegal materials
re s
Total Estimated Expenditures I 2a.0001 20.0001 I i i
Estimated Fnancmg
Municipal Capital ,_, 15�0C
Reserves 75 dt
Total Estimated
—23—
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name :
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page No: .
34505
Traffic Calming
Department: lWorks
Service 1 Program : Works
Year of Initiation : 2006
Flexible: I Yes
PROJECT DESCRIPTION
PURPOSE:
Program: Roads -To provide funding fro the installation of Traffic Calming measures.
PERFORMANCEIACTIVITY MEASURES:
INCREASE 1 (DECREASE)
Increase in residents' satisfaction. Increase in safety on roads where traffic calming measures are
installed.
EXPLANATIONSIHIGHLIG HTS:
Staff is currently processing requests for traffic calming for several streets, and anticipate that a number of
streets will be approved for the installation of traffic calming measures in 2006 and subsequent years.
Description
Estimated Expenditures
PROJECT COSTING AND FINANCING
Tota I
2006 12007 12008 12009
Contracts 100,000 25,000 25,000 25,000 25,000
Total Estimated Expenditures 100,000 25,000 25,000 25,000 25,000
Estimated Financing
Contribution from General
10,000
2,5C0
2,500
2,500
2,500
Other Financing
10,000
2,500
2,500
2,500
2,500
Development Charges
90,000
22,500
22,500
22,500
22,500
Reserve Funds
90,000
22,500
22,500
22,500
22,500
Total Estimated Financing
100,000
25,000
25,000
25,000
25,000
-24-
CAPITAL PLAN 2006-2009 {DRAFT 2}
TOWN OF AURORA
Project ID :
Project Name :
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
42013
Infrastructure Management System
Department: IStorm Sewer
Service / Program I Storm Sewer
Year of Initiation 12005
Flexible: Yes
Program: Sewer/Water — To continue to develop the infrastructure management plan which will
assist in the long-range maintenance and capital budgeting program for public infrastructure.
-Allow the department to be more proactive in maintenance and rehabilitation of infrastructure
systems
- Increase life cycle
- Decrease future maintenance costs and potential liability to Town
- Increase customer satisfaction
This is an ongoing project encompassing the Department's long term infrastructure management initiatives including
projects and programs such as MIDS, GIS, InfraPave, inventory information collection, and development of
proactive new policies and programs.
A reduction in funding for this account will result in the Public Works Department having to curtail projects whose '
goal is decreased operational costs and increased performance.
Estim
Estimated Financing _ '
Water & Sewer 500 000, 150,000 150,0001 150,000
1
150,000
-25-
CAPITAL PLAN 2006-2009 {DRAFT 21
If U0yTPkr01WrM1_1T9TZV
Project ID :
Project Name :
Department:
Service / Program
Year of Initiation
Flexible:
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
42022
WASTEWATER INFRAS REHAB PROGRAM
Storm Sewer
Storm Sewer
200E
Yes
Program: Storm Sewer —To collect and analyze condition data for the Town's sanitary sewer
infrastructure, to provide the background information necessary for the creation of an overall
Sanitary Sewer Maintenance/Rehabilitation Plan.
Essential step in the creation of a long range rehabilitation/maintenance program to ensure the
integrity of the Town's sanitary sewer infrastructure, which will result in a reduction in the reactive
approach to infrastructure maintenance, and decreased potential liability to Town.
This is a continuation of a current program which utilize sewer video cameras and in -place point repair trenchless
technologies to provide staff with better knowledge of the existing condition and maintenance requirements for the
Town's wastewater collection infrastructure.
The results of this project are intended to provide real time analysis capabilities to project an overall Wastewater
Maintenance and Rehabilitation Program.
The program is concentrated within the older sections of Town and will move to the newer sections over a number of
years.
nw FRSI' T;t:OSTING /N FIIANCF(G ; - .
aW
Estimated Expenditures
Contracts 1 1,200,000 250000i 300,000 300,000; 350,000
Total Estimated Expenditures I 1,200,000 250,0001 300,0001 300,0001 350,0001
Estimated Financing . ._.._
350,000
1Afa4ar R Rawar � ! 1.200.000 250.000 � � 300,000 300,0061 !
ated
-26-
CAPITAL PLAN 2006-2009 {DRAFT 2)
TOWN OF AURORA
Project ID :
Project Name :
Department:
Service / Program
Year of Initiation
Flexible:
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
42023
SWM Facility Retrofits - NW-1 and NC-2
Storm Sewer
Storm Sewer
2006
Yes
To provide funding for the upgrade of the Stormwater Management facilities located at McKinley
Gate/St John's Sideroad (NW-1) and in Atkinson Park (NC-2).
The purpose is to upgrade these facilities from being strictly quantity control facilities to ones that
improve the quality of stormwater passing through them.
This project was brought to Council's attention via Report PW 2004-11. That report dealt with the award of the
contract for the upgrade of the Kennedy Street West/Deerhorn Crescent SWM facility and also with the initiation of
the Class EA and Detail Design for these facilities.
-27-
Project ID :
Project Name
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
42024
iediment Removal from SWM facilities
Department. Istorm Sewer
Service / Program I Storm Sewer
Year of Initiation 12006
Flexible: Yes
PRJEG) DERIF.f1Ngffi
To provide funding for the removal of sediment from v
accumulated sediment will improve
By design sediment accumulates in "wet' SWM facilities, and needs to be removed periodically. The facilities to be
cleaned, including volume and classification of the sediment to be removed, will be confirmed through the SWM
Facility Remediation Study.
Contracts
ated
res
Estimated Financing I
Storm Sewers 100 000 100,000
Reserve Funds 100,0001 100,0001
Total Estimated Financing 1 100.000i 100.000E ! 1 E
W
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
Project ID 143029
Project Name : STRUCTURAL WATERMAIN RELINING - COMRIF PROGRAM
Department: Water
Service / Program : Water
Year of Initiation 12006
Flexible: 1yes
To provide funding for the Town's share of the COMRIF subsidy program to structurally reline
various castiron watermains in Town, as detailed in Council Report PW05-024. As part of the
application for subsidy, the structural relining of cast iron watermains had been declared as the
Town's highest priority project, with 1/3rd proj act funding to be allocated from the Water & Sewer
Reserve, if successful.
The rehabilitation of aging cast iron watermains will prevent main breaks, service disruptions and
will improve customer satisfaction. Potential liability claims and contamination of drinking water
An application had been submitted by the Town to a federal subsidy funding program for infrastructure projects
(COMRIF), the project submitted as the highest priority was the structural relining of various cast iron watermains in
Town that are prone to failure. A total project valve of $1 million had been submitted and if successful, the Town's
portion of the funding is 1/3rd the value of the project.Structural watermain relining is a new unintrusive trenchless
method.
Estimated Expenditures
Contracts
36050,000;
350,000t
Total Estimated Expenditures t
350,000i
350,000
Estimated Financing
A,,
Water &Sewer
350 000
350 000;
_ _ _.., ,
Reserve Funds
350.Og0
„
350,000€
-29-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
43024
Department:
lWater
Service / Program:
lWater
Year of Initiation
12005
Flexible:
Yes
Program: Water —To identify, rehabilitate and exercise existing main line water valves to ensure
their ability to close and isolate certain watermains if required.
- Increased customer satisfaction.
- Reduction in the reactive approach to underground situations.
- Decreased potential liability to Town.
a
4 � y
A number of main line water valves throughout the Town are potentially inoperable due to their age and lack of
operation. Failure in the ability to use these valves during emergencies such as a watermain break will lengthen the
time required to repair the watermain and may result in liability to the Town. This is a continuation of a current
program that requires staff to be proactive in the identification of defective valves and their
replacement/rehabilitation.
Contracts i
2000001
50,000i
50,000)
50,000iE
50,000
Total Estimated Expenditures
200,0001
50,000
SO,000j
50,000€
50,000
i�i
-11
Estimated Financtn
I
r
Water
Water &Sewer
Sewer9
00=
50 000'I
50000
50,000!
e
50,000
Ikeerve
200,0 001
50 000?
50,000
50 000'
50 000
Total Estimated Rnancina
200.000!
50.000
50.000!
50.000
50.000
-30-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGEr - ANALYSIS BY PROJECT
Pa a No:
43023
'athodic Watermain Protection
Department : lWater
Service / Program IWater
Year of Initiation 12005
Flexible: Yes
58
b,t�QJE TAESCRIO7 #
—To provide metallic
Deferring, reducing, or eliminating this program may result in both customer inconvenience and
increased liability claims to the Town due to watermain breaks.
This preventative program involves the installation of "sacrificial" anodes attached to specific watermains and
fittings and the application of a Denso mastic product thereby directing the corrosive forces toward the anode and
away from the water infrastructure.This is a continuation of the current program, and also encompasses the
Investigation of the watermain's current condition, and subsequent rehabilitation.
Estimated Expenditures I
Contracts
200,000
50,000!
50,0001
50,000
50,000'
Total Estimated Expenditures ;
200,000'
50,000!
50,0001
50,00611
so,000
I
Estimated Financing
Water & Sewer
200,000'
500001
60,00011
50,0001
50,000
Reserve Funds i
200,000
50,0001
50,0001
50,000
50,000;
Total Estimated Fnancinci 3
200.0001
50.0001
50.0001
50.000
50,000i
—31—
Project ID :
Project Name
Department:
Service I Program
Year of Initiation
Flexible:
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
43026
Water
Water
2006
Yes
To rehabilitate existing water service shut off valve so that private water services can be shut off
during emergency water repairs.
Deferring, reducing or eliminating this program may result in both customer inconvenience and
increased liability claims to the Town due to the inability to shut off the water service.
Decrease basement flooding risk.
This is an ongoing annual program to help capture and ultimately ensure that every water service valve fronting a
home is fully functional and capable of Isolating the water flow in the event of a service request or emergency.New
unintrusive hydrovac excavation and keyhole replacement technology minimizes the surface damage that had been
typically associated with traditional open cut excavation practices.
-32-
Project ID:
Project Name
Department:
Service / Program
Year of Initiation
Flexible:
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No'
72042
ACC Ice Surface and Dasher Board Replacement
Leisure
Leisure
2006
Yes
��.=fn _ _ _—k�,- _--�-P4tOJ� hI�ES ►fiQN�-� � -:-x -, . �. _ �— a.:,
Decrease risk of down time and interference with rink users.
Replacement of main floor refrigeration circulation lines as a result of aging and numerous brine
leaks that have plagued the refrigeration system with increasing frequency over the past two
seasons. The original brine circulation tubes have been in service for 37 seasons and have
begun to deteriorate resulting in numerous leaks underneath the concrete floor surface. These
leaks have been detected and successfully repaired, however they are recurring more frequently
now and will most likely continue to do so in the future. This situation, if left unattended could at
some point result in ongoing expenses associated with localized repairs and interruptions in ice
users schedules. In addtion replacement of the dasher board system and glass is also necessary
and recommended at this time as these components are in constant need of repair and the current
dasher board and glass system must be removed to perform the work woth refrigeration system.
Estimated Expenditures
Contracts I
450,000j
450,0001
Total Estimated Expenditures
a5o oao
450,000
Estimated Financm
MalorCapdalReairs
450000
45000_0
Reserves
450,000
450,0001
Total Estimated Financing
4%000
450,0001 }
—33—
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID:
Project Name :
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
72039
Town Hall Security System
Department : Leisure
Service / Program : Leisure
Year of Initiation 12006
Flexible: Yes
—sel -
-PL�OJ�G�
valuable assets at Town
7CP Ifs tGH tam
I - MEN
To secure and protect valuble human and physical assets, property and information at Town Hall it is imperative to
perform security upgrades to the following: 1) Security Card Access System 2) Digitally Recorded Close Circuit TV
(CCTV) 3) Panic buttons and hardware at select locations in Town Hall. The existing card reader system (readers
and panels) are now becoming obsolete and difficult to service. Equipment and components, in particular at the
control panel, must be replaced as random malfunctions are occuring with component failures. Digitally recorded
Close Circuit Television and panic buttons at select areas in Town Hall will provide an additional dimension of
security for staff, patrons and residents.
Estimated Financing
Mator Capital,Repairs __ 50 000 50 000
Reserves 50,000 50 000
. E
-34-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Proj act Name
Department:
Service / Program
Year of Initiation
Flexible:
CAPITAL BUDGET - ANALYSIS BY PROJECT
72046
Installation of Security Monitoring Devices - Aurora Rec Complex
Leisure
Leisure
2006
Yes
��r"PCTDESClttP Q
EZ-4
=_
secure the Aurora Recreation Complex and protect property an
To keep property and assets safe and mitigate the potential for vandalism it is recommended that close circuit
television and motion detection devices be installed at select locations at the Aurora Recreation Complex including:
The pool deck, streetscape, Ice area entrances and service bay.
Leisure Services Equipment
-35-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name :
CAPITAL BUDGET - ANALYSIS BY PROJECT
72041
4urora Central Library Security System
Department:
Leisure
Service / Program :
Leisure
Year of Initiation
12006
Flexible:
Yes
Central Library for patrons
To improve security for staff and patrons at the Aurora Central Library staff recommend the installation of digitally
recorded Close Circuit Television (CCTV) in select and critical public locations in the interior and exterior of the
Library. Additionally staff recommends the expansion of security card readers for high traffic staff service halls
within the Library.
Estimated Expenditures
Estimate
-36-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
73072
2b Buffer /Future Wildlife Park Edge Planting
Department: Leisure
Service / Program : Leisure
Year of Initiation 12006
Flexible: Yes
— _
`MM � — P120 7 D SG 3lP bt =:sue -
establish buffer along the entire edge of the future Wildlife Park in the 2b development area.
To increase vegitative buffers to the future wildlife park edges. To decrease impacts associted
with urban development in close proximity to the future Wildlife Park. To
To impliment buffer plantings associated with the futrure Urban Wildlife Park in the 2b development area along the
west edge of the park,Buffer plantings were recommended in the environmental background studies associted with
this area and funds have been collected from the developers group for this purpose. The Town is working closely
with LSRCA in the implimentaion of the planting works.
Estimated Rnancmg
Contributions from Developers
247
Total Estimated Financincl ] 247.0001 247.0W I {
-37-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
Project ID:
Project Name .
Department :
Service / Program
Year of Initiation
Flexible:
- Expand servce for programs
Pa a No:
72047
Aurora Leisure Complex Fitness Move
Leisure
Leisure
2006
Yes
With the movement of the childrens programs to the new Recreation Complex the activity rooms at the Leisure
Complex will be open for the expansion of the fitness centre into this area. The wood flooring In the current fitness
centre will be moved to the activity rooms for instructional fitness classes. The wood flooring in the fitness area will
be replaced with rubberized sport flooring to accomodate further gym and cardio expansion. In addition work to the
structure in the current activity area at the Leisure Complex will be required for this project (wall and kitchen
removal and re -finishing).
=r
-
�Descrr--A
Estimated Expenditures
Estimated . w
Egwpment Other 87 000
87,000
Contracts 150,000
150,000 . ~ ,
TotalEstimatedExpenditures 237,000
237,000
Estimated Fnancmg
I
Mqq ic ipaI 0apda1 150 000
150,000' _
.w
Leisure Services Egulpmenty L __ 87 000
._...._ _ ._.. ,._w. _ . .
, .. 87,000(. [
w ....._ .
Reserves 237,000
237,000
Total Estimated Financing 237,00
237,0001 9 E
Im
Project ID :
Project Name
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
71025
Department: Leisure
Service / Program: Leisure
Year of Initiation 12006
Flexible: I Yes
Maintain pool filtration standards at the Aurora Leisure Complex.
F
The original pool filtration tank at the Aurora Leisure Complex will need to be replaced as rust has effected the
structural integrity of the tank.
Estimated Financmg
Leisure Services Equipment 32,000 32,01
—39—
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name :
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
72023
Leisure Complex - exterior restoration
Department : Leisure
Service l Program : Leisure
Year of Initiation 12006
Flexible: I Yes
NO 0P120JG`IE5C�1QI>..
Program: Facilities —To restore deteriorated weather seals and to prevent further deterioration of
masonry block walls.
To decrease the potential for further damage to the exterior structure of the masonry walls
To increase life span of the Leisure Complex Building
To decrease the risk of further deterioration to the building fabric and additional and increased
restoration expenses.
Deterioration of masonry block wall above the main entrance to the Leisure Complex has occurred as a result of
humidity absorbsion originating in the cold side of the building. This situation has resulted in cracking of the mortar
joints which allows water to move freely into the building.
Staff has concluded through a detailed review with the aid of a building consultant that the problem can be
permanently solved by applying a metal cladding and an insulation barrier in this particular location. In addition,
there is also a need to re -caulk a number of windows, control joints and repainting all exposed exterior steel
surfaces.
Fstrmated Financing ......_.. _ _....._...
Major Capital Repairs
Reserves
12
1
12 000 12 000
12.0001 12.0001
CAPITAL PLAN 2006-2009 {DRAFT 2)
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
72018
%CC 1 Auditorium I Kitchen Up -grade
Department:
Leisure
Service / Program :
Leisure
Year of Initiation
12006
Flexible:
I Yes
Progam: Facilities —To upgrade original wall finishes, lighting and countertops in ACC1 Auditorium
and Kitchen.
ncrease
for functions in the auditorium.
To continue with the capital restoration work In the ACC1 building auditorium and kitchen areas. These areas are still
clad in the original wall coverings. The kitchen wall coverings and counter tops, all of which have deteriorated to a
point that they have become unsightly and as a result the auditorium has become underused for private events and
functions. Upgrades in the year 2004 Included new flooring, curtains and windows as well as some minor painting,
The above renovations will complete the upgrades necessary to restore the Auditorium for continued and enhanced
usage.
Estimated Financing
Mator Capital Repairs
-41-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No.
72043
theatre Aurora Capital Improvements
Department:
Leisure
Service / Program :
Leisure
Year of Initiation
12006
Flexible:
I Yes
To meet agreed upon capital improvment items listed in the lease with Theatre Aurora. Improve
the interior and exterior conditions of the building for use by patrons.
EXP CSt!�l��If=LGitS �,_
As agreed upon capital improvements to the factory theatre over a 10 year lease agreement with Theatre Aurora.
The Town has listed the following work for year two of the lease agreeement: 1) Replace emergency lighting
battery packs, 2) Replace outdoor electrical fixutures and light pole and 3) Parking lot paving and curbing restoration
in lieu of capital projects assigned to the Town of Aurora and undertaken by Theatre Aurora in year one of the 10
year lease agreement.
Estimated Financing I
Municipal Capital ,_ ��._„_
M
-42-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a Nc,
72040
Roller Shades Town Hall
Department: Leisure
Service / Program : Leisure
Year of Initiation: 12006
Flexible: I Yes
e conditions for patrons
.c...,,... a....""-�,x c�a�«-.sn. ,.-..- ................:. �.._ .� "�'+,.�'.=;m,--.'_--.tom.,,,...: .-.•?' -:..'Re_.= s.'�;.a'�
To improve conditions for employees and patrons visiting Town Hall it is recommended that the original horizontal
micro blind system be replaced with a commercial grade roller shade system in all public walkways and staff work
areas.
3aures
000
Estimated Financing E
Municipal Capital._._ . .. .. _. _ 30,000 _30 oo0p4 _.
Reserves i 30 000 30 0 10.
1i i
Total Estimated Financing 30.000 30 000i
-43-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
72048
nstallation of a Fire Supression System - Church St. School
Department ; Leisure
Service / Program I Leisure
Year of Initiation 12006
Flexible: I Yes
Installation of a Fire Supression System at Church Street School
- Improve life safety systems at Church Street School
- Protect historical society staff and patrons and physical assets within the building.
The Historical Society Capital Works Committee Report identifies the priority need for a Fire Suppression system
to be installed as a part of the interior renovations at Church Street School. A fire suppression system will assist
with monitoring and response to the threat of fire at a historically significant Town building housing historical society
staff, artifacts, records and archives.
I Expenditures
-44-
Project ID :
Project Name
Department:
Service / Program
Year of Initiation :
Flexible:
an
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:.
73069
iheppards Bush Sports Field
Leisure
Leisure
2006
Yes
playing field at Sheppard Bush Conservation Area.
To increase playing opportunities to all soccer and rugby organizations. To increase player safety -
To decrease the number of sports fields required to facilitate growth by extending the playing
season and hours of play on a single facility. To decrease ongoing maintenance expences. by
$60,000 per year.
Construction of an all weather artificial sports field has been well reseached and found to be much more efficient
from a maintenance and life cycling perspective, both LSAC and Council approved in principal the construction of a
all weather sports field in the year 2005.
ttimatea txpenanures I
Contributions to other Capital Projects 650 000 660,0001
Total Estimated EKDenditures 1 650.0001 650.0001 1
N
Other Finartcin . „
Cash in Lieu of Parkland
Development Charges
Reserve Funds
000
-45-
Project ID :
Project Name
Department:
Service / Program
Year of Initiation
Flexible:
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
73068
-rail Connection St Johns to Newmarket
Leisure
Leisure
2006
Yes
To connect the Holland Valley Trail/Nokiidaa Trail from Aurora to Newmarket To obtain Nokiidaa
Trail grant funds in the amount of $10,350.
- Increase recreational trail opportunities to residents and users of our trail system.lncrease in total
lenght of accessible trail system to approximately 11 km.
To complete final connection of Holland River Valley/Nokiidaa Trail to the Town of Newmarket. (Pending resolution
of a property matter in the Town of Newmarket preventing the link).work to include potential board walk and a
pedestrian bridge.Work was originally scheduled to occur in 2007, now scheduled to occur in 2006 to coincide with
the completion of St.Johns Sd. Rd.
Estimated E
Contributions to
Total Estim;
Provincial Grants 10�300 10,300 i„
_. _.. _ . _
Other Financtn 10r300 10,300
Cash in Lieu of Parkland 23 970 23,970 _ €,...
.,,.._... _ _... 9 ., ..
Develment Charles 215.730 215,7301
Total Estimated Financing I 250.0001 250.000E 1 1
-46-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
73067
Machell Park Playground Replacement
Department: Leisure
Service / Program : Leisure
Year of Initiation 12006
Flexible: Yes
tRO�JCiftr#TI.'.O�I
To replace MacheII Park playground and safety surface to comply with current CS Safety
Standards.
To increase public safety in our municipal playground system.
Replacement playground in an ongoing upgrade of all municipal playground equipment to comply with the current
CSA Standards and improve safety in our parks system. The existing equipment and safety surface was installed
in the early 1980's and does not comply with current Safety Standards.
res
Contributions
Estimated Financing .
Park Rehabiktation 75,000, 75 000:
-47-
Project ID :
Project Name
Department :
Service / Program
Year of Initiation
Flexible:
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No: 2
71033
3ackhoe Loader
Leisure
Leisure
2006
Yes
To replace Unit # 207 an aging 1992 John Deere backhoe loader currently in use in the municipal
operations fleet in both Public Works and Parks Divisions.
Increase equipment reliability and durability. Increase in project productivity. Decrease in
equipment breakdowns and failures. Decrease in ongoing maintenance and repair expences both
in parts and labour.
Existing 1992 backhoe loader equipment has been widely utilized by both the Parks and Works operational divisions
in our road and park maintenance needs as well as new construction projects. This equipment has served our needs
well however based on the age othis equipment and total number of hours now exceeding 9000 the equipment has
reached its service life. Our staff mechanics have inspected and evaluated both the machine and its repair records
and concur that this equipment should be removed from the fleet based on their findings.
Estimated Financing
Sale of Equpment, . _ 8,
Leisure Services Equipment I 137
d Finan
140aueur:.-
8,000,
8�000
137, 000
M
Project ID :
Project Name
Department:
Service / Program
Year of Initiation
Flexible:
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
73064
Leisure
Leisure
2006
Yes
fencing along the north property boundry at the Cenotaph.
To increase area astheics by removing unsightly and deteriorated fencing components. To
decrease the level of garbage and debris from migrating to Cenotaph from neighboring businesses.
Cenotaph fencing has been identified as a need based on the condition of the existing line fence.
Estimated Financing
—49—
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name :
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page No.
72044
Truck - New Recreation Complex
Deparbnent : Leisure
Service 1 Program : Leisure
Year of Initiation 12006
Flexible: Yes
PROJECT DESCRIPTION
PURPOSE:
To facilitate deliveries of supplies and equipment and transportation for operations supervisor to
monitor all buildings.
PERFORMANCEIAC7IVITY MEASURES:
INCREASE 1 (DECREASE)
EXPLANATIONSIHIGHLIGHTS:
With the opening of the new Recreation Complex ice arenas, aquatics centre and chiiidrens programing area staff
recommends the procurement of a truck for the movement, pick-up and drop-off of operations and programs
supplies and equipment and transportation for supervisory staff based out of the new Complex given the role of
supervising all facilities.
on
PROJECTCOSTING AND FINANCING
Tota I
2006 12007 12008 12009
Estimated Expenditures
Contracts 20,000 20,000
Total Estimated Expenditures 20,000 20,000
Estimated Financing
Leisure Services Equipment 20,000 20,000
Reserves 20,000 20,000
Total Estimated Financing 20,000 20,000
-50-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID:
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page No:
72035
Ice Re -surfacer (Aurora Leisure Complex)
Department: Leisure
Service I Program : Leisure
Year of Initiation 12006
Flexible: Yes
PROJECT DESCRIPTION
PURPOSE:
To continue with safe and efficient ice re -surfacing.
PERFORMANCEIACTNITY MEASURES_
INCREASE/(DECREASE)
EXP LANATIONWHIG HLIGHTS:
To continue maintaining a safe and high quality ice surface at the Aurora Leisure Complex arena. The Zamboni ice
re -surfacer at the Aurora Leisure Complex is over 8 years old and in need of replacement. The lifespan of an ice re -
surfacer servicing a single ice surface is typically 6-8 years.
PROJECTCOSTING AND FINANCING
Total
Description J Proi ection 12006 12007 12008 12009
Estimated Expenditures
Contracts 78,000 78,000
Total Estimated Expenditures 78,000 78,000
Estimated Financing
Leisure Services Equipment 78,000 78,000
Reserves 78,000 78,000
Total Estimated Financing 78,000 78,000
—51—
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
Department:
Service/ Program
Year of Initiation
Flexible:
PURPOSE:
CAPITAL BUDGET - ANALYSIS BY PROJECT
i'a e No:
72045
H2O Treatment Plant - Aurora Recreation Complex
Leisure
Leisure
2006
Yes
PROJECT DESCRIPTION
To provide treated water for the domestic and ice surfacing requirements at the East and West
Arenas at the Aurora Recreation Complex_
PERFORMANCEIACTIVITY MEASURES:
INCREASE I (DECREASE)
To increase ice surface quality at the East and West arenas by eliminating water born impurities. To
increase the life cycle of plumbing related fixtures in both facilities by removing the water born
impurities. To decrease the ongoing use of harsh chemicals required to remove lime and scale
from all plumbing and ice plant fixtures.
To improve employee health and safety by reducing the use of harsh chemicals currently used on a
regular basis.
Reduce costs associated with maintenance materials, labour and equipment replacement
EXPLANATIONSIHIGHLIGHTS:
Water treatment plant proposed as an additional upgrade to new Aurora Recreation Complex facility. Water
treatment plant is an upgrade to the base contract construction as each plant is customized to the needs of the
facility. Town of Aurora domestic water supply will leave heavy water deposits that leave plumbing facilities in
unsightly conditions without vigorous ongoing cleaning with harsh chemical treatment. In addition to the building
maintenance issue, our ice user groups have requested that the ice skating surface be upgraded to mirror that of
the Leisure Complex and ACC ice surfaces.
PROJECTCOSTING AND FINANCING
Total
Description
2006 12007 12008 12009
Estimated Expenditures
Contracts 30,000 30,000
Total Estimated Expenditures 30,000 30,000
Estimated Financing
Leisure Services Equipment
30,000 30,000
Reserves 30,000 30,000
Total Estimated Financing 30,000 30,000
—52—
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name :
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page No:
73068
Seston Park Playground Replacement
Department: ILeisure
Service 1 Program : Leisure
Year of Initiation 12006
Flexible: Yes
PROJECT DESCRIPTION
PURPOSE:
To implement Culture and Recreation Master Plan recommendations for park rehabilitation.
PERFORMANCEIACTIVITY MEASURES:
INCREASE/(DECREASE)
To replace non standard playground system and park furnishings.
EXPLANATIONSIHIGHLIGHTS.,-,
To replace existing children's playground and safety surface. This playground was installed by the developers of
the Darkwood Subdivision in 1993. As such this playground does not comply with current CSA Standards for
children's play spaces and should be replaced as per our town wide playground replacement program.
PROJECT COSTING AND FINANCING
Total
Description - {Proiection 12006 12007 12008 12009
Estimated Expenditures
Contributions to other Capital Projects 75,000 75,000
Total Estimated Expenditures 75,000 75,000
Estimated Financing
Park Rehabilitation 75,000 75,000
Reserves 75,000 75,000
Total Estimated Financing 75,0no 75,000
—53—
Project ID :
Project Name
Department:
Service I Program
Year of Initiation
Flexible:
PURPOSE:
CAPITAL PLAN 2006-2009 (DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page No:
73063
Machell Park Upgrade
Leisure
Leisure
2006
Yes
PROJECT DESCRIPTION
To implement Culture and Recreation Master Plan Park rehabilitation recommendations from former
culture and recreation master plan.
PERFORM ANCEIACTIVITY MEASURES:
INCREASE/(DECREASE)
Increase park safety and security with walkway lighting system. Reduction of ongoing
maintenance associated with gravel parking lot and control access by unauthorized motor
vehicles into Machell Park.
EXPLANATIONSIHIGHLIGHTS:
Machell Park Walkway Lighting and Pathway to Parkland Court - Pave Parking Lot, install barrier curbing and
improved parking lot drainage. Machell Park parking lot is being more heavilly utilized by the Aurora Tigers to
accomodate game parking, the Aurora Agricultual Society for the annual horse show and by the Chamber of
Commerce for the annaul home show. In addition, the existing sports field drainage system is in need of repair to
effectMey allow for rain water drainage.
PROJECT COSTING AND FINANCING
Total
Description Projection 12006 12007 12008 12009
Estimated Expenditures
Contributions to other Capital Projects 150,000 150,000
Total Estimated Expenditures 150,000 150,000
Estimated Financing
Park Rehabilitation
150,000 150,000
Reserves 150,000 150,000
Total Estimated Financing 150,000 150,000
-54-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page Noy
Project ID 171026
Project Name :
Skid Steer Loader Replacement Unit #228
Department: Leisure
Seryice 1 Program : Leisure
Year of Initiation 12006
Flexible: Yes
PROJECT DESCRIPTION
PURPOSE:
To replace a 1997 Skid Steer Loader currently in use in the Parks and Public Works Operations
Divisions.
PERFORMANCEIACTIVITY MEASURES:
INCREASE I (DECREASE)
To increase reliability and efficiency requirements associted with this particular piece of
equipment -To decrease frequency of equipment downtime due to on the job breakdowns. -To
decrease expences associted costly repairs and rental of replacement equipment
EXPLANATIONSIHIGHLIGHTS:
1997 Skid Steer loader is widely utilized in the fleet of equipment by both operational divisions for its versatility and
use with multiple attachments, based on the high level of use this equipment has reached its useful life prior to the
forcast life cycle of 15 years, however based on the ongoing expences associted with repairs and down time our
mechanics highly recommend that this unti be replaced as soon as possible.
PROJECT COSTING AND FINANCING
Total
Description IPromection 12006 12007 12008 12009
Estimated Expenditures
Equipment - Other 50,000 50,000
Total Estimated Expenditures 50,000 50,000
Estimated Financing
Sale of Equipment
10,000
10,000
Other Financing
10,000
10,000
Leisure Services Equipment
40,000
40,000
Reserves
40,000
40,000
Total Estimated Financing
50,000
50,000
—55—
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa e No:
71029
1 Ton Truck Replacement 1995 Unit 203
Department: Leisure
Service/ Program : Leisure
Year of Initiation 12006
Flexible: I Yes
PROJECT DESCRIPTION
PURPOSE:
To replace one 1995 1 ton truck, Unit# 203, in accordance with the Vehicle and Equipment
Schedule.
PERFORMANCEIACTIVITY MEASURES:
INCREASE 1 (DECREASE)
Increase equipment reliability, decrease down time and reduce equipment repair expenses.
EXPLANATIONSIHIGHLIGHTS:
Replace aging vehicle in accordance with the Vehicle and Equipment Replacement Forecast. Proceeds from sale
of existing vehicle to be applied to the Vehicle and Equipment Reserve Account.
PROJECT COSTING AND FINANCING
Total
Description (Projection-- _12006 12007 ]2008__ __ 12009
Estimated Expenditures
Equipment - Other 60,000 60,000
Total Estimated Expenditures 60,000 60,000
Estimated Financing
Sale of Equipment 2,000 2,000
Other Financing 2,000 2,000
Leisure Services Equipment 58,000 58,000
Reserves 58,000 58,000
Total Estimated Financing 60,000 60,000
-56-
CAPITAL PLAN 2006--2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page Nc
Project ID : 71030
Project Name :
Mower Unit no.243 replacement
Department: Leisure
Service 1 Program : Leisure
Year of Initiation 12006
Flexible: Yes
PROJECT DESCRIPTION
PURPOSE:
To replace 1999 Ransome Wide Area Mower #243.
PERFORMANCE/ACTIVITY MEASURES:
INCREASE 1 (DECREASE)
Increase equipment reliability, decrease down time and reduce equipment repair expenses.
EXP LANATI ONSIHIG HUG HTS:
Replace equipment in accordance with the Vehicle and Equipment Replacement Forecast.
PROJECT COSTING AND FINANCING
Total
Description l Proi ection 12006 12007 12008 12009
Estimated Expenditures
E ui ment - Other 20,000 20,000
Total Estimated Expenditures 20,000 20,000
Estimated Financing
Sale of Equipment 5,000 5,000
Other Financing 5,000 5,000
Leisure Services Equipment 15,000 15,000
Reserves 15,00015,000
Total Estimated Financing 20,000 20,000
—57—
CAPITAL PLAN 2006-2009 [DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
Department:
Service I Program
Year of Initiation
Flexible:
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page No:
7�a3�
1996 Half Ton Truck Replacement Unit no. 204
Leisure
Leisure
12006
Yes
PROJECT DESCRIPTION
PURPOSE:
To replace one Half Ton vehicle #204 in accordance with the Vehicle and Equipment Replacement
Schedule.
PERFORM ANCEIACTIVITY MEASURES:
INCREASE I (DECREASE)
Increase equipment reliabilty, decrease down time and reduce equipment repair expenses.
EXPLANATIONSIHIGHLIGHTS:
To replace aging vehicle in accordance with the Vehicle and Equipment Replacement Forecast. Proceeds of surplus
vehicle sale to be applied to the Vehicle and Equipment Reserve Account.
PROJECT COSTING AND FINANCING
Total
Description I Protection 12006 12007 12008 12009
Estimated Expenditures
Equipment - Other 35,000 35,000 _
Total Estimated Expenditures 35,000 35,000
Estimated Financing
Sale of Equipment 1,500 1,500
Other Financing 1,500 1,500
Leisure Services Equipment 33,500 33,500
Reserves 33,500 33,500
Total Estimated Financing 35,000 35,000
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page No:
71012
Replace 1991 Kubota Mower
Department, Leisure
Service / Program : Leisure
Year of Initiation 12005
Flexible: Yes
PROJECT DESCRIPTION
PURPOSE:
To replace 1991 Kubota Front Rotary Mower #217.
PERFORMANCE/ACTIVITY MEASURES:
INCREASE/(DECREASE)
-increase equipment reliability. Decrease downtime and equipment repair expenses.
EXPLANAMONSIHIGHLIGHTS:
Replace equipment in accordance with the Vehicle and Equipment Replacement Forecast.
PROJECT COSTING AND FINANCING
Total
Description
I Proi action
12006
12007
12008
12009 I
Estimated Expenditures
Contracts
19,000
19,000
Total Estimated Expenditures
19,000
19,000
Estimated Financing
Sale of Equipment
2,000
2,000
Other Financing
2,000
2,000
Leisure Services Equipment
1.7,000
17,000
Reserves
17,000
17,000
Total Estimated Financing
19,000
19,000
-59-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
71013
Replace 1999 Ransome Mower
Department: ILeisure
Service 1 Program : Leisure
Year of Initiation : 2006
Flexible: Yes
PROJECT DESCRIPTION
PURPOSE:
To replace 1999 Ransome Wide Area Mower, #243.
PERFORMANCEIACIIVITY MEASURES:
INCREASE / (DECREASE)
Increase equipment reliability. Decrease down time and equipment repair expenses.
EXPLANATIONSIHIGHLIGHTS:
Replace equipment in accordance with the Vehicle and Equipment Replacement Forecast.
PROJECT COSTING AND FINANCING
Total
Description lProi.ection 2006 12007 14008 12009
Estimated Expenditures
Contracts 19,000 19,000
Total Estimated Expenditures 19,000 19,000
Estimated Financing
Sale of Equipment 4,000 4,000
Other Financing 4,000 4,000
Leisure Services Equipment 15,000 15,000
Reserves 15,000 15,000
Total Estimated Fnancing 19,000 19,000
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name :
Department:
Service 1 Program
Year of Initiation
Flexible:
PURPOSE:
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page No:
73074
Wellington Street East Urban Design Features 1 Landscaping
Leisure
Leisure
2006
Yes
PROJECT DESCRIPTION
To impliment the Municipal urban design landscaping treatments as recommended and adopted by
Council in the Wellington Street East Urban Design Guidelines and to continue Entry Feature theme
that was implimented from John West Way to Bayview Avenue.
PERFORMANCE/ACTIVITY MEASURES:
INCREASE/(DECREASE)
Increased area asthetics and street beautification at a key entrance to the Municipality.
EXPLANATIONS/HIGHLIGHTS:
Urban Design Guide Lines that have been adotped by Council in conjunction with the Secondary Plan for the 2a and
2b development lands has identified Wellington St. E as a major entry point to the Town, As such a major
streetscaping program involving decorative intersection paving and tree planting has been recommended and
accepted in the background planning studies. Currently there are no reserve funds that have been identified to
fund this project and no development charges that have been applied to this enhancment. It may be possible to
enacat a by-law ammendment to recover the associted cost of this initiative.
PROJECT COSTING AND FINANCING
Total
Description
Estimated Expenditures
2006 12007 12008 12009
Consulting 35,000 35,000.
Contracts 365,000 365,000'
Total Estimated Expenditures 400,000 400,000
Estimated Financing
Development Charges 400,000 400,000
Reserve Funds 400,000 400,000
Total Estimated Financing 400,0@0 400,000
-61-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page No:
73070
Yonge Street South Landscape Feature
Department: IlLeisure
Service 1 Program I Leisure
Year of Initiation 12006
Flexible: Yes
PROJECT DESCRIPTION
PURPOSE:
To improve the image of the Town at a key entrance to the municipality but providing landscaping
enhancements with potential revenue opportunities.
PERFORMANCE/ACTIVITY MEASURES:
INCREASE 1(DECREASE)
To increase the awarness and image of our Town. To increase area asthetics associted with
major entry point to the Town. To decrease the level of maintenance and poor and unsightly
appearance of this area.
EXPLANATIONSIHIGHLIGHTS:
Project designed to enhance a key entry point to the Town centre, currently in poor condition which reflects poorly
on the image of our Town. Staff are exploring opportunities that may involve local landscape firms providing
services in kind in the construction project in exchange for advertising rights on site, or the Town leasing landscape
feature areas etc.
PROJECT COSTING AND FINANCING
Tota I
Description lProiection 12006 12007 12008 ___ _[2009
Estimated Expenditures
Contributions to other Capital Projects 100,000 100,000
Total Estimated Expenditures 100,000 100,000
Estimated Financing
Donations
50,000
50,000
Other Financing
50,000
50,000
Park Rehabilitation
50,000
50,000
Reserves
50,000
50,000
Total Estimated Financing
100,000
100,000
—62—
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project 1D :
Project Name
Department :
Service I Program
Year of Initiation
Flexible:
PURPOSE:
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page No:
73049
New Greenhouse Expansion
Leisure
Leisure
2005
Yes
PROJECT DESCRIPTION
To facilitate ongoing horticultural operations.
PERFORMANCE/ACTIVITY MEASURES:
INCREASE/(DECREASE)
Increase in greenhouse production for annual plant displays. Decrease energy costs with more
efficient structure. Decrease maintenance costs with better built permanent structure.
EXPLANATIONSIHIGHLIGHTS:
To construct a new greenhouse expansion, to be included with the ParksANorks facility expansion, as a result of
growth related needs. Current facility is undersized to facilitate the current needs of the department.
PROJECTCOSTING AND FINANCING
Total
Description Projection 12006 12007 12008 12009
Estimated Expenditures
Contracts 60,000 60,000
Total Estimated Expenditures 60,000 60,000
Estimated Financing
Cash in Lieu of Parkland
6,000
6,000
Development Charges
54,000
54,000
Reserve Funds
60,000
60,000
Total Estimated Financing
60,000
60,000
-63-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID:
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page No:
73048
Elizabeth Hader Park Trail Connection
Department., Leisure
Service 1 Program : Leisure
Year of Initiation : 2005
Flexible: Yes
PROJECT DESCRIPTION
PURPOSE:
To connect new trail to existing park.
PERFORMANCEIACTIVITY MEASURES:
INCREASE 1 (DECREASE)
Increase recreational trail opportunities to local residents and general community_
EXPLANATIONSIHIGHLIGHTS:
New additional trail required as a result of growth and new development in the vicinity of Elizabeth Hader Park to
Kennedy St.
EFFECT ON FUTURE OPERATING BUDGETS
Description I TOTAL 12006 12007 12008 12009
Salary and Waaes 300 300
Total Expenditures 300 300
Net Impact -300 -300
Description
Estimated Expenditures
PROJECT COSTING AND FINANCING
Total
2006 12007 12008 12009
Contracts 55,000 55,000
Total Estimated Expenditures 55,000 55,000
Estimated Financing
Cash in Lieu of Parkland
5,500
5,500
Development Charges
49,500
49,500
Reserve Funds
55,000
55,000
Total Estimated Financing
55,000
55,000
-64-
CAPITAL PLAN 2006-2009 {DRAFT 21
I 101111LN► 1101 SANI ZZ17;711
Project ID :
Project Name
Department:
Service I Program
Year of Initiation :
Flexible:
CAPITAL BUDGEF - ANALYSIS BY PROJECT
Page No.
73017
New Rugby Field
Leisure
Leisure
2005
Yes
PROJECT DESCRIPTION
PURPOSE:
Program: Parks — New Facility as outlined in the Culture and Recreation Master Plan.
PERFORMANCEIACTIVITY MEASURES:
INCREASEI(DECREASE)
Maintain service levels associated with new growth.
EXPLANATIONS/HIGHLIGHTS:
New Rugby Field to be constructed in accordance with the Culture and Recreation Master Plan to service the needs
and accommodate increasing demand for the sports field user groups.
This project will be managed and constructed utilizing in house resources for the most part with some aspects of the
project being contracted out. Funds in the amount of $20,000 will be allocated to the appropriate Parks Division
operational accounts for the purposes of funding salaries and fuel expenses incurred for the project. Project was
rlafP.rrPd in 2nn4
EFFECT ON FUTURE OPERATING BUDGETS
Description I TOTAL 12006 12007 12008 12009
Salary and Wages 4,000 4,000
Materials 1,000 1,000
Total Expenditures 5,000 5,000
Net Im pact -5,000: -5,000
PROJECT COSTING AND FINANCING
Total
Description 113rogection 200E 12007 12008 12009
Estimated Expenditures
Contracts 195,000 195,000
Total Estimated Expenditures 195,000 195,000
Estimated Financing
Cash in Lieu of Parkland
19,500
19,500
Development Charges
175,500
175,500
Reserve Funds
195,000
195,000
Total Estimated Financing
195,000
195,000
—65—
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page No:
73016
Baseball Facility
Department : JLeisure
Service/ Program : Leisure
Year of Initiation 12006
Flexible: Yes
PROJECT DESCRIPTION
PURPOSE:
Program: Parks -- New facility as outlined in the Culture and Recreation Master Plan.
PERFORMANCE/ACTIVITY MEASURES:
INCREASE 1 (DECREASE)
To maintain services levels associated with new growth.
EXPLANATIONSIHIGHLIGHTS:
Full size baseball facility to be constructed in accordance with Master Plan required to service the growth related
needs of our user groups.
EFFECT ON FUTURE OPERATING BUDGETS
Description ITOTAL 12006 12007 12008 12009
Salary and Wages 4,000 4,000
Materials 1,000 1,000
Total Expenditures
5.000
Net Impact -5,000 -5,000
PROJECT COSTING AND FINANCING
Total
Description lProiection 12006 12007 12008 12009
Estimated Expenditures
Contracts 550,000 550,000
Total Estimated Expenditures 550,000 550,000
Estimated Financing
Cash in Lieu of Parkland
55,000
55,000
Development Charges
495,000
495,000
Reserve Funds
550,000
550,000
Total Estimated Financing
550,000
550,000
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page No:
73065
Lambert Willson Park Washroom Rehab
Department: Leisure
Service 1 Program : Leisure
Year of Initiation 12006
Flexible: Yes
PROJECT DESCRIPTION
PURPOSE:
To repair front entrance concrete slab and walls way. To repair settlement in the sanitary sewer.
PERFORMANCE/ACTIVITY MEASURES:
INCREASE I (DECREASE)
Decrease in frequency of maintenance associted with sewer blockage, Increase safety to users of
the washroom facilities and drainage associted with deteriorated concrete entrance slab.
EXPLANATIONSIHIGHLIGHTS. „
Rehabilitation works needed to correct a minor sewer problem associted with improper benching in a manhole
connection.
PROJECT COSTING AND FINANCING
Total
Descriptions lPromection 12006 2007 20013 12009
Estimated Expenditures
Contributions to other Capital Projects 5,000 5,000
Total Estimated Expenditures 5,000 5,000
Estimated Financing
Park Rehabilitation 5,000 5,000
Reserves 5,000 5,000
Total Estimated Financing 5,000 5,000
-67-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project 10 :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page No:
73073
Billings Well Landscape Upgrade Project
Department: Leisure
Service 1 Program : Leisure
Year of initiation 12006
Flexible: Yes
PROJECT DESCRIPTION
PURPOSE:
To conduct landscape rehabilitation project in Billings Well Parkette.
PERFORMANCEIACTIVITY MEASURES:
INCREASE I (DECREASE)
To increase area asthetics in the area of Yonge Street and the Aurora Shopping Centre. To
decrease the level of maintenance and mis use of the parkette resulting from snow storage and pet
droppings from neighboring residents and businesses to the north of this location.
EXPLANATIONSIHIGHLIGHTS:
Landscape rehabilitation project of Billings Well will involve construction of appropriate line fencing, improved
lighting, restricted access to the north property line, sight line improvements, seating and trash receptacle
improvements as well as new plantings.
PROJECT COSTING AND FINANCING
Tota l
Description l Proi ection 12006 12007 12008 _ J2009
Estimated Expenditures
Contributions to other Capital Projects 50,000 50,000
Total Estimated Expenditures 50,000 50,000
Estimated Financing
Park Rehabilitation 50,000 50,000
Reserves 50,000 50,000
Total Estimated Financing 50,000 50,000
CAPITAL PLAN 2006-2009 (CRAFT 21
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page No.
71027
Sall Diamond Groomer
Department: Leisure
Service 1 Program : Leisure
Year of Initiation 12006
Flexible: Yes
PROJECT DESCRIPTION
PURPOSE:
To purchase one new additional ball diamond groomer for the Parks Division fleet to facilitate new
growth related maintenance.
PERFORMANCE/ACTIVITY MEASURES:
INCREASE 1 (DECREASE)
Increase in equipment fleet by one ball diamond groomer.
EXPL.ANATIONSIHIGHLIGHTS a p x 3
New equipment to be purchased during the term of the current Development Charges By -Law based on growth
related needs.
PROJECT COSTING AND FINANCING
Total
Description Projection 12006 2007 12008 12009
Estimated Expenditures
Equipment - Other 8,000 8,000
Total Estimated Expenditures 8,000 8,000
Estimated Financing
Leisure Services Equipment
800
800'
Reserves
800
800
Development Charges
7,200
7,200
Reserve Funds
7,200
7,200
Total Estimated Financing
8,a00
8,000
CAPITAL PLAN 2006-2009 {DRAFT 2)
TOWN OF AURORA
Project ID :
Project Name
Department:
Service 1 Program
Year of Initiation
Flexible:
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
71032
Landscape Rototiller Attachment
Leisure
Leisure
2006
Yes
PROJECT DESCRIPTION
PURPOSE:
New additional equipment required for Parks construction /renovation projects.
PERFORMANCEIACTIVITY MEASURES:
INCREASE 1(DECREASE)
Increase efficiencies in the preparation of landscped areas prior to seeding and sodding.
Decrease operational costs associtated with equipment rental and labour required to facilitate
parks rehabilitation landscape projects.
EXPLANATIONSMIGHLIGHTS:
Landscape Rototiller attachment required to facilitate landscape maintenance and new parks construction works.
This specialized equipment will provide soil preparation and conditioning to enable improved fine grading required in
our many landscape and horticultural projects and a major time savings in this operation.
Similar equipment has been loaned to our staff from the Town of Newmarket in the past and has been tested and
proven very effective for the Parks construction and maintenance operations.
PROJECT COSTING AND FINANCING
Total
Description IProiection 12006 12007 12008 12009
Estimated Expenditures
Equipment - Other 35,000 35,000
Total Estimated Expenditures 35,000 35,000
Estimated Financing
Leisure Service_ s Equipment
Reserves
Development Charges
3,500 3,500
3,500 3,500
31,500 31,500
Reserve Funds 31,500 31,500
Total Estimated Financinq 35.000 35.000
-70-
CAPITAL PLAN 2006-2009 [DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page No:
ID : 73025
Project Name :
Landscape Standards Manual Revision
Department: Leisure
Service I Program : Leisure
Year of Initiation : 2006
Flexible: Yes
PROJECT DESCRIPTION
PURPOSE:
To update the landscape standards manual to reflect current inductry and corporate landscape
standards and design details.
PERFORMANCEIACTIVITY MEASURES:
INCREASE / (DECREASE)
To improve consistency in our information package provided to developers and site plan
applicants.
To increase the quality of landscape design and maintenance on private development land and in
municipal parks.
EXPLANATIONSIHIGHLIGHTS:
The existing landscape standards document was developed in 1990 as a guideline document to be used by the
corporation to establish minimum industry standards to be utilized by both the development industry and the Town
when designing landscape construction plans.
These standards are applied to all development in the Town of Aurora and have been very useful over the years in
maintaining a consistent approach in the review and approval of site plans and subdivision agreements.
The existing standards are somewhat out dated at this time and it is necessary to revise the standards document to
better reflect improved design criteria.
PROJECT COSTING AND FINANCING
Total
Descripfion Projection_ 2005 12007 2008 12009
Estimated Expenditures
Contracts 30,000 30,000
Total Estimated Expenditures 30,000 30,000
Estimated Financing
Cash in Lieu of Parkland
3,000
3,000
Development Charges
27,000
27,000
Reserve Funds
30,000
30,000
Total Estimated Financing
30,000
30,000
—71—
Project ID :
Project Name
Department :
Service 1 Program
Year of Initiation
Flexible:
PURPOSE:
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page No:
73059
Trail Connection - Benneville Crescent
Leisure
Leisure
2006
Yes
PROJECT DESCRIPTION
To construct a section of recreational trail in the open space area connecting Evans Park to
Benville Crescent, Monkman Court and the Vandorf Sd. Rd. and the Nokiidaa Trail.
PERFORMANCEIACTIVITY MEASURES:
INCREASE/(DECREASE)
To improve recreational trail opportunities to the area residents and the general community in the
south east area of the municipality.
EXPLANATIONS/HIGHLIGHTS:
With the assumption of the open space lands in the Monkman Court and Benville Crescent area and the
construction of Evans Park there is an opportunity to provide an additional recreational trail connection through this
community to connect to the Nokiidaa Trail at the Vandorf Sd. Rd.
This trail was contemplated in the community plan however, due to site constraints the trail implementation was
delayed, staff believe the issues can be addressed and the trail can now be implemented
PROJECT COSTING AND FINANCING
Total
Description _ Projection 12006 12007 12008 12009
Estimated Expenditures
Contracts 35,000 35,000
Total Estimated Expenditures 35,000 35,000
Estimated Financing
Cash in Lieu of Parkland
3,500 3,500
Development Charges 31,500 31,500
Reserve Funds 35,000 35,000
Total Estimated Financing 35,000 35,000
-72-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
Department:
Service 1 Program :
Year of Initiation
Flexible:
PURPOSE:
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page No:
73060
Replace Lambert Wilson Walkway Lights & Pales
Leisure
Leisure
2006
Yes
PROJECT DESCRIPTION
To replace 20 existing walkway light poles.
PERFORMANCEIACTIVITY MEASURES:
INCREASE 1 (DECREASE)
To improve public safety associated with deteriorated concrete light poles,
To improve aesthetics associated with deteriorated concrete light poles.
To extend the life cycling of the walkway light system.
EXPLANATIONS/HIGHLIGHTS:
Existing concrete light poles have deteriorated as a result of prolonged exposure to the elements and the high
moisture ground conditions in the park.
Several light poles have developed major structural cracks to the point where they should be removed from a
safety perspective. Replacement poles have been provided by the manufacture at no charge as there was some
consideration given for their relatively early failure e.g. 16years; however there are additional cost associated with
fixtures and installation.
PROJECT COSTING AND FINANCING
Total
on
2006 12007 12008 12009
Estimated Expenditures
Contracts 25,000 25,000
Total Estimated Expenditures 25,000 25,000
Estimated Financing
Park Rehabilitation 25,000 25,000
Reserves 25,000 25,000
Total Estimated Financing 25,000 25,000
-73-
CAPITAL PLAN 2006-2009 {DRAFT 2)
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page No:
73061
Shade Structure - Hickson Park
Department: Leisure
Service 1 Program : t.eisure
Year of Initiation 12006
Flexible: Yes
PROJECT DESCRIPTION
PURPOSE:
To construct a park shelter in the newly constructed Hickson Park on Borealis Drive
PERFORM ANCEIACTIVITY MEASURES:
INCREASE 1 (DECREASE)
To complete the park construction project.
To provide a suitable shade structure for park users and programs.
EXPLANATIONSIHIGHLIGHTS:
Hickson Park was constructed in the year 2005; a component of the construction of the park was to include a
shade structure in the vicinity of the childrenOs playground area. The design and costing for this structure had not
been developed beyond the conceptual level prior to completion of the 2005 capital budget, a final design has been
completed and revised to reflect a modest shade structure that complies with the neighbourhood area urban design,
while serving a useful purpose to park users.
Description
Estimated Expenditures
PROJECTCOSTING AND FINANCING
Tota I
2006 12007 12008 12009
Contracts 50,000 50,000
Total Estimated Expenditures 50,000 50,000
Estimated Financing
Cash in Lieu of Parkland
5,000
5,000
Development Charges
45,000
45,000
Reserve Funds
50,000
50,000
Total Estimated Financing
50,000
50,000
—74—
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name :
CAPITAL BUDGET - ANALYSIS BY PROJECT
Page No:
73062
Rec Centre Playground Structure
Department: Leisure
Service / Program : Leisure
Year of Initiation : 2006
Flexible: I Yes
PROJECT DESCRIPTION
PURPOSE:
To provide a playground system in the vicinity of the child care area at the new Recreation Centre
on Wellington Street East
PERFORMANCE/ACTIVITY MEASURES:
INCREASE / (DECREASE)
To provide an outdoor recreational opportunity to children in the child care area as well as the
general public while visiting the new recreational center.
To take advantage of a partnership arrangement with a local community service club in the
establishment of a children's play ground.
EXPLANATIONSMIGHLIGHTS:
With the new construction of the Recreation Centre and the child care area there will be a need for additional
outdoor recreational activities, as there is no immediate plan to construct a park facility in this area. Staff have
found a suitable location near the childcare area to locate a playground system. The system will be constructed in
a manner that will permit it to be relocated to a future park location should the need arise.
The Rotary Club of Aurora has expressed an interest in assisting with the project by means of a financial
contribution.
PROJECT COSTING AND FINANCING
Total
Description lProlection 12006 ;00 00$ 12009
Estimated Expenditures
Contracts 100,000 100,000
Total Estimated Expenditures 100,000 100,000
Estimated Financing
Donations
50,000
50,000
Other Financing
50,000
50,000
Cash in Lieu of Parkland
5,000
5,000
Development Charges
45,000
45,000
Reserve Funds
50,000
50,000
Total Estimated Financing
100,000
100,000
-75-
Project ID :
Project Name
Department :
Service / Program
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS 13Y PROJECT
Pa a Nc.
77001
;ollection Development - Growth Related
Year of Initiation 12006
Flexible: I Yes
- -- ... ,�- -,: APR �t✓S�FD�'S�k��pt�-`_-� '�.,� � w==
To respond to growth -related need for expansion of the Library s collections, as provided for
through the Development Charges Act and the Town of Aurora Development Charges Policy.
Link to APL Strategic Directions:
Objective B -Strengthen the Library's services to meet changing community needs.
Strategy 4 - Enhance our collection by filling gaps and ensuring our ability to serve growing
groups within the community, particularly youth and seniors
Maintenance of the service standard of volumes per capita, established in the Town of Aurora
Development Charges Policy for Library collection development
XPLATiIA't1l.lG�iLt�C,'�F.��,_...�....:,::��..�:.,.,.�--...�_---�.a...,`�:-�`._�--•.�.-.-.�,...,--.�_:�".-:
The current operating budget for Collection Development provides for maintenance and renewal of the
materials in the existing collections. The capital program provides for growth of the collections, relative to the
population growth.
__...___.. .._.__-__-.._.__..--- ,_.... _ I__ -- __ .._-
_ ___. _ . .
Operating Materials 1 350,000 50 000; 100 000 100,000 100,000'
Total Estimated Expenditures 350,000 50,000' 100,0001 100,000! 100,000'.
Estimated Financing 1
_.
Development Charges 350 0001 5.01000 100 000 { 100,0001 100 000'
Reserve Funds l 350,0001 50,000" 100,000! 100,000i 100,000.
Total Estimated Financing 1 350.0001 50.0001 100.0001 100.000. 100.0001
-76-
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name :
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
77003
Library Information System
Department:
Library Operations
Service / Program :
Library Operations
Year of Initiation
12005
Flexible:
INo
=-
s,.--
To install a new version of the software for Horizon, the library information system which supports
the Library's public services in the primary areas of acquisition, circulation, and public catalogue
functions.
Link to APL Strategic Directions 2004 -2007:
Objective B - Strengthen the Library's services to meet changing community needs.
Strategy 7 - Continue to upgrade our technology and electronic resources to meet changing needs
and realize efficiencies.
• Maximize effectiveness and efficiency of the Horizon system and the public services it enables
• Ensure effective and ongoing Vendor support through use of a current software version
• Achieve operational efficiencies as well as enhancements requested by the organized library
client community.
I'l%►�"1�01�5�%HCfi�Ll^G}l'S --€� `` .v ���"� ��- "'��'r�.•, .�wm
New versions of software are not normally considered as capital expenditure. However, the Horizon system is a
very substantial umbrella system which facilitates the operations of a variety of primary Library functions. There
are periodic changes in the software version which are substantive enough to warrant funding through capital. In
2006, Dynix will be releasing such a major upgrade to the Horizon software.
The costs noted for 2008 and 2010 are planned developments to enhance the Horizon system functions, not new
software versions as in 2006.
Contracts
35,600j
11500
24,100
Total Estimated Expenditures i
35,600
11,500i
24,100,
�
i
I
Estimated Finanang
Library General Capital
35,600
11,500,
24,100
Reserves
35,600{
11,500E
24,100
Total Estimated Financing 1
35.6001
11.5001,
24.100
-77-
CAPITAL PLAN 2006-2009 {DRAFT 2}
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET' - ANALYSIS BY PROJECT
77004
Systems Development
Department: Library Operations
Service / Program Library Operations
Year of Initiation 12006
Flexible: Yes
P�RG4-507(bftd--W' N—WR
To maintain the Library's inventory of desktop computer workstations, in order to support new and
emerging technologies and to achieve operational efficiencies.
Link to APL Strategic Directions 2004 -2007:
Objective B -Strengthen the Library services to meet changing community needs.
Strategy 7 - Continue to upgrade our technology and electronic resources to meet changing needs
and realize efficiencies.
20 aging workstations, for
use.
The oldest components within the Library inventory of computer workstations for both public and staff use require
upgrading, as they have exceeded their life span and cannot not effectively support newer software applications
and emerging technologies, particularly with respect to public services. The inventory components are recycled
through a variety of high end to low end uses before being replaced, with a typical lifespan of four to six years.
Estimated Expenditures
Eu ir ne n t0 ther
q p
70,000
26,666
16,000
16,0004
Total Estimated Expenditures
70,000
20,000',
20,0001
15,00W
15,000`
Esttmated Financing
Library General Capital
.........
70,000
20,0001
000
15000
,
Reserves
70,0003
20,000(
20,000i
15,000
15,000i
Total Estimated Financina 1
70.000
20,0001
20.0001
15 00n I
Is non!
IME
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
77008
Self Check -Out Service
Department: Library Operations
Service ! Program : Library Operations
Year of Initiation 12005
Flexible: Yes
To enhance public services, notably increased provision of self -serve opportunities, through
provision of the ability for users to checkout their own Library materials.
Link to APL Strategic Directions 2004 - 2007:
Objective A—. Make the Library more welcoming and accessible.
Objective B -Strengthen the Library's services to meet changing community needs.
Strategy 7 - Continue to upgrade our technology and electronic resources to meet changing needs
and realize efficiencies.
• Implement two (2) self checkout workstations in 2006
• Contain, and to some degree avoid, future operating cost relating to increased checkout of Library
materials
• Focus staff effort on making the Library more welcoming, notably support for more complex user
needs
The 2006 budget provides for implementation of the service, through two (2) self checkout stations, with a possible
third station in 2008 or beyond, subject to success of the 2006 project. In 2005, the Library implemented a new
library information system and substantially completed the barcode standardization project, two major pre -requisites
for self -checkout service.
Contracts
Total Estimated
Estimated Financing
Library General Capital 90 000 60,0001 30,0001
-79-
CAPITAL PLAN 2006-2009 (DRAFT 21
TOWN OF AURORA
Pro] ect ID :
Project Name
Department :
Service / Program
Year of Initiation
Flexible:
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
77009
Strategic Directions
11-ibrary Operations
Libra Operations
2006
Yes
To undertake capital projects in 2006 pursuant to implementation of the APL Strategic Directions
2004 - 2007 and the 2006 APL Business Plan.
Correlated capital initiatives to be pursued in 2006:
• Improved organization of display of collections and wayfinding tools, including functional use of
the central main floor area (a cross -over accessibility issue)
• Completion of implementation of ergonomic adjustments to the Circulation service desk (a cross-
over accessibility issue)
• Improved means of access to Library services for people of different abilities, including
implementation of technological solutions
• Implementation of remedial actions in the 2005 accessibility audit of the Library facility, identified
as pertaining to Library service, in concert with the Town of Aurora Accessibility Committee
The project cost and financing outlook assumes annual capital projects related to implementation of the LibraryEls
current strategic plan and annual business plan.
Estimated Expenditures
Contracts 100,000
25,000
25,000
25,000
25,000T.
Total Estimated Expenditures 100,000
25,0001
25,0001
25,0001
25,0001
i
Estimated Financing
1-bran/ General Capital _ _ 100,000
Rnvuniuo 10&(100
25,000
25000E
25 000
25.0001
25,000
25.000,
25 000
25.000�
000
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
Project ID :
Project Name :
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
77006
Digital Micrographic Scanner - Printer
Department : I Library Operations
Service / Program : Libra O erations
Year of Initiation 12006
Flexible: Yes
.�._= � �- �"� �-
To acquire a digital micrographic scanner -printer workstation.
Link to APL Strategic Directions 2004 - 2007:
Objective A— Make the Library more welcoming and accessible.
Strategy 5 - Provide enhanced 2417 access to services through the Library's web -based
services.
Objective B - Strengthen the Library's services to meet changing community needs.
Strategy 7 - Continue to upgrade our technology and electronic resources to meet changing needs
and realize efficiencies.
Improve efficiency and effectiveness of service delivery through:
• Conversion of Library resources to a digital format, for ease of storage and retrieval, notably
archival data and images.
• Preservation of older, bulky, and fragile materials.
• Provision of public access to these resources, including remote access via the Library web -site.
The Ontario public library community is working together to digitize resources that are difficult to access or handle,
including archival data and local history resources. Grant funding for public libraries for this purpose is available on
a project specific basis and will be pursued.
rstimasea expenanures 3
Equipment Other j 15,000 15 ODO'
Total Estimated Expenditures 15,000 15,000
Estimated Financing
Libra General Ca dal 15 000 15,000
,
7 ...w _.__P _ _.
Estimated
-81-
Pro] ect ID :
Project Name
CAPITAL PLAN 2006-2009 {DRAFT 21
TOWN OF AURORA
CAPITAL BUDGET - ANALYSIS BY PROJECT
Pa a No:
81001
3rowth - Related Studies
Department: lRanning
Service / Program IPlanning
Year of Initiation 12006
Flexible: Yes
Various growth related studies (including Growth Management Study Update) to be completed during 2006. Funding
for growth related studies include staff and consulting related costs.
Consulting j
600,000i
150000
150,000
150,000=
150,000!
Total Estimated Expenditures 1
600,000E
150,000
150,000i
150,0001
150,0w
1
Estimated Finanang � ..
�
t
I
j
I
Development Charges
600 000 3
_.._ �
_ 150 000
150 000 t
150.0001
150,000 {
Reserve Funds
600.000
150.0001
150.000
150.000i
150.000
-82-
SPECIAL GENERAL COMMITTEE - BUDGET - DEC [AGENDA:
BER 1=ITEM
C/O: Mr: Bob Panizza, Dec/f4/05
Town Clerk, Town of Aurora
For: Public Correspondence for presentation to committee members at the
Thursday,Dec/15/05,Town Budget meeting G?6:00 pm
Appreciate if you could give this as a public input document that I was unable to
present at Wednesdays Council meeting,
2006 Buget Feedback for Review by Town of Aurora
Good evening Mr. Mayor, and Councilors.
I respect the amount of effort that the staff and Council have placed into this years
2006 budget having attended a couple of open meetings and examined the budget
draft #1 at the Aurora Library .I wish to make some open comments and written
submission for Councils consideration in its further review.
The Budget's composition is laid out differently with dozens of Capital Expendit',:re
projects listed by the various departments as flexible and few as non -flexible.
There appears to be no specific prioritization of each departments Capital projects
listing them from most to least importance level.
With this not being done it will no doubt make it difficult for Council to decide what
items to support considering the best returns with least costs associated to the
taxpayer. In your consideration of which Capital projects to delete or support, the
user groups contribution towards the costs associated versus the taxpayer subsidy
should be tame" into consideration. The budget has an overall fairness to most users
but some would appear to have a lot more going for them and my summary will
indicate some comments here.
Overall, the increase from the draft 1 budget is a department wish list which
potentially has a tax increase of 10% plus per household. This may not sound like a
lot but the year prior to this I think the increase was around 7.5% for an increase.
This is almost unheard today in the private sector where wage increases are at
best around 3% for 2006. Price increases in some major sectors such as
transportation- CN and CP Rail for example will be averaging around 6% ,These
are two major economic indicators in the private sector. Fuel costs were a major
contributor overall.
This year the Region's tax increase is coming in at 2.9% after a previous hefty
increase in 2005.
I can appreciate to -date the much needed large Capital acquisitions by the
Tw,r,n for its citizens in the Seniors Centre and the new Recreational Complex,
however when I reviewed the Capital Plan of the Draft 1 budget there were many
other items which were pretty high in costs and not related. These have added
substantially to this years budget and it is to these expenditures I will refer with the
hope that Council with staff can reconsider them. we have to smooth out the effects
of what we want to what is necessary so as to reduce the overall tax burden to the
average Auroran getting a 3% wage increase at best,
One key area which was mentioned at a open budget meeting was the accumulating
Operating budget surplus being around $870,000. This is substantial!
Im
SPECIAL GENERAL COMMITTEE — BUDGET — DECEMBER 15, 2005
Cont. page 2
This could have a direct effect if allocated to the Capital Project items shown on
the 2005 budget. Could this be considered?
The other major occurrence this year which can have effect on capital Budget
items is the Hydro sale debenture of $34 million along with the $5.0 million from the
New Recreational Complex surplus. With proper consideration this can no doubt
soften the the immediate blow of a substantial tax increase. Interest is also being
made from these debentures which should be considered under the operating
budget side due to its ongoing contributions to current and future budgets.
I have compiled this written submission for Council and would request Council
to consider these closely with the above comments in mind. Deferral does not mean
it can't still be done.
Respectfully,
Stephen !granger
Cont pages 3-5 attached.
IRIM
SPECIAL GENERAL COMMITTEE — BUDGET — DECEMBER 15, 2005
Cont pg 3
2006 Budget Draft 1 Items
Recommended for Reconsideration
Capital Plan:
Works Dept:
# 31028 : Salaries and benefits for Public Works Engineering Staff, @$71,783 for
2006. ( Should this not be under the Engineering :Services of the
Operating Budget section?)
#31029 and # 31030 : This is road reconstruction on certain streets(flexible) so as to
lessen the maintenance activity? Total stated $1,800,000 and $1,298,000.1s this
necessary or can it be delayed. What is the maintenance activity cost mentioned?
This is a total of $3,098,000 which is huge!
134703: @$75,000
Shows a study to assess the pole conditions,lighting types,overall system
review. Is this necessary or can it be deferred. ( The washroom item#34209 seems
more important for example.
Leisure Services:
This area had 44 items listed and of these;
#71013 , #71012, 971028, #71030 : All these items are each $19,000/$20,000 or
077,000 total. Their not part of the vehicle equipment replacement? They are stated
as purchases which are necessary to increase the equipment efficiency and repair
expenses. What are these expenses for 2006 ?
#71028: @ $50,000 . For replacing a skid steer loader. Again to improve efficiency?
# 71032: @$35,000 . For additional equipment purchased to increase efficiency —
landscape Rototiller.
Overall total: $142,000. What is the lack of efficiency now?
Are these items part of the Capital replacement schedule?
972018: 9$23,000. Upgrade Kitchen ACC1 for building aesthetics. Can this wait?
SPECIAL GENERAL COMMITTEE — BUDGET — DECEMBER 15, 2005
9720401 @$30,000 . Roller Shades at Town Hall. To improve conditions for patrons
and staff visiting at Town Ball. Can this wart?
Cont. pg 4, Capital Budget Draft 1
Leisure Services:
972042: @$450,000 . Replace completely the brine system which has been in service
for 37 years, Can this not wait and possibly be eonsidercd another year or as an
item in which the $870,000 accumulating Operating budget surplus can be
considered for?
#72047: (a)$237,000 The Aurora Leisure Complex Fitness Move. This is the
removal of the current bear l wood flooring to he replaced ;dish a rubberized
sport flooring. Why is this necessary now? Will it increase our current user group
considering we are building and providing a rdew Recreational Complex?
#73016: @ $550,000 . This is a full size Baseball facility associated with the master
plan growth. Can this wait based on the current number of users. ( Maybe as a
master plan item it can be considered when the Hydro funds are reviewed?)
#73017 : @$195,000 . Anew Rugby Field. Part of the master plan
also,
#73069: @$650,000 . Sheppard's Bush Sports Field. This is for the soccer and
Rugby group so as to enhance Sheppard.- Bush by making available an all season
field. This is a real luxury considering we already have a Bubble available for the
soccer and possible rugbey group now. Can this not be reviewed and wait til next
year considering the heavy tax level this year?
The maintenance cost of $60,000 for Sheppards Bush sounds really high and I could
not find an expense breakdown to justify this figure used in this example out of the
Parks Operating budget.
Both items are:$845.000 Almost a $1,000,000 for two user groups and a Town
full of current playing fields.
Items#73070,#73072,#73073,and #73074: *797,000 . All these items refer to
landscaping in one €unction or another. This is a lot of Landscaping for one years
budget.
Operatin¢ Budget Section:
Under the cover page of the operating budget it shows the tax rate 2006 @8.5% and
2007 @5.6% and 2008 @ 1.0% . Would this decline in percentages not show that
there is a good possibility to defer some expenses to another year?
WOriAS Capital:
SPECIAL GENERAL COMMITTEE - BUDGET - DECEMBER 15, 2005
#03300 is at $11162,000 and Works Capital Budget is shown at $3,098,000
Why do —nee have a total of $4,260,000 allocated for Works Capital. Surely in this
budget area some items can be found to be deferrable.
Cont. page 5
Parks Department
I'm confused why item #07302 shows $875,747 and at 2006 it shows $1,953,683. This
mmesents a increase 6f $1,077,936 or 45.0%. Ws.'augc and should have a closer
review on cost justification.
Overall, I appreciate the budget complexity but I also respect the job that Council
will have in sifting through these items so as to reduce *.he overall tax effect. There is
no doubt in my mind that there is definite room for the 2006 budget to be
substantially reduced. There are many project items and operating expenditures
which need to be questioned closely and where possible deferred. I think a much
lower single digit budget is very attainable!
Respectfully,
St heu Gran er
0
ADDITIONAL ITEMS TABLED FOR
SPECIAL GENERAL COMMITTEE BUDGET MEETING
Thursday, December 15, 2005
➢ Correspondence from the Director of Public Works
Re: Proposed Crossing Guards at the Bridgnorth &
Hollandview Trail and Gateway & Earl Stewart
Drive/Birkshire Drive intersections
➢ Correspondence from Councillor Kean
Re: Input for the Special General Committee Meeting -
Budget - Thursday, December 15, 2005
Memo
To: Mayor and Members of Council
From: Wayne Jackson, Director of Public Works
Date: December 15, 2005
Re: Proposed Crossing Guards at the Bridgenorth Drive and Hollandview Trail
and at the Gateway Drive and Earl Stewart Drive/Birkshire Drive Intersections
On December 14, 2005 the Traffic Safety Advisory Board considered Report No.
TSAB05- 034 — "Request for a School Crossing Guard at the Bridgenorth Drive and
Hollandview Trail and at the Gateway Drive and Earl Stewart Drive/Birkshire Drive
Intersections" (see attached) and adopted the following recommendations:
"THAT School Crossing Guards be provided during the a.m, and p.m.
peak periods at the intersections of Bridgnorth Drive and Hollandview
Drive and at Gateway Drive and Earl Stewart Drive/Birkshire Drive starting
September 2006,
THAT a letter be sent to Ms. Monica Elia and to St. Jerome and Northern
Lights Public Schools with the TSAB's recommendations; and
THAT funding in the amount of $15,000 be included in the 2006 crossing
guard budget to hire 2 new crossing guards."
As the recommendations will have potential impacts to the 2006 Crossing Guard
budget staff felt it prudent to present the recommendations to Council as its
December 15, 2005 budget meeting to be considered in conjunction with the 2006
Capital budget.
WayrZ-"k son, P. Eng.
Director of Public Works
SAPubllc Wags\General FoklemkT08 TmIOdT.S.A.B\PubIIC Works Reports M TSABt20051MemmOecember 15.2005 Memo to Council - Proposed Crossing Gaunds.doc
TOWN OF AURORA
TRAFFIC SAFETY ADVISORY BOARD REPORT No. TSAB05-034
SUBJECT: Request for School Crossing Guards at the Bridgenorth Drive and
Hollandview Trail and at the Gateway Drive and Earl Stewart
Drive/Birkshire Drive Intersections
FROM: W. H. Jackson, Director of Public Works
DATE: December 14, 2005
RECOMMENDATIONS
THAT School Crossing Guards be provided during the a.m. and p.m. peak periods at
the intersections of Bridgnorth Drive and Hollandview Drive and at Gateway Drive
and Earl Stewart Drive/Birkshire Drive starting September 2006; and
THAT a letter be sent to Ms. Monica Elia and to St. Jerome and Northern Lights
Public Schools with the TSAB's recommendations.
BACKGROUND
On October 25, 2005 staff received a letter and petition from residents in the Bayview
Wellington subdivisions requesting that a School Crossing Guard be provided at the
intersections of Bridgenorth Drive and Hollandview Trail and at Gateway Drive and Earl
Stewart Drive/Birkshire Drive.
1.0 Bridgenorth Drive and Hollandview Trail
Bridgenorth Drive is a two-lane local roadway with an urban cross-section (curbs and
sidewalks) a 10 meter pavement width, a posted 40km/hr speed limit and a sidewalk on the
west side. Hollandview Trail is a two-lane local roadway with an urban cross-section, a
pavement width of 8.5 meters, a posted speed limit of 40km/h and a sidewalk on the north
side.
Parking is prohibited at anytime on the east side of Hollandview Trail and on both sides of
Bridgenorth Drive for its entire length. Figure 1 shows these details.
2.0 Gatewav Drive and Earl Stewart Drive/Birkshire Drive
Gateway Drive is a two-lane collector roadway with an urban cross-section, a pavement
width of 11 meters, a posted 40km/hr speed limit and sidewalks on both sides. Earl Stewart
Drive and Birkshire Drive are two-lane local roadways with urban cross -sections, pavement
December 14, 2005 -2. Report No. TSAB05.034
widths of 10 meters, posted speed limits of 40km/h and sidewalks on the south side.
Parking is prohibited at anytime on both sides of Gateway Drive and on the south side of
Earl Stewart Drive and Birkshire Drive. Figure 1 shows these details.
ANALYSIS
On Thursday December 1, 2005 staff conducted Crossing Guard gap studies at the
intersections of Bridgenorth Drive and Hollandview Trail and Gateway Drive and Earl
Stewart Drive/Birkshire Drive. The studies were conducted to determine if a Crossing
Guard is warranted. An adequate gap for both intersections was determined to be 16
seconds which is based on the pavement width and the number of pedestrians crossing
the intersection. The results of the studies are shown below in Table No. 1 and No. 2
Tahla 1 —ran Studv at Bridaennrfh ❑rives and Hnllandviaw Trail
No. of Periods
No. of Periods
Number of
Number of
Time
with 4 or Less
with 5 or More
Students
Vehicles
Adequate Gaps
Adequate Gaps
a.m. (8:30-9:00)
6
0
39
226
noon (11:15-12:10)
(NA)
(NA)
(NA)
(NA)
p.m. (3:00-3:30)
4
3
75
202
Tahle Nn_ 2 — Gan Studv at Gatewav Drive and Earl Stewart Drive/Birkshire Drive
No. of Periods
No. of Periods
Number of
Number of
Time
with 4 or Less
with 5 or More
Students
Vehicles
Adequate Gaps
Adequate Gaps
a.m. (7:45-8:40)
14
4
59
201
noon (11:15-12:10)
(NA)
(NA)
(NA)
(NA)
p.m. (3:00-3:50)
1 5
3
137
1 193
The Current Ontario Traffic Conference Criteria establishes a requirement for an adult
Crossing Guard if there exists three or less safe crossing opportunities in a five minute
period. For Town standards, the number of safe crossing opportunities (gaps) are
considered not to be adequate when they are frequently occurring four times or less in a
five minute period on a regular basis
From the results of the Crossing Guard gap studies, it appears that a School Crossing
Guard is currently warranted at both intersections during the peak a.m. and p.m. hours.
Staff did not conduct gap studies during the noon lunch hours as Crossing Guards are
typically not required due to the lower traffic and pedestrian volumes. Furthermore, staff
r' r
December 14, 2005 .3. Report No. TSAB05-034
has already received Council approval to remove 5 of the 8 existing Crossing Guards
during the noon lunch hours.
CONCLUSION
Based on the Council approved evaluation criteria, School Crossing Guards are warranted
at the intersections of Bridgenorth Drive and Hollandview Trail and at Gateway Drive and
Earl Stewart Drive/Birkshire Drive. A field study has confirmed that there are insufficient
gaps available during the a.m. and p.m. peak periods for students to cross the street.
Should Council approve the new Guards they would begin work in September 2006.
OPTIONS
Council may wish not provide a Crossing Guard at the Bridgenorth Drive and
Hollandview Trail intersection
Council may wish not provide a Crossing Guard at the Gateway Drive and Earl Stewart
Drive/Birkshire Drive intersection.
FINANCIAL IMPLICATIONS
Crossing Guards are typically provided at an intersection between the hours of 7:30a.m.
and 9:00a.m. and from 3:00p.m. to 4:30p.m. As 2 Crossing Guards are warranted it is
estimated that each Crossing Guard would be expected to work 3 hours a day, 200 days a
year (on average) at the starting rate of $12.50. Therefore, it is estimated that $7,500 per
Crossing Guard or $15,000 total, should be provided in the Crossing Guard operating
budget for the addition of 2 new Crossing Guards.
It is, however, noted that Council as its November 22, 2005 meeting adopted the
recommendation to remove 5 crossing guards during the lunch hour starting in September
2006. This will result in a saving of over $30,000 per year. Staff could use these savings to
pay for the addition of the 2 new crossing guards starting in September 2006 and the 2007
crossing guard budget could also be reduced by over $15,000.
LINK TO STRATEGIC PLAN
Goal "C" speaks to continuing the well -planned moderate growth of the Town. This goal is
supported by the "Strategic Action" stating that Council will "incorporate measures into
Town policies and programs which contribute to a safe living and working environment".
The newly updated Strategic Plan includes the action to "address matters affecting public
safety, property and the environment and will formulate specific measures to deal with
them."
r
December 14, 2005 - 4 - Report No. TSAB05-034
ATTACHMENTS
Figure 1 — Key Map Showing the Bridgenorth Drive and Hollandview Drive Intersection
PRE -SUBMISSION REVIEW
None.
Prepared by. Brent Jefferson, Traffic/Transportation Analyst, ext. 4374
aNt-
�` ayne a on
Director of Public Works
w
I I I I I
I I I I I
3
I I,►I
c9
.
EARL STEWART DRIVE
W�
BIRKSHIRE DRIVE
—
—.
I
-
z
w
U
w
W
V
O
DOVE COURT LANE
Zz
Z
N
_
�
m
3
NAMw6 G:[X OifAFNt
BLOCK 94
OPEN SPACE
HOLLANDMEW TRAIL
1
S
9
3
S
SE
FIGURE 1
- KEY
MAP
OF AREA
IN
QUESTION
PUBLIC WORKS DEPARTMENT
DECEMBER 2005
SE
96
67
SE
BB
SE
69
SE
]0
SE
71
SE
]2
SE
73
SE
74
SE
75
SE
BLOC
76
SE
100
]7
SE
78
SE
79
SE
80
SE
81
SE
35
SE
g
84
-----Original Message -----
From: Kean, Nigel (External Mail)
Sent: Wednesday. December 14. 2005 3:29 pM
Cc: Gutterldge, John; Rogers, John
Subject: Budget meeting
To All Councillors,
As I am not sure that I will be able to attend tomorrow night's budget meeting I would like to say
the following.
In reviewing the Leisure Services budget there are a couple of items that I would ask you should
review.
7! The new Sheppards Bush Sports Field seems very extravagant in a year where we are looking
to cut budget items. Perhaps in the next couple of years where we are less stretched on the
dollars this item could be revisited.
2/item 4 73070 the Yonge Street south Landscaping. Again can we really afford this at this time.
3/ Item p 73068 The extension of the Nokiidaa Trail. This was scheduled for 2007 and perhaps
could stay there.
41 Item p 73016 Baseball Facility- We are told that baseball is declining in Interest and perhaps
this money could be used elsewhere in Leisure Services.
Also under Bylaw services we have increased the number of officers yet it shows that revenue
will actually go down in 2006. To me that defeats the purpose of the extra bodies.
I will try to get to the meeting but I have to pick up my daughter coming back from England at the
airport. Hopefully you will consider these suggestions.
Nigel