AGENDA - Accessibility Advisory Committee - 20170201
Accessibility
Advisory Committee
Meeting Agenda
Wednesday, February 1, 2017
4 p.m.
Leksand Room
Aurora Town Hall
Public Release
January 25, 2017
Town of Aurora
Accessibility Advisory Committee
Meeting Agenda
Date: Wednesday, February 1, 2017
Time and Location: 4 p.m., Leksand Room, Aurora Town Hall
1. Approval of the Agenda
Recommended:
That the agenda as circulated by Legislative Services be approved.
2. Declaration of Pecuniary Interest and General Nature Thereof
3. Receipt of the Minutes
Accessibility Advisory Committee Meeting Minutes of December 1, 2016
Recommended:
That the Accessibility Advisory Committee meeting minutes of December 1, 2016,
be received for information.
4. Delegations
Accessibility Advisory Committee Meeting Agenda
Wednesday, February 1, 2017 Page 2 of 2
5. Matters for Consideration
1. Memorandum from Planner
Re: Application for Site Plan
Metropolitan Square Inc.
180, 190 and 220 Wellington Street East
Part of Lot 106, Registered Plan 246, Lot 81, Con. 1, EYS
Related File Numbers: OPA-2015-05 and ZBA-2015-15
File Number: SP-2016-10
(Full-size drawings will be available at the meeting.)
Recommended:
1. That the memorandum regarding Application for Site Plan, Metropolitan
Square Inc., 180, 190 and 220 Wellington Street East, Part of Lot 106,
Registered Plan 246, Lot 81, Con. 1, EYS, Related File Numbers: OPA-
2015-05 and ZBA-2015-15, File Number: SP-2016-10 be received; and
2. That the Accessibility Advisory Committee provide comment regarding the
Site Plan Application.
6. Informational Items
7. New Business
8. Adjournment
Town of Aurora
Accessibility Advisory Committee
Meeting Minutes
Date: Thursday, December 1, 2016
Time and Location: 4 p.m., Leksand Room, Aurora Town Hall
Committee Members: Tyler Barker (Chair), John Lenchak (Vice Chair), Gordon
Barnes, James Hoyes, and Jo-anne Spitzer
Member(s) Absent: Councillor Sandra Humfryes
Other Attendees: Councillor John Abel, Chris Catania, Accessibility Advisor, and
Linda Bottos, Council/Committee Secretary
The Chair called the meeting to order at 4:05 p.m.
The Chair relinquished the chair to the Vice Chair at 4:51 p.m. and resumed the chair at
5:12 p.m. during consideration of Item 2.
1. Declaration of Pecuniary Interest and General Nature Thereof
There were no declarations of pecuniary interest under the Municipal Conflict of
Interest Act.
2. Approval of the Agenda
Moved by James Hoyes
Seconded by John Lenchak
That the agenda as circulated by Legislative Services be approved.
Carried
3. Receipt of the Minutes
Accessibility Advisory Committee Meeting Agenda
Wednesday, February 1, 2017
Minutes
Page 1 of 4
Accessibility Advisory Committee Meeting Minutes
Thursday, December 1, 2016 Page 2 of 4
Accessibility Advisory Committee Meeting Minutes of November 2, 2016
Moved by Gordon Barnes
Seconded by James Hoyes
That the Accessibility Advisory Committee meeting minutes of November 2, 2016,
be received for information.
Carried
4. Delegations
None
5. Matters for Consideration
1. Memorandum from Planner
Re: Application for Site Plan Amendment, 458021 Ontario Inc., 21 & 33
Eric T. Smith Way, Lots 8 & 9, Plan 65M4324, File No. SP-2016-08
Staff provided background and an overview of the proposed site plan
amendment, and the Committee discussed aspects of the application,
including entrance, lunchroom, and universal washroom accessibility.
Moved by Jo-anne Spitzer
Seconded by Gordon Barnes
1. That the memorandum regarding Application for Site Plan Amendment
(Submission #2), 458021 Ontario Inc., 21 & 33 Eric T. Smith Way, Lots 8 &
9, Plan 65M4324, File No. SP-2016-08 be received; and
2. That the following Accessibility Advisory Committee comments regarding
the Site Plan Amendment be considered by staff:
(a) Request to ensure accessible, barrier-free furniture in all common areas
including the lunchroom; and
(b) Request to install automatic door openers at entrance and universal
washroom;
Accessibility Advisory Committee Meeting Agenda
Wednesday, February 1, 2017
Minutes
Page 2 of 4
Accessibility Advisory Committee Meeting Minutes
Thursday, December 1, 2016 Page 3 of 4
(c) Suggestion to move the sink further away from the shower to allow room
for assistance in the universal washroom.
Carried
2. Memorandum from Accessibility Advisor
Re: Town of Aurora 2017-2023 Accessibility Plan
Staff provided an overview of the annual review and update of the Town’s multi-
year Accessibility Plan. The Committee discussed various aspects of the
document and suggested items for inclusion in Appendix B – Recommended
Accessibility Items 2017-2023, including: (1) Queen’s Diamond Jubilee Park; and
(2) evacuation chairs at Town Hall.
Issues were raised regarding: (1) an apparent elevation variance greater than four
degrees at a storm drain near a side exit of the Aurora Community Centre; and (2)
customer service gaps related to the adaptive swimming program at the Aurora
Family Leisure Complex. Staff agreed to follow up on these matters.
Moved by Gordon Barnes
Seconded by James Hoyes
1. That the memorandum regarding Town of Aurora 2017-2023 Accessibility
Plan be received; and
2. That the Accessibility Advisory Committee recommend to Council:
(a) That the Town of Aurora 2017-2023 Accessibility Plan be adopted as
amended.
Carried
3. Memorandum from Accessibility Advisor
Re: York Region Accessibility Advisory Committee – Feedback Survey
Staff provided a brief overview of the Feedback Survey regarding an educational
and networking forum to be hosted by the Region on May 31, 2017, and the
Committee provided feedback. It was agreed that staff would submit the
completed Feedback Survey to the Region on behalf of the Committee.
Accessibility Advisory Committee Meeting Agenda
Wednesday, February 1, 2017
Minutes
Page 3 of 4
Accessibility Advisory Committee Meeting Minutes
Thursday, December 1, 2016 Page 4 of 4
Moved by Gordon Barnes
Seconded by Jo-anne Spitzer
1. That the memorandum regarding York Region Accessibility Advisory
Committee – Feedback Survey be received for information.
Carried
6. Informational Items
None
7. New Business
Tyler Barker advised that he would arrange for a representative of Activate Aurora
to delegate at the February 2017 meeting of the Accessibility Advisory Committee
regarding the Sport Implementation Plan and access for those with disabilities.
Committee members discussed their preferences for the start time of Accessibility
Advisory Committee meetings, and it was agreed that the 4 p.m. start time would
be maintained.
8. Adjournment
Moved by John Lenchak
Seconded by Gordon Barnes
That the meeting be adjourned at 5:39 p.m.
Carried
Committee recommendations are not binding on the Town unless adopted by Council at a
later meeting.
Accessibility Advisory Committee Meeting Agenda
Wednesday, February 1, 2017
Minutes
Page 4 of 4
INTERNAL MEMORANDUM
DATE: January 3, 2017
TO: B. Butler, Planning and Building Services
A. Bazar, Planning and Building Services
A. Ierullo, Planning and Building Services
G. Greidanus, Parks, Recreation and Cultural Services
P. De Sario, Corporate Services
J. McDonald, Central York Fire Services
C. Catania, Accessibility Advisory Committee
J. Massadeh, Traffic/ Transportation Analyst
CC: Mayor Dawe and Members of Council
M. Ramunno, Director of Planning and Building Services
A. Mihail, Infrastructure and Environmental Services
Council Secretariat, Corporate Services
FROM: Lawrence Kuk, Planning and Building Services
Re: Application for Site Plan
Metropolitan Square Inc.
180, 190 and 220 Wellington Street East
Part of Lot 106, Registered Plan 246, Lot 81, Con 1, EYS
Related File Numbers – OPA-2015-05 & ZBA-2015-15
File Number: SP-2016-10
A Site Plan Application has been submitted to the Planning and Building Services
department for review. The Applicant is proposing two 8 storeys apartment buildings
jointed by a connecting atrium for a total of 223 residential units. Please find enclosed
copies of the supporting documents for your review and comments.
I would appreciate receiving your comments by January 30th, 2017.
Should you have any questions regarding the above noted proposal, please feel free to
contact me.
Attach.
100 John West Way
Box 1000
Aurora, ON L4G 6J1
Phone: 905-727-3123 Ext. 4343
Email: Lkuk@aurora.ca
www.aurora.ca
Planning and Building Services
This drawing, as an instrument of service, is provided by and is the property of Kojo La-Anyane Architect. The contractor must verify and accept responsibility for all dimensionsand conditions on site and must notify Kojo La-Anyane Architect of any variations fromthe supplied information. This drawing is not to be scaled. The architect is notresponsible for the accuracy of survey, structural, mechanical, electrical, etc.,information shown on this drawing. Refer to the appropriate consultant's drawingsbefore proceeding with the work. Construction must conform to all applicable codes andrequirements of authorities having jurisdiction. The contractor working from drawings notspecifically marked 'For Construction' must assume full responsibility and bear costs forany corrections or damages resulting from his work.&KHFNHGE\'UDZQE\ 'DWH6FDOH'UDZLQJ1R3URMHFW'UDZLQJ1DPH-81(INDUSTRIAL PARKWAY N.&WELLINGTON STREETAURORA, ONTARIORMKLA R C H I T E C T610 GAGNON PLACENEWMARKET, ON L3X 1V8TEL: 905 898 4989Kojo La-AnyaneSPA 0.00COVER SHEETSPA SHEET LISTDRAWING # DRAWING NAMESPA 0.00 COVER SHEETSPA 0.01 STATISTICSSPA 0.02 STATISTICSSPA 1.01 OVERALL CONTEXT PLANSPA 1.02 CONTEXT PLANSPA 1.03 SITE PLAN / ROOF PLANSPA 2.01 UNDERGROUND LEVEL 2SPA 2.02 UNDERGROUND LEVEL 1SPA 3.01 FLOOR 1SPA 3.02 FLOOR 2 PLANSPA 3.03 FLOOR 3 PLANSPA 3.04 FLOOR 4 PLANSPA 3.05 FLOOR 5 AND 6 PLANSPA 3.06 FLOOR 7 AND 8 PLANSPA 4.01 SOUTH ELEVATION AND EASTELEVATIONSPA 4.02 NORTH ELEVATION AND WESTELEVATIONSPA 4.03 INTERNAL ELEVATIONSSPA 5.01 BUILDING SECTIONSSPA 6.03 3D VIEWSMETROPOLITAN SQUARESPA SUBMISSION #1NOVEMBER 25, 20161R 'DWH ,VVXHG5HYLVLRQ %\ ,668(')256,7(3/$168%0,66,21 ./
This drawing, as an instrument of service, is provided by and is the property of Kojo La-Anyane Architect. The contractor must verify and accept responsibility for all dimensionsand conditions on site and must notify Kojo La-Anyane Architect of any variations fromthe supplied information. This drawing is not to be scaled. The architect is notresponsible for the accuracy of survey, structural, mechanical, electrical, etc.,information shown on this drawing. Refer to the appropriate consultant's drawingsbefore proceeding with the work. Construction must conform to all applicable codes andrequirements of authorities having jurisdiction. The contractor working from drawings notspecifically marked 'For Construction' must assume full responsibility and bear costs forany corrections or damages resulting from his work.&KHFNHGE\'UDZQE\ 'DWH6FDOH'UDZLQJ1R3URMHFW'UDZLQJ1DPH-81(INDUSTRIAL PARKWAY N.&WELLINGTON STREETAURORA, ONTARIORMKLA R C H I T E C T610 GAGNON PLACENEWMARKET, ON L3X 1V8TEL: 905 898 4989Kojo La-AnyaneSPA 0.01STATISTICS1R 'DWH ,VVXHG5HYLVLRQ %\ ,668(')256,7(3/$168%0,66,21 ./
This drawing, as an instrument of service, is provided by and is the property of Kojo La-Anyane Architect. The contractor must verify and accept responsibility for all dimensionsand conditions on site and must notify Kojo La-Anyane Architect of any variations fromthe supplied information. This drawing is not to be scaled. The architect is notresponsible for the accuracy of survey, structural, mechanical, electrical, etc.,information shown on this drawing. Refer to the appropriate consultant's drawingsbefore proceeding with the work. Construction must conform to all applicable codes andrequirements of authorities having jurisdiction. The contractor working from drawings notspecifically marked 'For Construction' must assume full responsibility and bear costs forany corrections or damages resulting from his work.&KHFNHGE\'UDZQE\ 'DWH6FDOH'UDZLQJ1R3URMHFW'UDZLQJ1DPH-81(INDUSTRIAL PARKWAY N.&WELLINGTON STREETAURORA, ONTARIORMKLA R C H I T E C T610 GAGNON PLACENEWMARKET, ON L3X 1V8TEL: 905 898 4989Kojo La-AnyaneSPA 0.02STATISTICS1R 'DWH ,VVXHG5HYLVLRQ %\ ,668(')256,7(3/$168%0,66,21 ./
0h
'0h
90h
90h
9L O T 1 0 5L O T 1R E G ' D P L A N 2 3 1R E S E R V E D2#46««4§L O T 4L O T 5%'064'.+0'«1(«#52*#.6%76$'..%#$+0'6$2%$%$)7;$2$2%*#+0.+0-«««««««««««('0%'%682'&ğ«%52612«1(«%74$%76/*0'9«%74$612«1(«%74$/*(#%'«1(«)#$+105/*/*/*/*+08))))6666)66))%10%«9#.-%*#+0.+0-«('0%'BUILDING 18 STOREYS18.40 m19.25 m34.80 m10.30 m3.50 m3.50 m16.35 m 29.00 m 41.25 m 29.00 m 3.00 mFIRE ROUTEFIRE ROUTEFIRE ROUTE6.00 m6.00 m6.00 mBUILDING 28 STOREYS3.00 m 6.00 m 8.60 m 39.00 m 16.00 m 32.20 m 9.40 m65.10 m82.70 m7.40 m 10.20 m 12.00 m 10.20 m 7.40 m47.25 mINDUSTRIAL PARKWAY NORTHWELLINGTON STREET EASTFUTURE ROAD WIDENINGFUTURE ROAD WIDENING99.25 mThis drawing, as an instrument of service, is provided by and is the property of Kojo La-Anyane Architect. The contractor must verify and accept responsibility for all dimensionsand conditions on site and must notify Kojo La-Anyane Architect of any variations fromthe supplied information. This drawing is not to be scaled. The architect is notresponsible for the accuracy of survey, structural, mechanical, electrical, etc.,information shown on this drawing. Refer to the appropriate consultant's drawingsbefore proceeding with the work. Construction must conform to all applicable codes andrequirements of authorities having jurisdiction. The contractor working from drawings notspecifically marked 'For Construction' must assume full responsibility and bear costs forany corrections or damages resulting from his work.&KHFNHGE\'UDZQE\ 'DWH6FDOH'UDZLQJ1R3URMHFW'UDZLQJ1DPH-81(INDUSTRIAL PARKWAY N.&WELLINGTON STREETAURORA, ONTARIORMKLA R C H I T E C T610 GAGNON PLACENEWMARKET, ON L3X 1V8TEL: 905 898 4989Kojo La-AnyaneSPA 1.02CONTEXT PLAN1R 'DWH ,VVXHG5HYLVLRQ %\ ,668(')256,7(3/$168%0,66,21 ./
0h
'0h
90h
90h
9L O T 1 0 5L O T 1R E G ' D P L A N 2 3 1R E S E R V E D2#46««4§L O T 4L O T 5%'064'.+0'«1(«#52*#.6%76$'..%#$+0'6$2%$%$)7;$2$2%*#+0.+0-«««««««««««('0%'%682'&ğ«%52612«1(«%74$%76/*0'9«%74$612«1(«%74$/*(#%'«1(«)#$+105/*/*/*/*+08))))6666)66))%10%«9#.-%*#+0.+0-«('0%'1SPA 5.011SPA 5.01SPA4.022SPA4.021SPA4.012SPA4.011BUILDING 1BUILDING 28 STOREYS8 STOREYSBUILDING 18 STOREYSBUILDING 28 STOREYSTERRACE AT FLOOR 5TERRACE AT FLOOR 5TERRACE AT FLOOR 7TERRACE AT FLOOR 7ROOF OFRECEPTION /LOBBYTERRACE ATFLOOR 3TERRACE ATFLOOR 3TERRACE ATFLOOR 3TERRACE ATFLOOR 3TERRACE AT FLOOR 3TERRACE AT FLOOR 3OUTDOOR AMENITYAT FLOOR 1FUTURE ROAD WIDENINGFUTURE ROAD WIDENINGROOF OF FLOOR 8ROOF OF FLOOR 8ROOF OF FLOOR 8ROOF OF FLOOR 82SPA 5.012SPA 5.01MECHANICALPENTHOUSEROOFMECHANICALPENTHOUSEROOF15.00 m 2.00 m 22.00 m 2.00 m 47.25 m 2.00 m 22.00 m2.00 m3.00 m13.55 m61.75 m2.25 m3.50 m3.00 m10.55 m3.25 m3.25 m6.10 m51.25 m3.50 m 3.50 m 15.25 m61.75 m5.70 m3.25 m3.25 m6.10 m16.00 m19.25 m34.80 m10.30 m3.50 m3.50 m41.25 mSPA4.031SPA4.032INDUSTRIAL PARKWAY NORTHWELLINGTON STREET EASTSIAMESECONNECTIONFIRE ROUTEFIRE ROUTEFIRE ROUTE6.00 m6.00 m6.00 mThis drawing, as an instrument of service, is provided by and is the property of Kojo La-Anyane Architect. The contractor must verify and accept responsibility for all dimensionsand conditions on site and must notify Kojo La-Anyane Architect of any variations fromthe supplied information. This drawing is not to be scaled. The architect is notresponsible for the accuracy of survey, structural, mechanical, electrical, etc.,information shown on this drawing. Refer to the appropriate consultant's drawingsbefore proceeding with the work. Construction must conform to all applicable codes andrequirements of authorities having jurisdiction. The contractor working from drawings notspecifically marked 'For Construction' must assume full responsibility and bear costs forany corrections or damages resulting from his work.&KHFNHGE\'UDZQE\ 'DWH6FDOH'UDZLQJ1R3URMHFW'UDZLQJ1DPH-81(INDUSTRIAL PARKWAY N.&WELLINGTON STREETAURORA, ONTARIORMKLA R C H I T E C T610 GAGNON PLACENEWMARKET, ON L3X 1V8TEL: 905 898 4989Kojo La-AnyaneSPA 1.03SITE PLAN / ROOF PLAN1R 'DWH ,VVXHG5HYLVLRQ %\ ,668(')256,7(3/$168%0,66,21 ./
FLOOR 1260.30FLOOR 2263.25U/G 1256.80FLOOR 3266.50FLOOR 4269.45FLOOR 5272.40U/G 2254.001SPA 5.01FLOOR 6275.35FLOOR 7278.30FLOOR 8281.25MPH284.65T/O MPH290.155.50 m3.40 m2.95 m2.95 m2.95 m2.95 m2.95 m3.25 m2.95 m3.50 m2.80 m24.35 m5.50 m3.40 m2.95 m2.95 m2.95 m2.95 m2.95 m3.25 m2.95 m3.50 m2.80 m24.35 m5.50 m3.40 m2.95 m2.95 m2.95 m2.95 m2.95 m3.25 m2.95 m3.50 m2.80 m24.35 m5.50 m3.40 m2.95 m2.95 m2.95 m2.95 m2.95 m3.25 m2.95 m3.50 m2.80 m24.35 mBUILDING 18 STOREYSBUILDING 28 STOREYS3b1b3c3a3a1c1a1b2a2a2a3b1a1a1c3b1b3a3a1c1a1b2a1a2a2a3b1a1c3c3b2a257.60259.40AVERAGE GRADE258.76FLOOR 1260.30FLOOR 2263.25U/G 1256.80FLOOR 3266.50FLOOR 4269.45FLOOR 5272.40U/G 2254.00FLOOR 6275.35FLOOR 7278.30FLOOR 8281.25MPH284.65T/O MPH290.152SPA 5.015.50 m3.40 m2.95 m2.95 m2.95 m2.95 m2.95 m3.25 m2.95 m3.50 m2.80 m24.35 mBUILDING 28 STOREYS3b1b3c3a3a1c1a1b2a1a2a3b1b3c3b3a1c1a1b2a1a2a259.40261.30AVERAGE GRADE258.76E X T E R I O R F I N I S H E S S C H E D U L EPRECAST CONCRETE PANELS 3a PRECAST CONCRETE PANELSFINISH - STAMPED BRICK PATTERNCOLOUR - DARK BROWN 3b PRECAST CONCRETE PANELS FINISH - SANDBLASTED COLOUR - BEIGE 3c PRECAST CONCRETE PANELS FINISH - SANDBLASTED COLOUR - DARK GRAY RAILINGS 2a BALCONY / TERRACE GLAZED RAILSFRAME FINISH - TO MATCH WINDOW FRAMESOLAR E VISION GLASS - LIGHT GREYALUMINUM WINDOW WALL GLAZING SYSTEM 1a DOUBLE GLAZED SEALED UNIT IN ALUMINUM FRAMEFRAME FINISH - SILVERSOLAR E VISION GLASS - LIGHT GREY 1b SPANDREL GLASS IN ALUMINUM FRAMEFRAME FINISH - SILVERSPANDREL GLASS PANEL - LIGHT GREY 1c SPANDREL GLASS IN ALUMINUM FRAMEFRAME FINISH - DARK GREYSPANDREL GLASS PANEL - DARK GREYThis drawing, as an instrument of service, is provided by and is the property of Kojo La-Anyane Architect. The contractor must verify and accept responsibility for all dimensionsand conditions on site and must notify Kojo La-Anyane Architect of any variations fromthe supplied information. This drawing is not to be scaled. The architect is notresponsible for the accuracy of survey, structural, mechanical, electrical, etc.,information shown on this drawing. Refer to the appropriate consultant's drawingsbefore proceeding with the work. Construction must conform to all applicable codes andrequirements of authorities having jurisdiction. The contractor working from drawings notspecifically marked 'For Construction' must assume full responsibility and bear costs forany corrections or damages resulting from his work.&KHFNHGE\'UDZQE\ 'DWH6FDOH'UDZLQJ1R3URMHFW'UDZLQJ1DPH-81(INDUSTRIAL PARKWAY N.&WELLINGTON STREETAURORA, ONTARIORMKLA R C H I T E C T610 GAGNON PLACENEWMARKET, ON L3X 1V8TEL: 905 898 4989Kojo La-AnyaneSPA 4.01SOUTH ELEVATION ANDEAST ELEVATION1 : 250SOUTH ELEVATION11 : 250BUILDING 2 - EAST ELEVATION21R 'DWH ,VVXHG5HYLVLRQ %\ ,668(')256,7(3/$168%0,66,21 ./
FLOOR 1260.30FLOOR 2263.25U/G 1256.80FLOOR 3266.50FLOOR 4269.45FLOOR 5272.40U/G 2254.00FLOOR 6275.35FLOOR 7278.30FLOOR 8281.25MPH284.65T/O MPH290.152.80 m3.50 m2.95 m3.25 m2.95 m2.95 m2.95 m2.95 m2.95 m3.40 m5.50 m24.35 m2.80 m3.50 m2.95 m3.25 m2.95 m2.95 m2.95 m2.95 m2.95 m3.40 m5.50 m24.35 mBUILDING 28 STOREYSBUILDING 18 STOREYS3b1b3c3a3a1c1a1b2a2a3b1a1c3b1b1a3a1c1a1b2a1a2a2a3b1a3c3b1c1aAVERAGE GRADE258.76FLOOR 1260.30FLOOR 2263.25U/G 1256.80FLOOR 3266.50FLOOR 4269.45FLOOR 5272.40U/G 2254.00FLOOR 6275.35FLOOR 7278.30FLOOR 8281.25MPH284.65T/O MPH290.155.50 m3.40 m2.95 m2.95 m2.95 m2.95 m2.95 m3.25 m2.95 m3.50 m2.80 m2SPA 5.0124.35 mBUILDING 18 STOREYS3b1b3c3a3a1c1a1b2a1a2a3b1b3c3a3a1c1a1b2a1a3b257.90257.60AVERAGE GRADE258.76E X T E R I O R F I N I S H E S S C H E D U L EPRECAST CONCRETE PANELS 3a PRECAST CONCRETE PANELSFINISH - STAMPED BRICK PATTERNCOLOUR - DARK BROWN 3b PRECAST CONCRETE PANELS FINISH - SANDBLASTED COLOUR - BEIGE 3c PRECAST CONCRETE PANELS FINISH - SANDBLASTED COLOUR - DARK GRAY RAILINGS 2a BALCONY / TERRACE GLAZED RAILSFRAME FINISH - TO MATCH WINDOW FRAMESOLAR E VISION GLASS - LIGHT GREYALUMINUM WINDOW WALL GLAZING SYSTEM 1a DOUBLE GLAZED SEALED UNIT IN ALUMINUM FRAMEFRAME FINISH - SILVERSOLAR E VISION GLASS - LIGHT GREY 1b SPANDREL GLASS IN ALUMINUM FRAMEFRAME FINISH - SILVERSPANDREL GLASS PANEL - LIGHT GREY 1c SPANDREL GLASS IN ALUMINUM FRAMEFRAME FINISH - DARK GREYSPANDREL GLASS PANEL - DARK GREYThis drawing, as an instrument of service, is provided by and is the property of Kojo La-Anyane Architect. The contractor must verify and accept responsibility for all dimensionsand conditions on site and must notify Kojo La-Anyane Architect of any variations fromthe supplied information. This drawing is not to be scaled. The architect is notresponsible for the accuracy of survey, structural, mechanical, electrical, etc.,information shown on this drawing. Refer to the appropriate consultant's drawingsbefore proceeding with the work. Construction must conform to all applicable codes andrequirements of authorities having jurisdiction. The contractor working from drawings notspecifically marked 'For Construction' must assume full responsibility and bear costs forany corrections or damages resulting from his work.&KHFNHGE\'UDZQE\ 'DWH6FDOH'UDZLQJ1R3URMHFW'UDZLQJ1DPH-81(INDUSTRIAL PARKWAY N.&WELLINGTON STREETAURORA, ONTARIORMKLA R C H I T E C T610 GAGNON PLACENEWMARKET, ON L3X 1V8TEL: 905 898 4989Kojo La-AnyaneSPA 4.02NORTH ELEVATION ANDWEST ELEVATION1 : 250NORTH ELEVATION11 : 250BUILDING 1 - WEST ELEVATION21R 'DWH ,VVXHG5HYLVLRQ %\ ,668(')256,7(3/$168%0,66,21 ./