Loading...
AGENDA - Accessibility Advisory Committee - 20210210Town of Aurora Accessibility Advisory Committee Meeting Agenda Date:Wednesday, February 10, 2021 Time:7:00 p.m. Location:Video Conference Pages 1.Procedural Notes This meeting will be held electronically as per Section 19. i) of the Town's Procedure By-law No. 6228-19, as amended, due to the COVID-19 situation. 2.Appointment of Chair and Vice Chair That a Committee member be elected as Chair for Year 2021 of the Accessibility Advisory Committee (2018-2022 Term); and 1. That a Committee member be elected as Vice Chair for Year 2021 of the Accessibility Advisory Committee (2018-2022 Term). 2. 3.Approval of the Agenda 4.Declarations of Pecuniary Interest and General Nature Thereof 5.Receipt of the Minutes 5.1.Accessibility Advisory Committee Meeting Minutes of December 9, 2020 1 That the Accessibility Advisory Committee meeting minutes of December 9, 2020, be received for information. 6.Delegations Note: At this time, the Municipal Offices are closed. This meeting will be live streamed at https://www.youtube.com/user/Townofaurora2012/videos. Anyone wishing to provide comment on an agenda item is encouraged to visit www.aurora.ca/participation for guidelines on electronic delegation. 7.Matters for Consideration 7.1.Memorandum from Accessibility Advisor; Re: Engaged, Inclusive Project 6 (Presentation to be provided by Erin Cerenzia, Manager, Neighbourhood Network and Kim Clark, Gazelle & Company) That the memorandum regarding Engaged, Inclusive Project be received; and 1. That the Accessibility Advisory Committee comments regarding Engaged, Inclusive Project be received and referred to staff for consideration and further action as appropriate. 2. 7.2.Memorandum from Accessibility Advisor; Re: Site Plan Application OPA- 2017-01, ZBA-2017-03 and SUB-2017-02, 20 and 25 Mavrinac Boulevard (Submission #2) 16 That the memorandum regarding Site Plan Application OPA- 2017-01, ZBA-2017-03 and SUB-2017-02, 20 and 25 Mavrinac Boulevard (Submission #2), be received; and 1. That the Accessibility Advisory Committee comments regarding Site Plan Application OPA-2017-01, ZBA-2017-03 and SUB-2017- 02, 20 and 25 Mavrinac Boulevard (Submission #2) be received and referred to staff for consideration and further action as appropriate. 2. 7.3.Memorandum from Accessibility Advisor; Re: Site Plan Application SP- 2020-12, 180 Industrial Parkway North (Submission #1) 22 That the memorandum regarding Site Plan Application SP-2020- 12, 180 Industrial Parkway North (Submission #1), be received; and 1. That the Accessibility Advisory Committee comments regarding Site Plan Application SP-2020-12, 180 Industrial Parkway North (Submission #1) be received and referred to staff for consideration and further action as appropriate. 2. 7.4.Memorandum from Accessibility Advisor; Re: Site Plan Application SP- 2020-13, 145-147 Wellington Street West (Submission #1) 29 That the memorandum regarding Site Plan Application SP-2020- 13, 145-147 Wellington Street West (Submission #1) be received; and 1. That the Accessibility Advisory Committee comments regarding Site Plan Application SP-2020-13, 145-147 Wellington Street West (Submission #1) be received and referred to staff for consideration and further action as appropriate. 2. 7.5.Memorandum from Accessibility Advisor; Re: Site Plan Application SP- 2020-14, 14452 Yonge Street (Submission #1) 38 That the memorandum regarding Site Plan Application SP-2020- 14, 14452 Yonge Street (Submission #1) be received; and 1. That the Accessibility Advisory Committee comments regarding Site Plan Application SP-2020-14, 14452 Yonge Street (Submission #1) be received and referred to staff for consideration and further action as appropriate. 2. 7.6.Memorandum from Accessibility Advisor; Re: Site Plan Application - Northern Trail and Boardwalk Planting Plan 47 That the memorandum regarding Site Plan Application Northern Trail and Boardwalk Planting Plan be received; and 1. That the Accessibility Advisory Committee comments regarding Site Plan Application Northern Trail and Boardwalk Planting Plan be received and referred to staff for consideration and further action as appropriate. 2. 7.7.Memorandum from Accessibility Advisor; Re: Site Plan Application - Vandorf Softball Diamonds Application 54 That the memorandum regarding Site Plan Application Vandorf Softball Diamonds Application be received; and 1. That the Accessibility Advisory Committee comments regarding Site Plan Application Vandorf Softball Diamonds Application be received and referred to staff for consideration and further action as appropriate. 2. 7.8.Round Table Discussion; Re: Town of Aurora Accessibility Plan 2018 to 2024 (Link to Accessibility Plan) That the Accessibility Advisory Committee comments regarding the Town of Aurora Accessibility Plan 2018 to 2024 be received and referred to staff for consideration and further action as appropriate. 1. 8.Informational Items 9.Adjournment 1 Town of Aurora Accessibility Advisory Committee Meeting Minutes Date: Time: Location: Wednesday, December 9, 2020 7:00 p.m. Video Conference Committee Members: John Lenchak (Chair) Hailey Reiss (Vice Chair) Matthew Abas Max Le Moine Rachelle Stinson Councillor Rachel Gilliland Members Absent: Jo-anne Spitzer Other Attendees: Tom Mrakas, Mayor (ex-officio) Mat Zawada, Accessibility Advisor Linda Bottos, Council/Committee Coordinator _____________________________________________________________________ 1. Procedural Notes This meeting was held electronically as per Section 19. i) of the Town's Procedure By-law No. 6228-19, as amended, due to the COVID-19 situation. The Chair called the meeting to order at 7 p.m. 2. Approval of the Agenda Moved by Matthew Abas Seconded by Hailey Reiss That the revised agenda as circulated by Legislative Services, including the following item, be approved: Page 1 of 57 2  Item 7.1 – Verbal Update from Accessibility Advisor; Re: Library Square Construction - Parking Update Carried 3. Declarations of Pecuniary Interest and General Nature Thereof There were no declarations of pecuniary interest under the Municipal Conflict of Interest Act, R.S.O. 1990, c. M.50. 4. Receipt of the Minutes 4.1 Accessibility Advisory Committee Meeting Minutes of November 11, 2020 Moved by Matthew Abas Seconded by Hailey Reiss That the Accessibility Advisory Committee meeting minutes of November 11, 2020, be received for information. Carried 5. Delegations None. 6. Matters for Consideration 6.1 Memorandum from Accessibility Advisor; Re: Accessibility Advisory Committee Input and Comments for Site Plan Application SP(EX)-2020-28, 77 Wellington Street East Staff provided an overview of the comments submitted to the Planner by the Accessibility Advisor on behalf of the Committee, noting the developer's response to the Committee's previous comments and that no permanent physical features would be implemented on the site plan. The Committee reviewed the memorandum and had no further comments. Moved by Matthew Abas Seconded by Max Le Moine 1. That the memorandum regarding Accessibility Advisory Committee Input and Comments for Site Plan Application SP(EX)-2020-28, 77 Wellington Street East be received for information. Page 2 of 57 3 Carried 6.2 Memorandum from Accessibility Advisor; Re: Accessibility Advisory Committee Input and Comments for Site Plan Application SP-2020-11 (Submission #1), 130 Addison Hall Circle Staff provided an overview of the comments submitted to the Planner by the Accessibility Advisor on behalf of the Committee. The Committee reviewed the drawings and site plan and had no further comments. Moved by Matthew Abas Seconded by Hailey Reiss 1. That the memorandum regarding Accessibility Advisory Committee Input and Comments for Site Plan Application SP-2020-11 (Submission #1), 130 Addison Hall Circle be received for information. Carried 6.3 Round Table Discussion; Re: Town of Aurora Accessibility Plan 2018 to 2024 Staff provided a status update on the 2020 operating budget projects including: accessible lifejackets; counter signage and testing devices for induction hearing loops in Town facilities; AbleDocs website report on status of Town's compliance with the Web Content Accessibility Guidelines (WCAG); sensory tent project; automatic wave door operators for changerooms at Aurora Family Leisure Complex (AFLC); AFLC spa railing installation; Seniors' Centre Without Walls (SCWW) community outreach program; evacuation chair; and low profile channel cable covers. The Committee inquired about the SCWW program and staff provided further details noting the success of the program. Staff provided a status update on the 2020 capital budget projects including: installation of change tables at the AFLC and Stronach Aurora Recreation Complex (SARC); and the Facility Accessibility Design Standards (FADS) project noting that the Committee can expect to see a first draft of the guidelines for review in early 2021. Staff provided an update on the Information and Communications Standard project, to be implemented in early 2021, and advised on staff's efforts to date toward achieving WCAG compliance through maintenance of accessible webpages and documents on the Town's website. Staff Page 3 of 57 4 noted that many municipalities and organizations are struggling to maintain compliance and letters of concern have been sent to the province. Staff advised that the Town has received a compliance extension to June 2021, and agreed to provide a copy of the Town's correspondence to the province. The Committee inquired about website document retention and availability, and whether social media would also be impacted, and staff provided clarification. Staff invited the Committee's feedback on the recent AFLC and Town Hall facility tours shared by video. The Committee expressed its appreciation of the virtual tours and gave feedback on the following matters: lack of accessible counter depth at service counters and washrooms at both facilities; lack of leg room for wheelchair accessibility under washroom counters; unsuitable location of grab rails next to toilets at both facilities; lack of automatic door openers at some rooms of AFLC; lack of true universal washroom at both facilities; and lack of accessibility checklist for the facility review. In response, staff provided clarification, agreed to resend the facility review checklist to the members, and prepare a priority list of items to be addressed, including costs and timelines, for the Committee's consideration. Moved by Hailey Reiss Seconded by Matthew Abas 1. That the Accessibility Advisory Committee comments regarding the Town of Aurora Accessibility Plan 2018 to 2024 be received and referred to staff for consideration and action as appropriate. Carried 7. Informational Items 7.1 Verbal Update from Accessibility Advisor; Re: Library Square Construction - Parking Update Staff gave a verbal update regarding the accessible parking situation, noting that the current temporary parking would be closed due to the construction work on Church Street. Staff advised that the current pick- up/drop-off program at the Library's Yonge Street entrance for patrons with accessible parking permits would continue, and that two new barrier- free parking spots would be designated in the plaza adjacent to the construction site off of Yonge Street, with an accessible path and entrance Page 4 of 57 5 on the north side of the Library. In response to Committee inquiries, staff provided clarification regarding the pathway snow removal, possible limitations of the temporary barrier-free entrance, and the potential for a temporary ramp. The Committee further inquired about any additional accessibility limitations that may occur during the construction process, and staff agreed to obtain a timeline of any potential limitations in order to address the expectations in advance. Moved by Matthew Abas Seconded by Rachelle Stinson 1. That the Verbal Update regarding Library Square Construction - Parking Update be received for information. Carried 8. Adjournment Councillor Gilliland noted that she would no longer be the Council representative for the Committee as of the new year and expressed appreciation to staff and Committee members for their efforts and community involvement. The Committee and staff thanked Councillor Gilliland for her contributions during the past two years. Moved by Hailey Reiss Seconded by Max Le Moine That the meeting be adjourned at 8:41 p.m. Carried Page 5 of 57 100 John West Way Aurora, Ontario L4G 6J1 (905) 727-3123 aurora.ca Town of Aurora Memorandum Corporate Services _______________________________________________________________________________________ Re: Engaged, Inclusive Project To: Accessibility Advisory Committee From: Mateusz Zawada, Accessibility Advisor Date: February 10, 2021 _______________________________________________________________________________________ Recommendations 1. That the memorandum regarding Engaged, Inclusive Project be received; and 2. That the Accessibility Advisory Committee comments regarding Engaged, Inclusive Project be received and referred to staff for consideration and further action as appropriate. Background Received at the General Committee Meeting on November 5, 2019, Ms. Cerenzia introduced Ms. Clark and presented an overview of the collaborative project to involve Aurora, East Gwillimbury, and Newmarket to create engaged, inclusive, and connected communities. Ms. Clark outlined the purpose of the project being a deep dive into the demographics of the three communities involved. She provided details of the study including looking at shared challenges, developing an integrated approach and conducting research to avoid duplication and finding efficiencies, key deliverables, and requested Members of Council to support the project. The Engaged, Inclusive Project initiative will be a collaborative approach across the three municipalities in North York Region with Neighbourhood Network as Lead Community Partner. Leveraging the strength of Neighbourhood Network’s leadership in engagement and understanding of our communities, while also building on the N6 communities’ historical strength of collaboration on shared issues, while valuing and recognizing different needs in each. This initiative will be:  Looking at shared challenges and opportunities  Taking an integrated approach to avoid duplication and find efficiencies Page 6 of 57 Engaged, Inclusive Project February 10, 2021 Page 2 of 2  Researching the specific needs of each individual community where growth, increased development and change is rapid Attachments Engaged, inclusive communities presentation Page 7 of 57 Engaged, inclusive communities Building towards increased inclusion in our communities FEB 2021 Page 8 of 57 Page 9 of 57 …why York Region Our communities •Lack of specific data •Our communities are changing •We want to engage meaningfully with our communities •Gain better understanding of our communities •Growth and opportunity Page 10 of 57 …why •Engage more effectively •Inform program and policy development •Ensure reflective and inclusive communications and engagement •Provide deeper connection and engagement •Encourage growth, economic opportunity and sense of community belonging Page 11 of 57 …what A collaborative project focused on better understanding of our communities and inclusive engagement Page 12 of 57 …what •A summary report that will: –Look a t creatingbetter understanding of communities and at shared challenges and opportunities –Leverage an integrated approach across 3 municipalities led by a Neighbourhood Network –Look at the specific needs of each individual community where growth, increased development and change is rapid Page 13 of 57 …the work –3 areas •Community Snapshot –Snapshot demographic information within 3 communities based on 2016 census data (based on York Region snapshots) •Municipal Action/Opportunity –Summary of work at municipalities •Promising practice and successes •Gaps and opportunities •Promising practices in other communities •Community Based Activity –Engaging with community based organizations and community leaders to: •Create better understanding of inclusive community work and opportunities •To build a Listing of organizations and stakeholders around inclusion Page 14 of 57 …in closing •What next? Page 15 of 57 100 John West Way Aurora, Ontario L4G 6J1 (905) 727-3123 aurora.ca Town of Aurora Memorandum Corporate Services _______________________________________________________________________________________ Re: Site Plan Application OPA-2017-01, ZBA-2017-03 and SUB-2017-02, 20 and 25 Mavrinac Boulevard (Submission #2) To: Accessibility Advisory Committee From: Mateusz Zawada, Accessibility Advisor Date: February 10, 2021 _______________________________________________________________________________________ Recommendations 1. That the memorandum regarding Site Plan Application OPA-2017-01, ZBA-2017-03 and SUB-2017-02, 20 and 25 Mavrinac Boulevard (Submission #2) be received; and 2. That the Accessibility Advisory Committee comments regarding Site Plan Application OPA-2017-01, ZBA-2017-03 and SUB-2017-02, 20 and 25 Mavrinac Boulevard (Submission #2) be received and referred to staff for consideration and further action as appropriate. Background The Accessibility Advisor has made comments on behalf of the Accessibility Advisory Committee. The comments are as follows:  Consideration for the developer to incorporate accessibility features, such as sensory and active play components, for children and caregivers with various disabilities into the design of outdoor play spaces; and  Ensure that outdoor play spaces have a ground surface that is firm, stable and has impact attenuating properties for injury prevention and sufficient clearance to provide children and caregivers with various disabilities the ability to move through, in and around the outdoor play space.  Consideration for the allocated outdoor space to have a minimum of 20% of its tables be accessible if used as an outdoor eating area. Page 16 of 57 Site Plan Application OPA-2017-01, ZBA-2017-03 and SUB-2017-02, 20 and 25 Mavrinac Boulevard (Submission #2) February 10, 2021 Page 2 of 2  The Accessibility Advisory Committee appreciates the number of barrier-free parking spots provided for visitor parking. Consideration for additional barrier- free parking to be provided at the various visitor parking locations to reduce path of travel in the different sections. Please also note that there are new Design of Public Spaces (Built Environment) Standards enacted from the Province of Ontario, under the Accessibility for Ontarians with Disabilities Act and revisions to the Ontario Building Code to help standardize and encourage barrier free access. On behalf of the Accessibility Advisory Committee, thank you for the opportunity to comment. Attachments OPA-2017-01 Page 17 of 57 INTERNAL MEMORANDUM VIA EMAIL DATE:December 21, 2020 TO:B. Butler, Planning and Development Services S.Sample, Planning and Development Services G. Greidanus, Operational Services E. Terry, Policy Planning J. Van Scheyndel, Corporate Services J. McDonald, Central York Fire Services M. Bat, Engineering and Capital Delivery (If Applicable) FROM:Matthew Peverini, Planning and Development Services RE:Official Plan Amendment, Zoning By-law Amendment and Draft Plan of Subdivision Applications TFP Aurora Developments Ltd. 20 and 25 Mavrinac Boulevard Blocks 1 and 2, Plan 65M-3852 File Number: OPA-2017-01, ZBA-2017-03 and SUB-2017-02 A second submission for the above Official Plan Amendment Zoning By-law Amendment, and Draft Plan of Subdivision applications have been submitted to the Planning and Development Services Department for review and consideration. The revised proposal consists of a 37 single detached dwellings, 209 townhouse dwelling units, and a 6-storey seniors building with 203 units. x 36 of the single detached dwellings will front onto existing local roads. x All Townhouse units, and 1 single detached dwelling are proposed on private roads. These units are contemplated as freehold with common elements tenure (tenure will be established through a future Draft Plan of Condo application) x Seniors building is located at the northeast corner of Mavrinac Boulevard and Wellington Street East. A link to the submission is below: https://townofaurora.kiteworks.com/w/8MnoqBttZpiHbryaBamyDGCiQw6TfT3FLrVxW4sntzBkI I would appreciate receiving your comments by January 15, 2020. If we have not received your comments by the specified time frame, we will assume you have no comments or concerns. Should you have any questions regarding the above noted proposal, please feel free to contact me. Planning and Development Services 100 John West Way, Box 1000, Aurora, ON L4G 6J1 Phone:905-727-3123 Ext. 4350 Email:mpeverini@aurora.ca www.aurora.ca Page 18 of 57 Page 19 of 57 Page 20 of 57            ! " " " "  !!!              !!!! !!!     !! " " " "    !" !"                    #"  #"  #"  #" #"  #"  #"  #"  #"   #"  #"  #"  #"  #"  #"  #"  #" $%$#"&% #"& #"&     #"       #" #" #" #"   #   $%  #"#"#"#"$!%&       " " " "      $%        " " "!!                         #"&""""  #"&#"&          &&&&  # #" #"#" #"#" #" #"#"#" #"#" #"  #"  #"  #"   #                        "                     #"       #    "                                                 '  !'  !'  !          #         ######()* *+ &&,-) !-) *) ) ) )    *) "!&&.!&*& + +  )$% .!#)$% . !&& && +  )$% . !"&&*##&&###"# ! #" !!&*& " &*&*&&*&"*&$%&&&! #"&#!&&$&%#" # !&&&!!Page 21 of 57 100 John West Way Aurora, Ontario L4G 6J1 (905) 727-3123 aurora.ca Town of Aurora Memorandum Corporate Services _______________________________________________________________________________________ Re: Site Plan Application SP-2020-12, 180 Industrial Parkway North (Submission #1) To: Accessibility Advisory Committee From: Mateusz Zawada, Accessibility Advisor Date: February 10, 2021 _______________________________________________________________________________________ Recommendations 1. That the memorandum regarding Site Plan Application SP-2020-12, 180 Industrial Parkway North (Submission #1) be received; and 2. That the Accessibility Advisory Committee comments regarding Site Plan Application SP-2020-12, 180 Industrial Parkway North (Submission #1) be received and referred to staff for consideration and further action as appropriate. Background The Accessibility Advisor has made comments on behalf of the Accessibility Advisory Committee. The comments are as follows:  Please note that the minimum number of accessible parking spaces is 3 parking spaces for the use of persons with disabilities, which meets the requirements of the AODA Design of Public Spaces O.Reg 191/11, section 80.36 (4).  Consideration for a rest/seating area to be provided along exterior path of travel, as long as it does not impede the minimum exterior path (sidewalk) clearance of 1,500 mm  Consideration for automatic door openers for all public access locations, including proper timed door delays. Please also note that there are new Design of Public Spaces (Built Environment) Standards enacted from the Province of Ontario, under the Accessibility for Ontarians Page 22 of 57 Site Plan Application SP-2020-12, 180 Industrial Parkway North (Submission #1) February 10, 2021 Page 2 of 2 with Disabilities Act and revisions to the Ontario Building Code to help standardize and encourage barrier free access. On behalf of the Accessibility Advisory Committee, thank you for the opportunity to comment. Attachments SP-2020-12 Page 23 of 57 INTERNAL MEMORANDUM DATE: November 24, 2020 TO: B. Butler, Planning and Development Services C. Tsang, Planning and Development Services (Heritage) B. Jean, Building Division S. Sample, Building Division G. Greidanus, Operations (Parks) M. Bat, Engineering and Capital Delivery Division J. Van Scheyndel, Corporate Services M. Zawada, Accessibility Advisor G. Zinck, Waste/Recycling Coordinator CC: Mayor and Members of Council D. Waters, Director of Planning and Development Services Council Secretariat, Corporate Services FROM: Sean Lapenna, Planning and Development Services RE: Application for Site Plan Approval 180 Industrial Parkway North Pt Lot 87, Plan 246 File Number: SP-2020-12 A 1st submission has been made to Planning and Development Services for the above noted Site Plan application to facilitate the development of a one and two storey building addition with a total GFA of approximately 1,364.02 m² (14,682 ft²) to accommodate additional Warehouse and Office Space to the existing building located onsite. Due to file size restrictions, the majority of supporting documents for this application have been uploaded into the following Kiteworks link: https://townofaurora.kiteworks.com/w/jbIQeEzR5jKShYu2lHIfxHbTI9ozhgQYN8YffQxPgb19Y I would appreciate receiving your comments by December 9, 2020. Should you have any questions regarding the above noted proposal, please feel free to contact me. Regards, Sean Lapenna, Planner Planning and Development Services Planning and Development Services 100 John West Way, Box 1000, Aurora, ON L4G 6J1 Phone: 905-727-3123 Ext. 4346 Email: slapenna@aurora.ca www.aurora.ca Page 24 of 57 C.B.F.H.C.B.81.68 m112.66 m63.70 mEXISTING 1-STOREY BUILDINGFFE: 262.90- 1ST FLOOR: WAREHOUSE/OFFICE- MEZZANINE: OFFICEPROPOSED1-STOREY BUILDING (ADDITION)FFE: 262.90- 1ST FLOOR: WAREHOUSE11.26 m10.48 m10.81 m70.83m(LOTFRONTAGE)7.50 m7.50 m93.23m(LOTDEPTH)MIDPOINTMIDPOINT63.71 m -(LOT WIDTH)1-WAY TRAFFICPROPOSED DRIVEWAY5PROPOSED2-STOREY BUILDING (ADDITION)FFE: 262.90- BASEMENT: STORAGE- 1ST FLOOR: WAREHOUSE- MEZZANINE: OFFICE323130EXISTING LOADING AREA PROP. ENTRANCE CANOPY(ADDITION)13.96 m32.55 m - (EXISTING BUILDING WIDTH)46.50 m - (PROPOSED BUILDING WIDTH)12.29 m 42.32 m 10.66 m 4.25 m 13.13 m(PROPOSED REAR SETBACK)9.00 m 4.50 m78.15 mEXISTINGSETBACK14.08m.3M LANDSCAPE STRIPEXIST.ENTRANCE43"B"291-WAY TRAFFICR6.00m10.50m3.00 m11.29 m32.22 m2827262524232221PROPOSED DRIVEWAYEXISTING CONCRETE CURB TO BE DEMOLISHEDR 6.0 0 m 4.52 m(PROPOSEDSETBACK)6.39m7.26mEXIST. DRIVEWAY22.70 m1.55 m2.70 m 3.65 m1.50 m2.70 m"A"7.00 m 5.30 mR8.26mR 1 0 .0 0 m 2300(TYP.)2.70 m(TYP.)2.70 m5.99 m(TYP.)5.30 m167891112131415161718192010R8.26m5.95 m(EXISTING SET BACK)18.41 m( EXISTING SET BACK)12.67 m(EXISTING REAR SET BACK)21.30 mPROPOSED 2-TRUCK LOADING AREA 3 .0 0 m 0.82 m1.14 mASPHALTASPHALTEXISTING SODSODPIN 03641-1056PIN03641-1658PART 3, PLAN 65R - 4236PART 2, PLAN 65R - 4236PART 4, PLAN 65R - 4236REGISTEREDASINST.No.R465358)2704-84,(FORMERLYINDUSTRYSTREET)PART8,PLAN65R-4236LOT 87PIN 03641-3168(LT)No.1802 STOREYCONCRETE BLOCKBUILDINGD.S.=262.90LEGENDC.L.F.NIL&PPINSSIBMN,S,E,WSIBIBC.B.W.V.D.S.P11574WITH.T.P.T.U.P.M.H.P2C.R.W.INV.C.S.P.F.H.P.A.0.1Dia.0.2Dia.261.98261.82261.99261.62261.53261.70261.61262.16262.31262.86262.65262.80262.95263.11262.99263.23263.33263.52263.44263.30262.90262.76264.19261.54261.46261.60261.79263.49265.01261.85261.54261.85261.69261.70261.78261.89261.85261.70261.45261.55261.69261.62261.35261.39261.64261.59261.40260.87260.93261.46261.60261.64261.77261.80261.87261.78261.78261.78261.79261.80261.83260.82INV.260.79261.01263.15263.36263.67261.82261.68262.29262.25261.99261.90261.70261.70261.75261.73261.75261.96262.14262.59262.62262.86262.93262.83262.77262.60262.77263.69263.21262.82263.46263.91263.43262.97262.75262.69262.43262.68262.35262.64262.44262.59262.09262.29262.19262.61262.35262.65262.95263.22262.91263.60263.39264.23263.92262.72262.98262.44261.76261.27261.50261.74261.68261.63261.64261.61261.38261.73263.22263.40263.44264.34264.33264.29264.36263.59263.41263.68263.69263.70263.82263.84263.77263.65263.54263.12262.95263.75263.06263.16263.01262.86262.67263.09262.85262.88262.85262.63262.64262.90263.02263.43263.37263.89264.18264.24263.73262.94262.57262.18262.13262.90263.50263.40263.52263.64263.47262.85262.87262.88263.03262.96262.63262.40262.90262.86263.03262.91262.80262.60262.75262.70262.76262.72262.70262.70262.76262.71262.82262.81262.71262.76262.85262.99263.12263.12263.01262.91262.15262.28262.64262.00262.48262.35262.84262.90263.01262.97262.96262.46262.45262.41262.42262.32262.91262.09(P1&M)(P1&SET)(P1&SET)(P1&SET)(P1&SET)(P1&SET)(P1&SET)(REFERENCEBEARING)48.46(P1&M)(P1&M)15.24IB(1574)0.06SIB(1574)101.17(P1&M)A=17.51(P1&M)SSIB(1574)IB(L&P)SSIB(1574)SSIB(1574)CONCRETECURBCURBCUTCONCRETE CURBCONCRETE CURBSHOULDER PARKING SPACES PARKING SPACES PARKING SPACESPARKING SPACESH.T.P.T.CONCRETEPORCHWOODPORCHC.R.W.C.L.F.C.L.F.C.L.F.C.L.F.0.09NC.L.F.C.L.F.0.42E0.25NC.L.F.0.12E1.21SC.L.F.C.L.F.1.29SPARKINGSPACESCONCRETEWALLCONCRETE CURBPARKWAYXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX18.4718.4110.0510.0118.9618.9112.7112.6721.0214.0818.21(P2&M)(P2&M)21.30(P1&M)N76°22'00"E112.66N76°22'00"E81.68N13°38'00"W63.70N3°43'15"E20.78N15°27'30"ER=120.00N27°11'35"E1.59A=49.16C=48.82U.P.P.A.P.A.U.P.P.A.P.A.PEDESTALT.V.PEDESTALT.V.PEDESTALBELLSIGNSIGN0.5Dia.0.3Dia.0.3Dia.0.3Dia.0.3Dia.0.3Dia.0.3Dia.0.4Dia.0.3Dia.0.2Dia.0.2Dia.0.2Dia.0.15Dia.0.2Dia.0.1Dia.0.3Dia.M.H.M.H.M.H.4.50 m333435Project number"ALL DRAWINGS, SPECIFICATIONS AND RELATED DOCUMENTS ARE THE COPYRIGHT PROPERTY OF THE ARCHITECT AND MUST BE RETURNED UPON REQUEST. REPRODUCTION OF DRAWINGS, SPECIFICATIONS AND RELATED DOCUMENTS IN PART OR IN WHOLE IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF THE ARCHITECT."DO NOT SCALE DRAWINGS.CONTRACTOR MUST CHECK & VERIFY ALL DIMENSIONS ON SITE.THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION UNTIL SIGNED BY THE ARCHITECT.TAES Architects Inc.98 SCARSDALE ROAD TORONTO, ON M3B 2R7CANADAT: 416 800 3284 DrawnCheckedScaleDateDrawing No.1 : 35010/30/2020 6:07:57 PMA001Site PlanT2019005WHAREHOUSEAdditionMarch 2020180 Industrial Parkway, Aurora. ON.No. Issues Date By1 SPA Pre-Consulation 2019-02-28 M.M.2 SPA Pre-Consulation 2019-07-03 J.W.3 SPA Submission 2020-10-01 H.W.4 Issued for Civil 2020-10-30 AWPage 25 of 57 ZONINGPLAN NO.LOT FRONTAGEDESCRIPTIONMIN.LOT FRONTAGEMIN. LOT AREAMAX.BUILDINGHEIGHTNO. OF STORIES BUILDING WIDTHMAX LOT COVERAGELOT NO.LOT AREALOT DEPTHPROPOSEDEXISTINGREQUIREDSECTIONMIN. LOT WIDTHDRIVEWAY WIDTHBUILDING AREAGFA-NON-RESIDENTIAL87PART 1 (65R-5027)PART 2,3 (65R-4236)E2 (BY-LAW # 6000-17)5,990.17 SM70.83 M93.23 M70.83 M63.71 M5,990.17 SM232.55 M 46.50 M5.95 M10.50 M & 7.26 M (NEW DRIVEWAYS)1,657.22 SM1,657.22 SM (EXISTING)1,148.36 SM(ADDITION)2,805.58 SM (TOTAL)1,657.22 SM2,805.58 SM27.67%46.84%30 M2,000 SM10.210.210.210 MN/A10.2NO CHANGEGROUND FLOOR MEZZANINE FLOOR 1,148.36 SM (WAREHOUSE)215.66 SM (OFFICE) 1,364.02 SM (TOTAL ADDITION)3,305.14 SM 284.20 SM (OFFICE) 1,941.12 SM (TOTAL EXIST.)1,398.80 SM (WAREHOUSE)258.12 SM (OFFICE) NO CHANGESETBACKFRONT (EAST)SIDE (NORTH)SIDE (SOUTH)REAR (WEST)EXISTINGPROPOSEDREQUIREDLANDSCAPED AREAEXISTINGPROPOSEDREQUIREDSECTIONSECTIONTOTAL BUILDING FOOTPRINT AREATOTAL LANDSCAPED SOFT AREATOTAL AREAPARKINGEXISTINGPROPOSEDREQUIREDSECTIONTOTAL PARKINGLOADINGEXISTINGPROPOSEDREQUIREDSECTIONTOTAL NUMBER OF LOADING SPACESINCLUDINGACCESIBLE PARKINGADJACENT PROPERTY ZONES AND USESEXISTINGPROPOSEDREQUIREDSECTION14.08 M 6.39 M 18.41 M 4.50 M 12.67 M NO CHANGE 21.30 M 9.00 M 3.00 M9.00 M3.00 M3.00 M10.210.210.210.22 SPACES 10.3.23 SPACES (WAREHOUSE TOTAL AREA) R3, E2, I5.434 SPACES (3.5 / 100 SM) OFFICE (D)23 SPACES (1.0 / 100 SM) WAREHOUSE (F2) 5.8.257 SPACES (TOTAL REQUIRED)2 SPACES (4% OF TOTAL)34 SPACESHARD SURFACED AREAS2,805.58 SM662.52 SM2,522.07 SM42.10 %11.06 %5,990.17 SM46.84%35 SPACES *757.98 SM ( OFFICES AREA)2,547.16 SM (WAREHOUSE AREA)ADDITIONTOTAL (ADDITION + EXIST.)LANDSCAPE STRIP2 SPACESTOTAL0.0 M (NORTH SIDE)*3 SPACES(1 EXISTING,2 PROPOSED)EXISTING10.2, 10.53.0m FROM LOT LINEProject number"ALL DRAWINGS, SPECIFICATIONS AND RELATED DOCUMENTS ARE THE COPYRIGHT PROPERTY OF THE ARCHITECT AND MUST BE RETURNED UPON REQUEST. REPRODUCTION OF DRAWINGS, SPECIFICATIONS AND RELATED DOCUMENTS IN PART OR IN WHOLE IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF THE ARCHITECT."DO NOT SCALE DRAWINGS.CONTRACTOR MUST CHECK & VERIFY ALL DIMENSIONS ON SITE.THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION UNTIL SIGNED BY THE ARCHITECT.TAES Architects Inc.98 SCARSDALE ROAD TORONTO, ON M3B 2R7CANADAT: 416 800 3284 DrawnCheckedScaleDateDrawing No.1 : 310/22/2020 11:44:09 AMA002Site StatisticsT2019005WHAREHOUSEAdditionMarch 2020180 Industrial Parkway, Aurora. ON.No. Issues Date By1 SPA Pre-Consulation 2019-07-03 J.W.2 SPA Submission 2020-10-01 H.W.Area Schedule (Max. Lot Coverage)Level Name AreaGROUND FL. 1_Ground Floor (Existing) 1,657.22 m²GROUND FL. 1_Ground Floor (Addition) 1,148.36 m²Grand total: 2 2,805.58 m²Page 26 of 57 GROUND FL.262.90EXIST. 2ND FL.265.87U/S LOWER ROOF268.50T/O HIGH ROOF270.39AVERAGE GRADE262.35T/O PARAPET270.50BASEMENT260.46EXIST. MEZZANINE265.27 %8,/',1*+(,*+70(;,676.</,*+7(;,67*/$=('&$123<000 00(;,6729(5+($''22572%('(02/,6+('$1'72%(),//(',1:,7+&21&%/2&.(;,6763$1'5(/3$1(/(;,679,6,21*/$6663$1'5(/3$1(/9,6,21*/$660(7$/)/$6+,1*352326('&$123<00000GROUND FL.262.90EXIST. 2ND FL.265.87U/S LOWER ROOF268.50T/O HIGH ROOF270.39AVERAGE GRADE262.35T/O PARAPET270.50BASEMENT260.46EXIST. MEZZANINE265.270%8,/',1*+(,*+70(;,67(;,7'225(;,67/2$',1*'2&.(;,67$5&+&21&5(7(%/2&.(;,676.</,*+7&21&5(7(%/2&.720$7&+:,7+(;,67,1*0(7$/)/$6+,1*3523(;,7'22500(;,67,1*:$//72%('(02/,6+('(;,67,1*:$//$1'$5($725(0$,1/(*(1'352326(':$//3URMHFWQXPEHU$//'5$:,1*663(&,),&$7,216$1'5(/$7(''2&80(176$5(7+(&23<5,*+73523(57<2)7+($5&+,7(&7$1'0867%(5(7851('83215(48(675(352'8&7,212)'5$:,1*663(&,),&$7,216$1'5(/$7(''2&80(176,13$5725,1:+2/(,6)25%,''(1:,7+2877+(:5,77(13(50,66,212)7+($5&+,7(&7'21276&$/('5$:,1*6&2175$&7250867&+(&. 9(5,)<$//',0(16,216216,7(7+,6'5$:,1*,612772%(86(')25&216758&7,21817,/6,*1('%<7+($5&+,7(&77$(6$UFKLWHFWV,QF6&$56'$/(52$'7252172210%5&$1$'$7'UDZQ&KHFNHG6FDOH'DWH'UDZLQJ1R$VLQGLFDWHG30$(DVW )URQW DQG:HVW 5HDU (OHYDWLRQV7:+$5(+286($GGLWLRQ0DUFK,QGXVWULDO3DUNZD\$XURUD216&$/($($67 )5217 (/(9$7,216&$/($:(67 5($5 (/(9$7,210$7(5,$//(*(1'0 (;,67,1*%/2&.725(0$,10 &21&5(7(:$//0 63$1'5(/0 7(03(5('9,6,21*/$66 '28%/(*/$=('$63(563(&,),&$7,216 0 1(:$5&+%/2&.720$7&+(;,67,1*1R ,VVXHV 'DWH %\ 63$6XEPLVVLRQ  +:Page 27 of 57 GROUND FL.262.90EXIST. 2ND FL.265.87U/S LOWER ROOF268.50T/O HIGH ROOF270.39AVERAGE GRADE262.35T/O PARAPET270.50BASEMENT260.46EXIST. MEZZANINE265.27 %8,/',1*+(,*+7  00 00&21&5(7(%/2&.720$7&+:,7+(;,67,1*0(7$/)/$6+,1*GROUND FL.262.90EXIST. 2ND FL.265.87U/S LOWER ROOF268.50T/O HIGH ROOF270.39AVERAGE GRADE262.35T/O PARAPET270.50BASEMENT260.46EXIST. MEZZANINE265.27%8,/',1*+(,*+703523(;,7'2253523/2$',1*'2&.(;,67$5&+&21&5(7(%/2&.(;,6763$1'5(/3$1(/(;,679,6,21*/$66(;,676.</,*+763$1'5(/3$1(/9,6,21*/$66352326('&$123<00000(7$/)/$6+,1*000(;,67,1*:$//72%('(02/,6+('(;,67,1*:$//$1'$5($725(0$,1/(*(1'352326(':$//3URMHFWQXPEHU$//'5$:,1*663(&,),&$7,216$1'5(/$7(''2&80(176$5(7+(&23<5,*+73523(57<2)7+($5&+,7(&7$1'0867%(5(7851('83215(48(675(352'8&7,212)'5$:,1*663(&,),&$7,216$1'5(/$7(''2&80(176,13$5725,1:+2/(,6)25%,''(1:,7+2877+(:5,77(13(50,66,212)7+($5&+,7(&7'21276&$/('5$:,1*6&2175$&7250867&+(&. 9(5,)<$//',0(16,216216,7(7+,6'5$:,1*,612772%(86(')25&216758&7,21817,/6,*1('%<7+($5&+,7(&77$(6$UFKLWHFWV,QF6&$56'$/(52$'7252172210%5&$1$'$7'UDZQ&KHFNHG6FDOH'DWH'UDZLQJ1R$VLQGLFDWHG30$1RUWKDQG6RXWK(OHYDWLRQV7:+$5(+286($GGLWLRQ0DUFK,QGXVWULDO3DUNZD\$XURUD211R ,VVXHV 'DWH %\ 63$6XEPLVVLRQ  +:6&$/($1257+(/(9$7,216&$/($6287+(/(9$7,210$7(5,$//(*(1'0 (;,67,1*%/2&.725(0$,10 &21&5(7(:$//0 63$1'5(/0 7(03(5('9,6,21*/$66 '28%/(*/$=('$63(563(&,),&$7,216 0 1(:$5&+%/2&.720$7&+(;,67,1*Page 28 of 57 100 John West Way Aurora, Ontario L4G 6J1 (905) 727-3123 aurora.ca Town of Aurora Memorandum Corporate Services _______________________________________________________________________________________ Re: Site Plan Application SP-2020-13, 145-147 Wellington Street West (Submission #1) To: Accessibility Advisory Committee From: Mateusz Zawada, Accessibility Advisor Date: February 10, 2021 _______________________________________________________________________________________ Recommendations 1. That the memorandum regarding Site Plan Application SP-2020-13, 145-147 Wellington Street West (Submission #1) be received; and 2. That the Accessibility Advisory Committee comments regarding Site Plan Application SP-2020-13, 145-147 Wellington Street West (Submission #1) be received and referred to staff for consideration and further action as appropriate. Background The Accessibility Advisor has made comments on behalf of the Accessibility Advisory Committee. The comments are as follows:  Consideration for barrier-free parking to be provided for visitors at blocks 1-3  No further comments at this time. The Accessibility Advisory Committee appreciates the opportunity to provide comments. Please also note that there are new Design of Public Spaces (Built Environment) Standards enacted from the Province of Ontario, under the Accessibility for Ontarians with Disabilities Act and revisions to the Ontario Building Code to help standardize and encourage barrier free access. On behalf of the Accessibility Advisory Committee, thank you for the opportunity to comment. Page 29 of 57 Site Plan Application SP-2020-13, 145-147 Wellington Street West (Submission #1) February 10, 2021 Page 2 of 2 Attachments SP-2020-13 Page 30 of 57 INTERNAL MEMORANDUM DATE:December 11, 2020 TO:B. Butler, Planning and Development Services S. Sample, Planning and Development Services G. Greidanus, Operational Services J. Van Scheyndel, Corporate Services J. McDonald, Central York Fire Services M. Zawada, Accessibility Advisory Committee M. Bat, Engineering and Capital Delivery C. Tsang, Planning and Development Services (Heritage) G. Zinck, Waste/Recycling Coordinator CC:Mayor and Members of Council D. Waters, Director of Planning and Development Services A. Henriques, Manager, Development Planning Council Secretariat, Corporate Services FROM:Matthew Peverini, Planning and Development Services Re: Application for Site Plan Approval (1st Submission) IMH 145 & 147 Wellington Ltd. (Starlight Investments) 145-147 Wellington Street West Pt Lot 28, Plan 246 Related File Number: ZBA-2018-01 File Number: SP-2020-13 A Site Plan Application has been submitted to the Planning and Development Services department for review. The Applicant is proposing infill development consisting of three, three- storey stacked townhouse buildings totalling 56 dwelling units, on lands containing two existing apartment buildings. Due to file size restrictions, the majority of supporting documents and studies for this application have been uploaded into the following Kiteworks link: https://townofaurora.kiteworks.com/w/vELooLQH8QSWuNb2YHqFmw4mJbzLvITfY8iGDLgd9Of05 I would appreciate receiving your comments by January 4, 2020.Should you have any questions regarding the above noted proposal, please feel free to contact me. Regards, Matthew Peverini, Planner Planning and Development Services. 100 John West Way Box 1000 Aurora, ON L4G 6J1 Phone:905-727-3123 Ext. 4350 Email: mpeverini@aurora.ca www.aurora.ca Planning and Development Services Page 31 of 57 project numberdrawingdatechk'ddrawnscaleprojectownerno.date revisionDO NOT SCALE DRAWINGSAll drawings are the property of the Architect and must bereturned upon request.Contractor shall check all dimensions and report anydiscrepancies to the Architect before proceeding with the work.GUTHRIE MUSCOVITCHA R C H I T E C T STel:(416) 252-5679 Fax: (416) 252-9637770 Brown's Line, Toronto, Ontario M8W 3W2The contractor and/or engineeer shall verify u/s footingelevations and soil bearing capacity prior to excavation and thecommencement of work.PROPOSEDTOWNHOUSES145-147 WELLINGTONSTREET WEST, AURORA3280 BLOOR STREET WEST,SUITE 1400TORONTO, ONTARIO,CANADA M8X 2X316030SP-1SITE PLANGROUND LEVEL1:400SEP 2020SYRG/BBKEY PLANSITER26R24R25REFUSE ROOMSPRINKLER/ELEC. ROOMRETAINING WALLOF DEPRESSEDPARKING13.09EDGE OF ROAD ALLOWANCE36.00 M (R.O.W) 36.00 M (R.O.W) 18.00 7.547.5418.00 2.002.7017.2236.88 3.051.50 6.50 6.606.6026.0610.7619.88REFUSE ROOMPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOBLOCK 2 - 3 STOREY18 STACKED UNITSBLOCK 1 - 3 STOREY18 STACKED UNITSMDL S1EMDL S2EMDL S3EMDL S1MDL S2MDL S3MDL S1MDL S2MDL S3MDL S1MDL S2MDL S3MDL S1MDL S2MDL S3MDL S1EMDL S2EMDL S3EMDL S1EMDL S2EMDL S3EMDL S1MDL S2MDL S3MDL S1MDL S2MDL S3MDL S1MDL S2MDL S3MDL S1MDL S2MDL S3MDL S1EMDL S2EMDL S3EBALC.BALC.BALC.BALC.BALC.BALC.BALC.BALC.BALC.BALC.BALC.BALC.PORCH PORCH PORCHSPRINKLER/ELEC. ROOMBLDG ABLDG BBLDG ABLDG B8.4013.299.9016.26 3.053.05145 WELLINGTON ST. WESTEXISTING 6-STOREY BRICKAPARTMENT BUILDING147 WELLINGTON ST. WESTEXISTING 7-STOREY BRICKAPARTMENT BUILDINGPOOL ENCLOSURE(258.65 M2)+24.8976.8136.8830.5416.163.0536.8812.2427.8 M43 M13.5 M10.408.5013.8617.7017.701.60FIREWALLLOCATIONFIREWALLLOCATION+24.6816.7616.5613.73R12.00R12.00R12.00R12.00+24.8821.3112.17 FFE=269.75FFE=269.75UP7RUP2LRUP7RDN7RUP7R1LRUP7RUP7RUP6RBLOCK 3 - 3 STOREY20 STACKED UNITSMDL 2AMDL 1BMDL 3C(X2)MDL 2AEMDL 1BEMDL 3CE(X2)MDL 2A-E2MDL 1B-E2MDL 3C-E2(X2)MDL 2AMDL 1BMDL 3C(X2)MDL 2AMDL 1BMDL 3C(X2)DN7RDN7RDN7RDN8RPATIOBALC.PATIOBALC.PATIOBALC.PATIOBALC.PATIOBALC.REF./SPRINK.RM.FFE=270.00FFE=269.6075 M (WALKING DISTANCE TO RECYCLE BINS)90 M (WALKING DISTANCE TO RECYCLE BINS)OUTDOOR SHAREDAMENITY AREA(1250 M2)6.605.30 2.70TYP.5.306.605.302.701.802.70TYP.1.506.405.3017.002.002.70 5.305.306.6017.005.306.405.302.70 5.301.802.70 1.50 5.305.306.605.301.800.60UP2LR3.651.502.702.701.503.652.701.503.655.306.605.305.306.410.50 MAILBOX(X 4)BICYCLERACKS X 8EXISTING FIRE ROUTE15 MRAMPDNR17R16R25V11R4R13V11R10R13R2R13R13R5R10V4R12R9R141.67TEMP.SNOWSTORAGEAREATEMP.SNOWSTORAGEAREAPYLONSIGNTEMP.SNOWSTORAGEAREATEMP.SNOWSTORAGEAREAFIRE ROUTER11R7R13R8R20R5TEMP.SNOWSTORAGEAREATEMP.SNOWSTORAGEAREATEMP.SNOWSTORAGEAREAEXISTINGRECYCLING/REFUSESTAGINGAREAEXISTINGRECYCLING/REFUSESTAGINGAREA2.400.9015.0015.00SIGHT TRIANGLE12.408.60LEGENDPRIMARY UNIT ENTRY - AT LEVEL 1PROPOSED FIRE HYDRANT LOCATIONPROPOSED LOCATION FOR SIAMESECONNECTIONPROPERTY LINEFFEFINISH FLOOR ELEVATIONEXISTING FIRE HYDRANTFHTACTILE INDICATORSDEPRESSED CURBPOLE MOUNTED LIGHT FIXTUREWALL MOUNTED LIGHT FIXTURECEILING MOUNTED OR FLOOR MOUNTEDLIGHT FIXTURE17.28 52.99 19.11 14.86Page 32 of 57 MODULE M1MODEL S1MODEL S2MODULE M1MODEL S1MODEL S2MODULE M1(REV)MODEL S1(REV)MODEL S2(REV)MODULE M1(REV)MODEL S1(REV)MODEL S2(REV)MODULE M2MODEL S1-EMODEL S2-EMODULE M2(REV)MODEL S1-E(REV)MODEL S2-E(REV)FIREWALLLOCATIONBLOCK 1WEST ELEVATIONMDL S1-E(REV) MDL S1(REV) MDL S1 MDL S1(REV) MDL S1-EMDL S1U/S SLABVARIEST/O PARKING FL.T/O PLATET/O PLATE9'-1" [2.77 M]T/O ROOF DECKT/O ROOF PARAPETT/O PARAPET9'-114" [2.77 M]T/O 3RD FL.T/O MECH. FL.T/O ROOF TERR. FL.T/O PLATET/O PLATE11.90 M13.0 M15.30 MMIN. A.G.SECOND LEVELGROUND LEVEL8'-114" [2.47 M]9'-234" [2.81 M]BLOCK 1EAST ELEVATIONFIREWALLLOCATIONU/S SLABVARIEST/O PARKING FL.T/O PLATET/O PLATE9'-1" [2.77 M]T/O ROOF DECKT/O ROOF PARAPETT/O PARAPET9'-114" [2.77 M]T/O 3RD FL.T/O MECH. FL.T/O ROOF TERR. FL.T/O PLATET/O PLATE11.90 M13.0 M15.30 MMIN. A.G.SECOND LEVELGROUND LEVEL8'-114" [2.47 M]9'-234" [2.81 M]BLOCK 1SOUTH ELEVATIONU/S SLABVARIEST/O PARKING FL.T/O PLATET/O PLATE9'-1" [2.77 M]T/O ROOF DECKT/O ROOF PARAPETT/O PARAPET9'-114" [2.77 M]T/O 3RD FL.T/O MECH. FL.T/O ROOF TERR. FL.T/O PLATET/O PLATE11.90 M13.0 M15.30 MMIN. A.G.SECOND LEVELGROUND LEVEL8'-114" [2.47 M]9'-234" [2.81 M]BLOCK 1NORTH ELEVATIONMASONRY - BRICK VENEER -1COLOUR:MANUFACTURER:MORTAR:HORIZONTAL METAL SIDING - 1COLOUR:MANUFACTURER:PRECAST SILL/BANDING (2"PROJECTION)COLOUR:MANUFACTURER:MORTAR:PREFINISHED METAL CAP FLASHINGCOLOUR:MANUFACTURER:PREFINISHED ALUMINIUM RAILINGCOLOUR:MANUFACTURER:PRECAST CONCRETE CAPCOLOUR:MANUFACTURER:MORTAR:PREFINISHED ALUMINIUM CANOPYCOLOUR:MANUFACTURER:EXTERIOR MATERIALS LEGENDEXTERIOR HOLLOW METAL DOORCOLOUR:MANUFACTURER:HORIZONTAL METAL SIDING - 2COLOUR:MANUFACTURER:PRIVACY SCREEN 1COLOUR:MATERIAL:MANUFACTURER:PREFINISHED METAL CAP FLASHINGCOLOUR:MANUFACTURER:PROPOSEDTOWNHOUSES145-147 WELLINGTONSTREET WEST, AURORA3280 BLOOR STREET WEST,SUITE 1400TORONTO, ONTARIO,CANADA M8X 2X316.030BE-1BLOCK 1BLOCK ELEVATIONS1/8" = 1'-0"MARCH 2020CRBBproject numberdrawingdatechk'ddrawnscaleprojectownerno.date revisionDO NOT SCALE DRAWINGSAll drawings are the property of the Architect and must bereturned upon request.Contractor shall check all dimensions and report anydiscrepancies to the Architect before proceeding with the work.GUTHRIE MUSCOVITCHA R C H I T E C T STel:(416) 252-5679 Fax: (416) 252-9637770 Brown's Line, Toronto, Ontario M8W 3W2The contractor and/or engineeer shall verify u/s footingelevations and soil bearing capacity prior to excavation and thecommencement of work.Page 33 of 57 U/S SLABVARIEST/O PARKING FL.T/O PLATET/O PLATE9'-1" [2.77 M]T/O ROOF DECKT/O ROOF PARAPETT/O PARAPET9'-114" [2.77 M]T/O 3RD FL.T/O MECH. FL.T/O ROOF TERR. FL.T/O PLATET/O PLATE11.90 M13.0 M15.30 MMIN. A.G.SECOND LEVELGROUND LEVEL8'-114" [2.47 M]9'-234" [2.81 M]MODULE M1MODEL S1MODEL S2MODULE M1MODEL S1MODEL S2MODULE M1(REV)MODEL S1(REV)MODEL S2(REV)MODULE M1(REV)MODEL S1(REV)MODEL S2(REV)MODULE M2MODEL S1-EMODEL S2-EMODULE M2(REV)MODEL S1-E(REV)MODEL S2-E(REV)FIREWALLLOCATIONBLOCK 2WEST ELEVATIONMDL S1-E(REV) MDL S1(REV) MDL S1 MDL S1(REV) MDL S1-EMDL S1BLOCK 2EAST ELEVATIONFIREWALLLOCATIONU/S SLABVARIEST/O PARKING FL.T/O PLATET/O PLATE9'-1" [2.77 M]T/O ROOF DECKT/O ROOF PARAPETT/O PARAPET9'-114" [2.77 M]T/O 3RD FL.T/O MECH. FL.T/O ROOF TERR. FL.T/O PLATET/O PLATE11.90 M13.0 M15.30 MMIN. A.G.SECOND LEVELGROUND LEVEL8'-114" [2.47 M]9'-234" [2.81 M]BLOCK 2SOUTH ELEVATIONU/S SLABVARIEST/O PARKING FL.T/O PLATET/O PLATE9'-1" [2.77 M]T/O ROOF DECKT/O ROOF PARAPETT/O PARAPET9'-114" [2.77 M]T/O 3RD FL.T/O MECH. FL.T/O ROOF TERR. FL.T/O PLATET/O PLATE11.90 M13.0 M15.30 MMIN. A.G.SECOND LEVELGROUND LEVEL8'-114" [2.47 M]9'-234" [2.81 M]BLOCK 2NORTH ELEVATIONMASONRY - BRICK VENEER -1COLOUR:MANUFACTURER:MORTAR:HORIZONTAL METAL SIDING - 1COLOUR:MANUFACTURER:PRECAST SILL/BANDING (2"PROJECTION)COLOUR:MANUFACTURER:MORTAR:PREFINISHED METAL CAP FLASHINGCOLOUR:MANUFACTURER:PREFINISHED ALUMINIUM RAILINGCOLOUR:MANUFACTURER:PRECAST CONCRETE CAPCOLOUR:MANUFACTURER:MORTAR:PREFINISHED ALUMINIUM CANOPYCOLOUR:MANUFACTURER:EXTERIOR MATERIALS LEGENDEXTERIOR HOLLOW METAL DOORCOLOUR:MANUFACTURER:HORIZONTAL METAL SIDING - 2COLOUR:MANUFACTURER:PRIVACY SCREEN 1COLOUR:MATERIAL:MANUFACTURER:PREFINISHED METAL CAP FLASHINGCOLOUR:MANUFACTURER:PROPOSEDTOWNHOUSES145-147 WELLINGTONSTREET WEST, AURORA3280 BLOOR STREET WEST,SUITE 1400TORONTO, ONTARIO,CANADA M8X 2X316.030BE-2BLOCK 2BLOCK ELEVATIONS1/8" = 1'-0"MARCH 2020CRBBproject numberdrawingdatechk'ddrawnscaleprojectownerno.date revisionDO NOT SCALE DRAWINGSAll drawings are the property of the Architect and must bereturned upon request.Contractor shall check all dimensions and report anydiscrepancies to the Architect before proceeding with the work.GUTHRIE MUSCOVITCHA R C H I T E C T STel:(416) 252-5679 Fax: (416) 252-9637770 Brown's Line, Toronto, Ontario M8W 3W2The contractor and/or engineeer shall verify u/s footingelevations and soil bearing capacity prior to excavation and thecommencement of work.Page 34 of 57 T/O SLABT/O PLATET/O PLATE9'-1" [2.77 M]T/O ROOF DECKT/O ROOF PARAPETT/O PARAPET9'-114" [2.77 M]T/O 3RD FL.T/O MECH. FL.T/O ROOF TERR. FL.T/O PLATET/O PLATE12.0 M13.05 M15.35 MMIN. A.G.SECOND LEVELGROUND LEVEL8'-114" [2.47 M]9'-114" [2.77 M]T/O PLATE9'-1" [2.77 M]MDL 3CMDL 1BMDL 2AMDL 3C(REV)MDL 1B(REV)MDL 2A(REV)MDL 3C-E2MDL 1B-E2MDL 2A-E2MDL 3C(REV)MDL 1B(REV)MDL 2A(REV)MDL 3C-EMDL 1B-EMDL 2A-EBLOCK 3SOUTH ELEVATIONT/O SLABT/O PLATET/O PLATE9'-1" [2.77 M]T/O ROOF DECKT/O ROOF PARAPETT/O PARAPET9'-114" [2.77 M]T/O 3RD FL.T/O MECH. FL.T/O ROOF TERR. FL.T/O PLATET/O PLATE12.0 M13.05 M15.35 MMIN. A.G.SECOND LEVELGROUND LEVEL8'-114" [2.47 M]9'-114" [2.77 M]T/O PLATE9'-1" [2.77 M]5'-0"1'-10"1'-3"6'-0"1'-10"1'-3"4'-0"4'-0"1'-114"MDL 3CMDL 1BMDL 2AMDL 3C(REV)MDL 1B(REV)MDL 2A(REV)MDL 3C-E2MDL 1B-E2MDL 2A-E2MDL 3C(REV)MDL 1B(REV)MDL 2A(REV)MDL 3C-EMDL 1B-EMDL 2A-EBLOCK 3NORTH ELEVATIONT/O SLABT/O PLATET/O PLATE9'-1" [2.77 M]T/O ROOF DECKT/O ROOF PARAPETT/O PARAPET9'-114" [2.77 M]T/O 3RD FL.T/O MECH. FL.T/O ROOF TERR. FL.T/O PLATET/O PLATE12.0 M13.05 M15.35 MMIN. A.G.SECOND LEVELGROUND LEVEL8'-114" [2.47 M]9'-114" [2.77 M]T/O PLATE9'-1" [2.77 M]MDL 3C-E (X2)MDL 1B-EMDL 2A-EBLOCK 3EAST ELEVATIONT/O SLABT/O PLATET/O PLATE9'-1" [2.77 M]T/O ROOF DECKT/O ROOF PARAPETT/O PARAPET9'-114" [2.77 M]T/O 3RD FL.T/O MECH. FL.T/O ROOF TERR. FL.T/O PLATET/O PLATE12.0 M13.05 M15.35 MMIN. A.G.SECOND LEVELGROUND LEVEL8'-114" [2.47 M]9'-114" [2.77 M]T/O PLATE9'-1" [2.77 M]MDL 3C-E2 (X2)MDL 1B-E2MDL 2A-E2BLOCK 3WEST ELEVATIONMASONRY - BRICK VENEER -1COLOUR:MANUFACTURER:MORTAR:HORIZONTAL METAL SIDING - 1COLOUR:MANUFACTURER:PRECAST SILL/BANDING (2"PROJECTION)COLOUR:MANUFACTURER:MORTAR:PREFINISHED METAL CAP FLASHINGCOLOUR:MANUFACTURER:PREFINISHED ALUMINIUM RAILINGCOLOUR:MANUFACTURER:PRECAST CONCRETE CAPCOLOUR:MANUFACTURER:MORTAR:PREFINISHED ALUMINIUM CANOPYCOLOUR:MANUFACTURER:EXTERIOR MATERIALS LEGENDEXTERIOR HOLLOW METAL DOORCOLOUR:MANUFACTURER:HORIZONTAL METAL SIDING - 2COLOUR:MANUFACTURER:PRIVACY SCREEN 1COLOUR:MATERIAL:MANUFACTURER:PREFINISHED METAL CAP FLASHINGCOLOUR:MANUFACTURER:PROPOSEDTOWNHOUSES145-147 WELLINGTONSTREET WEST, AURORA3280 BLOOR STREET WEST,SUITE 1400TORONTO, ONTARIO,CANADA M8X 2X316.030BE-3BLOCK 3BLOCK ELEVATIONS1/8" = 1'-0"MARCH 2020CRBBproject numberdrawingdatechk'ddrawnscaleprojectownerno.date revisionDO NOT SCALE DRAWINGSAll drawings are the property of the Architect and must bereturned upon request.Contractor shall check all dimensions and report anydiscrepancies to the Architect before proceeding with the work.GUTHRIE MUSCOVITCHA R C H I T E C T STel:(416) 252-5679 Fax: (416) 252-9637770 Brown's Line, Toronto, Ontario M8W 3W2The contractor and/or engineeer shall verify u/s footingelevations and soil bearing capacity prior to excavation and thecommencement of work.Page 35 of 57 PROPOSEDTOWNHOUSES145-147 WELLINGTONSTREET WEST, AURORA3280 BLOOR STREET WEST,SUITE 1400TORONTO, ONTARIO,CANADA M8X 2X316.030BE-4BLKS 1 AND 2 (TYPICAL)COLOURED ELEVATIONS1/8" = 1'-0"MARCH 2020CRBBproject numberdrawingdatechk'ddrawnscaleprojectownerno.date revisionDO NOT SCALE DRAWINGSAll drawings are the property of the Architect and must bereturned upon request.Contractor shall check all dimensions and report anydiscrepancies to the Architect before proceeding with the work.GUTHRIE MUSCOVITCHA R C H I T E C T STel:(416) 252-5679 Fax: (416) 252-9637770 Brown's Line, Toronto, Ontario M8W 3W2The contractor and/or engineeer shall verify u/s footingelevations and soil bearing capacity prior to excavation and thecommencement of work.Page 36 of 57 PROPOSEDTOWNHOUSES145-147 WELLINGTONSTREET WEST, AURORA3280 BLOOR STREET WEST,SUITE 1400TORONTO, ONTARIO,CANADA M8X 2X316.030BE-5BLK 3 (TYPICAL)COLOURED ELEVATIONS1/8" = 1'-0"MARCH 2020CRBBproject numberdrawingdatechk'ddrawnscaleprojectownerno.date revisionDO NOT SCALE DRAWINGSAll drawings are the property of the Architect and must bereturned upon request.Contractor shall check all dimensions and report anydiscrepancies to the Architect before proceeding with the work.GUTHRIE MUSCOVITCHA R C H I T E C T STel:(416) 252-5679 Fax: (416) 252-9637770 Brown's Line, Toronto, Ontario M8W 3W2The contractor and/or engineeer shall verify u/s footingelevations and soil bearing capacity prior to excavation and thecommencement of work.Page 37 of 57 100 John West Way Aurora, Ontario L4G 6J1 (905) 727-3123 aurora.ca Town of Aurora Memorandum Corporate Services _______________________________________________________________________________________ Re: Site Plan Application SP-2020-14, 14452 Yonge Street (Submission #1) To: Accessibility Advisory Committee From: Mateusz Zawada, Accessibility Advisor Date: February 10, 2021 _______________________________________________________________________________________ Recommendations 1. That the memorandum regarding Site Plan Application SP-2020-14, 14452 Yonge Street (Submission #1) be received; and 2. That the Accessibility Advisory Committee comments regarding Site Plan Application SP-2020-14, 14452 Yonge Street (Submission #1) be received and referred to staff for consideration and further action as appropriate. Background The Accessibility Advisor has made comments on behalf of the Accessibility Advisory Committee. The comments are as follows:  Please note that the minimum number of accessible parking spaces is one (1) parking spaces for the use of persons with disabilities, which meets the requirements of the AODA Design of Public Spaces O.Reg 191/11, section 80.36 (4).  Barrier-Free dimension requirements to meet that of the Town of Aurora Zoning By-Law. Type A parking should have a width of 3.65 metres, while Type B parking should have a width of 2.7 metres.  Automatic door openers for all public access locations, including proper timed door delays.  Washroom on main level that is served by the barrier-free path of travel and available to the public to be a universal washroom.  Installation of proper tactile indicators at the proposed staircases. Page 38 of 57 Site Plan Application SP-2020-14, 14452 Yonge Street (Submission #1) February 10, 2021 Page 2 of 2 Please also note that there are new Design of Public Spaces (Built Environment) Standards enacted from the Province of Ontario, under the Accessibility for Ontarians with Disabilities Act and revisions to the Ontario Building Code to help standardize and encourage barrier free access. On behalf of the Accessibility Advisory Committee, thank you for the opportunity to comment. Attachments SP-2020-14 Page 39 of 57 INTERNAL MEMORANDUM DATE: December 9, 2020 TO: B. Butler, Planning and Development Services C. Tsang, Planning and Development Services (Heritage) B. Jean, Building Division S. Sample, Building Division B. Jakovina, Operations (Parks) M. Bat, Engineering and Capital Delivery Division J. Van Scheyndel, Corporate Services M. Zawada, Accessibility Advisor G. Zinck, Waste/Recycling Coordinator CC: Mayor and Members of Council D. Waters, Director of Planning and Development Services Council Secretariat, Corporate Services FROM: Sean Lapenna, Planning and Development Services RE: Application for Site Plan Approval – Sewage Pumping Station 14452 Yonge Street Block 45, Plan 65M4642 File Number: SP-2020-14 A 1st submission has been made to Planning and Development Services for the above noted Site Plan application to facilitate the development of a one storey Sewage Pumping Station with a total GFA of approximately 28.25 m² (304 ft²). The proposed station will include a valve room, office, janitor space, washroom, mechanical space, a generator room and electrical room. Due to file size restrictions, the majority of supporting documents and studies for this application have been uploaded into the following Kiteworks link: https://townofaurora.kiteworks.com/w/gqE8xhkgPwY9apJS9TWYr8w71rf5MHhNnfAKH7ICTotCx I would appreciate receiving your comments by December 24, 2020. Should you have any questions regarding the above noted proposal, please feel free to contact me. Regards, Sean Lapenna, Planner Planning and Development Services Planning and Development Services 100 John West Way, Box 1000, Aurora, ON L4G 6J1 Phone: 905-727-3123 Ext. 4346 Email: slapenna@aurora.ca www.aurora.ca Page 40 of 57 PROP. 1.8m HIGHOP. 1.8m HIGHCHAIN LINK FENCEOPSD 972.130PROP. 1.8m WROUGHTR. IRON FENCEFPROP. 1.8m WROUGHTUGHTGGGGGGGGGHTGGGGGGGIRON FENCEAAACDWRDXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXTHE REGIONAL OF YORKHENDERSON SPS DETAILED DESIGNDRAWNDESIGNCHECKEDSHEET NO.CONT. NO.REV. NO.MTEIRCWSPPROJECT NO.181-08079SEALNO.DATEREVISIONSNAME1AUG '20ISSUED FOR 90% DETAILED DESIGNDW-DATESCALELEGEND19.3m9.3m11m16.2m1611m 666666666666666.06..0.0.0.0000m0mmmmm666666666666666.6...0.0000000mm6 14.0m4.141m6.0mm6m8888.88.98.8.9999m9mmm88m88888 2.1m1222.1m2.1mmm21222211m 18.9mm16.0mmm6.00000mmmmmmmmmm617.8mm1 41.1m414mPage 41 of 57 Page 42 of 57 Page 43 of 57 Page 44 of 57 Page 45 of 57 Page 46 of 57 100 John West Way Aurora, Ontario L4G 6J1 (905) 727-3123 aurora.ca Town of Aurora Memorandum Corporate Services _______________________________________________________________________________________ Re: Site Plan Application Northern Trail and Boardwalk Planting Plan To: Accessibility Advisory Committee From: Mateusz Zawada, Accessibility Advisor Date: February 10, 2021 _______________________________________________________________________________________ Recommendations 1. That the memorandum regarding Site Plan Application Northern Trail and Boardwalk Planting Plan be received; and 2. That the Accessibility Advisory Committee comments regarding Site Plan Application Northern Trail and Boardwalk Planting Plan be received and referred to staff for consideration and further action as appropriate. Background The Accessibility Advisor has made comments on behalf of the Accessibility Advisory Committee. The comments below are for consideration as the boardwalk does not have a running slope that is steeper than 1:20, therefore the running slopes do not need to meet the requirements for ramps set out in section 80.13. O. Reg. 413/12, s. 6.:  Current design of guard and handrails is designed in a manner that could facilitate climbing  Handrails be not less than 865 mm and not more than 965 mm high, measured vertically from the surface of the ramp, except that handrails not meeting these requirements are permitted if they are installed in addition to the required handrail  Handrails be continuously graspable along their entire length and have circular cross-section with an outside diameter not less than 30 mm and not more than 40 mm, or any non-circular shape with a graspable portion that has a perimeter not less than 100 mm and not more than 155 mm and whose largest cross- Page 47 of 57 Site Plan Application Northern Trail and Boardwalk Planting Plan February 10, 2021 Page 2 of 2 sectional dimension is not more than 57 mm. Difficult to tell from drawings, but it does not appear the railing is continuously graspable due to the notches in the posts.  Measurements don’t specify the size of the landings at the end of the ramps. Landings must be a minimum of 1,670 mm by 1,670 mm at the top and bottom of the ramp and where there is an abrupt change in direction of the ramp. Please also note that there are new Design of Public Spaces (Built Environment) Standards enacted from the Province of Ontario, under the Accessibility for Ontarians with Disabilities Act and revisions to the Ontario Building Code to help standardize and encourage barrier free access. On behalf of the Accessibility Advisory Committee, thank you for the opportunity to comment. Attachments Northern Trail and Boardwalk Planting Plan Page 48 of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age 49 of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‘&XOYHUW“P/RQJ/RFDWLRQWREH&RQILUPHG2QVLWH6WDQGDUG7UDLOVHHGHWDLORQ/'P:LGH%RDUGZDON/RFDWLRQDVSHU6LWH9LVLWZLWK/65&$6WDIIRQ$XJXVWWKDWDPVHHGHWDLORQ/'7UDLOKHDG5DPS $UPRXUVWRQH5HWDLQLQJ:DOOVVHHGHWDLORQ/'3RVWDQG3DGGOH*XDUGUDLOVHHGHWDLORQ/'/'$/'$([LVWLQJ'UDLQDJH2XWOHWDQG+HDGZDOOWR5HPDLQ*UDGLQJWR7LHLQWR([LVWLQJ“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age 50 of 57 127(6 635($'(;&$9$7('72362,/)520:$/.:$<&216758&7,218372P21(,7+(56,'(2)1(::$/.:$<$1'(1685(326,7,9('5$,1$*(2)6+28/'(56),1,6+:,7+$1$7,9(6(('0,;$663(&,),(' 5(9,6('(37+2)$**5(*$7(6$5281'(;,67,1*75((6$1'52276$65(48,5(' $//68%*5$'( 68%%$6(6+28/'%(5(9,(:('$1'$66(66('%<*(27(&+1,&$/(1*,1((55()(572*(27(&+1,&$/5(3257,)$9$,/$%/( %$6(0$7(5,$/6+28/'%(&203$&7(',1PP/,)7672(1685(3523(5&203$&7,217+528*+287PP/$<(5/,0(6721(6&5((1,1*6&203$&7('7263'7(55$),;5*(27(;7,/(),/7(5)$%5,&3529,'($685)$&(&52666/23(25&52:1726+(':$7(5$65(48,5('75$,/6(&7,2172%()/$7:+(5(/21*,78',1$/6/23((;&(('6PP/$<(5*5$18/$5 $ &203$&7('7263'81',6785%('68%*5$'(2568%*5$'(),50/<&203$&7('7263'3/$&( *5$'((;&$9$7('72362,/0,1,080PP'((321(,7+(56,'(2)3$7+:$< 6((':,7+1$7,9(0,;$663(&,),('127(6 635($'(;&$9$7('72362,/)520:$/.:$<&216758&7,218372P21(,7+(56,'(2)1(::$/.:$<$1'(1685(326,7,9('5$,1$*(2)6+28/'(56),1,6+:,7+$1$7,9(6(('0,;$663(&,),(' 5(9,6('(37+2)$**5(*$7(6$5281'(;,67,1*75((6$1'52276$65(48,5(' $//68%*5$'( 68%%$6(6+28/'%(5(9,(:('$1'$66(66('%<*(27(&+1,&$/(1*,1((55()(572*(27(&+1,&$/5(3257,)$9$,/$%/( %$6(0$7(5,$/6+28/'%(&203$&7(',1PP/,)7672(1685(3523(5&203$&7,217+528*+287PP/$<(5/,0(6721(6&5((1,1*6&203$&7('7263'7(55$),;5*(27(;7,/(),/7(5)$%5,&3529,'($685)$&(&52666/23(25&52:1726+(':$7(5$65(48,5('75$,/6(&7,2172%()/$7:+(5(/21*,78',1$/6/23((;&(('681',6785%('68%*5$'(2568%*5$'(),50/<&203$&7('7263'PP/$<(5+/ PP PP  &/($56721(&203$&7('7263'7(16$575,$;7;*(2*5,'3/$&( *5$'((;&$9$7('72362,/0,1,080PP'((321(,7+(56,'(2)3$7+:$< 6((':,7+1$7,9(0,;$663(&,),('(;,67,1*75,%87$5<0,1,080&/($5$1&(2)PP%(1&+*5$'(,172&52666/23(&877,1*+$/)7+(352326('75$,/,1727+((;,67,1*6/23($1'%8,/',1*837+(75$,/217+(27+(5+$/)6/23((;,67,1**5$'( $3352;6/23( $502856721(%28/'(569$5,(66((3/$166(('0,;PP72362,/67$1'$5'3$7+:$<6(('(7$,/217+,66+((7$//6721(672%(/,0(6721($502856721(%28/'(56127(66,=(6PP/21*[PP'((3[PP+,*+%28/'(56285&(72%(&21),50('$1'72:1,67235($33529(%28/'(56%()25(7+(<$5(%528*+7726,7(PP‘39&3(5)25$7('3,3(:,7+),/7(562&.6/23(72'5$,10,1287/(772'$</,*+7PP*5$18/$5 $ &203$&7('7263'68%*5$'(&203$&7('7263'7(55$),;5*(27(;7,/(),/7(5)$%5,&%27720%28/'(572%(PP0,1,080%(/2:),1,6+('*5$'(PP0$;9$5,(66((3/$163267$1'3$''/(*8$5'5$,/6(('(7$,/21/'PP:22'(167$.(62))6(763$&,1*$7P25/(66$65(48,5('PP‘ 8/75$ 7(55$),;6,/762&.(;,67,1**5$'()/2:9$5,(66((3/$16$//6721(672%(/,0(6721(%28/'(56127(66,=(6PP/21*[PP'((3[PP+,*+%28/'(56285&(72%(&21),50('$1'72:1,67235($33529(%28/'(56%()25(7+(<$5(%528*+7726,7(PP‘39&3(5)25$7('3,3(:,7+),/7(562&.6/23(72'5$,10,1287/(772'$</,*+7PP/$<(5+/ PP PP  &/($56721(&203$&7('7263'$502856721(%28/'(5668%*5$'(&203$&7('7263'7(55$),;5*(27(;7,/(),/7(5)$%5,&%27720%28/'(572%(PP%(/2:),1,6+('*5$'($'-$&(17685)$&($'-$&(17685)$&(PP+(/,&$/3,(56(;$&76,=($1''(37+72%('(7(50,1('8321*(27(&+1,&$/,19(67,*$7,21$'',7,21$/[)$6&,$86(1R67$,1/(666&5(:6%2$5'725(7$,13$7+:$<$502856721(5(7$,1,1*:$//)/$1.,1*%27+6,'(62)%2$5':$/.6(('(7$,/ /$1'6&$3(3/$165),/7(5)$%5,&&/($56721(67$1'$5'75$,/6(('(7$,/PP‘&('$53267&:  6/276)253$''/(5$,/63$''/(5$,/672%(PP‘&('$532/(675,00('$7(1'63/$19,(:6+2:,1*29(5/$33,1*3$''/(5$,/6&203$&7('*5$18/$5 $ 0,1PP'(37+2)PP&/($56721(32676“2&3$''/(66(&85('723267:,7+PP/21*&(5$0,&&2$7('/$*6&5(:(/(9$7,2132675$,/(0%('%$6(2):,5(0(6+,172*5281'PP$1'5(7851PP 237,21$/ 0,1,080PP'(37+2)&203$&7('PP&/($56721(,1%277202)3267+2/(75$,/0($'2:&52666(&7,21&203$&7('*5$18/$5 $ 0,1  PP/21**$/9$1,=('/$*6&5(:726(&85(5$,/6723267&('$53$''/(5$,/7$33(5('72),77+528*+:+2/(,13267&('$53$''/(5$,/3/$19,(:7+(6( '5$:,1*6 $5( 7+( 3523(57< 2) 0$5. 6(77(5$662&,$7(6 /7' $1' 6+$// 127 %( $/7(5(' 02',),('5(9,6(' 25 &+$1*(' :,7+287 7+( :5,77(1 &216(17 2)0$5.6(77(5$662&,$7(6/7'$//',0(16,216$5(72%(9(5,),(' 21 6,7( $1' $1< ',6&5(3$1&,(6 $5( 72 %(5(3257('727+(/$1'6&$3($5&+,7(&7WHO HPDLOPVHWWHU#URJHUVFRP/DNH'ULYH(DVW.HVZLFN2QWDULR/3(06$ZHEVLWHPDUNVHWWHUDVVRFLDWHVFRP/'-RVHSK+DUWPDQ7UDLO7RZQRI$XURUD5HJLRQDO0XQLFLSDOLW\RI<RUN/DQGVFDSH'HWDLOV 1RWHV.)066HSWHPEHU$V6KRZQ5HYLVHGDVSHU/65&$&RPPHQWV .),VVXHGIRU7HQGHU.)67$1'$5'75$,/)/2$7,1*75$,/6(&7,21$$%2$5':$/.29(575,%87$5<75$,/+($'5$03 $502856721(5(7$,1,1*:$//66,/762&.$502856721(5(7$,1,1*:$//%2$5':$/. 75$,/&211(&7,2175$,/+($'5$03 $502856721(5(7$,1,1*:$//6$66+2:1Page 51 of 57 7<3,&$/&251(53/$1   PP 0$;  2 & PP0$;2&   PP 0$;  2 &  PP 0 $ ; 2 &    PP 0$;  2 & PP0$;2&PP0$;2&  PP 0$;  2 & 127(6 $//)$67(1(5672%(*$/9$1,=('2567$,1/(6667((/7235(9(175867,1* 6+23'5$:,1*60867%(3529,'(')257+(+(/,&$/3,/(6'(6,*1('%<$352)(66,21$/(1*,1((5%$6('217+(72548(5($',1*7(67 ),/(DUHY %<7(&+120(7$/3267'$7(')(%58$5<WK $//:22',672%(35(6685(75($7(':(67(51+(0/2&.81/(6627+(5:,6(67$7(' 528*+&87:22',6$&78$/6,=(6 6((',0(16,2162)/80%(5 $1',672%(35(6685(75($7('+(0/2&.:,7+7+((;&(37,212)7+(5$,/,1*3,(&(6:+,&+$5(72%(3/$1('120,1$/6,=(6 60227+),1,6+ 35(6685(75($7(':(67(51+(0/2&. $1<'$0$*(6727+(),1,6+('685)$&(6+$//%(5(3$,5('255(3/$&('[%($0+(0/2&.PP21&(175(0$;[-2,676+(0/2&.PP0$;21&(175([3267528*+&87+(0/2&.[%5$&,1*[%/2&.,1*+(/,&$/3,(5:,7+)52676/((9(%<7(&+120(7$/3267[%($0+(0/2&.PP21&(175(0$;86+$3('6$''/(3/$7(PP0$;2&3/$1PP0$;2&['(&.,1*528*+&87+(0/2&.[%($0+(0/2&.PP21&(175([-2,676+(0/2&.PP0$;21&(175([3267528*+&87+(0/2&.PP21&(175([3267528*+&87+(0/2&.PP21&(175([%5$&,1*6(((1/$5*(0(1721')253267%5$&,1*[%/2&.,1*'(&.)$67(1(5[75866/2&.(1*,1((5(':22')$67(1(5 6&5(:63(5%2$5')25-2,67 +(/,&$/3,(5:,7+)52676/((9(%<7(&+120(7$/326786+$3('6$''/(3/$7(PP0$;2&0$;2&(/(9$7,21'(&.(/(9$7,21+(/,&$/3,(56%<7(&+120(7$/32676[-2,676+(0/2&.PP0$;21&(175([5$,/660227+),1,6+('+(0/2&.32676127&+('PP72$&&(375$,/,1*[3267528*+&87+(0/2&.PP21&(175([&$360227+),1,6+('+(0/2&.:,7+PP5287(5('('*(['(&.,1*528*+&87+(0/2&.&$55,$*(%2/76[%($0+(0/2&.PP21&(175(&$55,$*(%2/76/$*6&5(:66(('(7$,/)253267%5$&,1*)52676/((9($63(50$18)$&785(5663(&,),&$7,2186+$3('6$''/(3/$7(PP0$;2&PP0$;2&0,1,080&/($5$1&(2)PP7<3,&$//< PP$%29(:$7(5:$<127(6 $//)$67(1(5672%(*$/9$1,=('2567$,1/(6667((/7235(9(175867,1* 6+23'5$:,1*60867%(3529,'(')257+(+(/,&$/3,/(6'(6,*1('%<$352)(66,21$/(1*,1((5%$6('217+(72548(5($',1*7(67 ),/(DUHY %<7(&+120(7$/3267'$7(')(%58$5<WK $//:22',672%(35(6685(75($7(':(67(51+(0/2&.81/(6627+(5:,6(67$7(' 528*+&87:22',6$&78$/6,=(6 6((',0(16,2162)/80%(5 $1',672%(35(6685(75($7('+(0/2&.:,7+7+((;&(37,212)7+(5$,/,1*3,(&(6:+,&+$5(72%(3/$1('120,1$/6,=(6 60227+),1,6+ 35(6685(75($7(':(67(51+(0/2&. $1<'$0$*(6727+(),1,6+('685)$&(6+$//%(5(3$,5('255(3/$&('3267%5$&,1*6(&7,213267%5$&,1*3/$1[-2,676PP0$;21&(175(['(&.,1*528*+&87+(0/2&.&$55,$*(%2/7667((/6+2(PP7+,&.%2/7('723267 *$/9$1,=(' /$*%2/76[63)35(6685(75($7('%5$&,1*%2/7('7267((/6+2($1'%/2&.,1*[%/2&.,1*#($&+3267/$*%2/7667((/6+2(PP7+,&.%2/7('723267 *$/9$1,=(' %2/76[63)35(6685(75($7('%5$&,1*%2/7('7267((/6+2($1'%/2&.,1*'(&.)$67(1(5[75866/2&.(1*,1((5(':22')$67(1(5 6&5(:63(5%2$5')25-2,67 &$55,$*(%2/76&2817(5681.21%$&.6,'(2)32676(&7,21'(&.(/(9$7,21[-2,676PP0$;21&(175(+(0/2&.[5$,/660227+),1,6+('+(0/2&.32676127&+('PP72$&&(375$,/,1*[3267528*+&87+(0/2&.PP21&(175([&$360227+),1,6+('+(0/2&.:,7+PP5287(5('('*(['(&.,1*528*+&87+(0/2&.&$55,$*(%2/76[%($0+(0/2&.PP21&(175()52676/((9($63(50$18)$&785(5663(&,),&$7,21&$55,$*(%2/76/$*6&5(:6[5$,/60227+),1,6+('+(0/2&.32676127&+('PP72$&&(375$,/,1*[%/2&.,1*#($&+3267+(/,&$/3,(56%<7(&+120(7$/3267686+$3('6$''/(3/$7(127(6 $//)$67(1(5672%(*$/9$1,=('2567$,1/(6667((/7235(9(175867,1* 6+23'5$:,1*60867%(3529,'(')257+(+(/,&$/3,/(6'(6,*1('%<$352)(66,21$/(1*,1((5%$6('217+(72548(5($',1*7(67 ),/(DUHY %<7(&+120(7$/3267'$7(')(%58$5<WK $//:22',672%(35(6685(75($7(':(67(51+(0/2&.81/(6627+(5:,6(67$7(' 528*+&87:22',6$&78$/6,=(6 6((',0(16,2162)/80%(5 $1',672%(35(6685(75($7('+(0/2&.:,7+7+((;&(37,212)7+(5$,/,1*3,(&(6:+,&+$5(72%(3/$1('120,1$/6,=(6 60227+),1,6+ 35(6685(75($7(':(67(51+(0/2&. $1<'$0$*(6727+(),1,6+('685)$&(6+$//%(5(3$,5('255(3/$&('0$;7<30,1,080&/($5$1&(2)PP7<3,&$//< PP$%29(:$7(5:$<7+(6('5$:,1*6$5(7+(3523(57<2)0$5.6(77(5$662&,$7(6 /7' $1' 6+$// 127 %( $/7(5(' 02',),('5(9,6(' 25 &+$1*(' :,7+287 7+( :5,77(1 &216(17 2)0$5.6(77(5$662&,$7(6/7'$//',0(16,216$5(72%(9(5,),(' 21 6,7( $1' $1< ',6&5(3$1&,(6 $5( 72 %(5(3257('727+(/$1'6&$3($5&+,7(&7WHO HPDLOPVHWWHU#URJHUVFRP/DNH'ULYH(DVW.HVZLFN2QWDULR/3(06$ZHEVLWHPDUNVHWWHUDVVRFLDWHVFRP/'-RVHSK+DUWPDQ7UDLO7RZQRI$XURUD5HJLRQDO0XQLFLSDOLW\RI<RUN/DQGVFDSH'HWDLOV 1RWHV.)066HSWHPEHU$V6KRZQ5HYLVHGDVSHU/65&$&RPPHQWV .),VVXHGIRU7HQGHU.)P:,'(%2$5':$/.$V6KRZQPPPPPPage 52 of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age 53 of 57 100 John West Way Aurora, Ontario L4G 6J1 (905) 727-3123 aurora.ca Town of Aurora Memorandum Corporate Services _______________________________________________________________________________________ Re: Site Plan Application Vandorf Softball Diamonds Application To: Accessibility Advisory Committee From: Mateusz Zawada, Accessibility Advisor Date: February 10, 2021 _______________________________________________________________________________________ Recommendations 1. That the memorandum regarding Site Plan Application Vandorf Softball Diamonds Application be received; and 2. That the Accessibility Advisory Committee comments regarding Site Plan Application Vandorf Softball Diamonds Application be received and referred to staff for consideration and further action as appropriate. Background The Accessibility Advisor has made comments on behalf of the Accessibility Advisory Committee. The comments are as follows:  No further comments at this time. The Accessibility Advisory Committee appreciates the opportunity to provide comments. Please also note that there are new Design of Public Spaces (Built Environment) Standards enacted from the Province of Ontario, under the Accessibility for Ontarians with Disabilities Act and revisions to the Ontario Building Code to help standardize and encourage barrier free access. On behalf of the Accessibility Advisory Committee, thank you for the opportunity to comment. Regards, Mateusz Zawada Page 54 of 57 Site Plan Application Vandorf Softball Diamonds Application February 10, 2021 Page 2 of 2 Attachments Vandorf Softball Diamonds Page 55 of 57 project numberproject titledrawing numberdrawing titlescaledatedrawn byreviewed byVANDORF SOFTBALLDIAMONDS175 ENGELHARD DRIVE2018-130 clientTOWN OF AURORAuser: clee file: L:\LPL_Projects\2018\2018-130 - Vandorf Fields Aurora\3.0 Tender Phase\CAD\2020-130_R06_200804_Re-Tender\2018-130_Retender_200804.dwg plot: Jul 29, 2020 - 3:09pmno.revision datebyR1 ISSUED FOR TENDER AUG.04/20 CLTHESE DRAWINGS ARE THE PROPERTY OF LANDSCAPEPLANNING LIMITED AND SHALL NOT BE ALTERED, MODIFIED,REVISED OR CHANGED WITHOUT THE WRITTEN CONSENT OFLANDSCAPE PLANNING LIMITED. SEAL IS NOT VALID WITHOUTSIGNATURE OF THE LANDSCAPE ARCHITECT. DRAWINGSCANNOT BE USED FOR TENDER/CONSTRUCTION UNTIL SIGNEDBY LANDSCAPE ARCHITECT.Aug 04,2020OCOAITINSSALNAFORBEMEMCHITECRRTAONIOASEPACSDTN SHANOG.JHK JSDPN.T.S.MARCH 2019DETAILSD-5HEIGHT OF SIGN FROM MIDDLE OF SIGN TO THE TOP OF GRADE /SURFACE IS MINIMUM 1.5m TO MAXIMUM 2.0mACCESSIBLE PARKING STALL - TYPE 'A' & TYPE 'B'N.T.S.ACCESSIBLE PARKING SIGNAGEN.T.S.TYPE A - WITH VAN ACCESSIBLE SIGN1500UNDISTURBED OR COMPACTED SUBGRADE TO98% S.P.DF.G.300CONCRETE FOOTING28Mpa @ 28 DAYS1200 MIN.300SIGN FACE:0.064mm GAUGE ALUMINUM SIGN BLANK WHITE BACKGROUNDHOLES-METRO PUNCHEDMOUNTING:THE SIGN FACE MUST BE SECURED TO A POST WITH TWO (2)GALVANIZED 12mm HEX HEAD BOLTS & NUTS WITH FLATWASHERS ON BOTH SIDES. CONTRACTOR TO DEFORM BOLTSAFTER INSTALLATIONNOTE:REFER TO PLAN FOR LOCATIONPOST: 75mm DIAMETER GALVANIZED STANDARDSTEEL PIPE; POST TO BE CAST IN PLACE INCONCRETE FOOTINGSINGLE SIGN FACE, LOCATE SIGN 400mmFROM EDGE OF ASPHALT PAVING; REFER TOPLAN.METAL CHANNEL BAR (SIGN POST)N.T.S. BENCH ON CONCRETE SLABN.T.S.914REFER TO DETAIL 6/D-1, FOR CONCRETE PAVINGDETAILSUNDISTURBED OR COMPACTED SUBGRADE TO 98%SPD200mm OF 19MM DIA. CRUSHER-RUN LIMESTONECOMPACTED TO 98% S.P.M.D.D.INSERT 100mm LENGTH THREADED RODS THROUGHMOUNTING PLATE AND SECURE WITH NUT ABOVEPLATE, TYP. WELD OR DEFORM END OF THREADEDROD TO PREVENT NUT REMOVALBIKE RING - REFER TO SPECIFICATIONS FOR MODELAND COLOURREFER TO LAYOUT PLAN FOR WIDTH OF CONCRETEPADREFER TO LAYOUT PLAN FOR ADJACENT SURFACE150NOTES:1. ALL DIMENSIONS SHOWN IN MILLIMETRES2. ALL FASTENING HARDWARE TO BE STAINLESS STEEL.3. ALL CONCRETE TO BE 32 MPa @ 28 DAYS.200914BIKE RING - SURFACE MOUNTEDN.T.S. CONCRETE PAD FOR LITTER RECEPTACLEN.T.S.PLAN VIEW - BENCH ON CONCRETE SLAB183030050048530012855003230REFER TO DETAIL 6/ D-1 FOR CONCRETE PAVINGANCHOR BENCH 10mmØ, 75mm LONG HOTDIPPED GALVANIZED LAG BOLTS (EXPANSIONTYPE) THROUGH EACH MOUNTING TAB, DRIVEINTO CONCRETE, LEVEL BENCHBENCHREFER TO SPECIFICATIONS FOR MODEL ANDCOLOUR INFORMATIONNOTES:1. ALL DIMENSIONS SHOWN IN MILLIMETERS2. ALL FASTENING HARDWARE TO BE HOT DIPPED GALVANIZED3. ALL CONCRETE TO BE 32MPa @28 DAYS4. ALL FURNISHINGS TO BE FIELD LOCATED WITH SITE INSPECTOR PRIOR TO INSTALLATION.300MIN.200mm OF 19MM DIA. CRUSHER-RUN LIMESTONECOMPACTED TO 98% S.P.M.D.D.UNDISTURBED OR COMPACTED SUBGRADE TO98% SPD500MIN.1100PLAN VIEW - CONCRETE PAD500900900150MM CONCRETE PADNOTES:1. ALL DIMENSIONS SHOWN IN MILLIMETRES2. ALL FASTENING HARDWARE TO BE HOT DIPPED GALVANIZED3. ALL CONCRETE TO BE 32 MPa @ 28 DAYS.4. ALL FURNISHINGS TO BE FIELD LOCATED WITH SITE INSPECTOR PRIOR TO INSTALLATION200mm OF 19MM DIA. CRUSHER-RUN LIMESTONECOMPACTED TO 98% S.P.M.D.D.UNDISTURBED OR COMPACTED SUBGRADE TO 98%SPDREFER TO LAYOUT PLAN FOR ADJACENT SURFACENOTE:LITTER RECEPTACLETO BE INSTALLED BY THE TOWN OFAURORA100150900150200CLUSTER SEATING ON CONCRETE SLABN.T.S.NOTES:1. 1.65M x 1.65M SQUARE CONCRETE PAD 100MM THICK REQUIRED UNDERNEATH THE UNIT PAVING.2. ANCHOR CLUSTER SEATING 10mmØ, 200mm LONG HOT DIPPED GALVANIZED LAG BOLTS (EXPANSION TYPE)THROUGH EACH MOUNTING TAB, DRIVE INTO CONCRETE, LEVEL SEATING AS REQUIRED3. ALL CONCRETE TO BE 32MPa @28 DAYS4. ALL FURNISHINGS TO BE FIELD LOCATED WITH SITE INSPECTOR PRIOR TO INSTALLATION.365015002700270015003650MODEL 5R21AP(5)CWRG_EG_HDG MESHBY W.H. REYNOLDS, (TEL)1-519-653-9721.REFER TO SPECIFICATIONS.SURFACE MOUNT.* REAR AND END GUARD RAILS TO MEETOBC 4.1.15.aNOTES:1. ALL DIMENSIONS IN METRES2. BLEACHER GRAPHIC SHOWN DOES NOT REPRESENT ANYPARTICULAR MODEL .3. ALL FASTENING HARDWARE TO BE STAINLESS STEEL.4. REFER TO LAYOUT PLAN FOR PAD LOCATIONS AND ORIENTATION.STAKE OUT WITH LANDSCAPE ARCHITECT FOR APPROVAL.5. REFER TO NOTES ON CONCRETE PAVING DETAILES:NOTE5 ROW BLEACHERSN.T.S.P GATESN.T.S.1D-53D-54D-56D-57D-58D-52D-53000280053865300530040037505D-52150 12001000 OPEN 15025 65038 100 TRAIL WIDTHCLOSE20 REBAR PINTRAIL WIDTHP - GATE: PLANARM LENGTHTRAIL WIDTH + 60015003000 MMARM LENGTH1050 MMARM LENGTH SCHEDULE:ARM LENGTH64 DIA. SCHED. 40 GALVANIZED STEEL ARMSTEEL CAP TYP.GREASE FITTING, TWO UNITS TYP.50MM WIDE CONSPICUITY TAPE, 3M SCOTCHLITE983-21 FLUORESCENT YELLOW TYP.90 DIA. SCHED. 40 GALVANIZED STEELSLEEVE75 DIA. SCHED. 40 GALVANIZED STEELSET POST WITH WELDED STIRRUPS25 MPa, 5-7% AIR ENTRAINMENTCONCRETE FOOTING150400P - GATE: ELEVATION / SECTIONNOTES:1. ALL PIPE AND COMPONENTS TO BE GALVANIZED AFTER FABRICATION (TYP.).2. ALL PIPE SHALL BE SCHEDULE 40 STEEL.3. ALL WELDS TO BE 5 MM CONTINUOUS SEAM AND GROUND SMOOTH.4. CONTRACTOR TO SUPPLY HEAVY DUTY PADLOCK AS REQUIRED.5. CONTRACTOR TO SUBMIT SHOP DRAWINGS.6. ALL MEASUREMENTS ARE IN MILLIMETRES UNLESS STATED OTHERWISE.LOCKING DEVICE: SECTION75 DIA STEEL SET POST (FIXED)90 DIA STEEL SLEEVE (GATE)GREASE FITTING 50 MIN. ABOVEREBAR PIN20MM REBAR PIN THROUGH BOTHPIPES, BEND ONE END AT 90 DEGREE TOPROVIDE 100MM HANDLE. DRILL HOLEAT OTHER END TO ACCEPT HEAVYDUTY PADLOCK. REBAR TO BE WELDEDTO HEAVY DUTY CHAIN. CHAIN TO BEWELDED TO 90 DIA. SLEEVE75MM GALVANIZED STEEL SET POST TOBE DRILLED TO RECEIVED REBAR PIN INCLOSED OR OPEN POSITIONR15090.0°9D-5NOTES:.1TO CGSB1-GP-74M, ALKYD TRAFFIC PAINT. COLOUR: TO CGSB1-GP-12C, WHITE 513-301..2ORGANIC SOLVENT BASED TRAFFIC PAINT SHALL BE HOMOGENEOUS AND SHALL BE WELLGROUND TO A UNIFORM SMOOTH CONSISTENCY. IT SHALL BE FREE FROM SKIN, DIRT ANDOTHER FOREIGN PARTICLES, AND SHALL BE CAPABLE OF BEING SPRAYED AT THETEMPERATURE INTENDED FOR APPLICATION..3PAINT PRODUCTS SHALL BE ON THE MINISTRY OF TRANSPORTATION APPROVED LIST..4ALL PRODUCTS AND APPLICATION MUST CONFORM TO THE LATEST SPECIFICATIONSWITHIN OPSS 1712 AND THE OTM (ONTARIO TRAFFIC MANUAL) BOOKS 7 & 11.CURB DEPRESSION WITH TWSI REFERTO DETAIL 5/ D-1TYPE B - WITHOUT VAN ACCESSIBLE SIGN5Page 56 of 57 PROPERTY LINELIMIT OF CONTRACTASPHALT PAVING - LIGHT DUTYASPHALT PAVING - MEDIUM DUTYCONCRETE PAVINGSPORTS FIELDSEEDSODDECORATIVE FENCEARMOURSTONE WALLBENCHTABLESBIKE RINGSBOLLARDCATCH BASINCATCH BASIN MANHOLEMANHOLEPICNIC TABLEP GATESCONCRETE PAD FORRECEPTACLELIGHT POLES REFER TODRAWINGS BY MJSCONSULTANTSMARCO CLAY MIX WARNINGTRACK, SEE D-10 on D-4X XXXXXXXXXXXXXXXXXXXXXX X X X X XXXXX X X XXXXXX X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X XXXXXXXXXXXXXXXXXX XX XXXXXXXXXXXXXXXXXXXXXX X X X X XXXXX X X XXXXXX X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X XXXXXXXXXXXXX XXXXXX HANDDRYER X X XXXXXXXXXXXXXXXXX X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXNORTHproject numberproject titledrawing numberdrawing titlescaledatedrawn byreviewed byVANDORF SOFTBALLDIAMONDS175 ENGELHARD DRIVE2018-130 clientTOWN OF AURORAuser: clee file: L:\LPL_Projects\2018\2018-130 - Vandorf Fields Aurora\3.0 Tender Phase\CAD\2020-130_R06_200804_Re-Tender\2018-130_Retender_200804.dwg plot: Jul 29, 2020 - 10:33amno.revision datebyR1 ISSUED FOR TENDER AUG.04/20 CLTHESE DRAWINGS ARE THE PROPERTY OF LANDSCAPEPLANNING LIMITED AND SHALL NOT BE ALTERED, MODIFIED,REVISED OR CHANGED WITHOUT THE WRITTEN CONSENT OFLANDSCAPE PLANNING LIMITED. SEAL IS NOT VALID WITHOUTSIGNATURE OF THE LANDSCAPE ARCHITECT. DRAWINGSCANNOT BE USED FOR TENDER/CONSTRUCTION UNTIL SIGNEDBY LANDSCAPE ARCHITECT.Aug 04,2020OCOAITINSSALNAFORBEMEMCHITECRRTAONIOASEPACSDTN SHANOG.JHK JSDP1:500MARCH 2019LANDSCAPE/SURFACEMATERIALS PLANL-1LEGEND:DETAIL #SHEET #1D-0KEY MAPN.T.SENLARGEMENTAREANEIGHBOURINGCOMMERCIALPROPERTYNEIGHBOURING COMMERCIAL PROPERTYINDUSTRIAL PARKWAY SOUTHENGELHARD DRIVENEIGHBOURINGCOMMERCIAL PROPERTYACCESSIBLE PARKINGSTALL - TYPE 'A'1D-5ACCESSIBLE PARKINGSIGNAGE3D-5CONCRETE PAVING -HEAVY DUTY7D-1CURB DEPRESSIONWITH TWSI5D-1CONCRETE BARRIERCURB4D-1CONCRETE BARRIERCURB - LOCATED ONNEIGHBOURINGPROPERTY4D-1PATCH ASPHALTPAVING ASREQUIRED AFTERNEW CURB HAS BEENINSTALLEDNEIGHBOURINGASPHALT PARKINGLOT2M WIDEASPHALT PAVING- LIGHT DUTY9D-1CONCRETE BARRIERCURB4D-1CONCRETE BARRIERCURB - LOCATED ONNEIGHBOURINGPROPERTY4D-1PATCH ASPHALTPAVING ASREQUIRED AFTERNEW CURB HAS BEENINSTALLEDCULVERT3D-1CONCRETE PAVING -LIGHT DUTY6D-1PLAYERS BENCH ONCONCRETE PAD11D-46D-13M WIDE ASPHALT PAVING- LIGHT DUTY10D-1CONCRETE BARRIER CURBMATCH EXISTING PROFILECURB DEPRESSIONWITH TWSI5D-1CONCRETE BARRIERCURB4D-1ASPHALT PAVING- MEDIUM DUTY10D-1ASPHALT PAVING- MEDIUM DUTY10D-1WHITE PAINTEDPARKING LINESREFER TOSPECIFICATIONSCONCRETE PAVING -LIGHT DUTY6D-1WASHROOMBUILDING; REFER TODRAWINGS BYPYLON ARCHITECTSTHREE (3) 5 ROWBLEACHERS8D-5RIP-RAP OUTLET3D-2RIP-RAP OUTLET3D-2CURB CUT4D-1ARMOURSTONE HEADWALL (WITH 1000mmDIA. CULVERT) REFER TO VALDORENGINEERING DRAWINGS1D-21.2m h.t. DECORATIVEMETAL FENCE2D-2RIP-RAP OUTLET3D-2REFER TO SHEET D-3& D-4 FOR SOFTBALLDIAMOND DETAILSAND LAYOUT2M WIDEASPHALT PAVING- LIGHT DUTY9D-1PATHWAY CULVERT3D-1REFER TO SHEET D-3& D-4 FOR SOFTBALLDIAMOND DETAILSAND LAYOUT2M WIDEASPHALT PAVING- LIGHT DUTY9D-1RIP-RAP OUTLET3D-2THREE (3) 5 ROWBLEACHERS8D-5CONCRETE PAVING -LIGHT DUTYPLAYERS BENCH ONCONCRETE PAD6D-111D-46D-1ENHANCED GRASSSWALE WITH SEEDEDSIDE SLOPES7D-2ENHANCED GRASSSWALE WITH SEEDEDSIDE SLOPES7D-2CBRIP-RAP OUTLET3D-2ENHANCED GRASSSWALE WITH SEEDEDSIDE SLOPES7D-2ENHANCED GRASSSWALE WITH SEEDEDSIDE SLOPES7D-2ENHANCED GRASSSWALE WITH SEEDEDSIDE SLOPES7D-2P GATEENHANCED GRASS SWALEWITH SEEDED SIDE SLOPES7D-2CONCRETE PAD FORLITTER RECEPTACLE6D-5TWO (2) BIKE RINGS -SURFACE MOUNTED7D-5CONCRETE PAD FORLITTER RECEPTACLE6D-5TWO (2) BIKE RINGS -SURFACE MOUNTED7D-5CONCRETE PAD FORLITTER RECEPTACLE6D-5THREE (3) CLUSTERSEATING SURFACE MOUNT;ONE (1) TO BE ACCESSIBLEP GATES9D-5SWM PONDREFER TOCIVIL DWGSLANDSCAPE PLANNING LIMITED CANNOT GUARANTEETHE ACCURACY OF THE INFORMATION AS PROVIDEDON THE SURVEY. ANY AND ALL LIABILITIES FORDAMAGE, DIRECT OR INDIRECT, HOWEVER CAUSEDAND RESULTING IN ANY WAY BY THE USE OF THESUPPLIED DATA SHOWN ON THE SURVEY IS THE FULLRESPONSIBILITY OF THE USER.NOTE:1. REFER TO SITE SERVICING DRAWINGS, NOTES ANDDETAILS BY VALDOR ENGINEERING INC.2. REFER TO SITE ELECTRICAL DRAWINGS NOTES ANDDETAILS BY MJS CONSULTANTS.BIOSWALE;REFER TOCIVILDWGSBIOSWALE;REFER TOCIVILDWGSWALKWAY DRAIN WITHMETAL COVER PLATEREFER TO SITESERVICING DRAWINGSRIP-RAP OUTLET3D-2BIOSWALE;REFER TOCIVILDWGSSWM PONDREFER TOCIVIL DWGSWALKWAY DRAIN WITHMETAL COVER PLATEREFER TO SITE SERVICINGDRAWINGSWALKWAY DRAINWITH METALCOVER PLATEREFER TO SITESERVICINGDRAWINGSRIP-RAP OUTLET3D-2TWO (2) BIKE RINGS -SURFACE MOUNTED7D-55D-530001.2M HT CHAIN-LINKFENCE - PROVISIONAL3M WIDE GAP INPROVISIONALCHAIN-LINK FENCE1.2M HT CHAIN-LINKFENCE - PROVISIONAL11D-111D-11.2M HT CHAIN-LINKFENCE - PROVISIONAL11D-1PATHWAY CULVERT3D-13M WIDEASPHALT PAVING- LIGHT DUTY10D-1BENCH ONCONCRETE SLAB4D-57637Page 57 of 57