BYLAW - Yonge St. Improvements Proposal & Estimates - 19890719 - 312889® Ministry
of
Ministere
des
Transportation Transports
Ontario
"89 11l!G 17 A 9 :48
Ms. c. (Oowan
Clerk
Town of Aurora
50 Wellington St. W.
Aurora, Ontario
L4G 3L8
Dear Madam:
Re: Contruction Proposal
Central Region
Reg. Mun./Mtce. Office
1201 Wilson Avenue
Atrium Tower
2nd Floor
Downsview, Ontario
M3M 1J8
Tel: 235-5413
August 14, 1989
Connecting Link, Appendix No. 18
Yonge Street (Hwy #11)
North Twin Pipe Arch Remedial Works
I am enclosing for your records, one original/certified
copy of a construction proposal dated July 19, 1989.
The proposal is authorized by a basic agreement dated
November 18, 1963 and has been duly executed on behalf
of the Minister.
Yours truly,
J .. Robinson
R . Mun./Mtce. Eng.
Central Region
Enc.
I /A)~~.~
.~ '
-.i..A...-:...:;l
<.~ /.'
~~~IJ-t-.._.
I !
''
' '
>,
il
fum ~00
I oro
'0~
rd (Y') 01
.,_, '0
~ > ~
.0:: " ,,
'H· co. -I
g:s,>, ~p::j 3
~'Hro
0 c
..1! >, 0
+' §< §
lH C)•rl
0 +' 1iJ c C) § .~ ~ P. ~8~
e'O '0
0 ~·~ u Ul
(!)
~~..1! +'+'
'Hrd'H
0 0 ~.2lrl !'< ·rl
(!) 0 C)
(j+'§
bOO ".~ u ~ f?, .1! s-J . 6' r.c!•
c ~'-~
rl >, rd
rl 'H P<
s·rl t~
" (!) ;; HC)'O
'0
~ •rl
(j)
BY-LAW NUMBER 3128-89
OF THE CORPORATION OF THE TOWN OF AURORA
BEING A BY-LAW to authorize the
execution of a proposal and estimate of
cost pursuant to an agreement with Her
Majesty the Queen, In Right of the
Province of Ontario, as represented by
the Minister of Transportation and
Communications, entered into under The
Public Transportation and Highway
Improvement Act, R.S.O. 1980, Chapter 421.
WHEREAS the appended proposal and estimate of cost dated the 19th of July,
1989, for the construction of Remedi a 1 Works to Improve the Yonge Street
North Twin Pipe Arch, located on Yonge Street, North of Batson Drive, being
part of a highway designated as a connecting link has been prepared pursuant
to the said agreement with Her Majesty the Queen, In Right of the Province
of Ontario, as represented by the said Minister;
BE IT THEREFORE ENACTED by the Counci 1 of the Corporation of the Town of
Aurora:
1. THAT the hereinbefore recited proposal and estimate of cost be
approved.
2. THAT the Mayor/Reeve and Clerk be and they are hereby authorized
and directed to sign the hereinbefore recited proposal and
estimate of cost and to affix thereto the seal of the Corporation.
3. THAT the provisions of this By-law come into force and effect
upon final reading thereof.
READ A FIRST AND SECOND TIME THIS 19th DAY OF ..July • 1989.
READ A THIRD TIME AND FINALLY PASSED THIS 19th DAY OF July • 1989.
\
i
APPENDIX NO. ---11-43-DATE __ rw"u.,~Jr....a.l.z,9,......~1_.9~8.;z.9 __ _
PROPOSAL AND ESTIMATE OF COST FOR THE CONSTRUCTION OF A CONNECTING
LINK OR EXTENSION OF THE KING'S HIGHWAY (OR SECONDARY HIGHWAY) NO.
IN THE TOWN OF AURORA IN THE COUNTY (OR
DISTRICT) OF THE REGIONAL MUNICIPALITY OF YORK
Designated Route: HWY 11
Pursuant to an agreement dated the ..J&_ day of NOVEMBER 19 63 hereinafter called
the agreement made between the Minister and the Corporation of the -.JTI.LOIJIJJNUll....-----
of AURORA and subject to the terms and conditions thereof, and subject
also to any necessary approval of the Board under The Ontario Municipal Board Act,
the TOWN op AURORA (Minister/Corporation) proposes that the following por-
tions of highway, heretofore designated as a connecting link, be constructed by the
TOWN OF AURORA (Ministry/Corporation) namely, (describe portion(s) of
street(s) to be constructed):
REMEDIAL WORKS TO IMPROVE THE YONGE STREET NORTH TWIN PIPE ARCH rocATFP
ON YONGE STREET NORTH OF BATSON DRIVE.
and illustrated on the plan or sketch attached thereto; provided construction to be in
accordance with plans and specifications approved by the Minister and the Corporation
in the manner and at a cost estimated and divided substantially as follows:
(a) Type of construction -......tRu:E.t:P.a.A.L.IFIS....IOJJF'-J.TWliU.TNJli...JP~IL..tP:.tE;....aAR~rwHL---------------
(b) Len~h-~N~/A~---------------------------------------------------------------------------------
(c) Width--~N~/~A~--------------------------------------------------------------------------------
(d) Commencing at _...;T::!ANN=~E:::RY~C~RE=E~K:.z.,_N~O~R~TH~~O:;.F_.B~A~T!..>S!l.O!JJNi....!!.DR!l.I!.;VUE;__ __________ _
(e) Terminating at_-=N~/A~--------------------------
(f) Total estimated cost of construction _____________ $ 120.000 go
(g) Deduct: Items not chargeable under agreement:
(h)
(i)
(I) Items to be paid by the Corporation
(II) Charged to others
(ill) Charged under Part X of The Public
Transportation and Highway Improve-
ment Act
Total Deductions
$ ___ ..JNll,l/;,aA ___ ;,_ ___ _
$ N/A
$ ____ _
$ ____ _
$ ____ _
$ N/A
Total estimated cost of construction to be shared
Minister's share ( 90 %)
\
$ ____ _
$ 120 pOp no
$ 108: gpo PO
.. l . ' '
(j) Estimated annual expenditure of Minister's share for fiscal year(s):
April 1st, 19 .Ji9tO March 31st, 19 .!ill.. $ 108.000.00
April 1st, 19 to March 31st, 19 $
April 1st, 19 to March 31st, 19 $
April 1st, 19 _to March 31st, 19 $ $ 108.000 00
It is understood that the estimated cost is based on the best information available at the
time of submission and that no substantial increase in such cost will be undertaken or
incurred without the prior written approval of the Minister, and where necessary, the
approval of the Ontario Municipal Board.
(SEAL)
(SEAL)
(Note:
This proposal is hereby submitted this
~1~1.__dayof_~.cu~~~v~f--____ 191j
by or on behalf of the Corporation of
the _ _.T,O.,WN..,_ ______ of
AURORA
and is hereby accepted by or on behalf
of the Minister.
Attach a statement of the total estimated cost in detail and a breakdown thereof
showing how the Minister's share was computed on Form MR-A-138)
®
Ontario
Ministry of
Transportation and
Communications
CONNECTING LINK in the Town of _ _,A.,'JJ'To.<nJJr"'a'-----
DETAILS OF CONSTRUCTION ESTIMATED
GROSS COST
1. Construction of Temporary Access 4000
2. Diversion and/or Damming Up Creek 6000
3. Cut Pipe Arch 5000
4. Construction of the Cut-Off Walls 15000
4a Subexcavation (if required) 3000
5. Clean Culvert 17000
' 6. Pump Grout Under Culvert for 1st 10m3 8000
6a Pump Grout Under Above 10m3 3000
7. Supply and Install Reinforced 150mm
Concrete Pad at the Invert of Each
Culvert, Extending to 4.0m (if required) 16000
7a Supply and Install Reinforced, 150mm
Concrete Pad at the Invert of Each
Culvert, Outside the 4.0m Maximum
Distance (if required) 4000
TOTAL Page 1 81000
being !guge Street from Vandorf Side Road to St Tobn Sicli: Rd
v
SHAREABLE UNDER CHARGEABLE UNDER CHARGEABLE TO CHARGEABLE TO EXPLANATION C.L. AGREEMENT PART X OF THE ACT CORPORATION OTHERS•
4000
6000
5000
15000
3000
17000
8000
3000
16000
4000
81000
"'Chargeable to others: e.g. Local Improvement Act; Railway Grode Crossing Fund; Public Service Works on Highway Act, etc:
MR-A-138 77-07 (FORMERLY A9.-P~-3)
• -.
'.~
®
Ontario
Ministry of
Transportation and
Communications
CONNECTING LINK in the Town of Aurora
ESTIMATED DETAILS OF CONSTRUCTION GROSS COST
8. Backfilling and Construction of
Clay Seal 4000
9. Construction of Concrete Headwall 20000
10. Channelization & Restoration 7000
11. Supply and Install Silt Control 3000
12. Supply and Install Pedestrian
Handrail 5000
TOTAL 120.000
being Yonge
SHAREABLE UNDER CHARGEABLE UNDER
C.L. AGREEMENT PART X OF THE ACT
4000
20000
7000
3000
5000
120.000
*Chargeable to others: e.g. Local Improvement Act; Railway Grade Crossing Fund; Public Service Works on Highway Act, etc:
'
MP-A-13R 77-07 IFORMF.RLV AB-PR-3)
Street from lla11derf Side Rd w St IQhns Side pa
CHARGEABLE TO CHARGEABLE TO EXPLANATION CORPORATION OTHERS•
/
.......
BY-LAW NUMBER 3128-89
OF THE CORPORATION OF THE TOWN OF AURORA
BEING A BY-LAW to authorize the
execution of a proposal and estimate of
cost pursuant to an agreement with Her
Majesty the Queen, In Right of the
Province of Ontario, as represented by
the Minister of Transportation ·and
Communications, entered into under The
Public Transportation and Highway
Improvement Act, R.S.O. 1980, Chapter 421.
WHEREAS the appended proposal and estimate of cost dated the 19th of July,
1989, for the construction of Remedi a 1 Works to Improve the Yonge Street
North Twin Pipe Arch, located on Yonge Street, North of Batson Drive, being
part of a highway designated as a connecting link has been prepared pursuant
to the said agreement with Her Majesty the Queen, In Right of the Province
of Ontario, as represented by the said Minister;
BE IT THEREFORE ENACTED by the Counci 1 of the Corporation of the Town of
Aurora:
1. THAT the hereinbefore recited proposal and estimate of cost be
approved.
2. THAT the Mayor/Reeve and Clerk be and they are hereby authorized
and directed to sign the hereinbefore recited proposal and
estimate of cost and to affix thereto the seal of the Corporation.
3. THAT the provisions of this By-law come into force and effect
upon final reading thereof.
READ A FIRST AND SECOND TIME THIS 19th DAY OF July , 1989.
READ A THIRD TIME AND FINALLY PASSED THIS 19th DAY OF July , 1989 •
APPENDIX NO. DATE ________________ _
PROPOSAL AND ESTIMATE OF COST FOR THE CONSTRUCTION OF A CONNECTING
LINK OR EXTENSION OF THE KING'S HIGHWAY (OR SECONDARY HIGHWAY) NO.
IN THE TOWN OF AURORA IN THE COUNTY (OR
DISTRICT) OF THE REGIONAL MUNICIPALITY OF YORK
Designated Route: HWY 11
Pursuant to an agreement dated the _lL. day of NOVEMBER 19 63 hereinafter called
the agreement made between the Minister and the Corporation of the ......J'l'u.n!.IOT.JNL!ll..------
of AURORA and subject to the terms and conditions thereof, and subject
also to any necessary approval of the Board under The Ontario Municipal Board Act,
the TOWN QF AURORA (Minister/Corporation) proposes that the following por-
tions of highway, heretofore designated as a connecting link, be constructed by the
TOWN OF AURORA (Ministry/Corporation) namely, (describe portion(s) of
street(s) to be constructed):
REMEDIAL WORKS TO IMPROVE THE YONGE STREET NOR'l'H TWIN pipE ARCH IQCATFD
ON YONGE STREET NORTH OF BATSON DRIVE.
and illustrated on the plan or sketch attached thereto; provided construction to be in
accordance with plans and specifications approved by the Minister and the Corporation
in the manner and at a cost estimated and divided substantially as follows:
(a) Type of construction _......JRii.JE:..tP~Aui..llRc_uO"'-F-'l'W.LJOLIJ.JflL.! ...JP~IW:P:.oE._..aA~R.L:CHll----------------
(b) Length ___ N~/A-----------------------------------------------------------
(c) Width--~N~/~A~--------------------------------------------------------
(d) Commencing at __ T~AN=N~E:,oR~Y:......::C!.!CR:=:E~E~K.._, -'N~O~R~T~H~O::F~B~A"'-TS2:0~N~D!.!Rl.<I-.!V"'E'--------------
(e) Terminating at __ ~N~/~A~----------------------------------
(f) Total estimated cost of construction--------------$ 120.000 00
(g) Deduct: Items not chargeable under agreement:
(h)
(i)
(I) Items to be paid by the Corporation $ _...J.li.....,. ___ __
(II) Charged to others
(III) Charged under Part X of The Public
Transportation and Highway Improve-
ment Act
Total Deductions
$ N/A
$ ____ _
$ ____ _
$ ____ _
$ N/A
Total estimated cost of construction to be shared
Minister's share ( 90 o/o)
$---~-
$ J2Q.OOQ 00
$ 1 QS 000 QO
{j) Estimated annual expenditure of Minister's share for fiscal year(s):
April 1st, 19 .Jl9tO March 31st, 19 .'lll.. $ 108.000.00
April 1st, 19 to March 31st, 19 $
April 1st, 19 to March 31st, 19 $
April 1st, 19 to March 31st, 19 $ $ JOB.OQO go
It is understood that the estimated cost is based on the best information available at the
time of submission and that no substantial increase in such cost will be undertaken or
incurred without the :Prior written approval of the Minister, and where necessary, the
approval of the Ontario, Municipal Board.
\
\
\
This proposal is hereby submitted this
~1~1~_dayof __ ~,~rv~~~1~-----19~
by or on behalf of the Corporation of
the -~T..,O'-'lWN""-------of
AURORA
(SEAL)
and is hereby accepted by or on behalf
of the Minister.
(SEAL)
(Note: Attach a statement of the total estimated cost in detail and a breakdown thereof
showing how the Minister's share was computed on Form MR-A-138)
®
Ontario
Ministry of
Transportation and
Communications
CONNECTING LINK in the ---'.lllOtl.L_ ____ _ of Aurora
ESTIMATED DETAILS OF CONSTRUCTION GROSS COST
l. Construction of Temporary Access 4000
2. Diversion and/or Damming Up Creek 6000
3. Cut Pipe Arch 5000
4. Construction of the Cut-Off Walls 15000
4a Subexcavation (if required) 3000
5. Clean Culvert 17000
!
6. Pump Grout Under Culvert for 1st 10m3 8000
6a Pump Grout Under Above 10m3 3000
7. Supply and Install Reinforced 150mm
Concrete Pad at the Invert of Each
Culvert, Extending to 4.0m (if required) 16000
7a Supply and Install Reinforced, 150mm
Concrete Pad at the Invert of Each
Culvert, Outside the 4.0m Maximum
Distance (if required) 4000
TOTAL Page 1 81000
---------------------
being Y ~
SHAREABLE UNDER CHARGEABLE UNDER
C.L. AGREEMENT PART X OF THE ACT
*Chargeable to others: e.g. Local Improvement Act; Railway Grode Crossing Fund; Public Service Works on Highway Act, etc:
MR-A-138 77-07 (FORMERLY AB-PR-3)
Street from Vandorf Side Road to , St }ohn S;i Q~ Rd
CHARGEABLE TO CHARGEABLE TO EXPLANATION CORPORATION OTHERS*
®
Ontario
Ministry of
Transportation and
Communications
CONNECTING LINK in the __ T"-'o"'wn""'-------
DETAILS OF CONSTRUCTION
8. Backfilling and Construction of
Clay Seal
9. Construction of Concrete Headwall
10. Channelization & Restoration
11. Supply and Install Pedestrian
Handrail
TOTAL
. ---·--
of Aurora being _...3.illlg<'--------------
ESTIMATED SHAREABLE UNDER CHARGEABLE UNDER
GROSS COST C.L. AGREEMENT PART X OF THE ACT
4000
20000
7000
5000
120, 000
-
*Chargeable to others: e.g. Local Improvement Act; Railway Grade Crossing Fund; Public Service Works on Highway Act, etc:
MR-A-138 77-07 (FORMERLY A8-PR-3)
Streetfrom llandorf Side R<l to St. John Side Rd.
CHARGEABLE TO CHARGEABLE TO EXPLANATION CORPORATION OTHERS*
--·-