Loading...
BYLAW - Amend 2893 (Building Permits) - 19880217 - 296988BY-LAW NUMBER 2969-88 OF THE CORPORATION OF THE TOWN OF AURORA BEING A BY-LAW to amend By-law 2893-87, a By-law regulating Building Permits and Inspections WHEREAS Subsection 2 of Section 5 of the Building Code Act empowers municipal councils to pass by-laws respecting building permits; AND WHEREAS The Council of The Corporation of the Town of Aurora enacted By-law 2893-87 pursuant to the provisions of said Section; AND WHEREAS it is deemed expedient to amend the provisions of By-law 2893-87; NOW THEREFORE The Municipal Council of The Corporation of the Town of Aurora ENACTS AS FOLLOWS: 1. That Schedule "A" of By-law No. 2893-87 be and is hereby repealed and Schedule "A" appended to this By-law shall be added in the place and stead of said Schedule. 2. That the provisions of this By-law shall come into force and effect upon final passage thereof. READ A FIRST AND SECOND TIME THISC~~y DF ~~· • 1988. READ A THIRD TIME AND FINALLY PASSED THIS /7~ OF cXji::_~~·-') 988. J MAYOR ·~ ~ ~--( CLERK - 2 - SCHEDULE "A" CLASSES OF PERMITS AND PERMIT FEES: 1. The following types of permits identified in 2(a) to (h) shall be classed as "Building Permits". The fee structure will vary with respect to the nature of the application. 2. (a) Basi.c Application Fee, Permit Renewal, Transfer of Permit: $25.00 minimum of gross floor area, excluding areas. (c) Commercial, Industrial, ad ition thereto : Institutional Buildin s (includin $1~40 per m2 ($.13 per ft 2) for the first 930 m2 (10,000 ft ) of gross floor area. $1~30 per m2 ($.12 per ft 2) for the next 1,394 m2 (15,000 ft ) gross floor area. $1.18 per m2 ($.11 per ft 2) for the remainder of gross floor area. (d) Alterations, Repairs: $9.00 per $1,000.00 of work to be performed. (e) Farm Buildings (excluding dwellings): $13.00 per 46.5 m2 (500 ft 2) of gross floor area or portion thereof. (f) Demolition Fee: $13.00 per 93 m2 (1,000 n 2) of gross floor area or portion thereof. (g) Aboveground or Underground Tanks: $13.00 per 4,546 litres (1,000 gallons) or portion thereof. (h) A Building Permit is not r~quired for a building or structure with an area less than 10 m (107.6 square ft) however the Town Zoning By-law is applicable.