Loading...
BYLAW - Traffic Control Signals Proposal and Estimates - 19820920 - 252982• '.Fo_R:II AB-PR-17A REV; MAY 1973 BY-LAW NUMBER 2529 -82 OF THE CORPORATION OF THE _....!T~O""WN"--____ OF __ .,AU""R""O"'RA,__ ___ _ A BY-LAW TO AUTHORIZE the execution of a proposal and estimate of cost pursuant to an agreement with Her Majesty the Queen, In Right of the Province of Ontario, as represented by the Minister of Trans- portation and Communi<':ations, entered into under The Public Transportation and Highway Improvement Act, R, S, 0. 1970, Chapter 201. "WHEREAS the appended proposal and estimate of cost dated the _2_o __ day of __ s_E_P_T_E_MB_E_R--'''------19 ....!E._, for the construction of TRAFFIC CONTROL SIGNALS AT YONGE ,SJ (HWY NO 11) AND BROOK! AND DRIVE, AND ALTERATIONS TO SIGNALS AT YONGE ST. {HWY.NO.ll) AND DUNNING AVE.,. being part of a highway de signa ted as a connecting link has been prepared pursuant to the said agreement with Her Majesty the Queen, In Right of the Province of Ontario, as represented by the said Minister. 11 BE IT THEREFORE ENACTED by the Council of the Corpor- ation of the ____ T:..:O:.:.W"'N'------of _____ .:..:A.:::URc:.:O:.:.R::..A=------ 1, That the hereinbefore recited proposal and estimate of cost. be approved, 2. That the Mayor /ll(ol(lOI"~Xand Clerk be and they are hereby.- authorized and directed to sign the hereinbefore recited proposal and estimate of cost and to affix thereto the seal of the Corporation. PASSED by the Council of the Corporation of the TOWN of _____ A_U_R_O_RA _____ this _2_0 __ day of __ s_E_P_T_E_M_B_ER ___ t __ 19 ~. (SEAL) ·' l FORM,AB-PR-17A REV. MAY 1973 APPENDIX NO. 11 DATE SEPTEMBER 20,1982 PROPOSAL AND ESTIMATE OF COST FOR THE CONSTRUCTION OF A CONNECTING LINK OR EXTENSION OF THE KING'S HIGHWAY (OR SECONDARY HIGHWAY) NO. 11 IN THE TOWN OF AURORA IN THE OO~X'XY<X(t~ID: ~pal~ REGION OF YORK. Designated Route: Yonge St. (Hwy,#ll). Brookland Dr,. Dunning Ave .. Intersections Pursuant to an agreement dated the 18TH day of NOVEMBER 19'i.::_ hereinafter called the agreement made between the Minister and the Corporation of the Town of Aurora and subject to the terms and conditions thereof, and subject also to any necessary approval of the Board under The Ontario Municipal Board Act, th~ Corporation (Minister/Corporation) proposes that the following por- tions of highway, heretofore designated as a connecting link, be constructed by the Corporation (Ministry/Corporation) namely, (describe portion(s) of ' street(s) to be constructed): Installation of Traffic Control Signals at Intersection of Yonge St. (Hwy.#ll) and Brookland Dr., and Alterations to Existing Traffic Lights at Yonge St., and Dunning Ave. and illustrated on the plan or sketch attached thereto; provided construction to be in accordance with plans and specifications approved by the Minister and the Corporation in the manner and at a cost estimated and divided substantially as follows: Installation of Traffic Control Signals and Modifications (a) Type of construction to Existing Traffic Control Signals (b) Length ______ ___ll.l..t:L_ ______________________ _ (c) Width (not less than 22 feet) ____ N"-/_A ______ ____,---------'---- Intersections of Yonge St., and Brookland Drive and Yonge (d) ·commencing at Street and Dunning Avenue (e) Terminating at ____ ~S=a~m=e~--~--------------------~ (f) Total estimated cost of construction-~------------$ 54,600.00 (g) Deduct: Items not chargeable under agre~ment: (h) (i) . (I) Items to be paid by the Corporation $ ------- (II) Charged to others Alterations to Existing Signals at Yonge and Dunning due to Addition of Golf Links Drive (III) Charged under Part X of The Public Transportation and Highway Improve- ment Act Total Deductions $---~- $ ____ _ $ 5 '183 .1 5 $ ____ _ $ ____ _ Total estimated cost of construction to be shared Minister's share ( 90 %) • $ 5,183.15 $ 49,416.85 $ 44,475.16 I c l FORM AB-PR-17A 'REV. MAY 1973 (j) Estimated annual expenditure of Minister's share for fiscal year(s): April 1st, 19 !R_ to March 31st, 19 ~ $ 44,475.16 April 1st, 19 to March 31st, 19 $ ____ _ April 1st, 19 to March 31st, 19 $ ____ _ April lst, 19 to March 31st, 19 $ -------$ 44,475.16 Construction to take place during 1982-1983 fiscal year. It is understood that the estimated cost is based on the best information available at the time of submission and that no substantial increase in such cost will be undertaken or incurred without the prior written approval of the Minister, and where necessary, the approval of the Ontario Municipal Board. This proposal is hereby submitted this day of SEPTEMBER ---20 19 g_ by or on behalf of the Corporation of the __ T_O_WN _______ of AURORA (SEAL) and is hereby accepted by or on behalf . ,' of the Minister. (SEAL) (Note: Attach a statement of the total estimated cost in detail and a breakdown thereof showing how the Minister's share was computed on Form AB-PR-3) Lew Ontario Ministry of Transportation and Communications RELATESTO DESIGN ESTIMATE OF COST 20th September, 1982 -KI:.V!St.U 1'1\l:it. I CONNECTING LINK in the TOWN of AURORA being YONGE STREET Street from BROOKLAND DRIVE to DUNNII~G AVENUE • DETAILS OF CONSTRUCTION ESTIMATED SHAREABLE UNDER CtiARGEABLE UNDER CHARGEABLE TO CHARGEABLE TO GROSS COST C.L. AGREEMENT PART X OF THE ACT CORPORATION OTHERS* EXPLANATION l. Rigid Ducts, Direct Buried, One 75 mm Conduit and Ground Wire 220 m @ $40.00 8,800.00 8,800.00 2. Rigid Ducts, Direct Buried, One 25 mm 5 m to Others Conduit Remainder S.U.C.L.A. 14 m @ $15.00 210.00 135 .oo 75.00 3. Concrete Junction Box, 460 mm Dia. 1 Each to Others 12 Each @ $200.00 2,400.00 2,200.00 200.00 Remainder S.U.C.L.A. 4. Signal Wiring and Power Supply Wiring Lump Sum 1 ,500.00 1 ,500.00 5. Loops, Vehicle Detector Amplifiers, and Detector Cables Lump Sum l ,500. 00 l ,500. 00 6. Concrete Foundations in Ear.th for 2 Each to Others at Signal Poles Locations, 3 and 9 8 Each @ $400.00 3,200.00 2,400.00 800.00 Remainder S.U.C.L.A. 7. 7.5 m Steel Pole, Base Mounting 2 Each to Others at 8 Each @ $420.00 3,360.00 2,520.00 840.00 Locations 3 and 9 Remainder S.U.C.L.A. 8. Pedestrian Push Buttons and Signs 4 Each @ $400 00 1 600.00 l 600.00 TOTAL "Chargeable to others: e.g. Local Improvement Act; Raz1way Grade Crossing Fund; Public Service Works on Highway Act, etc: AB-PR-3 7-72 '• .\ _/ ) i t ' I '3 1 :~ ~ . /~ -® Ontario Ministry of Transportation and Communications ... RELATES TO DESIGN ESTIMATE OF COST -REV !SED September, 1982 . PAGE 2 CONNECTING LINK in the TOWN of AURORA being YONGE STREET Streetfrom '·BROOKLAND DRIVE to DUNNING AVENUE • DETAILS OF CONSTRUCTION ESTIMATED SHAREABLE UNDER CljARGEABLE UNDER CHARGEABLE TO CHARGEABLE TO GROSS COST C.L. AGREEMENT PART X OF THE ACT CORPORATION OTHERS* EXPLANATION 9o Arms, Brackets and Signal Heads (a) lo8 m Mast Arm with Highway Signal Head and Backboard 2 Each @ $450000 900000 900o00 (b) 3o0m Mast Arm with Highway Signal Head and Backboard 2 Each @ $500000 1 ,OOOoOO 1 ,OOOoOD (c) 305 m Mast Arm with Highway Signal Head and Backboard 1 Each @ $520 0 00 520000 520.00 (d) 5o0 m Mast Arm with Highway Signal Head and Backboard 1 Each to Others at 2 Each @ $570000 1 ,1400 00 1 '140.00 570000 Location 3 (e) 306m Mast Arm with Standard Signal Head 1 Each to Others at 1 Each @ $460 0 00 460000 460000 Location 9 (f) 4o0 m Mast Arm with Standard Signal Head 1 Each @ $480.00 480000 480o00 TOTAL *Chargeable to others: e.g. Local Improvement Act; Railway Grade Crossing Fund; Public Service Works on Highway Act, etc: AB-PR-3 7-72 ·' ® Ontario Ministry of Transportation and Communications RELATES TO DESIGN ESTIMATE OF COST -REVISED September, 1982 PAGE 3 CONNECTING LINK in the TOWN of AURORA being YONGE STREET Streetfrom B'ROOKLAND STREET to DUNIHNG AVENUE • DETAILS OF CONSTRUCTION ESTIMATED SHAREABLE UNDER CHARGEABLE UNDER CHARGEABLE TO CHARGEABLE TO EXPLANATION GROSS COST C.L. AGREEMENT PART X OF THE ACT CORPORATION OTHERS• 9. (g) Double Arm Bracket with Pedestrian Signal Head 10 Each @ $270.00 2,700.00 2,700.00 1 0. Controller Lump Sum 5,000.00 5,000.00 11. Optical Detectors -Lump Sum 4,500 .oo 4,500.00 12. Removal of Existing Items (a) Controller and Overhead Wiring Lump Sum 300.00 300.00 (b) Traffic Signal Head, Mast Arm 2 Each to Others at and/or Support Bracket· Locations 2 and 3 2 Each @ $50.00 1 00 .00 100 .oo (c) Pole and Pole Foundation 2 Each to Others at 2 Each @ $200.00 400.00 400.00 Locations 2 and 3 (d) Traffic Signs 1 Each @ $20.00 20.00 20.00 13. Pavement Markings Lump Sum 500.00 500.00 ESTIMATED TOTAL FOR CONTRACT ITEMS $40 ,590. 00 37,145.00 3,445.00 TOTAL ---------__ ___J -- *Chargeable to others: e.g. Local Improvement Act; Railway Grade Crossing Fund; Public Service Works on Highway Act, etc: AB-PR-3 7-72 ,-,,, ·' ~ Ministry of Transportation and Communications Ontario RELATES TO DESIGN ESTIMATE OF COST -REVISED September, 1982 I nYI-"'T CONNECTING LINK in the TOWN of AURORA being YONGE STREET s t treat rom llROOKLAND STREET DUNl'IING AVENUE ~~-~------~----~-------------- DETAILS OF CONSTRUCTION ESTIMATED SHAREABLE UNDER CHARGEABLE UNDER CHARGEABLE TO CHARGEABLE TO EXPLANATION GROSS COST C.L. AGREEMENT PART X OF THE ACT CORPORATION OTHERS* continued ---- BALANCE FORWARD $40,590.00 37,145.00 3,445.00 Contingencies (10%} 4,059.00 4,059.00 3,714.50 344.50 Pro-rated on Totals for Engineering 9,351.00 9,351 .00 8,557.35 793.65 Contract Items and Canting. 600.00 600.00 600.00 To Others For Temporary Installation at Golf Links TOTAL 54,600,00 49,416.85 5 '183 .l 5 *Chargeable to others: e.g. Local Improvement Act; Railway Grade Crossing Fund; Public Service Works on Highway Ac~ etc: ,_, AB-PR-3 7-72 -,....__ __ ,_, __ /