Loading...
BYLAW - Traffic Signals Proposal & Estimates - 19810504 - 242981F;ORMAB-PR-17A .. .:...----;.;,.<"• 'REV. MAY 1973 ,. r, ' ;(: \' \::::.1 :j BY-LAW NUMBER 2429 -81 OF THE CORPORATION OF THE __ TO_W_N ____ OF ___ A_UR_O_RA _____ _ A BY-LAW TO AUTHORIZE the execution of a proposal and estimate of cost pursuant to an agreement with Her Majesty the Queen, In Right of the Province of Ontario, as represented by the Minister of Trans- ·portation and Communications, entered into under The Public Transportation and Highway Improvement Act, R. S. 0. 1970, Chapter 201. "WHEREAS the appended proposal and estimate of cost dated the _6TH ___ day of ___ A_P_R_I_L ______ 19 ~. for the construction of TRAFFIC CONTROL SIGNALS AT YONGE ST. (HWY.NO.ll) AND BROOKLAND DRIVE, AND ALTERATIONS TO SIGNALS AT YONGE ST. (HWY.NO.ll) AND DUNNING AVE., being part of a highway de signa ted as a connecting link has been prepared pursuant to the said agreement with Her Majesty the Queen, In Right of the Province of Ontario, as represented by the said Minister. 11 BE IT THEREFORE ENACTED by the Council of the Corpor- ation of the ___ T_O_W_N _____ of ___ A_U_R_O_R_A _______ . l. That the hereinbefore recited proposal and estimate of cost be approved. 2. That the Mayor/!il(E(ll~~ and Clerk be and they are hereby authorized and directed to sign the hereinbefo're recited proposal and estimate of cost and to affix thereto the seal of the Corporation. PASSED by the Council of the Corporation of the __ T-'-O~Wo..:N.:.__ __ of ____ A_U_R_O_RA ______ this 6th day of __ A_P_R_IL _______ 19 ~. (SEAL) ' ,FORM"AB-PR-17A REV. MAY 1973 APPENDIX NO. 10 DATE APRIL 6TH.l981 ----------~~~~~----- i ' ... I (:J " PROPOSAL AND ESTIMATE OF COST FOR THE CONSTRUCTION OF A CONNECTING LINK OR EXTENSION OF THE KING'S HIGHWAY (OR SECONDARY HIGHWAY) NO. 11 IN THE TOWN OF AURORA IN THE <:J<l§~~_J(-~X~~ ~~~X~ REGION OF YORK. Designated Route: Yonge St. {Hwy.#ll), Brookland Dr., Dunning Ave., Intersections 18TH . NOVEMBER 63 . Pursuant to an agreement dated the ____ day of 19 · heremafter called the· agreement made between the Minister and the Corporation of t~ __ T:..o:...w;_n.:__ _____ _ of Aurora and subject to the terms and conditions thereof, and subject also to any necessary approval of the Board under The Ontario Municipal Board Act, the Corporation (Minister/Corporation) proposes that the following por- tions of highway, heretofore designated as a connecting link, be constructed by the Corporation (Ministry/Corporation) namely, (describe portion(s) of street( s) to be constructed): Installation of Traffic Control Signals at Intersection of Yonge St. (Hwy.#ll) and Brookland Dr., and Alterations to Existing Traffic Lights at Yonge St. and Dunning Ave., and illustrated on the plan or sketch attached thereto; provided construction to be in accordance with plans and specifications approved by the Minister and the Corporation in the manner and at a cost estimated and divided substantially as follows: (a) (b) (c) (d) (e) (f) (g) (h) ( i) Installation of Traffic Control Signals and Modifications Type of construction to Existing Traffic Control Sj gna 1 s Len~h ____________ N~/_A __________________________________________ __ Width (not less than 22 feet) ------'-"N'-'A_,_ __________________ _ Intersections of Yonge St., and Brookland Drive and Yonge Commencing at Street and Dunning Avenue · Terminating at __________________ s_am_e ____________________________________ _ Total estimated cost of construction-------------------~$ 51,000.00 Deduct: Items not chargeable under agreement: (I) Items to be paid by the Corporation $ ------------- (II) Charged to others Alterations to Existing Signals At Yonge and Dunning due to Addition of Golf Links Drive (III) Charged under Part X of The Public Transportation and Highway Improve- $ ____ _ $ ____ _ $ 8,591.83 $ ____ _ ~~kt $ ------------ Total Deductions Total estimated cost of construction to be shared Minister's share ( 90 o/o) $ 8 ,591 .83 $ 42,408.17 $ 38,167 .35 ···,., :·: ·FORMAB-PR-17A R'EV. MAY 1973 (j) Estimated annual expenditure of·Minister' s share for fiscal year(s): April 1st, 198j_ to March 31st, 19lg_ $ 38,167.35 April 1st, 19 to March 31st, 19 $ April 1st, 19 to March 31st, 19 $ April 1st, 19 to March 31st, 19 $ $ 38.167.35 It is understood that the estimated cost is based on the best information available at the time of submission and that no s-qbstantial increase in such cost will be undertaken or incurred without the prior written approval of the Minister, and where necessary, the approval of the Onta::io Municipal Board. This proposal is hereby submitted this 6TH APRIL 81 day of 19 by or on behalf of the Corporation of the Town of (SEAL) MAYOR ~ &~/ CLERK J and is hereby accepted by or on behalf of the Minister. (SEAL) (Note: Attach a statement of the total estimated cost in detail and a breakdown thereof showing how the Minister's share was computed on Form AB-PR-3) ' I'-, ' i :TEM lO. -1. 2. 3. 4. 5. 6. ,, 7. 18. 9. (a) (b) (c) (d) (e) TOWN OF AURORA YONGE STREET, DUNNING AVE., GOLF LINKS DRIVE AND YONGE STREET, BROOKLAND DR., INTERSECTIONS TRAFFIC CONTROL SIGNALS PROJECT NO. 904 E S T I M A T E 0 F C 0 S T DESCRIPTION UNIT ESTIMATED UNIT QUANTITY PRICE Rigid Ducts, Direct Buried, One 75 mm Conduit and ground wire. m 220 40.00 Rigid Ducts, Direct Buried, One 25 mm Conduit. m 14 15.00 Concrete Junction Box, 460 mm Dia. Ea. 12 200.00 Signal Wiring and Power Supply Wiring L.S. Loops, Vehicle Detector Amplifiers, and Detector Cables L.S. Concrete Foundations in Earth for Signal Poles Ea. 10 400.00 7.5 m Steel Pole,Base Mounting Ea. 10 420.00 Pedestrian Push Buttons & Signs Ea. 4 400.00 Arms, Brackets and Signal Heads 1 .8 m Mast Arm with Highway Signal Head and Backboard Ea. 2 450.00 3.0 m Mast Arm with Highway Signal Head and Backboard Ea. 3 500.00 3.5 m.Mast Arm with Highway Signa 1 Head and Backboard Ea. 1 520.00 5.0 m Mast Arm with Highway Signa 1 Head and Backboard Ea. 3 570.00 3.0 m Mast Arm with Standard Signal Head Ea. 1 450.00 ... 2 AMOUNT 8,800.00 210.00 2,400.00 1,500.00 1 ,500.00 4,000.00 4,200.00 1 ,600.00 900.00 1,500.00 520.00 1,710.00 450.00 ·® Ontario Ministry of Transportation and -Communications RELATES TO DESIGN ESTIMATE OF COST MARCH 1981 PAGE 1 CONNECTING LINK in the TOWN of AURORA being YONGE STREET Street from BROOKLAND DRIVE to DUNNING AVENUE . ESTIMATED SHAREABLE UNDER CHARGEABLE UNDER CHARGEABLE TO CHARGEABLE TO DETAILS OF CONSTRUCTION GROSS COST C.L. AGREEMENT . PART X OF THE ACT CORPORATION OTHERS* EXPLANATION l. Rigid Ducts, Direct Buried, One 75 mm Conduit and Ground Wire 220 m @ $40.00 8,800.00 8,800.00 2. Rigid Ducts, Direct Buried, One 25 mm 5 m to Others Conduit Remainder S.U.C.L.A. 14 m @ $15.00 210.00 135.00 75.00 3. Concrete Junction Box, 460 mm Dia. 1 Each to Others 12 Each @ $200.00 2,400.00 2,200.00 200.00 Remainder S.U.C.L.A. 4. Signal Wiring and Power Supply Wiring Lump Sum 1 ,500.00 1,500.00 5. Loops, Vehicle Detector Amplifiers. and Detector Cables . Lump Sum 1 ,500.00 1,500.00 6. Concrete Foundations in Earth for 4 Each to Others at Signal Poles Locations 3,7,8, and 9 10 Each @ $400.00 4,000.00 2,400.00 1 ,600.00 Remainder S.U.C.L.A.- 7. 7.5 m Steel Pole, Base Mounting 4 Each to Others at 10 Each @ $420.00 4,200.00 2,520.00 1,680.00 Locations 3R,8, and 9 Remainder S.U.C.L.A. 8. Pedestrian Push Buttons and Signs 4 Each @ $400 00 1 600.00 1 ,600.00 TOTAL *Chargeable to others: e.g. Locdl Improvement Act; Railway Grode Crossing Fund; Public Service Works on Highway Act, etc: AB-PR-3 7-72 _;;; I i ' l j · .. j 1 , ' ® Ontario Ministry of Transportation and Communications RELATES TO DESIGN ESTIMATE OF COST MARCH 1981 CONNECTING LINK in the TOWN of AURORA being YONGE STREET Street from BROOKLAND DRIVE DE TAl LS OF CONSTRUCTION ESTIMATED SHAREABLE UNDER CHARGEABLE UNDER CHARGEABLE TO CHARGEABLE TO GROSS COST C.L. AGREEMENT PART X OF THE ACT CORPORATION OTHERS• .. · 9. Arms, Brackets and Signa 1 Heads (a} 1.8 m Mast Arm with Highway Signal Head and Backboard 2 Each @ $450.00 900.00 900.00 (b) 3.0 m Mast Arm with Highway Signal Head and Backboard 3 Each @ $500.00 1,500.00 1 ,000.00 500.00 (c) 3.5 m Mast Arm with Highway Signal Head and Backboard 1 Each @ $520.00 520.00 520.00 (d) 5.0 m Mast Arm with Highway Signal Head and Backboard 3 Each @ $570.00 1,710.00 570.00 1 '140. 00 (e) 3.0 m Mast Arm with Standard Signa 1 Head 1 Each @ $450.00 450.00 450.00 (f) 3.6 m Mast Arm with Standard Signal Head 1 Each @ $460.00 460.00 460.00 (g) 4.0 m Mast Arm with Standard Signal Head 1 Each @ $480.00 480.00 480.00 TOTAL *Chargeable to others: e.g. Local Improvement Act; Railway Grode Crossing Fund; Public Service Works on Highway Act, etc: AB-PR-3 7-72 i PAGE 2 to DUNNING AVENUE EXPLANATION ,, 1 Each to Others at Location 8 Remainder S.U.C.L.A. . 2 Each to Others at Locations 3 and 7 1 Each to Others at Location 9 i I 1 j i i I I I -~ i I .D > -w Ontario Ministry of Transportation and Communications CONNECTING LINK in the TOWN of AURORA DETAILS OF CONSTRUCTION ESTIMATED GROSS COST 9.(h} Double Arm Bracket with Pedestrian Signal Head 10 Each @ $270.00 2,700.00 10. Controller Lump Sum 5,000.00 11. Removal of Existing Items (a} Controller and Overhead Wiring Lump Sum 300.00 (b) Traffic SignaJ, Head, 'Mast Arm and/or Support Bracket 5 Each @ $50.00 250.00 (c) Pole and Pole Foundation 4 Each @ $200.00 800.00 (d) Traffic Signs 1 Each @ $20.00 20:00 12. Pavement Markings Lump Sum 500.00 ESTIMATED TOTAL FOR CONTRACT ITEMS 39,800.00 Contingencies (10%) 3,980.00 3,980.00 Engineering 7,220.00 7,220.00 TOTAL 51 ,000.00. ~ -· ----- 1'\l-l-rl.ll-... IV Vl-... ..1.'\Ail ........ ..LI"U\1 L.. VI MARCH 1981 being YONGE STREET Streetfrom BROOKLAND DRIVE SHAREABLE UNDER CHARGEABLE UNDER CHARGEABLE TO CHARGEABLE TO C.L. AGREEMENT PART X OF THE ACT CORPORATION OTHERS* I 2,700.00 5,000.00 300.00 250.00 800.00 20.00 < 500.00 33,095.00 6,705.00 3,309.50 670.50 6,003.67 1,216.33 42,408.17 8,591 .83 - *Chargeable to others: e.g. Local Improvement Act; Railway Grade Crosring Fund; Public Service Works on Highway Act, etc: AB-PR-3 7-72 to DUNNING AVENUE EXPLANATION 5 Each to Others at Locations 2,3,5 and 5 (2 Heads.at Loc.5} 4 Each to Others at Locations 2,3,5 and 6 I Pro-rated on Totals for Contract Items and Canting.