BY-LAW NUMBER 2429 -81
OF
THE CORPORATION OF THE __ TO_W_N ____ OF ___ A_UR_O_RA _____ _
A BY-LAW TO AUTHORIZE the execution of a proposal and
estimate of cost pursuant to an agreement with Her Majesty the Queen, In
Right of the Province of Ontario, as represented by the Minister of Trans-
·portation and Communications, entered into under The Public Transportation
and Highway Improvement Act, R. S. 0. 1970, Chapter 201.
"WHEREAS the appended proposal and estimate of cost dated
the _6TH ___ day of ___ A_P_R_I_L ______ 19 ~. for the construction of
TRAFFIC CONTROL SIGNALS AT YONGE ST. (HWY.NO.ll) AND BROOKLAND DRIVE, AND
ALTERATIONS TO SIGNALS AT YONGE ST. (HWY.NO.ll) AND DUNNING AVE.,
being part of a highway de signa ted as a connecting link has been prepared
pursuant to the said agreement with Her Majesty the Queen, In Right of the
Province of Ontario, as represented by the said Minister. 11
BE IT THEREFORE ENACTED by the Council of the Corpor-
ation of the ___ T_O_W_N _____ of ___ A_U_R_O_R_A _______ .
l. That the hereinbefore recited proposal and estimate of
cost be approved.
2. That the Mayor/!il(E(ll~~ and Clerk be and they are hereby
authorized and directed to sign the hereinbefo're recited
proposal and estimate of cost and to affix thereto the seal
of the Corporation.
PASSED by the Council of the Corporation of the __ T-'-O~Wo..:N.:.__ __
of ____ A_U_R_O_RA ______ this 6th day of __ A_P_R_IL _______ 19 ~.
(SEAL)
' ,FORM"AB-PR-17A
REV. MAY 1973 APPENDIX NO. 10 DATE APRIL 6TH.l981 ----------~~~~~-----
i
' ... I
(:J "
PROPOSAL AND ESTIMATE OF COST FOR THE CONSTRUCTION OF A CONNECTING
LINK OR EXTENSION OF THE KING'S HIGHWAY (OR SECONDARY HIGHWAY) NO.
11 IN THE TOWN OF AURORA IN THE <:J<l§~~_J(-~X~~
~~~X~ REGION OF YORK.
Designated Route: Yonge St. {Hwy.#ll), Brookland Dr., Dunning Ave., Intersections
18TH . NOVEMBER 63 . Pursuant to an agreement dated the ____ day of 19 · heremafter called
the· agreement made between the Minister and the Corporation of t~ __ T:..o:...w;_n.:__ _____ _
of Aurora and subject to the terms and conditions thereof, and subject
also to any necessary approval of the Board under The Ontario Municipal Board Act,
the Corporation (Minister/Corporation) proposes that the following por-
tions of highway, heretofore designated as a connecting link, be constructed by the
Corporation (Ministry/Corporation) namely, (describe portion(s) of
street( s) to be constructed):
Installation of Traffic Control Signals at Intersection of Yonge St. (Hwy.#ll)
and Brookland Dr., and Alterations to Existing Traffic Lights at Yonge St. and Dunning Ave.,
and illustrated on the plan or sketch attached thereto; provided construction to be in
accordance with plans and specifications approved by the Minister and the Corporation
in the manner and at a cost estimated and divided substantially as follows:
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
( i)
Installation of Traffic Control Signals and Modifications
Type of construction to Existing Traffic Control Sj gna 1 s
Len~h ____________ N~/_A __________________________________________ __
Width (not less than 22 feet) ------'-"N'-'A_,_ __________________ _
Intersections of Yonge St., and Brookland Drive and Yonge
Commencing at Street and Dunning Avenue ·
Terminating at __________________ s_am_e ____________________________________ _
Total estimated cost of construction-------------------~$ 51,000.00
Deduct: Items not chargeable under agreement:
(I) Items to be paid by the Corporation $ -------------
(II) Charged to others
Alterations to Existing Signals
At Yonge and Dunning due to
Addition of Golf Links Drive
(III) Charged under Part X of The Public
Transportation and Highway Improve-
$ ____ _
$ ____ _
$ 8,591.83
$ ____ _
~~kt $ ------------
Total Deductions
Total estimated cost of construction to be shared
Minister's share ( 90 o/o)
$ 8 ,591 .83
$ 42,408.17
$ 38,167 .35
···,.,
:·:
·FORMAB-PR-17A
R'EV. MAY 1973
(j) Estimated annual expenditure of·Minister' s share for fiscal year(s):
April 1st, 198j_ to March 31st, 19lg_ $ 38,167.35
April 1st, 19 to March 31st, 19 $
April 1st, 19 to March 31st, 19 $
April 1st, 19 to March 31st, 19 $ $ 38.167.35
It is understood that the estimated cost is based on the best information available at the
time of submission and that no s-qbstantial increase in such cost will be undertaken or
incurred without the prior written approval of the Minister, and where necessary, the
approval of the Onta::io Municipal Board.
This proposal is hereby submitted this
6TH APRIL 81
day of 19
by or on behalf of the Corporation of
the Town of
(SEAL)
MAYOR ~ &~/
CLERK J
and is hereby accepted by or on behalf
of the Minister.
(SEAL)
(Note: Attach a statement of the total estimated cost in detail and a breakdown thereof
showing how the Minister's share was computed on Form AB-PR-3)
' I'-, '
i :TEM
lO.
-1.
2.
3.
4.
5.
6.
,, 7.
18.
9.
(a)
(b)
(c)
(d)
(e)
TOWN OF AURORA
YONGE STREET, DUNNING AVE., GOLF LINKS DRIVE AND
YONGE STREET, BROOKLAND DR., INTERSECTIONS
TRAFFIC CONTROL SIGNALS
PROJECT NO. 904
E S T I M A T E 0 F C 0 S T
DESCRIPTION UNIT ESTIMATED UNIT
QUANTITY PRICE
Rigid Ducts, Direct Buried, One 75 mm
Conduit and ground wire. m 220 40.00
Rigid Ducts, Direct Buried, One 25 mm
Conduit. m 14 15.00
Concrete Junction Box, 460 mm Dia. Ea. 12 200.00
Signal Wiring and Power Supply
Wiring L.S.
Loops, Vehicle Detector Amplifiers,
and Detector Cables L.S.
Concrete Foundations in Earth for
Signal Poles Ea. 10 400.00
7.5 m Steel Pole,Base Mounting Ea. 10 420.00
Pedestrian Push Buttons & Signs Ea. 4 400.00
Arms, Brackets and Signal Heads
1 .8 m Mast Arm with Highway Signal
Head and Backboard Ea. 2 450.00
3.0 m Mast Arm with Highway Signal
Head and Backboard Ea. 3 500.00
3.5 m.Mast Arm with Highway Signa 1
Head and Backboard Ea. 1 520.00
5.0 m Mast Arm with Highway Signa 1
Head and Backboard Ea. 3 570.00
3.0 m Mast Arm with Standard Signal
Head Ea. 1 450.00
... 2
AMOUNT
8,800.00
210.00
2,400.00
1,500.00
1 ,500.00
4,000.00
4,200.00
1 ,600.00
900.00
1,500.00
520.00
1,710.00
450.00
·®
Ontario
Ministry of
Transportation and
-Communications
RELATES TO DESIGN ESTIMATE OF COST MARCH 1981 PAGE 1
CONNECTING LINK in the TOWN of AURORA being YONGE STREET Street from BROOKLAND DRIVE to DUNNING AVENUE
.
ESTIMATED SHAREABLE UNDER CHARGEABLE UNDER CHARGEABLE TO CHARGEABLE TO DETAILS OF CONSTRUCTION GROSS COST C.L. AGREEMENT . PART X OF THE ACT CORPORATION OTHERS* EXPLANATION
l. Rigid Ducts, Direct Buried, One 75 mm
Conduit and Ground Wire
220 m @ $40.00 8,800.00 8,800.00
2. Rigid Ducts, Direct Buried, One 25 mm 5 m to Others
Conduit Remainder S.U.C.L.A.
14 m @ $15.00 210.00 135.00 75.00
3. Concrete Junction Box, 460 mm Dia. 1 Each to Others
12 Each @ $200.00 2,400.00 2,200.00 200.00 Remainder S.U.C.L.A.
4. Signal Wiring and Power Supply Wiring
Lump Sum 1 ,500.00 1,500.00
5. Loops, Vehicle Detector Amplifiers.
and Detector Cables .
Lump Sum 1 ,500.00 1,500.00
6. Concrete Foundations in Earth for 4 Each to Others at
Signal Poles Locations 3,7,8, and 9
10 Each @ $400.00 4,000.00 2,400.00 1 ,600.00 Remainder S.U.C.L.A.-
7. 7.5 m Steel Pole, Base Mounting 4 Each to Others at
10 Each @ $420.00 4,200.00 2,520.00 1,680.00 Locations 3R,8, and 9
Remainder S.U.C.L.A.
8. Pedestrian Push Buttons and Signs
4 Each @ $400 00 1 600.00 1 ,600.00
TOTAL
*Chargeable to others: e.g. Locdl Improvement Act; Railway Grode Crossing Fund; Public Service Works on Highway Act, etc:
AB-PR-3 7-72
_;;;
I
i
'
l
j · .. j
1 ,
'
®
Ontario
Ministry of
Transportation and
Communications
RELATES TO DESIGN ESTIMATE OF COST
MARCH 1981
CONNECTING LINK in the TOWN of AURORA being YONGE STREET Street from BROOKLAND DRIVE
DE TAl LS OF CONSTRUCTION ESTIMATED SHAREABLE UNDER CHARGEABLE UNDER CHARGEABLE TO CHARGEABLE TO
GROSS COST C.L. AGREEMENT PART X OF THE ACT CORPORATION OTHERS•
.. ·
9. Arms, Brackets and Signa 1 Heads
(a} 1.8 m Mast Arm with Highway Signal
Head and Backboard
2 Each @ $450.00 900.00 900.00
(b) 3.0 m Mast Arm with Highway Signal
Head and Backboard
3 Each @ $500.00 1,500.00 1 ,000.00 500.00
(c) 3.5 m Mast Arm with Highway Signal
Head and Backboard
1 Each @ $520.00 520.00 520.00
(d) 5.0 m Mast Arm with Highway Signal
Head and Backboard
3 Each @ $570.00 1,710.00 570.00 1 '140. 00
(e) 3.0 m Mast Arm with Standard
Signa 1 Head
1 Each @ $450.00 450.00 450.00
(f) 3.6 m Mast Arm with Standard Signal
Head
1 Each @ $460.00 460.00 460.00
(g) 4.0 m Mast Arm with Standard Signal Head
1 Each @ $480.00 480.00 480.00
TOTAL
*Chargeable to others: e.g. Local Improvement Act; Railway Grode Crossing Fund; Public Service Works on Highway Act, etc:
AB-PR-3 7-72
i
PAGE 2
to DUNNING AVENUE
EXPLANATION
,,
1 Each to Others at
Location 8
Remainder S.U.C.L.A.
.
2 Each to Others at
Locations 3 and 7
1 Each to Others at
Location 9
i
I
1
j
i
i
I
I
I -~
i I
.D
>
-w
Ontario
Ministry of
Transportation and
Communications
CONNECTING LINK in the TOWN of AURORA
DETAILS OF CONSTRUCTION ESTIMATED
GROSS COST
9.(h} Double Arm Bracket with Pedestrian
Signal Head
10 Each @ $270.00 2,700.00
10. Controller
Lump Sum 5,000.00
11. Removal of Existing Items
(a} Controller and Overhead Wiring
Lump Sum 300.00
(b) Traffic SignaJ, Head, 'Mast Arm
and/or Support Bracket
5 Each @ $50.00 250.00
(c) Pole and Pole Foundation
4 Each @ $200.00 800.00
(d) Traffic Signs
1 Each @ $20.00 20:00
12. Pavement Markings
Lump Sum 500.00
ESTIMATED TOTAL FOR CONTRACT ITEMS 39,800.00
Contingencies (10%) 3,980.00 3,980.00
Engineering 7,220.00 7,220.00
TOTAL 51 ,000.00.
~ -· -----
1'\l-l-rl.ll-... IV Vl-... ..1.'\Ail ........ ..LI"U\1 L.. VI
MARCH 1981
being YONGE STREET Streetfrom BROOKLAND DRIVE
SHAREABLE UNDER CHARGEABLE UNDER CHARGEABLE TO CHARGEABLE TO
C.L. AGREEMENT PART X OF THE ACT CORPORATION OTHERS*
I
2,700.00
5,000.00
300.00
250.00
800.00
20.00 <
500.00
33,095.00 6,705.00
3,309.50 670.50
6,003.67 1,216.33
42,408.17 8,591 .83
-
*Chargeable to others: e.g. Local Improvement Act; Railway Grade Crosring Fund; Public Service Works on Highway Act, etc:
AB-PR-3 7-72
to DUNNING AVENUE
EXPLANATION
5 Each to Others at
Locations 2,3,5 and 5
(2 Heads.at Loc.5}
4 Each to Others at
Locations 2,3,5 and 6
I
Pro-rated on Totals for
Contract Items and Canting.