BYLAW - Traffic Control Signals - 19801103 - 239980FORM AB-PR-17A
~ ~. ~-· .... ·~
REV. t<.-1Av 1973 0
BY-LAW NUMBER .JJ9f 80
OF
THE CORPORATION OF THE __ _:_TO::.:W;.:.N:__ ___ OF --~A~U~RO~RA~-----
A BY-LAW TO AUTHORIZE the execution of a proposal and
estimate of cost pursuant to an agreement with Her Majesty the Queen, In
Right of the Province of Ontario, as represented by the Minister of Trans-
portation and Communications, entered into under The Public Transportation
and Highway Iml'rovement Act, R. S, 0. 1970, Chapter 201.
#'?t(l> . . "WHEREAS the appended proposal and estimate of cost dated
the ~day of N'O V£ .M. bE g, 19 iQ_, for the construction of
Traffic control signals at the intersection of Yonge Street (Hwy. No. 11)
Henderson Drive and Allaura Boulevard
being part of a highway de signa ted as a connecting link has been prepared
pursuant to the said agreement with Her Majesty the Queen, In Right of the
Province of Ontario, as represented by the said Minister, 11
BE IT THEREFORE ENACTED by the Council of the Corpor-
ation of the ___ T'-0'-W_N:._ ____ of __ _:Ac:.U::.:R.::O:.:.RA::.:;_ _____ _
1. That the hereinbefore recited proposal and estimate of
cost be approved,
2. That the Mayor/Reeve and Clerk be and they are hereby
authorized and directed to sign' the hereinbefore recited
proposal and estimate of cost and to affix thereto the seal
of the Corporation,
PASSED by the Council of the Corporation of the TOWN
of _ _,_A,U'-'-RO::.:RA-"-'---------'-this 3 f?f) day of
(SEAL)
t
;
------~-------~· ~----
. .. ,, .
FORM AB-PR-17A
R·=:v •. MAY 1973
-
'
(j) Estimated annual expenditure of Minister's share for fiscal year(s):
April 1st, 19 _ao_to March 31st, 19 _m_ $ 31,050.00
April 1st, 19 to March 31st, 19 $
April' lst, 19 to March 31st, 19 $
April lst, 19 to March 31st, 19 $ $ 31.050.00
It is understood that the e stimatedcost is based on the best information available at the
·time of submis sian and that no substantial increase in such cost will be undertaken or
incurred without the prior written approval of the Minister, and where necessary, the
. approval of the Ontario Municipal Board.
This proposal is hereby submitted this
;5/fD ~ J#eff day of Ill 0 V Euuse-o 19 ~
by or on behalf of the Corporation of ·
th Town f e ----------o
A rora
(SEAL)
and is hereby accepted by or on behalf
(SEAL)
·-~
(Note: Attach a statement of the total estimated cost in detail and a breakdown thereof
showing how the Minister's share was computed on Form AB -PR-3)
FOR'M,AB-PR-17A
REV. •. MAY 1973
~/(~
DATE JjH t/o vEii1!:£R, t 9 £o
PROPOSAL AND ESTIMATE OF COST FOR THE CONSTRUCTION OF A CONNECTING
LINK OR EXTENSION OF THE KING'S HIGHWAY (OR SECONDARY HIGHWAY) NO.
11 IN THE Town OF Aurora IN THE J(}QXJiNlB('Xx()QXt
~~'X'x~xx Region of York
Designated Route: Yonge Street (HWJI No 11), Henderson Dr Al] a 'Ira Blvd il'ltersectiol'l . \ . xd?
Pursuant to. an agreement dated the 18th. day of November 1961...:: hereinafter called
the agreement made between the Minister and the Corporation of the __ T.:,o::.w:.::n::_ ____ _
of Aurora . and subject to the terms and conditions thereof, and subject
also to any necessary approval of the Board under The Ontario Municipal Board Act,
the Corporation (Minister/Corporation) proposes that the following por-
tions of highway, heretofore designated as a connecting link, be constructed by the
Corporation (Ministry/Corporation) namely, (describe portion(s) of
street(s) to be constructed):
installation of traffic control signals at the intersection of Yonge Street
(Hwy. No. 11), Henderson Drive & All aura Boulevard
and illustrated on the plan or sketch attached thereto; provided construction to be in
accordance with plans and specifications approved by the Minister and the Corporation
in the manner and at a cost estimated and divided substantially as follows:
(a) Type of c ons true ti on __ _:_i _:_n.:..s .:..ta_:_l.:..l:__a:;_t:__i:.co:.cn:_:o_:_f_::t.:..r.:::a.:..f.:_fl.:_. c=-c:.:o:.:n.:_t:.:r...:o:_:l~s-=-i 2g:.:.n ::a .:;1 s=---------
(b) Length _______________________________ N_._A_. ____________________________ _
(c) Width (not less tha:r{ 22 feet) ________ N.:_.A~. ----------------
(d) Comme nc ing at __:i~n:..:t~e~r-=s~ec.=c~te".i ~o!!n_o~f.!.-Y:..:o~n!.:g:!-'e:......::S~t'-"'-''.....!!H=.en=de::.r!..:s~o~n.!......'D'.!r_,.'--.!:&!....!:Au.l.!l-""a.!!u!..ra!!....!B~l!..v~de!._ ___ _
(e) Terminating at __________ ~ _______ s_a_m_e _________________ __
(f) Total estimated cost of construction __________________ $$34,500.00
(g) Deduct: Items not chargeable under agreement:
(h)
(i)
(I) Items to be paid by the Corporation $ -------
(II) Charged to others·
(III) Charged under Part X of The Public
Transportation and Highway Improve-
$ ____ _
$ ____ _
$ ____ _
$ __ ___; __
ment Act $ --------
Total Deductions
Total estimated cost of construction to be shared
Minister's share ( 90 o/o)
$ _-c-"Nu.IJ...L __ _
$ 34,500.00
$ 31,050.00
: .: .. ;
I
'
"
® Ministry of
Transportation and
Commumcat1ons
Ontario Yonge Street, Henderson Drive
All aura Boulevard
October 1980
Relates to Estimate of Cost Sheet # 1
CONNECTING LINK in the Town of Aurora being Intersection Street from to---------
1.
2.
3.
4.
5.
6.
7.
. DETAILS OF CONSTRUCTION ESTIMATED SHAREABLE UNDER CHARGEABLE UNDER
GROSS COST C.L. AGREEMENT PART X OF THE ACT
Rigid ducts, direct buried, one
75 mm conduit and ground wire
102 m @ 50.00 5, 100.00 5,100.00
Rigid ducts, direct buried, one
25 mm conduit
110 m@ 20.00 2,200.00 2,200.00
Concrete junction box
460 mm dia.
8 each @ 300.00 2,400.00 2,400.00
Signal wiring & power supply wiring
Lump sum 1,500.00 1,500.00 1,500.00
Loops, vehicle detector, amplifiers
and cab 1 es
Lump sum 1,000.00 1,000.00 1,000.00·
Concrete foundations in earth for
signal poles
8 each @ 300.00 2,400.00 2,400.00
7.5 m steel pole, base mounting
8 each @ 300.00 2,400.00 2,400.00
TOTAL
*Chargeable to others: e.g. Local Improvement Act; Railway Grade Crossing Fund; Public Service Works on Highw11)1 Act, etc:
AS-PR-3 7-72
\
j
CHARGEABLE TO CHARGEABLE TO •
CORPORATION OTHERS• EXPLANATION
I
)
'
® Ministry of
. Transportation and
Communications
Ontario Yonge Street, Henderson
Allaura Boulevard
October 1980
Relates to Estimate of Cost Sheet # 2
Drive
CONNECTING LINK in the Town of Aurora being Intersection Street from to---------
DETAILS OF CONSTRUCTION ESTIMATED SHAREABLE UNDER CHARGEABLE UNDER CHARGEABLE TO CHARGEABLE TO EXPLANATION GROSS COST C.L. AGREEMENT PART X OF THE ACT CORPORATION OTHERS•
8. Pedestrian push buttons and signs
4 each@ 25.00· 100.00 100.00
9. Arms, brackets and signal heads
(a) 8.0 m Mast arm with highway
signal head and backboard
2 each @ 250.00 500.00 500.00
(b) 5.0 m Mast arm with highway
signal head and backboard
1 each @ 220.00 220.00 220.00
.
(c) 4.5 m Mast arm with highway
signal head and backboard
1 each @ 220.00 220.00 220.00
(d) 3.0 m Mast arm with standard
signal head
1 each @ 200.00 200.00 200.00
(e) Double arm bracket with
standard signal head
3 each @ 190.00 570.00 570.00
(f) Doub 1 e arm bracket with
pedestriam signal head
8 each @ 190.00 1,520.00 1,520.00
TOTAL
*Chargeable to others: e.g. Local Improvement Act; Railway Grade Crossing Fund; Public Service Works on Highway Act, etc:
AB-PR-3 7-72
j
•
® Ministry of
Transportation and
Commun~cat1ons
Ontario
Yonge Street, Henderson Drive
Allaura Boulevard
October 1980
Relates to Estimate of Cost Sheet # 3
CONNECTINGLINKinthe Town of Aurora beingintersection Streetfrom _______________________ to-------------------
DETAILS OF CONSTRUCTION ESTIMATED SHAREABLE UNDER CHARGEABLE UNDER CHARGEABLE TO CHARGEABLE TO EXPLANATION GROSS COST C.L. AGREEMENT PART X OF THE ACT , CORPORATION OTHERS*
10. Controller
Lump sum 6,000.00 6,000.00 6,000.00
11. Remove existing overhead flashing
beacon and esixting stop signs
Lump sum 200.00 200.00 200.00
12. Pavement markings
Lump sum 200.00 200.00 200.00
Total for contract items $26,730.00 $26,730.00
Contingencies 2,673.00
Engineering 5,097.00 7' 770.00 7,770.00
TOTAL $34,500.00 $34,500.00
--
*Chargeable to others: e.g. Local Improvement Act; Railway Grade Crossing Fund; Public Service Works on HighwllJ' Act, etc:
AB-PR-3 7-72
-\ -~)
Item
No.
l.
2.
3.
4.
5.
6.
7.
; \ 8.
~
\ .... 9.
·-·._,
~----~--·····~·--·~---~··· ---
fl"~~~ v
TOWN OF AURORA
TRAFFIC CONTROL SIGNALS
YONGE, HENDERSON, ALLAURA INTERSECTION
PROJECT NO. 905
ESTIMATE OF COST ·
Estimated Unit
Description Unit Quantity Price
Rigid ducts, direct buried
one 75 mm conduit and ground
wire m 102 50.00
Rigid ducts, direct buried
one 25 mm conduit m 110 20.00
Concrete junction box
460 mm dia. each 8 300.00
Sigal wiring and power
supply wiring L.S. 1,500.00
Loops, vehicle detector
amplifiers & detector cables L.S. 1,000.00
Concrete foundations in
earth for signal poles each 8 300.00
7.5 m steel pole base mounting each 8 300.00
Pedestrian push buttons and signs each 4 25.00
Arms, brackets & signals heads
(a) 8.0 m mast arm with highway
signal head & backboard each 2 250.00
(b) 5.0 m mast arm with highway
signal head & backboard each 1 220.00
(c) 4.5 mast arm with highway
signal head & backboard each 1 220.00
(d) 3.0 m mast arm with standard
signal head each 1 200.00
(e) Double arm bracket with
standard signal head each 3 190.00
(f) Double arm bracket with
pedestrian si g'na 1 head each 8 190.00
Amount
5,100.00
2,200.00
2,400.00
1,500.00
1,000.00
2,400.00
2,400.00
100.00
500.00
220.00
220.00
200.00
570.00
1,520.00
. ---."'
ESTIMATE OF COST (Continued)
Project No. 905
Page 2
Item
No.
10 .
11.
12.
Description
Controller
Remove existing overhead
flashing beacon and existing
stop signs
Pavement markings
Estimated Total for Contract Items
Contingencies (10%)
Engineering
TOTAL ESTIMATED COST
October 1980
'~----·-~--'-----·-~--~-----~----~~----~--· -~---
Unit
L.S.
L.S.
L. s.
Estimated
Quantity
2,673.00
5,097.00
Unit
Price Amount
6,000.00 6,000.00
200.00 200.00
200.00 200.00
26,730.00
7,770.00
$34,500.00