Loading...
BYLAW - Traffic Control Signals - 19801103 - 239980FORM AB-PR-17A ~ ~. ~-· .... ·~ REV. t<.-1Av 1973 0 BY-LAW NUMBER .JJ9f 80 OF THE CORPORATION OF THE __ _:_TO::.:W;.:.N:__ ___ OF --~A~U~RO~RA~----- A BY-LAW TO AUTHORIZE the execution of a proposal and estimate of cost pursuant to an agreement with Her Majesty the Queen, In Right of the Province of Ontario, as represented by the Minister of Trans- portation and Communications, entered into under The Public Transportation and Highway Iml'rovement Act, R. S, 0. 1970, Chapter 201. #'?t(l> . . "WHEREAS the appended proposal and estimate of cost dated the ~day of N'O V£ .M. bE g, 19 iQ_, for the construction of Traffic control signals at the intersection of Yonge Street (Hwy. No. 11) Henderson Drive and Allaura Boulevard being part of a highway de signa ted as a connecting link has been prepared pursuant to the said agreement with Her Majesty the Queen, In Right of the Province of Ontario, as represented by the said Minister, 11 BE IT THEREFORE ENACTED by the Council of the Corpor- ation of the ___ T'-0'-W_N:._ ____ of __ _:Ac:.U::.:R.::O:.:.RA::.:;_ _____ _ 1. That the hereinbefore recited proposal and estimate of cost be approved, 2. That the Mayor/Reeve and Clerk be and they are hereby authorized and directed to sign' the hereinbefore recited proposal and estimate of cost and to affix thereto the seal of the Corporation, PASSED by the Council of the Corporation of the TOWN of _ _,_A,U'-'-RO::.:RA-"-'---------'-this 3 f?f) day of (SEAL) t ; ------~-------~· ~---- . .. ,, . FORM AB-PR-17A R·=:v •. MAY 1973 - ' (j) Estimated annual expenditure of Minister's share for fiscal year(s): April 1st, 19 _ao_to March 31st, 19 _m_ $ 31,050.00 April 1st, 19 to March 31st, 19 $ April' lst, 19 to March 31st, 19 $ April lst, 19 to March 31st, 19 $ $ 31.050.00 It is understood that the e stimatedcost is based on the best information available at the ·time of submis sian and that no substantial increase in such cost will be undertaken or incurred without the prior written approval of the Minister, and where necessary, the . approval of the Ontario Municipal Board. This proposal is hereby submitted this ;5/fD ~ J#eff day of Ill 0 V Euuse-o 19 ~ by or on behalf of the Corporation of · th Town f e ----------o A rora (SEAL) and is hereby accepted by or on behalf (SEAL) ·-~ (Note: Attach a statement of the total estimated cost in detail and a breakdown thereof showing how the Minister's share was computed on Form AB -PR-3) FOR'M,AB-PR-17A REV. •. MAY 1973 ~/(~ DATE JjH t/o vEii1!:£R, t 9 £o PROPOSAL AND ESTIMATE OF COST FOR THE CONSTRUCTION OF A CONNECTING LINK OR EXTENSION OF THE KING'S HIGHWAY (OR SECONDARY HIGHWAY) NO. 11 IN THE Town OF Aurora IN THE J(}QXJiNlB('Xx()QXt ~~'X'x~xx Region of York Designated Route: Yonge Street (HWJI No 11), Henderson Dr Al] a 'Ira Blvd il'ltersectiol'l . \ . xd? Pursuant to. an agreement dated the 18th. day of November 1961...:: hereinafter called the agreement made between the Minister and the Corporation of the __ T.:,o::.w:.::n::_ ____ _ of Aurora . and subject to the terms and conditions thereof, and subject also to any necessary approval of the Board under The Ontario Municipal Board Act, the Corporation (Minister/Corporation) proposes that the following por- tions of highway, heretofore designated as a connecting link, be constructed by the Corporation (Ministry/Corporation) namely, (describe portion(s) of street(s) to be constructed): installation of traffic control signals at the intersection of Yonge Street (Hwy. No. 11), Henderson Drive & All aura Boulevard and illustrated on the plan or sketch attached thereto; provided construction to be in accordance with plans and specifications approved by the Minister and the Corporation in the manner and at a cost estimated and divided substantially as follows: (a) Type of c ons true ti on __ _:_i _:_n.:..s .:..ta_:_l.:..l:__a:;_t:__i:.co:.cn:_:o_:_f_::t.:..r.:::a.:..f.:_fl.:_. c=-c:.:o:.:n.:_t:.:r...:o:_:l~s-=-i 2g:.:.n ::a .:;1 s=--------- (b) Length _______________________________ N_._A_. ____________________________ _ (c) Width (not less tha:r{ 22 feet) ________ N.:_.A~. ---------------- (d) Comme nc ing at __:i~n:..:t~e~r-=s~ec.=c~te".i ~o!!n_o~f.!.-Y:..:o~n!.:g:!-'e:......::S~t'-"'-''.....!!H=.en=de::.r!..:s~o~n.!......'D'.!r_,.'--.!:&!....!:Au.l.!l-""a.!!u!..ra!!....!B~l!..v~de!._ ___ _ (e) Terminating at __________ ~ _______ s_a_m_e _________________ __ (f) Total estimated cost of construction __________________ $$34,500.00 (g) Deduct: Items not chargeable under agreement: (h) (i) (I) Items to be paid by the Corporation $ ------- (II) Charged to others· (III) Charged under Part X of The Public Transportation and Highway Improve- $ ____ _ $ ____ _ $ ____ _ $ __ ___; __ ment Act $ -------- Total Deductions Total estimated cost of construction to be shared Minister's share ( 90 o/o) $ _-c-"Nu.IJ...L __ _ $ 34,500.00 $ 31,050.00 : .: .. ; I ' " ® Ministry of Transportation and Commumcat1ons Ontario Yonge Street, Henderson Drive All aura Boulevard October 1980 Relates to Estimate of Cost Sheet # 1 CONNECTING LINK in the Town of Aurora being Intersection Street from to--------- 1. 2. 3. 4. 5. 6. 7. . DETAILS OF CONSTRUCTION ESTIMATED SHAREABLE UNDER CHARGEABLE UNDER GROSS COST C.L. AGREEMENT PART X OF THE ACT Rigid ducts, direct buried, one 75 mm conduit and ground wire 102 m @ 50.00 5, 100.00 5,100.00 Rigid ducts, direct buried, one 25 mm conduit 110 m@ 20.00 2,200.00 2,200.00 Concrete junction box 460 mm dia. 8 each @ 300.00 2,400.00 2,400.00 Signal wiring & power supply wiring Lump sum 1,500.00 1,500.00 1,500.00 Loops, vehicle detector, amplifiers and cab 1 es Lump sum 1,000.00 1,000.00 1,000.00· Concrete foundations in earth for signal poles 8 each @ 300.00 2,400.00 2,400.00 7.5 m steel pole, base mounting 8 each @ 300.00 2,400.00 2,400.00 TOTAL *Chargeable to others: e.g. Local Improvement Act; Railway Grade Crossing Fund; Public Service Works on Highw11)1 Act, etc: AS-PR-3 7-72 \ j CHARGEABLE TO CHARGEABLE TO • CORPORATION OTHERS• EXPLANATION I ) ' ® Ministry of . Transportation and Communications Ontario Yonge Street, Henderson Allaura Boulevard October 1980 Relates to Estimate of Cost Sheet # 2 Drive CONNECTING LINK in the Town of Aurora being Intersection Street from to--------- DETAILS OF CONSTRUCTION ESTIMATED SHAREABLE UNDER CHARGEABLE UNDER CHARGEABLE TO CHARGEABLE TO EXPLANATION GROSS COST C.L. AGREEMENT PART X OF THE ACT CORPORATION OTHERS• 8. Pedestrian push buttons and signs 4 each@ 25.00· 100.00 100.00 9. Arms, brackets and signal heads (a) 8.0 m Mast arm with highway signal head and backboard 2 each @ 250.00 500.00 500.00 (b) 5.0 m Mast arm with highway signal head and backboard 1 each @ 220.00 220.00 220.00 . (c) 4.5 m Mast arm with highway signal head and backboard 1 each @ 220.00 220.00 220.00 (d) 3.0 m Mast arm with standard signal head 1 each @ 200.00 200.00 200.00 (e) Double arm bracket with standard signal head 3 each @ 190.00 570.00 570.00 (f) Doub 1 e arm bracket with pedestriam signal head 8 each @ 190.00 1,520.00 1,520.00 TOTAL *Chargeable to others: e.g. Local Improvement Act; Railway Grade Crossing Fund; Public Service Works on Highway Act, etc: AB-PR-3 7-72 j • ® Ministry of Transportation and Commun~cat1ons Ontario Yonge Street, Henderson Drive Allaura Boulevard October 1980 Relates to Estimate of Cost Sheet # 3 CONNECTINGLINKinthe Town of Aurora beingintersection Streetfrom _______________________ to------------------- DETAILS OF CONSTRUCTION ESTIMATED SHAREABLE UNDER CHARGEABLE UNDER CHARGEABLE TO CHARGEABLE TO EXPLANATION GROSS COST C.L. AGREEMENT PART X OF THE ACT , CORPORATION OTHERS* 10. Controller Lump sum 6,000.00 6,000.00 6,000.00 11. Remove existing overhead flashing beacon and esixting stop signs Lump sum 200.00 200.00 200.00 12. Pavement markings Lump sum 200.00 200.00 200.00 Total for contract items $26,730.00 $26,730.00 Contingencies 2,673.00 Engineering 5,097.00 7' 770.00 7,770.00 TOTAL $34,500.00 $34,500.00 -- *Chargeable to others: e.g. Local Improvement Act; Railway Grade Crossing Fund; Public Service Works on HighwllJ' Act, etc: AB-PR-3 7-72 -\ -~) Item No. l. 2. 3. 4. 5. 6. 7. ; \ 8. ~ \ .... 9. ·-·._, ~----~--·····~·--·~---~··· --- fl"~~~ v TOWN OF AURORA TRAFFIC CONTROL SIGNALS YONGE, HENDERSON, ALLAURA INTERSECTION PROJECT NO. 905 ESTIMATE OF COST · Estimated Unit Description Unit Quantity Price Rigid ducts, direct buried one 75 mm conduit and ground wire m 102 50.00 Rigid ducts, direct buried one 25 mm conduit m 110 20.00 Concrete junction box 460 mm dia. each 8 300.00 Sigal wiring and power supply wiring L.S. 1,500.00 Loops, vehicle detector amplifiers & detector cables L.S. 1,000.00 Concrete foundations in earth for signal poles each 8 300.00 7.5 m steel pole base mounting each 8 300.00 Pedestrian push buttons and signs each 4 25.00 Arms, brackets & signals heads (a) 8.0 m mast arm with highway signal head & backboard each 2 250.00 (b) 5.0 m mast arm with highway signal head & backboard each 1 220.00 (c) 4.5 mast arm with highway signal head & backboard each 1 220.00 (d) 3.0 m mast arm with standard signal head each 1 200.00 (e) Double arm bracket with standard signal head each 3 190.00 (f) Double arm bracket with pedestrian si g'na 1 head each 8 190.00 Amount 5,100.00 2,200.00 2,400.00 1,500.00 1,000.00 2,400.00 2,400.00 100.00 500.00 220.00 220.00 200.00 570.00 1,520.00 . ---."' ESTIMATE OF COST (Continued) Project No. 905 Page 2 Item No. 10 . 11. 12. Description Controller Remove existing overhead flashing beacon and existing stop signs Pavement markings Estimated Total for Contract Items Contingencies (10%) Engineering TOTAL ESTIMATED COST October 1980 '~----·-~--'-----·-~--~-----~----~~----~--· -~--- Unit L.S. L.S. L. s. Estimated Quantity 2,673.00 5,097.00 Unit Price Amount 6,000.00 6,000.00 200.00 200.00 200.00 200.00 26,730.00 7,770.00 $34,500.00