MINUTES OF A SPECIAL MEETING OF COUNCIL OF THE TOWN OF AURORA, HELD IN
THE COUNCIL CHAMBERS ON WEDNESDAY, AUGUST 30, 1967 AT 7.00 P.M.
PRESENT
MAYOR
REEVE
DEPUTY REEVE
C OUNCILLCRS
and Mr. Rotundo .
C. F. DAVIS
D. J. MURRAY
J. WILLIAMSON
CORBETT, DAVIS, ILLINGWORTH, MILLER and TRENT
Mr. J.\lbb, Mr. T. McPherson, Mr. Walker, Mr. Mattucci
Mayor Davis explained that this was a Special Meeting
of Council called for the purpose of receiving the report of the Planning
Committee for the development o~ Phase two of .Sunnybrook Subdivision by
White Strip Construction Company Limited. ·
PLANNING COMMITTEE REPORT
The Planning Committee met on Thursday August L7th. at
8.00 P.M. and Thursday August 24th at 7.00 P.M. with Mr. Mattucci: and
Mr. Rotundo of White Strip Construction.1Co. Ltd. and their Solici'tor Mr.
Walker. All members of the Committee were present at both meetings as
well as Councillor Corbett and Mr. Jubb, the Building Inspector. Mr. J.
Reid, Town Engineer was present at the 1st. meeting and Mr. T. McPherson,
Town Solicitor was present at the second Meeting.
These meetings were called to discuss the 1st. Draft of
the Subdivision Agreement for Phase 2 of Sunnybrook Subdivision ...
A third Meeting was held at 7.00 P.M. Monday August 28th
with the following present: Chairman, Deputy Reeve Williamson, Vice
Chairman J. Murray, Member Councillor w. Davis, also Mayor Davis,
Councillors Buck, Corbett, Miller and Trent. Mr. J. Reid Town Engineer,
Mr. A. Jubb Building Inspector and Messrs. Mattucci, Rotundo and Walker.
The draft agreement was discussed thoroughly and amendments·made to the
mutual satisfaction of all.
The Draft Agreement as amended was returned to the Town
Solicitor for retypeing and a copy is in front of all memebers og Council.
IVILLIAMSON:
MURRAY:
'Resolved that the report of the Planning
Committee, dated August 30, 1967, re Phase
2 of Sunnybrook Subdivisio~~be discussed
item by item and accepted.' As Amended.
I
I
rl ~ I I
L-
•
..
SPECIAL COUNCIL
Section 2
Section 4
Section 7
Section 11
Section 13
Section 18 {2)
done.
BY-LAW
NUMBER
1748-67
.18 (14)
2 AUGUST 30, 1967
The amendments to the draft agreement were as follows:
The time limit for completion of the services, except
for the final coat of asphalt, referred to in Schedule
'F' is to be eighteen months.
'Phase two' was
'Phase t~ro' was
'Phase two' was
added to the paragraph.
added to the paragraph.
asded to the paragraph.
'not to be more than the total cost of construction'
was added to the paragraph.
This paragraph was deleted •
'before .any building permits are issued for model homes
and prior t~ the. 31st. of December 1967' was added to
the paragraph.
WILLIAMSON:
MURRAY:
CARRIED-.
·'Resolved that· the report of the Planning
Committee, dated August 30, 1967, re
Phase tvo of Sunnybrook Subdivision, be
discussed item by item and accepted as
amended. 1
The Planning Committee was congratulated on a job well
MILLER~
TRENT:
Ci!EIH:ED
CORBETT:
ILLINGWORTH:
CARRIED
CORBETT:
DAVIS,W:
CARRIED
WILLIAMSON:
ILLINGWORTH:
CARRIED
WILLIAMSON:
· "That leave be given to introduce a By-law
to enter into an agreement with Whitestrip
Construction Company Limited re Phase 2
Sunnybrook Subdivision and that the same
be now read a first time.
That the By-law now before the Council
be read a second time and that the Council ...
resolve itself into a committee of the
··whole for that purpose,
"Resolved that the second reading be taken
as read.
"Resolved that the third reading ·of the
By-law be held over.
"Resolved that the meeting be adjourned'
~~he. meeting then adjourned. _ '-~-ee~